CN212671734U - Layered injection and production well capable of improving recovery ratio through gas injection - Google Patents
Layered injection and production well capable of improving recovery ratio through gas injection Download PDFInfo
- Publication number
- CN212671734U CN212671734U CN202020746822.5U CN202020746822U CN212671734U CN 212671734 U CN212671734 U CN 212671734U CN 202020746822 U CN202020746822 U CN 202020746822U CN 212671734 U CN212671734 U CN 212671734U
- Authority
- CN
- China
- Prior art keywords
- well
- production
- steam
- injection
- production well
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 127
- 238000011084 recovery Methods 0.000 title claims abstract description 33
- 238000002347 injection Methods 0.000 title claims abstract description 24
- 239000007924 injection Substances 0.000 title claims abstract description 24
- 239000010410 layer Substances 0.000 claims abstract description 100
- 238000010793 Steam injection (oil industry) Methods 0.000 claims abstract description 69
- 239000011229 interlayer Substances 0.000 claims abstract description 26
- 238000000034 method Methods 0.000 claims description 14
- 238000009413 insulation Methods 0.000 claims description 7
- 238000010795 Steam Flooding Methods 0.000 abstract description 18
- 238000011161 development Methods 0.000 abstract description 16
- 230000008901 benefit Effects 0.000 abstract description 5
- 239000003921 oil Substances 0.000 description 127
- 235000019198 oils Nutrition 0.000 description 116
- 230000005465 channeling Effects 0.000 description 40
- 239000010779 crude oil Substances 0.000 description 17
- 230000005484 gravity Effects 0.000 description 10
- 230000035699 permeability Effects 0.000 description 9
- 230000008569 process Effects 0.000 description 9
- 230000000694 effects Effects 0.000 description 7
- 238000000605 extraction Methods 0.000 description 6
- 238000005065 mining Methods 0.000 description 4
- 238000005070 sampling Methods 0.000 description 4
- 230000004069 differentiation Effects 0.000 description 3
- 238000010796 Steam-assisted gravity drainage Methods 0.000 description 2
- 238000004891 communication Methods 0.000 description 2
- 238000006073 displacement reaction Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000000295 fuel oil Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000010521 absorption reaction Methods 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 239000003129 oil well Substances 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 235000015112 vegetable and seed oil Nutrition 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Landscapes
- Geophysics And Detection Of Objects (AREA)
Abstract
The utility model relates to a gas injection enhanced recovery's layering notes production well, including at least one notes vapour well and distribute a plurality of production wells around each notes vapour well, each production well is the vertical well. The bottom end of each steam injection well is provided with a first perforation section, the lower part of each production well is provided with at least two second perforation sections, and the horizontal position of the first perforation section is lower than that of each second perforation section. A general steam injection pipe column can be inserted into each steam injection well, and a layered production pipe column can be inserted into each production well. Each layered production pipe column comprises at least two interlayer packers which are sequentially connected from top to bottom, and a normally-open sliding sleeve switch is connected between every two adjacent interlayer packers. The utility model discloses a layering is annotated and is adopted well can make full use of steam heat energy, reduces different layer position well demands, reduces the production well operating cost, and furthest improves the recovery ratio, reduces steam flooding development cost, improves whole economic benefits.
Description
Technical Field
The utility model relates to a steam flooding development field especially relates to a gas injection enhanced recovery's layering notes production well.
Background
In oil field development, natural energy depletion development is generally referred to as primary oil recovery, conventional waterflood development as secondary oil recovery, and oil recovery measures other than secondary oil recovery are all referred to as tertiary oil recovery, such as chemical flooding, fire flooding, and steam flooding. The steam flooding belongs to an important measure in tertiary oil recovery, and belongs to a powerful means for high-permeability, high-viscosity and middle-deep layer heavy oil recovery.
