CN212747910U - Green construction dust and noise real-time supervision device - Google Patents

Green construction dust and noise real-time supervision device Download PDF

Info

Publication number
CN212747910U
CN212747910U CN202022121872.7U CN202022121872U CN212747910U CN 212747910 U CN212747910 U CN 212747910U CN 202022121872 U CN202022121872 U CN 202022121872U CN 212747910 U CN212747910 U CN 212747910U
Authority
CN
China
Prior art keywords
plate
dust
stay tube
display screen
noise
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022121872.7U
Other languages
Chinese (zh)
Inventor
王祖秀
詹成义
刘军
岳贵勇
马强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanhe Construction Group Co ltd
Original Assignee
Shanhe Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanhe Construction Group Co ltd filed Critical Shanhe Construction Group Co ltd
Priority to CN202022121872.7U priority Critical patent/CN212747910U/en
Application granted granted Critical
Publication of CN212747910U publication Critical patent/CN212747910U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Measurement Of Mechanical Vibrations Or Ultrasonic Waves (AREA)

Abstract

The utility model discloses a green construction dust and noise real-time supervision device, including stay tube, display screen, PLC and stabilizing mean, the top welding of stay tube has the cardboard of U style of calligraphy, and the inner wall of cardboard bonds and has the display screen, and there are dust monitor and noise monitor in the both sides of display screen through the screw connection respectively, the top of display screen still is connected with and shelters from the mechanism, the front end of the vertical portion of stay tube still is provided with PLC, the extension board of L style of calligraphy all bonds to the side that PLC's two sets of symmetries set up, and the vertical portion of extension board passes through connecting bolt to be connected with the vertical portion of stay tube, and the bottom of stay tube still welds there is the counterweight plate, and is connected with stabilizing mean between still and the stay tube with the counterweight plate, the counterweight plate passes through multiunit countersunk. This green construction dust and noise real-time supervision device not only can shelter from the protection, can also strengthen overall stability.

