CN112814233A - Unitization method of complex stone line - Google Patents

Unitization method of complex stone line Download PDF

Info

Publication number
CN112814233A
CN112814233A CN202110067653.1A CN202110067653A CN112814233A CN 112814233 A CN112814233 A CN 112814233A CN 202110067653 A CN202110067653 A CN 202110067653A CN 112814233 A CN112814233 A CN 112814233A
Authority
CN
China
Prior art keywords
fastener
stone
piece
connecting piece
fasteners
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110067653.1A
Other languages
Chinese (zh)
Inventor
郑昌猛
金剑锋
邵孟锴
杨凤玲
吴江锋
宋佳兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202110067653.1A priority Critical patent/CN112814233A/en
Publication of CN112814233A publication Critical patent/CN112814233A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

The invention discloses a unitization method of complex stone lines. According to the invention, the number of the fasteners is multiple, a keel is connected after the interior of the bottom fastener penetrates through the connecting piece, the tail end of the fastener after penetrating through the top of the keel is connected with a supporting piece, one end of the supporting piece, far away from the fastener, is connected with an embedded piece through a thread and a nut, and a hanging piece is hung at the tail end of one side, close to the hanging piece, of the supporting piece; the bottom of stone material fixedly connected with mounting substrate, the inside of mounting substrate is seted up and is put the storehouse in.

