CN212703307U - Jack part iron fillings washing unit - Google Patents

Jack part iron fillings washing unit Download PDF

Info

Publication number
CN212703307U
CN212703307U CN202021342240.7U CN202021342240U CN212703307U CN 212703307 U CN212703307 U CN 212703307U CN 202021342240 U CN202021342240 U CN 202021342240U CN 212703307 U CN212703307 U CN 212703307U
Authority
CN
China
Prior art keywords
water
fixed frame
top plate
water retaining
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021342240.7U
Other languages
Chinese (zh)
Inventor
张明明
蔡燕祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiaxing Datong Machinery Co ltd
Original Assignee
Jiaxing Datong Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiaxing Datong Machinery Co ltd filed Critical Jiaxing Datong Machinery Co ltd
Priority to CN202021342240.7U priority Critical patent/CN212703307U/en
Application granted granted Critical
Publication of CN212703307U publication Critical patent/CN212703307U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a jack part scrap iron washing device, which comprises a fixed frame positioned above a conveying device, wherein the rear side of the fixed frame is provided with a plurality of water spray nozzles, the front side of the fixed frame is fixedly connected with a cylinder installation block, the lower end of the cylinder installation block is provided with a long-stroke cylinder, the piston rod of the long-stroke cylinder faces towards the fixed frame, the end part of the piston rod of the long-stroke cylinder is connected with a fixed block, the lower ends of the left side and the right side of the fixed frame are provided with auxiliary moving blocks, the side wall of the auxiliary moving blocks, which is close to the inside of the fixed frame, is provided with a chute along the length direction of the auxiliary moving blocks, the left end and the right end of the fixed block are fixedly connected with an auxiliary sliding block I, one end of the auxiliary sliding block I, which, and a water receiving assembly is arranged below the conveying device.

