CN206693165U - Dam slope U-shaped drainage ditch in earth dam downstream excavates and lining cutting device - Google Patents

Dam slope U-shaped drainage ditch in earth dam downstream excavates and lining cutting device Download PDF

Info

Publication number
CN206693165U
CN206693165U CN201720563449.8U CN201720563449U CN206693165U CN 206693165 U CN206693165 U CN 206693165U CN 201720563449 U CN201720563449 U CN 201720563449U CN 206693165 U CN206693165 U CN 206693165U
Authority
CN
China
Prior art keywords
lining cutting
drainage ditch
bucket body
shaped
dam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720563449.8U
Other languages
Chinese (zh)
Inventor
武先恒
卫瑞岗
李春平
闫永平
武智杰
胡慧杰
陈文会
王芳
薛文萍
崔晓云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Water Conservancy Construction Engineering Bureau Co ltd
Original Assignee
SHANXI WATER CONSERVANCY CONSTRUCTION ENGINEERING BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANXI WATER CONSERVANCY CONSTRUCTION ENGINEERING BUREAU filed Critical SHANXI WATER CONSERVANCY CONSTRUCTION ENGINEERING BUREAU
Priority to CN201720563449.8U priority Critical patent/CN206693165U/en
Application granted granted Critical
Publication of CN206693165U publication Critical patent/CN206693165U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model is specially that a kind of dam slope U-shaped drainage ditch in earth dam downstream excavates and lining cutting device, solves the problems, such as that dam slope U-shaped drainage ditch in existing earth dam downstream excavates lining cutting and has that labor intensity is big, efficiency of construction is low, it cannot be guaranteed that concrete quality and potential safety hazard is larger.Including bucket body and concrete hopper:Bucket body upper end is provided with canal along digging plate, the back side of bucket body is provided with outer stiffener, traction is provided with positioned at the outer backboard side of putting more energy into of centre to hook, traction is connected with chute pull rope in hooking, the inner surface setting of bucket body has interior stiffener, and is provided with tabular below middle interior stiffener and digs block;Concrete material case includes frame-shaped casing and bottom plate, and bottom plate is hinged with frame-shaped casing, and the rear end of bottom plate is provided with latch, and pin-and-hole is provided with frame-shaped casing.The utility model realizes the excavation and lining cutting function of U-shaped drainage ditch, and can heavy grade, low-angle constructed, ensure thoroughly to have broken off relations the generation of potential safety hazard while concrete quality.