Description

Unitization method of complex stone line
Technical Field
The invention belongs to the technical field of building production, and particularly relates to a unitization method of a complex stone line.
Background
The building curtain wall is composed of a supporting structure system and a panel, can have certain displacement capacity relative to the main body structure, and does not share the external protective structure or the decorative structure of the building acted on the main body structure. The curtain wall is an outer wall enclosure of a building, does not bear load, is hung like a curtain, is also called a hanging wall, and is a light wall with decoration effect commonly used by modern large-scale and high-rise buildings. The building envelope structure consists of a structural frame and an embedded plate, and does not bear the load and the action of a main structure; along with the development of modern building curtain wall industry, modern building curtain wall lines are more and more complicated, and to the continuous improvement of the complicated exquisite degree of present building curtain wall lines, the construction degree of difficulty of building curtain wall lines is more and more big, and the accident that consequently causes is also more and more.
At present, the construction difficulty is increased more and more, so that the construction process of workers in the construction process does not reach the standard. Leading to uneven curtain wall quality; because the field personnel of the construction site have large mobility, the environment is complex, the working environment is restricted by equipment, and the requirements of the modern building external vertical surface on the complexity and the exquisite degree of the lines of the stone curtain wall are higher and higher; the construction difficulty and the process difficulty of the complicated stone curtain wall lines are increased more and more; thus, higher requirements are put on the quality of workers; however, high-quality talents cannot be found on site, so that the construction quality is difficult to control, and a plurality of potential safety hazards are generated.
Disclosure of Invention
The invention aims to: in order to solve the above-mentioned problems, a method for unitizing a complex stone line is provided.
The technical scheme adopted by the invention is as follows: the unitized method of the complicated stone lines comprises stone, wherein fasteners are arranged in the stone through set through holes, connecting pieces are fixedly connected to the ends of the fasteners, the fasteners penetrate through the inner parts behind the connecting pieces and are fixedly provided with fixing sleeves through threads, the fasteners are multiple in number and are arranged at the bottom, keels are connected to the inner parts of the fasteners after the connecting pieces are penetrated through, supporting pieces are connected to the ends of the fasteners after the tops of the keels are penetrated through, one ends, far away from the fasteners, of the supporting pieces are connected with embedded pieces through threads and nuts, and hanging pieces are hung at the ends, close to one sides of the hanging pieces, of the supporting pieces.
In a preferred embodiment, the blocks of different stones are integrally constructed by fixing the fasteners and the keels, and are integrally hung on the facade of the building through the hanging pieces.
In a preferred embodiment, the number of the fastening pieces and the fixing sleeves when the fastening pieces are fixed is two, the fastening pieces are L-shaped, and the fastening pieces and the fixing sleeves are respectively fixed on the upper side and the lower side of the fastening pieces.
In summary, due to the adoption of the technical scheme, the invention has the beneficial effects that:
1. according to the invention, the stone can be fixed outside the keel by matching the fastener with the connecting piece, and meanwhile, by matching with the use of the hanging piece and the supporting piece, the stone can be firmly fixed, and meanwhile, the operation is simple and convenient.
Drawings
FIG. 1 is a schematic diagram of the structure of the present invention;
FIG. 2 is a right side view of the present invention;
FIG. 3 is an enlarged view of FIG. 2 at A.
The labels in the figure are: 1-stone, 2-fasteners, 3-connectors, 4-keels, 5-hangers, 6-supporting pieces, 7-embedded pieces and 8-fixed sleeves.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Referring to fig. 1-3, a unitized method of a complex stone line includes a stone 1, a plurality of fasteners 2 are disposed inside the stone 1 through holes, a connecting member 3 is fixedly connected to the ends of the fasteners 2, a fixing sleeve 8 is fixedly installed inside the fasteners 2 after passing through the connecting member 3 through a screw thread, a keel 4 is connected to the bottom of the fasteners 2 after passing through the connecting member 3, a supporting member 6 is connected to the end of the fasteners 2 after passing through the top of the keel 4, an embedded member 7 is connected to one end of the supporting member 6 far away from the fasteners 2 through a screw thread and a nut, a hanging member 5 is hung to the end of the supporting member 6 near the hanging member 5, and plates of different stones 1 are integrally constructed by fixing the fasteners 2 and the keel 4, and the integrated hanging is carried out on the outer vertical surface of the building through the hanging piece 5; fastener 2 with adapter sleeve 8 is fixed quantity in the time of connecting piece 3 is two, connecting piece 3 is the L type, fastener 2 with adapter sleeve 8 is fixed respectively the upper and lower both sides of connecting piece 3, stone material 1 can be fixed in fossil fragments 4's outside through fastener 2 cooperation connecting piece 3, cooperates the use of pendant 5 and support piece 6 again simultaneously, can be with 1 firm the fixing of stone material, and it is comparatively simple and convenient to operate simultaneously, to the unitized construction scheme of complicated stone material lines, carries out unitized construction with complicated stone material lines, makes to accomplish work and can go forward to accomplish at the mill car at the job site, guarantees construction quality.
The working principle is as follows: when the unitized method of the complex stone lines is operated, the unitized structure of the complex stone lines can be firstly fixed by the stone 1 through the stone fasteners 2 and the connecting pieces 3, and then the stone is connected with the main keels 4. Repeating the steps to connect different stone plates together; the hanging piece is in bolt connection with the main keel, so that up-down, left-right, front-back sliding is realized, and three-dimensional adjustability is realized; the supporting piece 6 is connected with the embedded piece 7, and then the unit stone plate is effectively connected and fixed with the building main body through the connection of the hanging piece 5 and the supporting piece 6.
This unitized method of complicated stone material lines, stone material 1 pass through fastener 2 cooperation connecting piece 3, can fix in the outside of fossil fragments 4, cooperates the use of pendant 5 and support piece 6 again simultaneously, can be with 1 firm the fixing of stone material, and it is comparatively simple and convenient to operate simultaneously, to the unitized construction scheme of complicated stone material lines, carries out unitized construction with complicated stone material lines, makes and to accomplish work can the mill car at the job site completion, guarantees construction quality.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
The above examples are only intended to illustrate the technical solution of the present invention, but not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions of the embodiments of the present invention.

Claims (3)

1. A unitization method of complex stone lines comprises a stone (1), and is characterized in that: the inside of stone material (1) is provided with fastener (2) through the through-hole of seting up, the terminal fixedly connected with connecting piece (3) of fastener (2), fastener (2) pass inside after connecting piece (3) has fixed sleeve (8) through screw thread fixed mounting, the quantity of fastener (2) is a plurality of, the bottom the inside of fastener (2) is run through be connected with fossil fragments (4) after connecting piece (3), fastener (2) run through end-to-end connection after the top of fossil fragments (4) has support piece (6), support piece (6) are kept away from the one end of fastener (2) is connected with through screw thread and nut and is buried piece (7), being close to of support piece (6) the end of one side of pendant (5) has been articulated pendant (5).
2. The unitization method of a complex stone line as claimed in claim 1, wherein: the blocks of different stones (1) are integrally constructed through the fixation of the fasteners (2) and the keels (4), and the blocks are integrally hung on the outer vertical surface of the building through the hanging pieces (5).
3. The unitization method of a complex stone line as claimed in claim 1, wherein: the number of the fastener (2) and the fixed sleeve (8) in the fixing process of the connecting piece (3) is two, the connecting piece (3) is of an L shape, and the fastener (2) and the fixed sleeve (8) are fixed on the upper side and the lower side of the connecting piece (3) respectively.
CN202110067653.1A 2021-01-19 2021-01-19 Unitization method of complex stone line Pending CN112814233A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110067653.1A CN112814233A (en) 2021-01-19 2021-01-19 Unitization method of complex stone line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110067653.1A CN112814233A (en) 2021-01-19 2021-01-19 Unitization method of complex stone line