In order to extract oil in an oil layer as much as possible in the prior art, the Steam Assisted Gravity Drainage (SAGD) technology is generally used for extracting the oil layer in a general mode, a perforation section of a production well is arranged on the lower portion of the oil layer, a bottom perforation section of a steam injection well is arranged on the upper portion of the oil layer, steam is injected into the steam injection well to heat the upper oil layer and move upwards continuously, a steam cavity is formed by utilizing the steam super-coverage characteristic, the crude oil is continuously expanded and further driven downwards along with the steam cavity, the oil layer is heated and softened from top to bottom, and the crude oil and condensate which are heated and viscosity reduced are downwards discharged to the perforation section of the production well under the action of gravity by utilizing the mode that the steam drives the crude oil downwards continuously.
However, if the steam cavity is used to gradually heat the oil reservoir from top to bottom to extract as much oil as possible, the oil reservoir needs to have the following conditions: (1) the inclination angle of the oil layer is relatively gentle and cannot have too large fluctuation change of the inclination angle; (2) the porosity and the permeability of each sub oil layer divided by the oil layer along the longitudinal direction are relatively homogeneous; (3) there is no shale interlayer between each oil layer, or the shale interlayer is less developed. If these three conditions are not satisfied, when the steam drives the development, drive the in-process downwards in the steam chamber, will inevitably appear serious steam channeling phenomenon, can't effectively realize steam assisted gravity draining.
However, the three conditions are ideal oil layers, such oil layers rarely exist in reality, a certain shale interlayer develops in most of actual sandstone oil layers, the shale interlayer plays a role in shielding to divide the oil layers into sub oil layers, and the porosity and the permeability of each sub oil layer are greatly different; and the inclination angle of the whole oil layer is not smooth, and the inclination angle of the stratum influenced by geological motion is also falling and fluctuating. Therefore, the actual reservoir tends to have strong heterogeneity with very poor permeability and is accompanied by discontinuous development of shale interbeddes. The shale interlayer directly influences the rising speed of steam, has obvious barrier effect on the development of a steam cavity, and the volume of the steam cavity is directly related to the steam flooding development effect. In addition, the uneven oil layer, the difference of permeability and porosity and the existence of a shale interlayer all cause the serious steam channeling phenomenon in the process of heating the oil layer by downward driving of steam, and the exploitation effect is influenced.
In addition to the above, with other forms of steam flooding general recovery, the problem of steam channeling of superheated steam in underground hyperosmotic channels is also becoming more pronounced as steam flooding is developed. Steam flooding with blow-by will face the following problems:
1. because the steam injection speed is too fast and the waste of steam is caused, steam carries a large amount of heat energy, if the heat energy can not be fully utilized underground, the crude oil in the stratum can not be fully heated, the mobility is deteriorated, and the effective thick oil yield which can enter a production well is continuously reduced due to the driving of the steam, so that the steam flooding development effect is directly influenced.
2. Due to the channeling of high-temperature steam, the production well directly carries high temperature and high pressure, the lifting effect of the production well is influenced, high risk is caused to the safety production of the well mouth, and the safety development of steam flooding is not facilitated.
The steam flooding stratified mining is generally proposed at present aiming at the problem of steam channeling, however, the stratified mining technology of the steam flooding is not mature at present, the stratified steam injection of a steam injection well mainly utilizes a stratified steam distribution valve or an eccentric double-pipe steam injection pipe column at present, one steam injection pipe column is used for specially injecting steam to an upper oil layer, the other steam injection pipe column is used for specially injecting steam to a lower oil layer, and the steam injection pipe column is matched with the steam injection pipe column and is specially used for oil extraction to the upper oil layer corresponding to a production well, and the other well is specially used for oil extraction to the lower oil layer. In the mode, more wells need to be arranged on the same oil layer level, so that the cost is higher; in addition, because the shale interlayers exist among the oil layers and are discontinuously developed, the oil layers cannot be strictly separated, and therefore layered mining in the true sense is not realized, and the oil layers are still mined in a general manner, so that the recovery ratio is influenced.