Description

Jack part iron fillings washing unit
Technical Field
The utility model relates to a jack production technical field especially relates to a jack part iron fillings washing unit.
Background
The jack is light and small lifting equipment which takes a rigid jacking piece as a working device and jacks a heavy object through a top bracket or a bottom supporting claw within a small stroke. The jack is mainly used for the departments of factories, mines, transportation and the like as vehicle repair, other lifting, supporting and the like. The structure is light, firm, flexible and reliable, and can be carried and operated by one person.
In order to improve the air tightness between the jack parts, the parts of the jack need to be soaked and cleaned in a cleaning pool for multiple times, and scrap iron on the surfaces of the parts is cleaned when the parts are processed. The factory typically places the jack modules into a module transport frame and then transports them to the wash tank soak zone via a conveyor. And a hoisting mechanism is arranged above the conveying device, the hoisting mechanism hoists the component conveying frame and moves the component conveying frame to a position right above the cleaning pool, and then the component conveying frame moves downwards to be soaked in the cleaning pool, so that the jack component in the component conveying frame is soaked and cleaned. Because the residual iron fillings are more on the jack part that just process the completion, will lead to there being a large amount of iron fillings in the cleaning pool when soaking the washing for the first time when using this kind of cleaning means, influence the cleaning performance of follow-up jack part, so need frequently to change the water in the cleaning pool and guarantee the cleaning performance, the water change in cleaning pool needs longer time to the cleaning efficiency of jack part has been reduced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a jack part iron fillings washing unit can carry out preliminary washing to it earlier before soaking into the washing pond with jack part, makes a large amount of remaining iron fillings wash off partly earlier on the jack part, then soaks it and further washs in the washing pond again, and remaining iron fillings are less on the jack part this moment, so can reduce the frequency that the washing pond traded water, improve holistic cleaning efficiency.
The above technical purpose of the present invention can be achieved by the following technical solutions: a lifting jack part scrap iron washing device comprises a fixed frame positioned above a conveying device, wherein a plurality of water spray nozzles are arranged on the rear side of the fixed frame, water spray ports of the water spray nozzles face the position under the fixed frame, a water inlet pipe is connected to the upper ends of the water spray nozzles, a cylinder mounting block is fixedly connected to the front side of the fixed frame, a long-stroke cylinder is arranged at the lower end of the cylinder mounting block, a piston rod of the long-stroke cylinder faces the fixed frame, a fixed block is connected to the end portion of the piston rod of the long-stroke cylinder, auxiliary moving blocks are arranged at the lower ends of the left side and the right side of the fixed frame, sliding grooves along the length direction of the auxiliary moving blocks are formed in the side wall, close to the inside of the fixed frame, of the auxiliary moving blocks, first auxiliary sliding blocks are fixedly connected to the left, the lateral wall that the fixed block is close to long stroke cylinder is provided with the manger plate subassembly that water splashes when preventing to wash, conveyer's below is provided with the water receiving subassembly that is used for handling the back waste water that washes.
Through above-mentioned technical scheme, conveyer transports the frame with the part and carries behind to fixed frame under, makes the inlet tube to the water jet head water delivery to make water jet head spun water carry out preliminary washing to the jack part that the part transported in the frame, wash clean with most iron fillings on the jack part. The manger plate subassembly can concentrate the water that washes in fixed frame under regional, strengthens the cleaning performance on the one hand, and on the other hand can conveniently collect abluent water, prevents that water from splashing everywhere and causing the pollution to operational environment when washing. In addition, after the flushing is finished, the water retaining assembly can move towards the front side under the driving of the long-stroke cylinder, and the water retaining top plate is prevented from blocking the hoisting mechanism to hoist and transport the component transport frame. The water receiving assembly can collect and intensively treat the cleaned wastewater, and the utilization rate of water resources is improved.
The utility model discloses still further set up to: and a buffer mechanism is arranged on the inner wall of the sliding chute far away from the long-stroke cylinder.
Through the technical scheme, the fixed block can move back and forth under the driving of the piston rod of the long-stroke cylinder, after the piston rod of the long-stroke cylinder is pushed out to the rear side of the fixed frame, the fixed block moves towards the rear side of the fixed frame, meanwhile, the first auxiliary sliding block moves towards the rear side of the sliding groove in the sliding groove, and when the piston rod moves to the rearmost end position, the first auxiliary sliding block impacts the buffer mechanism for a moment so as to play a role in decelerating the piston rod and the fixed block.
The utility model discloses still further set up to: buffer gear is including buffering striking piece and elastic component, buffering striking piece sliding connection is in the spout, the elastic component sets up and keeps away from between the inner wall of long stroke cylinder in buffering striking piece and spout.
Through above-mentioned technical scheme, supplementary slider strikes buffer impact block of buffer gear for a moment when the piston rod moves to last terminal position, and buffer impact block compression elastic component plays the effect that slows down impact force and speed reduction, can prevent in addition that the piston rod from continuing to move to the rear side under inertial effect and the tip that the piston rod is located long stroke cylinder body causes the striking to the rear end lid of long stroke cylinder.
The utility model discloses still further set up to: the water retaining assembly comprises a water retaining top plate and three water retaining side plates, the water retaining top plate is horizontally arranged, the rear side wall of the water retaining top plate is fixedly connected onto the fixed block, the three water retaining side plates are vertically arranged and are respectively located below the left side, the right side and the front side of the water retaining top plate, and the upper ends of the water retaining side plates are fixedly connected to the lower surface of the water retaining top plate.