Publications (1)

Publication Number Publication Date
CN112814233A true CN112814233A (en) 2021-05-18

Family

ID=75870043

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110067653.1A Pending CN112814233A (en) 2021-01-19 2021-01-19 Unitization method of complex stone line

Country Status (1)

Country Link
CN (1) CN112814233A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113404194A (en) * 2021-07-27 2021-09-17 苏州金螳螂幕墙有限公司 Heavy-duty mounting structure for hoisting masonry stone curtain wall

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100996902B1 (en) * 2010-04-07 2010-11-26 (주)원남양행 Inner finishing member of curtain wall system and the assembly therof
CN202416649U (en) * 2011-12-27 2012-09-05 莱尔斯特(厦门)幕墙科技有限公司 Improved stone curtain wall structure
CN207553391U (en) * 2017-09-21 2018-06-29 北京江河幕墙系统工程有限公司 A kind of big face aluminium keel pendant stone material system
CN109457850A (en) * 2018-12-28 2019-03-12 上海绿地建设(集团)有限公司 Back-bolt type stone curtain wall mounting hung rack and method
CN208899709U (en) * 2018-09-17 2019-05-24 中建深圳装饰有限公司 Lines hanging piece for stone system for grid curtain wall

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100996902B1 (en) * 2010-04-07 2010-11-26 (주)원남양행 Inner finishing member of curtain wall system and the assembly therof
CN202416649U (en) * 2011-12-27 2012-09-05 莱尔斯特(厦门)幕墙科技有限公司 Improved stone curtain wall structure
CN207553391U (en) * 2017-09-21 2018-06-29 北京江河幕墙系统工程有限公司 A kind of big face aluminium keel pendant stone material system
CN208899709U (en) * 2018-09-17 2019-05-24 中建深圳装饰有限公司 Lines hanging piece for stone system for grid curtain wall
CN109457850A (en) * 2018-12-28 2019-03-12 上海绿地建设(集团)有限公司 Back-bolt type stone curtain wall mounting hung rack and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113404194A (en) * 2021-07-27 2021-09-17 苏州金螳螂幕墙有限公司 Heavy-duty mounting structure for hoisting masonry stone curtain wall

Similar Documents

Publication Publication Date Title
CN112814233A (en) Unitization method of complex stone line
CN208072731U (en) A kind of building curtain wall
CN110905179A (en) Construction equipment supporting platform for building construction
CN204899108U (en) Node structure is hung futilely to marble
CN209620560U (en) A kind of novel climbing frame hanging seat
CN212926602U (en) Building curtain wall structure convenient to installation and dismantlement
CN210562935U (en) Low-cost light gauge steel mounting structure for furred ceiling
CN211899408U (en) Building outer wall dry-hanging stone structure
CN204754070U (en) Hang mounting structure
CN214739161U (en) Hanging system of assembled indoor high-altitude ecological wood square tube
CN207178903U (en) A kind of compound supporting construction
CN202625559U (en) Lift hoistway door sill assembly
CN205134687U (en) Keel connecting piece convenient to diversified switching
CN111456315A (en) Detachable ceiling system and construction method thereof
CN205153124U (en) Steel construction building bearing axle
CN211923333U (en) Building outer wall hangs stone material positioner futilely
CN202913537U (en) Integrated connection system of steel grating and glass balustrade
CN219436586U (en) Novel temporary electricity-consumption suspension device for decoration engineering
CN206428965U (en) A kind of architectural engineering aluminum alloy mould plate
CN112482648A (en) Hanging system of assembled indoor high-altitude ecological wood square tube
CN218652779U (en) High altitude construction safety belt hangs some device
CN210798007U (en) Double-layer curtain wall system with maintenance platform
CN110670834B (en) Indoor wallboard for wall decoration and mounting method
CN211769692U (en) Elevator landing door pocket
CN220768697U (en) High-precision aluminum veneer convenient to disassemble and assemble

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210518