Description

Dam slope U-shaped drainage ditch in earth dam downstream excavates and lining cutting device
Technical field
It the utility model is related to hydraulic engineering field, more particularly to excavation and lining cutting device, specially a kind of earth dam downstream The U-shaped drainage ditch of dam slope excavates and lining cutting device.
Background technology
Earth dam downstream drainage ditch construction technology is divided into excavation method and lining methods.Wherein, excavation method includes trencher Excavating load and man digging method;Lining methods include artificial abnormal formwork lining method and the U-shaped machine lining method of channel etc..
Canal body earth excavation:
1st, earth dam downstream dam slope slope ratio generally 1:1.75(30°)With 1:2.5(22°), and the maximum excavation gradient of trencher For 8 °, because slope is bigger, trencher can not carry out longitudinal slope section excavation;
2nd, dam slope transverse drainage canal can use trencher, Miniature digging machine to excavate, but can not meet canal body cross dimensions It is required that secondary finishing need to be manually carried out, and trencher can not voluntarily reach packway among dam slope, potential safety hazard be present;
3rd, the dam earthwork is compacting side, and hand excavation's cost is big, and speed of application is slower, and longitudinal slope section, which is excavated, to be present Potential safety hazard.
Canal body concrete lining:
1st, during artificial abnormal formwork lining cutting, template peace is carried out first, template system peace need to put into a large amount of manpower and materials, and apply Work speed is slow;Secondly as template can not remove in time, construction period is long, and is easily damaged template when removing And concrete, it is impossible to ensure concrete quality;
2nd, during the U-shaped machine lining cutting of channel, U-shaped lining cutting mechanomotive force is diesel engine, and power is smaller, it is impossible to carries out heavy grade and applies Work is expected, it is necessary to be shoveled in artificial past U-shaped machine hopper, need to put into a large amount of manpower and materials, diesel engine horsepower is increased in construction, still can not Solves longitudinal slope voluntarily lining cutting, and concrete clinker needs artificial Secondary Transport just to put in storage lining cutting.
The content of the invention
The utility model excavates lining cutting to solve the U-shaped drainage ditch of existing earth dam downstream dam slope and has that labor intensity is big, applies Work efficiency rate is low, cannot be guaranteed the problem of concrete quality and potential safety hazard are larger, there is provided a kind of U-shaped row of earth dam downstream dam slope Water channel excavates and lining cutting device.
The utility model adopts the following technical scheme that realization:Dam slope U-shaped drainage ditch in earth dam downstream excavates and lining cutting dress Put, including be arranged on digging machine bucket end and the bucket body coordinated with U-shaped drainage ditch and the concrete that is arranged on rear side of digging machine bucket Hopper:Bucket body upper end is provided with the canal integral with it and is provided with some along plate, the back side of bucket body is dug and vertically fixes Outer stiffener, positioned at centre outer backboard side of putting more energy into be provided with traction hook, traction hook in be connected with chute pull rope, bucket body Inner surface setting have some vertically fixed interior stiffeners, and tabular digging is provided with below middle interior stiffener Block;Concrete material case includes frame-shaped casing and the bottom plate positioned at its bottom, and front end and the frame-shaped casing of bottom plate are hinged, after bottom plate End is provided with the latch of left and right distribution, and the pin-and-hole coordinated with latch is provided with frame-shaped casing.
When carrying out excavation operation, unwrapping wire is measured first, it is once right using excavation formula is scraped under the dynamic action of digging machine U-shaped drainage ditch and canal excavate shaping along part, are not required to manual amendment, only need to manually be detected in digging process, interior, The setting of outer stiffener is effectively guaranteed the rigidity of bucket body, and tabular digging block, which further increases, scrapes digging efficiency;Excavate Into when carrying out lining cutting operation, rotation digging machine bucket to concrete hopper is in horizontality, and by chute pull rope and coffering machine Lining cutting synovial membrane connects, now by pouring out concrete to concrete hopper, and it is mixed by unplug that latch will be in concrete hopper Solidifying soil is discharged into lining cutting synovial membrane, and the movement of lining cutting synovial membrane is realized in the presence of chute pull rope, it is not necessary to manually carries out scraper Concrete, horizontal, longitudinal slope section canal lining can be carried out, overcome the U-shaped drainage ditch of existing earth dam downstream dam slope and excavate lining cutting presence Labor intensity is big, efficiency of construction is low, it cannot be guaranteed that the problem of concrete quality and potential safety hazard are larger.
The utility model is reasonable in design reliable, realizes the excavation and lining cutting function of U-shaped drainage ditch, easy to operate fast Victory, effectively increases efficiency of construction, and can heavy grade, low-angle constructed, solve the bottleneck of traditional construction, ensure mixed The generation of potential safety hazard has thoroughly been broken off relations while solidifying soil property amount, there is the advantages of simple in construction, easy to process and cost is low.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
In figure:1- digging machine buckets, 2- bucket bodies, 3- concrete hoppers, 4- canals hook along plate, the outer stiffeners of 5-, 6- tractions is dug, Stiffener in 7-, 8- tabulars dig block, 9- bottom plates, 10- latches.
Embodiment
Dam slope U-shaped drainage ditch in earth dam downstream excavates and lining cutting device, including be arranged on the end of digging machine bucket 1 and with U-shaped draining The bucket body 2 that canal coordinates and the concrete hopper 3 for being arranged on the rear side of digging machine bucket 1:The upper end of bucket body 2 is provided with and its one Canal along digging plate 4, the back side of bucket body 2 is provided with some vertically fixed outer stiffeners 5, the outer stiffener positioned at centre 5 dorsal parts are provided with traction and hook 6, and traction hooks and chute pull rope is connected with 6, and the inner surface setting of bucket body 2 has some vertically Fixed interior stiffener 7, and the middle lower section of interior stiffener 7 is provided with tabular and digs block 8;Concrete hopper 3 includes frame-shaped Casing and the bottom plate 9 positioned at its bottom, front end and the frame-shaped casing of bottom plate 9 are hinged, and the rear end of bottom plate 9 is provided with left and right distribution Latch 10, the pin-and-hole coordinated with latch 10 is provided with frame-shaped casing.
In specific implementation process, digging machine the model PC120 or PC160 supporting with digging machine bucket 1.
, can be in ruling grade 1 using bucket body 2:1.5 it is domatic on excavated, excavate 400m need one machine-team of digging machine, Machine-team takes 800 yuan, needs artificial 2 people, 200 yuan of labour cost, costs altogether with 1200 yuan;And when manually being excavated, excavating 400m needs Manually 40, cost altogether with 4800 yuan.
The setting of concrete hopper 3 can directly transport concrete put in storage, reduce artificial shovel material and put in storage, one day few people of recruitment 4; Digging machine draws lining cutting slipform lining, can complete within one day domatic lining cutting 120m, and former diesel oil coffering machine can not carry out domatic lining cutting.