Through above-mentioned technical scheme, manger plate roof and three manger plate curb plates can carry the top, left side, right side and the front side of frame with the part of conveyer upper end to shelter from respectively, and the water of water jet washes the jack top spare that lies in the part transport frame from the rear side that the frame was carried to the part to the water, and most water of spill all can be blockked in manger plate subassembly.
The utility model discloses still further set up to: and the left side wall and the right side wall of the water retaining top plate are fixedly connected with an auxiliary sliding block II, and one end, far away from the water retaining top plate, of the auxiliary sliding block II is connected in the sliding groove in a sliding mode.
Through the technical scheme, the water retaining top plate can slide in the sliding groove together when being driven by the long-stroke cylinder to move, on one hand, the water retaining top plate can be supported, and on the other hand, the water retaining top plate can be more stable when moving.
The utility model discloses still further set up to: the water receiving assembly comprises a fixed base and a water receiving box, the water receiving box is fixed at the upper end of the fixed base, the bottom surface of the water receiving box is obliquely arranged, and the height of the rear side of the bottom surface of the water receiving box is higher than that of the front side.
Through above-mentioned technical scheme, waste water after the washing falls into can flow downwards along the slope bottom surface after the water receiving box to the convenience is collected it.
The utility model discloses still further set up to: the vertical cross-sectional shape of the bottom surface of the water receiving box in the front-back direction is wavy, a magnetic strip is embedded in the protruding position of the bottom surface of the water receiving box, and a pull ring is arranged on the upper surface of the front end of the magnetic strip.
Through above-mentioned technical scheme, when washing waste water fell into the water receiving box, iron fillings in the washing waste water can be adsorbed by the magnetism strip of bellied position and be in the upper end of bellied position, and the clear water then can flow downwards along the slope in the depressed part of bottom surface to carry out the initial gross separation to the iron fillings in the washing waste water, convenient follow-up further processing to the water of collecting. The staff can take out the caulking groove in the magnetic strip follow protruding position through the pull ring to in putting into the water receiving box after clearing away above-mentioned adsorbed iron fillings, thereby guarantee that the magnetic strip can continue to adsorb iron fillings.
The utility model discloses still further set up to: the lower end of the front side wall of the water receiving box is provided with a water outlet, and a water storage tank is arranged right below the water outlet.
Through above-mentioned technical scheme, the washing waste water that flows to water receiving box front side flows out and flows into the storage water tank from the delivery port in, makes things convenient for the staff to carry out centralized processing to it.
Drawings
Fig. 1 is a first schematic structural diagram of the present invention;
FIG. 2 is a second schematic structural view of the present invention;
FIG. 3 is an enlarged schematic view of the part A of FIG. 2 according to the present invention;
fig. 4 is a schematic structural view of the water receiving assembly of the present invention.
The reference numbers in the figures mean: 1. a fixed frame; 2. a water spray nozzle; 3. a water inlet pipe; 4. a cylinder mounting block; 5. a long stroke cylinder; 6. a fixed block; 7. an auxiliary moving block; 8. a chute; 9. a first auxiliary sliding block; 10. a water retaining assembly; 11. a water receiving component; 12. a buffer mechanism; 13. a buffer impact block; 14. an elastic member; 15. a water retaining top plate; 16. a water retaining side plate; 17. a second auxiliary sliding block; 18. a fixed base; 19. a water receiving box; 20. a magnetic strip; 21. a pull ring; 22. a water outlet; 23. a water storage tank; 24. a conveying device; 25. a hoisting mechanism; 26. a cleaning tank; 27. a component conveyance frame.
Detailed Description
The following detailed description of the embodiments of the present invention is provided with reference to the accompanying drawings and examples. The following examples are intended to illustrate the invention, but are not intended to limit the scope of the invention.
The present invention will be described below with reference to fig. 1 to 4.
The utility model provides a jack top spare iron fillings washing unit, including being located the fixed frame 1 of 24 tops of conveyer, fixed frame 1 is the rectangular frame who comprises four connection iron poles fixed connection, the upper end of fixed frame 1 is connected with the fixed link pole that is fixed in indoor top, indoor top is provided with hoisting mechanism 25, hoisting mechanism 25 is located fixed frame 1 central point and puts directly over, hoisting mechanism 25 can transport frame 27 with the part of fixed frame 1 below and lift by crane and upward move and transport to cleaning bath 26 after passing the centre of fixed frame 1. The rear side of the fixed frame 1 is connected with a plurality of water spray nozzles 2 fixedly connected with the lower end of the iron rod, the water spray nozzles of the water spray nozzles 2 face the lower part of the fixed frame 1, and the upper ends of the water spray nozzles 2 are connected with a water inlet pipe 3. Conveyor 24 transports frame 27 with the part and carries behind the fixed frame 1 under, makes inlet tube 3 to water jet 2 water delivery to make water jet 2 spun water carry out preliminary washing to the jack part in the frame 27 is transported to the part, wash clean most iron fillings on the jack part.
The middle position of the front side connecting iron rod of the fixed frame 1 is fixedly connected with a horizontally arranged cylinder mounting block 4 through screws, the lower end of the cylinder mounting block 4 is provided with a long-stroke cylinder 5, and a piston rod of the long-stroke cylinder 5 faces the fixed frame 1. The end of the piston rod of the long-stroke cylinder 5 is connected with a fixing block 6, the fixing block 6 is rectangular, and the fixing block 6 is located below the fixing frame 1. The lower ends of the connecting iron rods on the left side and the right side of the fixed frame 1 are provided with auxiliary moving blocks 7, and the length of each auxiliary moving block 7 is twice that of each connecting iron rod. The auxiliary moving block 7 is close to the side wall inside the fixed frame 1 and is provided with a sliding groove 8 along the length direction, the lower end positions of the left side and the right side of the fixed block 6 are fixedly connected with an auxiliary sliding block I9, and one end, far away from the fixed block 6, of the auxiliary sliding block I9 is connected into the sliding groove 8 in a sliding mode.