Therefore, the inventor provides a layered injection-production well with gas injection and enhanced recovery efficiency to overcome the defects of the prior art.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a gas injection enhanced recovery's layering notes production well, can make full use of steam heat energy, reduce different layer position well demands, reduce the production well operating cost, furthest enhanced recovery, reduce steam flooding development cost, improve whole economic benefits.
The utility model aims at realizing the layered injection and production well with gas injection and enhanced recovery ratio, which comprises at least one steam injection well and a plurality of production wells distributed around each steam injection well, wherein each production well is a vertical well; the bottom end of each steam injection well is provided with a first perforation section, the lower part of each production well is provided with at least two second perforation sections, and the horizontal position of the first perforation section is lower than that of each second perforation section; a general steam injection pipe column can be inserted into each steam injection well, and a layered production pipe column can be inserted into each production well; each layered production pipe column comprises at least two interlayer packers which are sequentially connected from top to bottom, and a normally-open sliding sleeve switch is connected between every two adjacent interlayer packers.
In a preferred embodiment of the present invention, each steam injection well is a vertical well.
In a preferred embodiment of the present invention, the lower portion of each production well has two second perforated sections, and each zonal production string includes two packers between the layers.
The utility model discloses an in a preferred embodiment, every layering production string still including the oil pipe of connecting at the interlayer packer lower extreme of bottom, can overlap at oil pipe lower extreme and establish an interior blanking plug.
In a preferred embodiment of the present invention, each zonal production string further comprises a first telescoping tube positioned above the top layer inter-layer packer.
In a preferred embodiment of the present invention, each of the plurality of general steam injection strings includes an upper heat insulation pipe, a heat sensitive packer, and a lower heat insulation pipe which are sequentially connected from top to bottom.
In a preferred embodiment of the present invention, each of the general steam injection columns further includes a second telescopic pipe located above the heat-sensitive packer.
In a preferred embodiment of the present invention, four production wells are arranged around each steam injection well, and the steam injection wells and the production wells around the steam injection wells are arranged according to a five-point method.
In a preferred embodiment of the present invention, the horizontal distance between the steam injection well and the production well is less than or equal to 150 m.
In a preferred embodiment of the present invention, a vertical distance between the first perforation section and the second perforation section of the bottom layer is less than or equal to 20 m.
From above, the utility model discloses well utilize packer between layer can separate a plurality of sub oil layers of dividing to the horizontal position of the first perforation section of control steam injection well is less than the second perforation section of producing well, when annotating steam, utilizes steam normally to impel the preferential displacement lower part oil reservoir, and steam also upwards moves simultaneously, and steam upwards displacement to the certain degree at last just can take place the steam scurries from the upper portion oil reservoir. If steam channeling occurs, closing the corresponding steam channeling layer position to fully utilize steam heat energy; and then a steam cavity is formed in an upper oil layer with steam channeling due to the steam overtopping characteristic, the original crude oil space is occupied, crude oil is driven downwards by utilizing the steam gravity drainage characteristic, the crude oil in the oil layer can be extracted to the maximum extent, and the recovery ratio is improved to the maximum extent.
The whole exploitation process does not need to consider how many shale interlayers exist in each sub oil layer, the gentle degree and the permeability difference of each sub oil layer can not influence the whole exploitation process, the steam channeling layer position is closed by means of a layering mode for preventing steam channeling, the steam gravity oil drainage characteristic is used, the two modes are combined together, oil layer resources can be fully utilized, all crude oil is exploited as far as possible, the steam injection of a steam injection well is realized by utilizing the steam overtaking and gravity differentiation characteristics, the well drilling of a production well is reduced, oil recovery is increased, and the operation is reduced. In addition, because the whole exploitation process does not need layered steam injection, the steam is directly injected in a general mode, all normally-open sliding sleeve switches of the production well are opened, and the steam channeling position is closed when the steam channeling occurs subsequently, the requirements of different position wells can be reduced, the operation cost of the production well is reduced, the steam flooding development cost is reduced, and the overall economic benefit is improved.
