CN212656296U - Gully backfilling device for green construction planning of gully - Google Patents

Gully backfilling device for green construction planning of gully Download PDF

Info

Publication number
CN212656296U
CN212656296U CN202021139419.2U CN202021139419U CN212656296U CN 212656296 U CN212656296 U CN 212656296U CN 202021139419 U CN202021139419 U CN 202021139419U CN 212656296 U CN212656296 U CN 212656296U
Authority
CN
China
Prior art keywords
gully
main baffle
heavy burden
midbody
auxiliary wheel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021139419.2U
Other languages
Chinese (zh)
Inventor
宣海丰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Haize Water Conservancy Engineering Co ltd
Original Assignee
Hangzhou Haize Water Conservancy Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Haize Water Conservancy Engineering Co ltd filed Critical Hangzhou Haize Water Conservancy Engineering Co ltd
Priority to CN202021139419.2U priority Critical patent/CN212656296U/en
Application granted granted Critical
Publication of CN212656296U publication Critical patent/CN212656296U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a green construction planning of ditch is with device of backfilling of gully, including the midbody, the upper end surface of midbody is provided with rings, the both sides surface of midbody all is provided with flexible scraper blade, the front end surface of flexible scraper blade is provided with heavy burden formula side fender. A green construction planning of ditch is with ditch backfill device of gully, be equipped with flexible scraper blade and heavy burden formula side shield, can pull out certain length from outer jacket shell with interior panel when using, then it fixes to screw up fixed turn button, so just can adapt to the irrigation canals and ditches of different width better, and can contact with ground through auxiliary wheel, then break the earth of direction of advance by the front lip, main baffle just can push away the irrigation canals and ditches with the earth of digging out like this and backfill, and heavy burden frame can increase the dead weight of device, just so can guarantee better when pulling with the contact on ground, bring better use prospect.