And a buffer mechanism 12 is arranged on the inner wall of the chute 8 far away from the long-stroke cylinder 5. Buffer gear 12 is including buffering striking piece 13 and elastic component 14, and buffering striking piece 13 sliding connection is in spout 8, and elastic component 14 is buffer spring, and buffer spring sets up and keeps away from between the inner wall of long stroke cylinder 5 in buffering striking piece 13 and spout 8, and buffer spring's one end fixed connection is on buffering striking piece 13, and buffer spring keeps away from the inner wall that long stroke cylinder 5 was kept away from to the one end fixed connection of buffering striking piece 13 in spout 8. The fixed block 6 can move back and forth under the drive of the piston rod of the long-stroke cylinder 5, after the piston rod of the long-stroke cylinder 5 is pushed out to the rear side of the fixed frame 1, the fixed block 6 moves to the rear side of the fixed frame 1, meanwhile, the auxiliary slide block I9 moves to the rear side of the slide groove 8 in the slide groove 8, when the piston rod moves to the final end position, the auxiliary slide block I9 can impact on a buffering impact block 13 of a buffering mechanism 12, so that the speed reduction effect is achieved, and in addition, the piston rod can be prevented from continuously moving to the rear side under the inertia effect, and the end part of the piston rod, which is positioned in the long-stroke cylinder 5, can impact on the rear side end cover of the long-.
Being provided with the manger plate subassembly 10 that water splashes when preventing to wash on the lateral wall that fixed block 6 is close to long stroke cylinder 5, manger plate subassembly 10 can concentrate the water that washes in fixed frame 1 under regional, strengthens the cleaning performance on the one hand, and on the other hand can conveniently collect abluent water, prevents that water from splashing everywhere and causing the pollution to operational environment when washing. The water retaining assembly 10 comprises a water retaining top plate 15 and three water retaining side plates 16, the water retaining top plate 15 is horizontally arranged, the rear side wall of the water retaining top plate 15 is fixedly connected onto the fixing block 6, the three water retaining side plates 16 are vertically arranged and are respectively located below the left side, the right side and the front side of the water retaining top plate 15, and the upper ends of the water retaining side plates 16 are fixedly connected to the lower surface of the water retaining top plate 15. The water blocking top plate 15 and the three water blocking side plates 16 can respectively block the upper side, the left side, the right side and the front side of the component conveying frame 27 at the upper end of the conveying device 24, the jack parts in the component conveying frame 27 are washed by the water of the water spraying nozzles 2 from the rear side of the component conveying frame 27, and most of the splashed water can be blocked in the water blocking assembly 10. In addition, after the washing is finished, the water retaining assembly 10 can move to the front side under the driving of the long-stroke cylinder 5, and the water retaining top plate 15 is prevented from blocking the hoisting mechanism 25 to hoist and transport the component transport frame 27.
And the left side wall and the right side wall of the water retaining top plate 15 are fixedly connected with a second auxiliary sliding block 17, and one end, far away from the water retaining top plate 15, of the second auxiliary sliding block 17 is connected in the sliding groove 8 in a sliding manner. The water retaining top plate 15 is driven by the long-stroke cylinder 5 to move, the two auxiliary sliding blocks 17 can slide in the sliding groove 8 together, on one hand, the water retaining top plate 15 can be supported, and on the other hand, the water retaining top plate 15 can be more stable in moving.
The below of conveyer 24 is provided with the water receiving subassembly 11 that is used for handling the back waste water that washes, and water receiving subassembly 11 can be collected and centralized processing the waste water after the washing, improves the utilization ratio of water resource. The water receiving assembly 11 comprises a fixed base 18 and a water receiving box 19, the water receiving box 19 is fixed at the upper end of the fixed base 18, the bottom surface of the water receiving box 19 is arranged in an inclined mode, the height of the rear side of the bottom surface of the water receiving box 19 is higher than that of the front side of the bottom surface of the water receiving box, and waste water after cleaning falls into the water receiving box 19 and then can flow downwards along the inclined bottom surface, so that the waste water can be conveniently collected. The lower end of the front side wall of the water receiving box 19 is provided with a water outlet 22, a water storage tank 23 is arranged right below the water outlet 22, and the cleaning wastewater flowing to the front side of the water receiving box 19 flows out of the water outlet 22 and flows into the water storage tank 23, so that the centralized treatment of the cleaning wastewater is facilitated for workers. The vertical section of the bottom surface of the water receiving box 19 in the front-back direction is in a wavy line shape, a magnetic strip 20 is embedded in the protruding position of the bottom surface of the water receiving box 19, and a pull ring 21 is arranged on the upper surface of the front end of the magnetic strip 20. When washing waste water fell into water receiving box 19, the iron fillings in the washing waste water can be adsorbed by the magnetism strip 20 of protruding position and be in the upper end of protruding position, and the clear water then can flow downwards along the slope in the depressed part of bottom surface to carry out the initial gross separation to the iron fillings in the washing waste water, convenient follow-up further processing to the water of collecting. The staff can take out magnetic strip 20 from the caulking groove in the protruding position through pull ring 21 to in putting into water receiving box 19 after clearing away above-mentioned adsorbed iron fillings, thereby guarantee that magnetic strip 20 can continue to adsorb iron fillings.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of modifications and variations can be made without departing from the technical principle of the present invention, and these modifications and variations of the above assumption should also be regarded as the protection scope of the present invention.