Drawings
The drawings are only intended to illustrate and explain the present invention and do not limit the scope of the invention. Wherein:
FIG. 1: do the utility model provides a structural schematic of layering notes production well.
FIG. 2: do the utility model provides a main view of layering notes production well.
FIG. 3: do the utility model provides a plan view of layering notes production well.
FIG. 4: do the utility model provides a steam injection well and general steam injection tubular column's schematic structure.
FIG. 5: do the utility model provides a production well and layering production string's structural schematic.
The reference numbers illustrate:
1. a steam injection well; 11. first perforation section
2. A production well; 21. a second perforation segment;
3. a steam injection pipe column is integrated; 31. an upper insulating tube; 32. a second telescopic tube; 33. a heat sensitive packer; 34. a lower insulating tube;
4. producing the tubular column by layers; 41. a first telescopic tube; 42. an interlayer packer; 43. a normally open sliding sleeve switch;
5. and (3) an oil layer.
Detailed Description
In order to clearly understand the technical features, objects, and effects of the present invention, embodiments of the present invention will be described with reference to the accompanying drawings.
As shown in fig. 1 to 3 and 5, the present embodiment provides a gas injection enhanced-recovery layered injection-production well, which includes at least one gas injection well 1 and a plurality of production wells 2 distributed around each gas injection well 1, wherein each production well 2 is a vertical well. The bottom end of each steam injection well 1 is provided with a first perforation section 11, the lower part of each production well 2 is provided with at least two second perforation sections 21, and the horizontal position of the first perforation section 11 is lower than that of each second perforation section 21. A general steam injection pipe column 3 can be inserted into each steam injection well 1, and a layered production pipe column 4 can be inserted into each production well 2. Each layered production string 4 comprises at least two interlayer packers 42 which are sequentially connected from top to bottom, and a normally open sliding sleeve switch 43 is connected between every two adjacent interlayer packers 42.
Wherein, the normally open sliding sleeve switch 43 is in an open state at an initial state, so that the corresponding sub-oil layer is in a communication state with the layered production string 4; when the appointed oil layer needs to be closed and the communication between the appointed oil layer and the layered production string 4 is cut off, the normally-open sliding sleeve switch 43 can be closed by putting in an impact tool; then another impact tool can be put in to open the normally open sliding sleeve switch 43 as required. To this normally open sliding sleeve switch 43 and realize the concrete structure of the striking tool of its switching be prior art, as long as can utilize the striking tool to realize its switching repeatedly can, the utility model discloses not injecing this. In addition, when a plurality of normally open sliding sleeve switches 43 are provided, the specific structure of each normally open sliding sleeve switch 43 is also different, so that repeated opening and closing can be conveniently realized, and the specific structure is also the prior art.
Specifically, the method for carrying out layered injection and production by utilizing the layered injection and production well comprises the following steps:
and S1, dividing the oil layer 5 into a plurality of sub oil layers along the longitudinal direction according to the characteristics of the heavy oil reservoir, wherein the number of the interlayer packers 42 and the number of the second perforation segments 21 are the same as that of the sub oil layers.
Wherein, when dividing oil reservoir 5, a seed oil layer can contain a plurality of shale intermediate layers simultaneously, and it is specific how to divide according to actual need to decide, the utility model discloses do not prescribe a limit to this.
And S2, arranging the production well 2 and the steam injection well 1 according to the layered injection and production well.
S3, a general steam injection pipe column 3 is put into the steam injection well 1, and a layered production pipe column 4 is put into the production well 2.
Generally, in order to improve the economic benefit, the production wells 2 are not simultaneously produced, but one production well 2 is first produced or a plurality of production wells 2 are simultaneously produced according to the overall plan of the oil reservoir 5.