Description

Green construction dust and noise real-time supervision device
Technical Field
The utility model belongs to the technical field of the construction monitoring, concretely relates to green construction dust and noise real-time supervision device.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. The site of the construction work is called a "construction site" or "job site", also called a worksite. Green construction is index control such as dust and noise in reasonable within range promptly, so need monitor in the region of difference, guarantee that managers can know the index condition of job site, but traditional monitoring facilities do not have protective apparatus mostly, meet bad weather and can exert an influence to whole equipment.
Therefore, in order to meet the current situation, a real-time monitoring device for green construction dust and noise is urgently needed to be designed and produced so as to meet the requirement of actual use.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a green construction dust and noise real-time supervision device to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a real-time monitoring device for dust and noise in green construction comprises a supporting tube, a display screen, a PLC and a stabilizing mechanism, wherein a U-shaped clamping plate is welded at the top end of the supporting tube, the display screen is bonded on the inner wall of the clamping plate, a dust monitor and a noise monitor are respectively connected to two sides of the display screen through screws, and a shielding mechanism is further connected to the top end of the display screen;
the utility model discloses a supporting tube, including the support tube, the support tube is connected with the support tube, the front end of the vertical portion of support tube still is provided with PLC, the extension board of L style of calligraphy has all been bonded to the side that PLC's two sets of symmetries set up, and the vertical portion of extension board passes through connecting bolt and is connected with the vertical portion of support tube, and the bottom of support tube still welds there is the counterweight plate, and is connected with stabilizing mean between counterweight plate still and the support tube, the counterweight plate passes through multiunit.
Preferably, shelter from the connecting plate that the mechanism includes the shielding plate of V style of calligraphy and L style of calligraphy, the welding of the bottom of shielding plate has the connecting plate that two sets of symmetries set up, the horizontal portion of connecting plate is connected with the display screen through vertical bolt, the top coating of shielding plate has waterproof paint, the inner wall bonding of shielding plate has the sound absorbing layer.
Preferably, the side of counterweight plate is two sets of putting the thing passageway that sets up side by side, and all is provided with two sets of extension plates in two sets of thing passageways of putting, the extension plate passes through vertical bolt and is connected with the counterweight plate, four sets of vertical through-holes that change the extension plate position have still been seted up on the top of counterweight plate, one side that the extension plate is kept away from the counterweight plate still integrated into one piece have with the equal altitude balancing weight of counterweight plate.
Preferably, stabilizing mean includes the fagging and links the board to one side, the homogeneous body shaping in both sides of fagging has even board, vertical setting link the board to be connected with the stay tube through connecting bolt, transversely set up link the board to be connected with the weight plate through connecting bolt.
Preferably, PLC passes through electric wire and display screen, dust monitor and noise monitor electric connection, PLC still is connected with outside battery through the electric wire, and the inner chamber of stay tube is passed to the electric wire, and the electric wire still runs through the weight plate.
The utility model discloses a technological effect and advantage: according to the real-time monitoring device for the green construction dust and noise, the shielding plate of the shielding mechanism is used for shielding and protecting the display screen, the PLC, the dust monitor and the noise monitor, so that the influence of external sunshine, heavy rain and other conditions on the instrument is reduced; through the two groups of stabilizing mechanisms, the stability between the counterweight plate and the supporting tube can be improved by utilizing the matching of the inclined supporting plate and the connecting plate; the extension plate and the balancing weights can extend out and are fixed by using vertical bolts, and the overall stability can be improved by matching one group of balancing weight plates with the four groups of balancing weights; this green construction dust and noise real-time supervision device not only can shelter from the protection, can also strengthen overall stability.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a front view of the shielding mechanism of the present invention;
fig. 3 is a schematic structural view of the extension plate of the counterweight plate of the present invention in a stretching state.
In the figure: 1 stay tube, 2 cardboard, 3 display screens, 4 dust monitors, 5 noise monitor, 6 shelter from mechanism, 7PLC, 8 extension boards, 9 counter weight boards, 10 stabilizing mean, 11 shielding plates, 12 connecting plates, 13 extension plates, 14 balancing weights, 15 faggings, 16 even boards.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Unless defined otherwise, all references to up, down, left, right, front, back, inner and outer directions herein are to be interpreted as referring to up, down, left, right, front, back, inner and outer directions in the drawings to which the invention is applied, and all references are hereby incorporated herein by reference.
The utility model provides a green construction dust and noise real-time monitoring device as shown in figures 1-3, which comprises a supporting tube 1, a display screen 3, a PLC7 and a stabilizing mechanism 10, wherein a U-shaped clamping plate 2 is welded at the top end of the supporting tube 1, the display screen 3 is bonded on the inner wall of the clamping plate 2, the two sides of the display screen 3 are respectively connected with a dust monitor 4 and a noise monitor 5 through screws, and the top end of the display screen 3 is also connected with a shielding mechanism 6;
the front end of the vertical portion of stay tube 1 still is provided with PLC7, the extension board 8 of the L style of calligraphy has all been bonded to the side that two sets of symmetries of PLC7 set up, and the vertical portion of extension board 8 passes through connecting bolt and is connected with the vertical portion of stay tube 1, and the bottom of stay tube 1 has still welded the weight plate 9, and the weight plate 9 still with be connected with stabilizing mean 10 between the stay tube 1, the weight plate 9 passes through multiunit countersunk bolt and ground connection.
Specifically, shelter from mechanism 6 including the connecting plate 12 of the shielding plate 11 and the L style of calligraphy of V style of calligraphy, the bottom welding of shielding plate 11 has the connecting plate 12 that the welding has two sets of symmetries to set up, and the length of shielding plate 11 and the size of width guarantee can shelter from the protection, the horizontal portion of connecting plate 12 passes through vertical bolt and is connected with display screen 3, the top coating of shielding plate 11 has waterproof paint, the inner wall bonding of shielding plate 11 has the sound absorbing layer, and the sound absorbing layer is optional for the centrifugal glass cotton.
Specifically, two sets of thing passageways of putting that set up side by side in the side of counterweight plate 9, and all be provided with two sets of extension plates 13 in two sets of thing passageways of putting, extension plate 13 is connected with counterweight plate 9 through vertical bolt, four sets of vertical through-holes that change extension plate 13 positions have still been seted up on the top of counterweight plate 9, one side that counterweight plate 9 was kept away from to extension plate 13 still integrated into one piece have with counterweight plate 9 equal high balancing weight 14, avoid balancing weight 14 and extension plate 13 unstability.
Specifically, stabilizing mean 10 includes fagging 15 and even board 16 to one side, the equal integrated into one piece in both sides of fagging 15 has even board 16, vertical setting even board 16 passes through connecting bolt and is connected with stay tube 1, and horizontal setting even board 16 passes through connecting bolt and is connected with counterweight plate 9.
Specifically, PLC7 passes through electric wire and display screen 3, dust monitor 4 and 5 electric connection of noise monitor, and PLC7 model can select to be Siemens S7300, and noise monitor 5 can select to gather the AWA5688 who creates environmental protection group for the Qingdao, and dust monitor 4 can select to be Jiangsu Jihua electron science and technology Limited' S dust concentration monitor, PLC7 is still connected with outside battery through the electric wire (the battery is installed in the below of counterweight plate, the below of cement piece, and the battery also can trade 220V for the commercial power), and the electric wire passes the inner chamber of stay tube 1, and the electric wire still runs through counterweight plate 9.
The theory of operation, this green construction dust and noise real-time supervision device, utilize countersunk head bolt to install at the assigned position with weight plate 9, if need promote stability, extension plate 13 and balancing weight 14 can be pulled out, and utilize vertical bolt to fix, then utilize connecting bolt to connect stabilizing mean 10 between stay tube 1 and weight plate 9, then utilize vertical bolted connection connecting plate 12 on display screen 3, utilize PLC7 connection control display screen 3, dust monitor 4 and noise monitor 5, display screen 3 shows the data of dust monitor 4 and the transmission of noise monitor 5.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.