Claims (8)

1. A jack part iron fillings washing unit, includes that is located fixed frame (1) above conveyer (24), its characterized in that: the water spraying device is characterized in that a plurality of water spraying nozzles (2) are arranged on the rear side of the fixed frame (1), water spraying ports of the water spraying nozzles (2) face the right lower side of the fixed frame (1), a water inlet pipe (3) is connected to the upper end of the water spraying nozzles (2), a cylinder mounting block (4) is fixedly connected to the front side of the fixed frame (1), a long-stroke cylinder (5) is arranged at the lower end of the cylinder mounting block (4), a piston rod of the long-stroke cylinder (5) faces the fixed frame (1), a fixed block (6) is connected to the end portion of the piston rod of the long-stroke cylinder (5), auxiliary moving blocks (7) are arranged at the lower ends of the left side and the right side of the fixed frame (1), sliding grooves (8) along the length direction of the auxiliary moving blocks (7) are formed in the side wall of the inner portion of the fixed frame (1), and auxiliary, one end sliding connection that fixed block (6) were kept away from in spout (8) in supplementary slider (9), be provided with water retaining component (10) that water splashes when preventing to wash on the lateral wall that fixed block (6) are close to long stroke cylinder (5), the below of conveyer (24) is provided with water receiving component (11) that are used for handling the waste water after washing.
2. The scrap iron washing device for the jack parts as claimed in claim 1, wherein: and a buffer mechanism (12) is arranged on the inner wall of the sliding chute (8) far away from the long-stroke cylinder (5).
3. The scrap iron washing device for the jack parts as claimed in claim 2, wherein: buffer gear (12) are including buffering striking piece (13) and elastic component (14), buffering striking piece (13) sliding connection is in spout (8), elastic component (14) set up and are kept away from between the inner wall of long stroke cylinder (5) in buffering striking piece (13) and spout (8).
4. The scrap iron washing device for the jack parts as claimed in claim 1, wherein: the water retaining assembly (10) comprises a water retaining top plate (15) and three water retaining side plates (16), the water retaining top plate (15) is horizontally arranged, the rear side wall of the water retaining top plate (15) is fixedly connected onto the fixing block (6), the three water retaining side plates (16) are vertically arranged and are respectively located below the left side, the right side and the front side of the water retaining top plate (15), and the upper ends of the water retaining side plates (16) are fixedly connected to the lower surface of the water retaining top plate (15).
5. The scrap iron washing device for the jack parts as claimed in claim 4, wherein: and the left side wall and the right side wall of the water retaining top plate (15) are fixedly connected with a second auxiliary sliding block (17), and one end, far away from the water retaining top plate (15), of the second auxiliary sliding block (17) is connected into the sliding groove (8) in a sliding manner.
6. The scrap iron washing device for the jack parts as claimed in claim 1, wherein: the water receiving assembly (11) comprises a fixed base (18) and a water receiving box (19), the water receiving box (19) is fixed at the upper end of the fixed base (18), the bottom surface of the water receiving box (19) is obliquely arranged, and the height of the rear side of the bottom surface of the water receiving box (19) is higher than that of the front side.
7. The scrap iron washing device for the jack parts as claimed in claim 6, wherein: the vertical cross-sectional shape of the bottom surface of the water receiving box (19) in the front-back direction is wavy line-shaped, a magnetic strip (20) is embedded in the protruding position of the bottom surface of the water receiving box (19), and a pull ring (21) is arranged on the upper surface of the front end of the magnetic strip (20).
8. The scrap iron washing device for the jack parts as claimed in claim 6, wherein: a water outlet (22) is formed in the lower end of the front side wall of the water receiving box (19), and a water storage tank (23) is arranged right below the water outlet (22).
CN202021342240.7U 2020-07-09 2020-07-09 Jack part iron fillings washing unit Active CN212703307U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021342240.7U CN212703307U (en) 2020-07-09 2020-07-09 Jack part iron fillings washing unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021342240.7U CN212703307U (en) 2020-07-09 2020-07-09 Jack part iron fillings washing unit