S4, injecting steam into the general steam injection pipe column 3, monitoring the logging data of the production well 2 in real time, and judging whether the steam channeling phenomenon exists in the production well 2 according to the logging data; if the steam channeling phenomenon does not exist, the general exploitation is continued; if not, then,
an auxiliary sampling tool is put into the layered production pipe column 4, and oil at the layer position of each sub-oil layer is sampled respectively to obtain oil samples of each sub-oil layer; and then analyzing the oil sample, determining the position of the oil layer with the steam channeling phenomenon, and closing the normally open sliding sleeve switch 43 corresponding to the position of the oil layer with the steam channeling phenomenon to realize layered injection and production.
Specifically, in step S4, if there is no steam channeling, when general production is performed, as long as the production well 2 can produce the oil naturally, the production can be performed by direct flowing, and continuous oil recovery can be realized. If the self-injection production cannot be realized, the oil production string with the oil well pump can be put into the oil extraction pipe for manual lifting oil extraction, and the oil production string can be pulled out when an auxiliary sampling tool needs to be put into the oil extraction pipe in the subsequent steam channeling phenomenon. And if the steam channeling phenomenon exists in the production well 2 in the mining process according to the logging data, determining a steam channeling horizon by using an oil liquid sample collected by an auxiliary sampling tool, and then closing the steam channeling horizon.
Because the connectivity of a certain sub-oil layer corresponding to the steam injection well 1 and the production well 2 is good, the connectivity with other sub-oil layers is possibly poor, and steam flows more easily in the oil layer 5 than thick oil, so that the sub-oil layer with poor permeability and the sub-oil layer with strong heterogeneity can hardly absorb the heat of the steam sufficiently and can not be used effectively, and the steam channeling phenomenon is easy to occur at the moment. Because the characteristic of steam itself just upwards moves easily, utilize steam upward movement to form the steam chamber above the upper oil reservoir among the prior art, occupy original crude oil space to the mode of drive crude oil downwards extrudees crude oil gradually downwards and is mined out, and serious steam channeling phenomenon and unable improvement can't be avoided appearing in this kind of mode, and whether current this kind of mode can effectively realize still having very big relation with the mud shale intermediate layer, the degree of smoothness and the permeability and the porosity difference of oil reservoir simultaneously.
In the embodiment, because the horizontal position of the first perforation section 11 of the steam injection well 1 is lower than the second perforation section 21 of the production well 2, the first perforation section 11 of the steam injection well 1 is arranged corresponding to the middle lower part of the oil layer 5, and the second perforation section 21 of the production well 2 is arranged above. When steam is injected, the steam heats the lower oil layer, then the oil layer 5 is driven gradually from bottom to top and is softened continuously by utilizing the gravity differentiation characteristic and adopting a steam driving mode, and the lower oil layer is exploited as far as possible. After the oil production is continued for a period of time, the crude oil in the lower oil layer can be basically produced, the upper oil layer possibly still has part of crude oil which is not used, when steam is upwards displaced to a certain degree, steam channeling inevitably occurs, and after the steam channeling occurs, the steam can upwards jump to the upper part of the upper oil layer which is not used; but in this embodiment can find out the position of taking place steam scurring and close the normally open sliding sleeve switch 43 that layering production string 4 corresponds after appearing steam scurring, reserve steam in the underground as far as possible, effectively prevent steam scurring, make full use of steam heat energy.
Like this, because steam self characteristic will continue constantly upward movement, if form the hypertonic passageway in upper oil reservoir when the steam scurries, later steam also can continue upwards to deposit through this hypertonic passageway, and then utilize the steam to surpass the characteristic and will form the steam chamber in the oil reservoir top that upper portion did not use completely, later the steam chamber begins from the top down redriven oil reservoir 5, forces steam to the horizon flow of hyposmosis, utilizes the characteristic of steam gravity draining to make the oil reservoir that does not use be exploited as far as possible exploited.