Claims (5)

1. The utility model provides a green construction dust and noise real-time supervision device, includes stay tube (1), display screen (3), PLC (7) and stabilizing mean (10), its characterized in that: the dust monitoring device is characterized in that a U-shaped clamping plate (2) is welded at the top end of the supporting tube (1), a display screen (3) is bonded on the inner wall of the clamping plate (2), two sides of the display screen (3) are respectively connected with a dust monitor (4) and a noise monitor (5) through screws, and a shielding mechanism (6) is further connected at the top end of the display screen (3);
the front end of the vertical portion of stay tube (1) still is provided with PLC (7), extension board (8) of L style of calligraphy have all been bonded to the side that two sets of symmetries of PLC (7) set up, and the vertical portion of extension board (8) passes through connecting bolt and is connected with the vertical portion of stay tube (1), and the bottom of stay tube (1) has still welded counterweight plate (9), and counterweight plate (9) still with be connected with stabilizing mean (10) between stay tube (1), counterweight plate (9) are connected with ground through multiunit countersunk bolt.
2. The real-time monitoring device for dust and noise in green construction according to claim 1, wherein: shelter from baffle (11) that mechanism (6) includes the V style of calligraphy and connecting plate (12) of L style of calligraphy, the bottom welding of baffle (11) has connecting plate (12) that two sets of symmetries set up, the horizontal portion of connecting plate (12) is connected with display screen (3) through vertical bolt, the top coating of baffle (11) has waterproof coating, the inner wall bonding of baffle (11) has the sound absorbing layer.
3. The real-time monitoring device for dust and noise in green construction according to claim 1, wherein: two sets of thing passageways of putting that set up side by side in the side of counterweight plate (9), and two sets of thing passageways of putting all are provided with two sets of extension plates (13), extension plate (13) are connected with counterweight plate (9) through vertical bolt, four sets of vertical through-holes that change extension plate (13) position are still seted up on the top of counterweight plate (9), one side that counterweight plate (9) were kept away from in extension plate (13) still integrated into one piece have with counterweight plate (9) equal height balancing weight (14).
4. The real-time monitoring device for dust and noise in green construction according to claim 1, wherein: stabilizing mean (10) are including fagging (15) and link board (16) to one side, the equal integrated into one piece in both sides of fagging (15) has even board (16), vertical setting link board (16) are connected with stay tube (1) through connecting bolt, transversely set up link board (16) are connected with counterweight plate (9) through connecting bolt.
5. The real-time monitoring device for dust and noise in green construction according to claim 1, wherein: PLC (7) pass through electric wire and display screen (3), dust monitor (4) and noise monitor (5) electric connection, PLC (7) still are connected with outside battery through the electric wire, and the inner chamber of stay tube (1) is passed to the electric wire, and the electric wire still runs through counterweight plate (9).
CN202022121872.7U 2020-09-24 2020-09-24 Green construction dust and noise real-time supervision device Expired - Fee Related CN212747910U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022121872.7U CN212747910U (en) 2020-09-24 2020-09-24 Green construction dust and noise real-time supervision device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022121872.7U CN212747910U (en) 2020-09-24 2020-09-24 Green construction dust and noise real-time supervision device

Publications (1)

Publication Number Publication Date
CN212747910U true CN212747910U (en) 2021-03-19

Family

ID=74989849

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022121872.7U Expired - Fee Related CN212747910U (en) 2020-09-24 2020-09-24 Green construction dust and noise real-time supervision device

Country Status (1)

Country Link
CN (1) CN212747910U (en)

Similar Documents

Publication Publication Date Title
CN107034800A (en) Closed tunnel structure sound barrier
CN109372174A (en) Hood type ceiling system and its construction method for steel structure truss roof system
CN212747910U (en) Green construction dust and noise real-time supervision device
CN110905179A (en) Construction equipment supporting platform for building construction
CN216007760U (en) Non-counterweight ultrahigh hanging basket suspension device
CN114033189A (en) Large-area high-altitude grid structure aluminum grid ceiling construction device and construction method
CN210342719U (en) Movable operation frame for quickly installing assembled inner wall plate
CN211143406U (en) Energy-saving fireproof building curtain wall
CN203308070U (en) Totally-closed lifting scaffold
CN212053696U (en) Steel beam wall high altitude welding safety protection operation platform
CN112814233A (en) Unitization method of complex stone line
CN216446592U (en) Prevent assembly room of wind husky
CN216276828U (en) Telescopic adjusting device capable of changing transverse position of trackless construction hanging basket
CN214884703U (en) Outer hanging installation device of super large glass curtain wall
CN220210310U (en) Steel construction roof photovoltaic board connecting device
CN211690956U (en) Hook type curtain wall
CN218233926U (en) Ultra-large span cable and frame composite curtain wall structure
CN214942954U (en) Multifunctional power transmission tower pole
CN217896902U (en) Curtain wall connecting structure
CN219852772U (en) Unit type high-altitude welding operation protection shed
CN213171379U (en) High-altitude operation device
CN109025031B (en) Movable container office building corridor lighting ceiling and construction method thereof
CN217420149U (en) Horizontal hidden rod structure of unidirectional cable curtain wall
CN220550721U (en) Wallboard connecting structure of steel structure factory building
CN217811824U (en) Mounting structure of assembled aluminum alloy grid curtain wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210319