Publications (1)

Publication Number Publication Date
CN212703307U true CN212703307U (en) 2021-03-16

Family

ID=74978182

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021342240.7U Active CN212703307U (en) 2020-07-09 2020-07-09 Jack part iron fillings washing unit

Country Status (1)

Country Link
CN (1) CN212703307U (en)

Similar Documents

Publication Publication Date Title
CN105455748B (en) Multi-modal robot for cleaning wall surface control method
CN205234409U (en) High -efficient wall cleaning robot
CN111764361A (en) Comprehensive cleaning method for pump station forebay
CN207837462U (en) Cleaning system
CN212703307U (en) Jack part iron fillings washing unit
CN207361857U (en) A kind of waste water circulation treating device of concrete placement vehicle
CN103962334A (en) Washing machine used for large workpiece
CN206305089U (en) A kind of residual silver-colored cleaning machine of pulley type
CN102580374B (en) Overhead filter press cloth washing mechanism and double-click guiding cleaning method
CN213612960U (en) Special self-cleaning machine of duplex position negative plate
CN114768362B (en) Inner inflow ultra-fine grid dirt removing device with cleaning function and using process
CN108465654A (en) A kind of kiln car automatic cleaning machine
CN209792128U (en) Steel wire cleaning machine
CN2053551U (en) Cleaning and spray coating machine of steel ingot mould
CN210766322U (en) Road surface breaker that road construction used
CN203400556U (en) Sewage treatment and filtration device
CN206168000U (en) Water treatment device
CN208603741U (en) A kind of self-tipping type overturning slag remover
CN216855870U (en) Vertical screen accumulated mud cleaning equipment for sunken sewage treatment plant
CN210947895U (en) Movable environment-friendly public toilet
CN211001265U (en) Quick belt cleaning device of concrete truck
CN216195347U (en) Cleaning system of prefabricated pump station
CN2391699Y (en) Water feeding device for circulation water for bottle washing machine
CN210159381U (en) Dust-proof device
CN220599020U (en) Building rubbish transportation system attached to building body

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A flushing device for iron filings of jack components

Effective date of registration: 20230918

Granted publication date: 20210316

Pledgee: Zhejiang Hecheng Rural Commercial Bank Co.,Ltd.

Pledgor: Jiaxing Datong Machinery Co.,Ltd.

Registration number: Y2023990000459