Therefore, in the present embodiment, the interlayer packer 42 is used to separate the plurality of sub-oil layers, and the horizontal position of the first perforation section 11 of the steam injection well 1 is controlled to be lower than the horizontal position of the second perforation section 21 of the production well 2, so that when steam is injected, the steam is normally pushed to preferentially displace the lower oil layer, and meanwhile, the steam moves upwards, and finally, the steam is displaced upwards to a certain extent, so that steam channeling can occur from the upper oil layer. If steam channeling occurs, closing the corresponding steam channeling layer position to fully utilize steam heat energy; and then a steam cavity is formed in an upper oil layer with steam channeling due to the steam overtopping characteristic, the original crude oil space is occupied, crude oil is driven downwards by utilizing the steam gravity drainage characteristic, the crude oil in the oil layer 5 can be extracted to the maximum extent, and the recovery ratio is improved to the maximum extent.
The whole exploitation process does not need to consider how many shale interlayers exist in each sub oil layer, the gentle degree and the permeability difference of each sub oil layer can not influence the whole exploitation process, the steam channeling layer position is closed by means of a layering mode for preventing steam channeling, the steam gravity oil drainage characteristic is used, the two modes are combined together, the oil layer 5 resources can be fully utilized, crude oil is completely exploited as far as possible, the steam injection of the steam injection well 1 is realized by utilizing the steam overtaking and gravity differentiation characteristics, the production well 2 is drilled with less wells, more oil extraction is realized, and the purpose of less operation is realized. In addition, as the whole exploitation process does not need layered steam injection, the steam injection is directly performed in a general mode, all normally-open sliding sleeve switches 43 of the production well 2 are opened, and the steam channeling position is closed when the steam channeling occurs subsequently, the requirements of different position wells can be reduced, the operation cost of the production well 2 is reduced, the steam flooding development cost is reduced, and the overall economic benefit is improved.
In a specific implementation manner, in step S4, the logging data at least includes wellhead temperature, oil production, water content and pressure disturbance frequency, and the auxiliary sampling tool is a dryness sampler.
Wherein, the logging data can be observed on the computer of the well head. Under the normal condition without steam channeling, the temperature of the injected steam generally reaches 350 ℃, and the wellhead temperature of the production well 2 is 50-70 ℃. After steam injection, if various data such as rapid temperature rise of a wellhead, water content rise, oil production quantity reduction, unstable pressure disturbance frequency and the like are detected to be out of a normal range, the fact that the steam channeling phenomenon occurs in the production well 2 is indicated.
When the steam channeling phenomenon occurs, the dryness sampler is put into the layered production pipe column 4, oil samples of all oil layers can be collected, the oil samples are cooled to room temperature on the ground, the oil samples are analyzed to obtain the gasoline ratio of the oil samples, then the gasoline ratio of all the oil samples is compared and analyzed, and the oil layer position with the steam channeling phenomenon can be judged. The dryness sampler and the gasoline-oil ratio process for analyzing the oil sample are all the prior art, and are not described herein again.
In practical application, each steam injection well 1 is a vertical well in order to facilitate construction and reduce cost.
To improve economics and to facilitate the production operation, each production well 2 has two second perforated sections 21 in its lower part, as shown in fig. 5, and each of said separate production strings 4 comprises two interlayer packers 42. Of course, according to actual needs, three or more second perforation sections 21 may be disposed at the lower part of the production well 2 to meet the development requirements.
In the specific implementation, each layered production string 4 further comprises an oil pipe connected to the lower end of the bottom layer interlayer packer 42, and an inner plug can be sleeved on the lower end of the oil pipe.
Specifically, most of the common gas channeling phenomenon exists in the upper oil layer, and the lower oil layer is relatively easy to be extracted, so that the gas channeling phenomenon is less, and therefore, a normally open sliding sleeve switch 43 is basically arranged between two adjacent interlayer packers 42, and the opening and closing of the corresponding sub oil layer are convenient to control. In a few cases, when the steam channeling layer is determined to be the sub-oil layer of the lowest layer, an inner blanking plug can be put into the layered production string 4, so that the bottom end of the layered production string 4 can be plugged, and the purpose of closing the sub-oil layer of the lowest layer is achieved. The structure of the inner plug is prior art and will not be described in detail herein.