Claims (1)

1. a kind of dam slope U-shaped drainage ditch in earth dam downstream excavates and lining cutting device, it is characterised in that:Including being arranged on digging machine bucket(1) End and the bucket body coordinated with U-shaped drainage ditch(2)Be arranged on digging machine bucket(1)The concrete hopper of rear side(3):Bucket sheet Body(2)Upper end is provided with the canal integral with it along digging plate(4), bucket body(2)The back side be provided with some it is vertically fixed Outer stiffener(5), the outer stiffener positioned at centre(5)Dorsal part is provided with traction and hooked(6), traction hook(6)Inside it is connected with chute traction Rope, bucket body(2)Inner surface setting have some vertically fixed interior stiffeners(7), and positioned at middle interior stiffener (7)Lower section is provided with tabular and digs block(8);Concrete hopper(3)Including frame-shaped casing and the bottom plate positioned at its bottom(9), bottom plate (9)Front end be hinged with frame-shaped casing, bottom plate(9)Rear end be provided with left and right distribution latch(10), set on frame-shaped casing Have and latch(10)The pin-and-hole of cooperation.
CN201720563449.8U 2017-05-19 2017-05-19 Dam slope U-shaped drainage ditch in earth dam downstream excavates and lining cutting device Expired - Fee Related CN206693165U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720563449.8U CN206693165U (en) 2017-05-19 2017-05-19 Dam slope U-shaped drainage ditch in earth dam downstream excavates and lining cutting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720563449.8U CN206693165U (en) 2017-05-19 2017-05-19 Dam slope U-shaped drainage ditch in earth dam downstream excavates and lining cutting device

Publications (1)

Publication Number Publication Date
CN206693165U true CN206693165U (en) 2017-12-01

Family

ID=60448455

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720563449.8U Expired - Fee Related CN206693165U (en) 2017-05-19 2017-05-19 Dam slope U-shaped drainage ditch in earth dam downstream excavates and lining cutting device

Country Status (1)

Country Link
CN (1) CN206693165U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106958230A (en) * 2017-05-19 2017-07-18 山西省水利建筑工程局 Dam slope U-shaped drainage ditch in earth dam downstream is excavated and lining cutting device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106958230A (en) * 2017-05-19 2017-07-18 山西省水利建筑工程局 Dam slope U-shaped drainage ditch in earth dam downstream is excavated and lining cutting device

Similar Documents

Publication Publication Date Title
US3595411A (en) Roller attachments to hydraulic backhoe
CN105970900A (en) Offshore wind turbine gravity type foundation installation seabed treatment process
CN103334450B (en) Construction method of pile precast slab retaining wall with drainage ditch
CN101787701B (en) Construction method for supporting pine pile in elevator shaft foundation pit
CN107246015A (en) A kind of super-sized foundation pit subregion adds inner supporting structure and construction method after excavating
CN108612086A (en) A kind of crack geotechnical boring cast-in-place pile construction method
CN203066134U (en) Synchronous dredging device of dredge boat
CN206693165U (en) Dam slope U-shaped drainage ditch in earth dam downstream excavates and lining cutting device
CN106958230A (en) Dam slope U-shaped drainage ditch in earth dam downstream is excavated and lining cutting device
CN103866787B (en) A kind of spacious reverse masonry method concrete cut that digs builds construction technology
CN209603214U (en) A kind of one-pass molding embankment gutter excavating device
CN206205027U (en) Supervise irrigation canals and ditches excavating gear in a kind of soil
CN207295765U (en) Tunnel engineering construction platform back structure
CN205975727U (en) Excavator
CN211900696U (en) Karst tunnel groundwater open type drainage structure
CN112144425B (en) Box culvert drainage ditch pouring method located at high water level and in sandy soil environment
CN212052139U (en) Steel reinforcement cage bamboo shoot pile in mountainous heavy hill area
CN211498995U (en) Underground continuous wall construction auxiliary device
CN206554118U (en) City integrated piping lane protects self-propelled laydown machine certainly
CN209339210U (en) Trapezoidal irrigation canals and ditches bucket device
CN219298311U (en) Drainage canal excavation device
CN214883982U (en) Excavator bucket formed by trapezoidal side ditches at one time
CN110735434A (en) Construction method for replacing traditional inner support by underground force transmission belt in long and narrow deep foundation pits
CN220768213U (en) Novel embankment side ditch excavation device
CN212656296U (en) Gully backfilling device for green construction planning of gully

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 030006 No.368 Qinxian North Street, Taiyuan City, Shanxi Province

Patentee after: SHANXI WATER CONSERVANCY CONSTRUCTION ENGINEERING BUREAU Co.,Ltd.

Address before: 030006 No.368 Qinxian North Street, Taiyuan City, Shanxi Province

Patentee before: SHANXI WATER CONSERVANCY BUILDING ENGINEERING BUREAU

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171201

CF01 Termination of patent right due to non-payment of annual fee