Description

Gully backfilling device for green construction planning of gully
Technical Field
The utility model relates to a green construction field of irrigation canals and ditches, in particular to green construction planning of irrigation canals and ditches is with device of backfilling of gully.
Background
The ditches can be roughly divided into two types, one type is a rainwater sewer which is usually seen everywhere on the roadside, the other type is a sewage sewer which conveys the waste water of households and factories to a sewage treatment plant in a closed pipeline mode, the construction of the rainwater sewer is roughly completed, and the construction of the sewage sewer depends on the mutual cooperation of governments and people to jointly popularize the connection of the sewage sewer; the existing gully backfilling device for green construction planning of the ditches has certain disadvantages in use, firstly, the fixed backfilling device cannot adapt to the width in use, so that the efficiency in actual use is reduced, and secondly, when backfilling is carried out by using handheld tools such as shovels and the like, although flexible operation can be carried out, for operation with large engineering quantity, the actual working hours can be influenced, and certain adverse effects are brought to the use process of people.
SUMMERY OF THE UTILITY MODEL
A primary object of the present invention is to provide a gully backfill device for green construction planning of gully, which can effectively solve the problems of the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a gully backfill device for green construction planning of a gully comprises an intermediate body, wherein a hanging ring is arranged on the outer surface of the upper end of the intermediate body, telescopic scrapers are arranged on the outer surfaces of two sides of the intermediate body, and a load-bearing side stop is arranged on the outer surface of the front end of each telescopic scraper.
Preferably, the telescopic scraper comprises an outer casing, a fixed rotating button and an inner panel, the outer casing is arranged in the middle of the telescopic scraper, the inner panel is arranged in the outer casing, and the fixed rotating button is arranged on the outer surface of the upper end of the outer casing.
Preferably, heavy burden formula side keeps off including auxiliary wheel, heavy burden frame, main baffle and front lip, the middle part that heavy burden formula side kept off is provided with main baffle, the front end surface of main baffle is provided with the front lip, the both sides surface of main baffle all is provided with heavy burden frame, the lower extreme surface of main baffle is provided with the auxiliary wheel.
Preferably, the outer surface of the inner panel is movably connected with the inner surface of the outer casing through a fixed rotating knob.
Preferably, an installation frame is arranged between the auxiliary wheel and the main baffle, the outer surface of the auxiliary wheel is movably connected with the outer surface of the main baffle through the installation frame, and the front lip is of a front convex structure.
Preferably, the lifting ring is in welded connection with the intermediate body, the load-bearing side baffle is in welded connection with the telescopic scraper, and the load-bearing side baffle, the lifting ring, the intermediate body and the telescopic scraper are all made of aluminum alloy materials.
Compared with the prior art, the utility model discloses following beneficial effect has: according to the gully backfilling device for green construction planning of the ditch, the inner embedded plate can be pulled out of the outer casing for a certain length in use through the arranged telescopic scraper, then the fixed rotating button is screwed up for fixing, so that the gully backfilling device can be better adapted to ditches with different widths, through the arranged load-bearing side baffle, the gully backfilling device can be in contact with the ground through the auxiliary wheel in use, then soil in the advancing direction is broken through the front lip, the excavated soil can be pushed down to the gully to be backfilled through the main baffle, the self weight of the device can be increased through the load-bearing frame, and therefore the contact with the ground can be better ensured in traction.
Drawings
Fig. 1 is the overall structure schematic diagram of the gully backfill device for green construction planning of the ditch of the utility model.
Fig. 2 is a schematic structural view of the retractable scraper 4 in fig. 1 of the gully backfill device for green construction planning of the ditch of the present invention.
Fig. 3 is a schematic structural view of the load-bearing side stop 1 in fig. 1 of the gully backfill device for green construction planning of the trench of the present invention.
In the figure: 1. a load-bearing side block; 2. a hoisting ring; 3. an intermediate; 4. a telescopic scraper plate; 41. an outer casing; 42. fixing the rotating button; 43. an inner panel; 11. an auxiliary wheel; 12. a load frame; 13. a main baffle; 14. the anterior lip.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
It should be noted that, in the description of the present invention, it should be noted that the terms "inner", "outer", "both ends", "one end", "the other end" and the like indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, which is only for convenience of description and simplification of description, but does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.
As shown in fig. 1 to 3, a gully backfill device for green construction planning of a ditch comprises an intermediate body 3, a lifting ring 2 is arranged on the outer surface of the upper end of the intermediate body 3, telescopic scrapers 4 are arranged on the outer surfaces of both sides of the intermediate body 3, and a load-bearing side stop 1 is arranged on the outer surface of the front end of each telescopic scraper 4.
Further, the telescopic scraper 4 comprises an outer casing 41, a fixed rotating button 42 and an inner embedded plate 43, the outer casing 41 is arranged in the middle of the telescopic scraper 4, the inner embedded plate 43 is arranged inside the outer casing 41, and the fixed rotating button 42 is arranged on the outer surface of the upper end of the outer casing 41.
Further, heavy-duty formula side keeps off 1 includes auxiliary wheel 11, heavy-duty frame 12, main baffle 13 and front lip 14, and the middle part of heavy-duty formula side keeps off 1 is provided with main baffle 13, and the front end surface of main baffle 13 is provided with front lip 14, and the both sides surface of main baffle 13 all is provided with heavy-duty frame 12, and the lower extreme surface of main baffle 13 is provided with auxiliary wheel 11.
Further, the outer surface of the inner insert plate 43 is movably connected with the inner surface of the outer casing 41 through the fixed knob 42.
Further, an installation frame is arranged between the auxiliary wheel 11 and the main baffle 13, the outer surface of the auxiliary wheel 11 is movably connected with the outer surface of the main baffle 13 through the installation frame, and the front lip 14 is of a front convex structure.
Furthermore, the hanging ring 2 and the intermediate body 3 are connected in a welding mode, the load-bearing side baffle 1 and the telescopic scraper 4 are connected in a welding mode, and the load-bearing side baffle 1, the hanging ring 2, the intermediate body 3 and the telescopic scraper 4 are all made of aluminum alloy materials.
It should be noted that, the utility model relates to a gully backfill device for green construction planning of ditches, before using, the rope can be connected with the hanging ring 2 on the surface of the intermediate body 3, or connected with the buckle on the side of the load-bearing side shield 1, so that the whole device can be pulled to realize the backfill of ditches, when in use, the telescopic scraper 4 can be better adapted to ditches with different widths, only the inner panel 43 needs to be pulled out for a certain length from the outer casing 41, then the fixed rotating button 42 is screwed up for fixing, so as to be better adapted to ditches with different widths, meanwhile, the low tool efficiency of shovels and the like can be avoided through the load-bearing side shield 1, when in use, the auxiliary wheel 11 is contacted with the ground, then the front lip 14 breaks the soil in the advancing direction, so that the main baffle 13 can push the dug-out ditches for backfilling, and the dead weight of the device can be increased by the load bearing frame 12, so that the contact with the ground can be better ensured when the device is pulled, the actual backfilling effect is better finally, and the whole operation is simple, fast and practical.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a green construction planning of ditch is with gully backfill device, includes midbody (3), its characterized in that: the outer surface of the upper end of the intermediate body (3) is provided with a lifting ring (2), the outer surfaces of the two sides of the intermediate body (3) are provided with telescopic scrapers (4), and the outer surface of the front end of each telescopic scraper (4) is provided with a load-bearing side baffle (1).
2. The device of claim 1, wherein the device comprises: the telescopic scraper (4) comprises an outer casing (41), a fixed rotating button (42) and an inner panel (43), the outer casing (41) is arranged in the middle of the telescopic scraper (4), the inner panel (43) is arranged inside the outer casing (41), and the fixed rotating button (42) is arranged on the outer surface of the upper end of the outer casing (41).
3. The device of claim 1, wherein the device comprises: heavy burden formula side fender (1) is including auxiliary wheel (11), heavy burden frame (12), main baffle (13) and front lip (14), the middle part of heavy burden formula side fender (1) is provided with main baffle (13), the front end surface of main baffle (13) is provided with front lip (14), the both sides surface of main baffle (13) all is provided with heavy burden frame (12), the lower extreme surface of main baffle (13) is provided with auxiliary wheel (11).
4. The device for backfilling gullies for green construction planning of ditches as claimed in claim 2, wherein: the outer surface of the inner panel (43) is movably connected with the inner surface of the outer casing (41) through a fixed rotating button (42).
5. The device of claim 3, wherein the device comprises: be provided with between auxiliary wheel (11) and main baffle (13) and install the frame, the surface swing joint of auxiliary wheel (11) through installing frame and main baffle (13), front lip (14) are protruding structure before.
6. The device of claim 1, wherein the device comprises: be welded connection between rings (2) and midbody (3), be welded connection between formula of bearing a burden side fender (1) and flexible scraper blade (4), and formula of bearing a burden side fender (1), rings (2), midbody (3), flexible scraper blade (4) are the aluminum alloy material.
CN202021139419.2U 2020-06-18 2020-06-18 Gully backfilling device for green construction planning of gully Expired - Fee Related CN212656296U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021139419.2U CN212656296U (en) 2020-06-18 2020-06-18 Gully backfilling device for green construction planning of gully

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021139419.2U CN212656296U (en) 2020-06-18 2020-06-18 Gully backfilling device for green construction planning of gully

Publications (1)

Publication Number Publication Date
CN212656296U true CN212656296U (en) 2021-03-05

Family

ID=74752595

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021139419.2U Expired - Fee Related CN212656296U (en) 2020-06-18 2020-06-18 Gully backfilling device for green construction planning of gully

Country Status (1)

Country Link
CN (1) CN212656296U (en)

Similar Documents

Publication Publication Date Title
CN212358419U (en) Irrigation canals and ditches are seted up device for hydraulic engineering construction
CN203066134U (en) Synchronous dredging device of dredge boat
CN212656296U (en) Gully backfilling device for green construction planning of gully
CN214090058U (en) Ground ditch excavating equipment for building site
CN212641468U (en) Pit-in-pit rapid construction structure
CN206736876U (en) Once excavate the repacking bucket device of shaping in a kind of trapezoidal ditch
CN108798775A (en) A kind of jacking construction active well
CN208219738U (en) A kind of high-efficient dredging machine that building building water conservancy construction uses
CN2846515Y (en) Crushing and digging device
CN213625537U (en) Water and soil conservation is with high-efficient consolidation device of side slope
CN211498995U (en) Underground continuous wall construction auxiliary device
CN210372898U (en) Reinforced concrete water pipe leakage detection device
CN210621799U (en) Equipment for excavating cable trench and prefabricating cement firmware
CN211571826U (en) Fluidized soil construction equipment
CN206693165U (en) Dam slope U-shaped drainage ditch in earth dam downstream excavates and lining cutting device
CN203594060U (en) Excavator used safely
CN217027256U (en) Channel dredging device for hydraulic engineering
CN213868008U (en) Silt screening front end feeding structure
CN211368827U (en) Building foundation desilting device
CN206554118U (en) City integrated piping lane protects self-propelled laydown machine certainly
CN104452960A (en) Urban drainage pipeline silt remover
CN213014406U (en) Excavator scraper bowl that durable intensity of municipal building engineering is high
CN214994201U (en) Highway side ditch excavation finisher
CN219298311U (en) Drainage canal excavation device
CN210766971U (en) Quick assembly and disassembly type dredging plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210305