Further, in order to compensate for absorbing deformations of the layered production string 4 in the vertical direction, each of said layered production strings 4 further comprises a first telescopic tube 41 above a top layer of inter-layer packers 42, as shown in fig. 5.
Further, as shown in fig. 4, each conventional steam injection string 3 includes an upper heat insulation pipe 31, a heat sensitive packer 33, and a lower heat insulation pipe 34, which are connected in this order from top to bottom.
Wherein the heat sensitive packer 33 is set a distance above the first perforated section 11 in use. Vacuum heat insulating pipes are preferably used as the upper heat insulating pipe 31 and the lower heat insulating pipe 34. The specific structure of the thermal packer 33 and the vacuum insulation pipe are the prior art and will not be described in detail herein. In addition, in order to compensate for the absorption of deformations of the general steam injection columns 3 in the vertical direction, as shown in fig. 4, each of said general steam injection columns 3 further comprises a second telescopic tube 32 located above said heat-sensitive packer 33.
In practical application, in order to facilitate production, as shown in fig. 1 and 3, four production wells 2 are arranged around each steam injection well 1, and the steam injection wells 1 and the surrounding production wells 2 are arranged in a five-point method.
Of course, the steam injection wells 1 and the production wells 2 may be arranged in other arrangements according to actual needs, and this embodiment is only for illustration.
Further, in order to be more beneficial to the production effect of the steam flooding, the horizontal distance between the steam injection well 1 and the production well 2 is less than or equal to 150 m.
In actual well arrangement, the horizontal spacing between each production well 2 and the steam injection well 1 is generally different according to factors such as permeability and porosity of an oil layer 5, the production wells 2 which are relatively close to the steam injection wells 1 (for example, the horizontal spacing is between 50 and 75 m) are generally called first-line wells, and the production wells 2 which are relatively far from the steam injection wells 1 (for example, the horizontal spacing is between 100 and 150 m) are generally called second-line wells. The specific value of the horizontal distance is determined according to the actual condition of the on-site oil layer 5 so as to ensure a reasonable development range.
In a possible implementation, the vertical distance between the first perforation segment 11 and the second perforation segment 21 of the bottom layer is less than or equal to 20 m. Of course, the vertical distance may also be adjusted according to actual needs, and this embodiment is only for illustration.
The above description is only exemplary of the present invention, and is not intended to limit the scope of the present invention. Any person skilled in the art should also realize that such equivalent changes and modifications can be made without departing from the spirit and principles of the present invention.
Claims (10)
1. The layered injection and production well with the gas injection and the enhanced recovery ratio is characterized by comprising at least one gas injection well and a plurality of production wells distributed around each gas injection well, wherein each production well is a vertical well;
the bottom end of each steam injection well is provided with a first perforation section, the lower part of each production well is provided with at least two second perforation sections, and the horizontal position of the first perforation section is lower than that of each second perforation section; a general steam injection pipe column can be inserted into each steam injection well, and a layered production pipe column can be inserted into each production well; every layering production string includes from last to two at least layer packer that connect gradually down to adjacent two connect a normally open sliding sleeve switch between the packer between the layer.
2. The gas-injected enhanced oil recovery stratified injection-production well of claim 1,
and each steam injection well is a vertical well.
3. The gas-injected enhanced oil recovery stratified injection-production well of claim 1,
the lower portion of each of the production wells has two of the second perforated sections, and each of the layered production strings includes two of the zonal packers.
4. The gas injection enhanced oil recovery stratified injection well of claim 1 or 3,
each layered production pipe column further comprises an oil pipe connected to the lower end of the interlayer packer at the bottom layer, and an inner plug can be sleeved at the lower end of the oil pipe.
5. The gas-injected enhanced oil recovery stratified injection-production well of claim 1,
each of the layered production strings further comprises a first telescoping tube positioned above the inter-layer packer at the top layer.
6. The gas-injected enhanced oil recovery stratified injection-production well of claim 1,
each of the general steam injection pipe columns comprises an upper heat insulation pipe, a heat-sensitive packer and a lower heat insulation pipe which are sequentially connected from top to bottom.
7. The gas-injected enhanced oil recovery stratified injection-production well of claim 6,
each general steam injection pipe column further comprises a second telescopic pipe located above the heat-sensitive packer.
8. The gas-injected enhanced oil recovery stratified injection-production well of claim 1,
four production wells are arranged around each steam injection well, and the steam injection wells and the surrounding production wells are arranged according to a five-point method.
9. The gas-injected enhanced oil recovery stratified injection-production well of claim 1,
the horizontal distance between the steam injection well and the production well is less than or equal to 150 m.
10. The gas-injected enhanced oil recovery stratified injection-production well of claim 1,
the vertical distance between the first perforation section and the second perforation section of the bottom layer is less than or equal to 20 m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020746822.5U CN212671734U (en) | 2020-05-08 | 2020-05-08 | Layered injection and production well capable of improving recovery ratio through gas injection |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020746822.5U CN212671734U (en) | 2020-05-08 | 2020-05-08 | Layered injection and production well capable of improving recovery ratio through gas injection |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212671734U true CN212671734U (en) | 2021-03-09 |
Family
ID=74815728
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020746822.5U Active CN212671734U (en) | 2020-05-08 | 2020-05-08 | Layered injection and production well capable of improving recovery ratio through gas injection |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212671734U (en) |
-
2020
- 2020-05-08 CN CN202020746822.5U patent/CN212671734U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105114048B (en) | A kind of staged fracturing of horizontal well single-well injection-production oil production method | |
US5016709A (en) | Process for assisted recovery of heavy hydrocarbons from an underground formation using drilled wells having an essentially horizontal section | |
US3692111A (en) | Stair-step thermal recovery of oil | |
CA2593585C (en) | In situ heavy oil and bitumen recovery process | |
CN101592028B (en) | Method for exploiting super-thick oil by gas-assisted SAGD (steam assisted gravity drainage) | |
CA2651527C (en) | Method and system for enhancing a recovery process employing one or more horizontal wellbores | |
CN101787854B (en) | Subsection well completion system of bottom water reservoir horizontal well | |
CN206174945U (en) | Three branch U type well multiple spot well pattern mining system are adopted altogether to three gas | |
US4392530A (en) | Method of improved oil recovery by simultaneous injection of steam and water | |
CA2549369A1 (en) | Heavy oil recovery method and apparatus | |
CN106194131A (en) | It is spaced CO between multistage fracturing horizontal well seam2oil flooding method | |
CN107269255B (en) | Method and device for exploiting compact oil through inter-cluster oil displacement | |
CN202325428U (en) | Drive and let out compound oil recovery system | |
CN110284862A (en) | The method for infusing remaining oil in non-condensing gas or combustion (of oil) insitu exploitation oriented perforating | |
CA2744749C (en) | Basal planer gravity drainage | |
CN104234677A (en) | Method for improving condensate recovery ratio of condensate gas reservoir through gas injection vertical displacement | |
US20150096748A1 (en) | Systems and methods for enhancing steam distribution and production in sagd operations | |
CN110306965A (en) | A kind of method for increasing for coal bed gas low yield wellblock | |
CN104265258A (en) | Fracture-assisted combustion of oil in-situ stimulation thickened oil exploiting method | |
CN218862588U (en) | Hot dry rock horizontal well exploitation tubular column structure | |
CN203394482U (en) | Thickened oil exploitation device for horizontal well | |
CN201372779Y (en) | Oil jacket communicating vessel | |
CN212671734U (en) | Layered injection and production well capable of improving recovery ratio through gas injection | |
CN113622885B (en) | Layered injection-production method for improving recovery ratio through gas injection | |
CN107558975B (en) | Method for improving later development of steam assisted gravity drainage by using viscosity reducer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |