CN212613061U - Connecting structure of precast beam and precast slab - Google Patents

Connecting structure of precast beam and precast slab Download PDF

Info

Publication number
CN212613061U
CN212613061U CN202020959347.XU CN202020959347U CN212613061U CN 212613061 U CN212613061 U CN 212613061U CN 202020959347 U CN202020959347 U CN 202020959347U CN 212613061 U CN212613061 U CN 212613061U
Authority
CN
China
Prior art keywords
precast
water stop
precast beam
prefabricated
section bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020959347.XU
Other languages
Chinese (zh)
Inventor
罗贵加
陈文理
李剑锋
温松涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiamen Zhuoyi Construction Engineering Co Ltd
Original Assignee
Xiamen Zhuoyi Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen Zhuoyi Construction Engineering Co Ltd filed Critical Xiamen Zhuoyi Construction Engineering Co Ltd
Priority to CN202020959347.XU priority Critical patent/CN212613061U/en
Application granted granted Critical
Publication of CN212613061U publication Critical patent/CN212613061U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a connection structure of precast beam and prefabricated plate belongs to construction technical field, and it includes precast beam and prefabricated plate, the relative lateral wall of precast beam and prefabricated plate is provided with a plurality of sand grips, and is adjacent be provided with pre-buried section bar in the recess between the sand grip, pre-buried section bar the lateral wall with the lateral wall looks butt of sand grip, one side of pre-buried section bar is provided with the stagnant water strip, it has the concrete to fill between precast beam and the prefabricated plate. The utility model has the advantages of good waterproof effect.

Description

Connecting structure of precast beam and precast slab
Technical Field
The utility model belongs to the technical field of the construction, especially, relate to a connection structure of precast beam and prefabricated plate.
Background
Compared with the traditional reinforced concrete cast-in-place building, the prefabricated member of the prefabricated building can be produced in a factory and assembled on site, so that the prefabricated building can realize factory standardized production, the quality is controllable, the prefabricated building is efficient and quick, the material is saved, no waste is caused, the production site and the construction site have no environmental pollution, the advantages are obvious, and the application market accounts for more and more.
At present, in the field assembly process of prefabricated parts in an assembly type building, in order to prevent rainwater from permeating into a room from the outer side of a prefabricated external wall panel and influencing the load bearing capacity of the prefabricated external wall panel, waterproof treatment needs to be carried out on the prefabricated external wall panel.
However, the existing precast beam and precast slab are filled with waterproof material at the joint, but the waterproof effect is not obvious, which causes the problem of easy water leakage, and the water leakage maintenance cost is high and the difficulty is high.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims at providing a connection structure of precast beam and prefabricated plate with water-proof effects is good.
The above utility model discloses an above-mentioned utility model purpose can realize through following technical scheme:
the utility model provides a connection structure of precast beam and prefabricated slab, includes precast beam and prefabricated slab, the relative lateral wall of precast beam and prefabricated slab is provided with a plurality of sand grips, and is adjacent be provided with pre-buried section bar in the recess between the sand grip, pre-buried section bar's lateral wall with the lateral wall looks butt of sand grip, one side of pre-buried section bar is provided with the sealing rod, it has the concrete to fill between precast beam and the prefabricated slab.
Through adopting above-mentioned technical scheme, install prefabricated plate and precast beam in appointed position, put into corresponding recess with pre-buried section bar, then to pouring the concrete between prefabricated plate and the precast beam, treat the concrete setting back, take out pre-buried section bar, make in the sealing rod gets into the recess, when water infiltrates through the gap between prefabricated plate and the precast beam, can prolong the flow path of water through the sand grip, slow down the time of water infiltration, when water infiltration and sealing rod contact, the sealing rod meets the water collision, and the extrusion is in the concrete, block the way of rivers, play waterproof effect.
The present invention may be further configured in a preferred embodiment as: and a screw rod is arranged on one side of the embedded section bar, and a threaded hole in threaded fit with the screw rod is arranged on one side of the water stop strip.
Through adopting above-mentioned technical scheme, pulling pre-buried section bar for the sealing rod is located the concrete back, rotates pre-buried section bar, makes pre-buried section bar and sealing rod separation, simple structure, convenient operation, and the staff of being convenient for retrieves and recycles pre-buried section bar.
Furthermore, a guide fillet is arranged on one side, facing the screw rod, of the water stop strip.
Through adopting above-mentioned technical scheme, the setting of circle of leading angle can play the guide effect to be convenient for the sealing rod get into the dead slot that leaves when pre-buried section bar leaves the concrete.
Furthermore, the lateral wall of sealing rod is provided with the isolation protection film.
Through adopting above-mentioned technical scheme, the setting of isolation protection film can avoid when pouring the concrete, and the sealing rod meets water inflation and leads to the sealing rod can't get into the empty groove that the pre-buried section bar left when leaving the concrete to prevent that the sealing rod from becoming invalid.
Furthermore, the cross section of the convex strip is in an equilateral trapezoid shape, and the longer side of the convex strip is close to the precast beam.
Through adopting above-mentioned technical scheme, when the sealing rod met water inflation, the transversal equilateral trapezoid of personally submitting of sand grip can make the sealing rod can be more firm joint leave the dead slot that stays when pre-buried section bar leaves the concrete for the installation of sealing rod is more stable.
Furthermore, the opposite side walls of the convex strips are provided with water stop steel plates.
Through adopting above-mentioned technical scheme, the setting of stagnant water steel sheet, after the concrete completion watering, the infiltration that stops the water is played in the concrete to stagnant water steel sheet gomphosis, improves precast beam and precast slab connection structure's water-proof effects.
Furthermore, one side of the water stop strip, which is far away from the embedded section, is provided with a separation blade, and the cross section of the separation blade is larger than that of the water stop strip.
Through adopting above-mentioned technical scheme, when can avoiding taking pre-buried section bar out, owing to lead to taking the sealing rod out too much with too big hard, make the sealing rod can be stable install leave the dead slot that stays when concrete is left to pre-buried section bar in.
Furthermore, one side of the embedded section bar, which is far away from the water stop bar, is provided with a holding part.
Through adopting above-mentioned technical scheme, the setting of holding portion can provide the stress point for the staff pulls pre-buried section bar to be convenient for the staff to pull out pre-buried section bar from the concrete.
To sum up, the utility model discloses a following at least one useful technological effect:
the prefabricated slab and the prefabricated beam are arranged at appointed positions, the embedded section is placed in the corresponding groove, concrete is poured between the prefabricated slab and the prefabricated beam, after the concrete is condensed, the embedded section is taken out, so that the water stop strip enters the groove, when water seeps through a gap between the prefabricated slab and the prefabricated beam, the flow path of the water can be prolonged through the convex strip, the water seepage time is shortened, when the water seeps and contacts with the water stop strip, the water stop strip collides with the water and is extruded in the concrete, the path of the water flow is blocked, and the waterproof effect is achieved;
when the water stop strip expands when encountering water, the cross section of the raised line is in an equilateral trapezoid shape, so that the water stop strip can be more firmly clamped in a hollow groove left when the embedded section bar leaves concrete, and the water stop strip is more stably installed;
through the setting of stagnant water steel sheet, after the concrete accomplished the watering, the infiltration of stagnant water steel sheet gomphosis in the concrete plays and stops the infiltration of water, improves precast beam and precast slab connection structure's water-proof effects.
Drawings
FIG. 1 is an overall cross-sectional view of the present embodiment;
fig. 2 is a schematic structural view of the pre-buried profile highlighted in this embodiment.
Reference numerals: 1. prefabricating a beam; 2. prefabricating a slab; 3. a convex strip; 4. a groove; 5. pre-burying the section; 6. a water stop bar; 7. a screw; 8. a threaded hole; 9. a water stop steel plate; 10. a holding portion; 11. a baffle plate; 12. and (3) concrete.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1 and 2, for the utility model discloses a connection structure of precast beam and precast slab, including precast beam 1 and precast slab 2, integrated into one piece has a plurality of sand grips 3 on precast slab 2 and precast beam 1's the relative lateral wall, and sand grip 3 sets up along precast slab 2's direction of height, forms recess 4 between two liang of sand grips 3, has all placed pre-buried section bar 5 in every recess 4, and pre-buried section bar 5's lateral wall and sand grip 3's lateral wall looks butt, and one side of pre-buried section bar 5 is connected with waterstop 6, and it has the concrete to fill between precast beam 1 and precast slab 2.
Wherein, a screw 7 is fixed on one side of the pre-buried section bar 5, and a threaded hole 8 in threaded connection with the screw 7 is arranged on one side of the water stop bar 6. After pouring the concrete between precast beam 1 and precast slab 2, treat that the concrete is placed a period of time after, will stimulate pre-buried section bar 5 for waterstop 6 is located the concrete, then rotate pre-buried section bar 5, make pre-buried section bar 5 and waterstop 6 separation, simple structure, convenient operation, the staff of being convenient for retrieves and recycles pre-buried section bar 5.
In order to facilitate the water stop bar 6 to enter the empty groove left when the prefabricated section bar leaves the concrete, a guide fillet is arranged on one side of the water stop bar 6 facing the concrete, and the water stop bar 6 provides a guiding effect through the guide fillet, so that the water stop bar 6 is convenient to enter the empty groove left when the prefabricated section bar leaves the concrete.
Then, in order to avoid that the water stop strip 6 is expanded when meeting water and leads to the water stop strip 6 can't get into the empty groove that the precast profile left when leaving the concrete when pouring the concrete, the lateral wall cover at the water stop strip 6 is equipped with the layer and keeps apart the protection film. Avoid sealing rod 6 and water contact through keeping apart the protection film to avoid sealing rod 6 inflation grow, when packing into the prefabricated section bar with sealing rod 6 and leaving the dead slot that the concrete was left, will keep apart the protection film and tear, make sealing rod 6 play water-proof effects.
In order to stably install the water stop strip 6 in the groove 4, the cross section of the convex strip 3 is in an equilateral trapezoid shape, and the longer side of the convex strip is close to the precast beam 1. When water stop 6 meets water inflation, the transversal equilateral trapezoid of personally submitting of sand grip 3 can make in the empty groove that joint that water stop 6 can be more firm left when precast profile leaves the concrete for water stop 6's installation is more stable.
Then, water stop steel plates 9 are attached to the opposite side walls of the beads 3. Through stagnant water steel sheet 9, after the concrete accomplished the watering, stagnant water steel sheet 9 gomphosis plays the infiltration that blocks water in the concrete, improves precast beam 1 and precast slab 2 connection structure's water-proof effects.
It is worth mentioning that, in order to facilitate the staff to pull out prefabricated section bar from the concrete, be provided with the portion of holding 10 in the one side of pre-buried section bar 5 keeping away from sealing rod 6, provide the stress point for the staff pulling prefabricated section bar through the portion of holding 10 to the staff of being convenient for pulls out prefabricated section bar from the concrete.
Then, in order to avoid that the worker pulls the embedded section 5 to an excessive extent to draw out the water stop bar 6, a blocking piece 11 is arranged on one side of the water stop bar 6 far away from the prefabricated section, and the cross section of the blocking piece 11 is larger than that of the water stop bar 6.
The implementation principle of the embodiment is as follows: install prefabricated plate 2 and precast beam 1 in appointed position, put into corresponding recess 4 with pre-buried section bar 5, then to pouring concrete between prefabricated plate 2 and the precast beam 1, treat the concrete setting back, take out the prefabricated section bar, make in sealing rod 6 gets into recess 4, when water seeps in through the gap between prefabricated plate 2 and the precast beam 1, can prolong the flow path of water through sand grip 3, slow down the time of water infiltration, when water infiltration and sealing rod 6 contact, sealing rod 6 meets the water collision, and the extrusion is in the concrete, block the way of rivers, play waterproof effect.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (8)

1. A connection structure of precast beam and precast slab, includes precast beam (1) and precast slab (2), its characterized in that: the prefabricated beam is characterized in that a plurality of convex strips (3) are arranged on opposite side walls of the prefabricated beam (1) and the prefabricated plate (2), adjacent embedded sections (5) are arranged in grooves (4) between the convex strips (3), outer side walls of the embedded sections (5) are in butt joint with side walls of the convex strips (3), water stop strips (6) are arranged on one sides of the embedded sections (5), and concrete is filled between the prefabricated beam (1) and the prefabricated plate (2).
2. A coupling structure of a precast beam and a precast slab according to claim 1, wherein: one side of the embedded section bar (5) is provided with a screw rod (7), and one side of the water stop strip (6) is provided with a threaded hole (8) in threaded fit with the screw rod (7).
3. A coupling structure of a precast beam and a precast slab according to claim 2, wherein: and a guide fillet is arranged on one side of the water stop bar (6) facing the screw rod (7).
4. A coupling structure of a precast beam and a precast slab according to claim 1, wherein: and an isolation protective film is arranged on the outer side wall of the water stop strip (6).
5. A coupling structure of a precast beam and a precast slab according to claim 1, wherein: the cross section of the convex strip (3) is in an equilateral trapezoid shape, and the longer side of the convex strip is close to the precast beam (1).
6. A coupling structure of a precast beam and a precast slab according to claim 1, wherein: and water stop steel plates (9) are arranged on the opposite side walls of the convex strips (3).
7. A coupling structure of a precast beam and a precast slab according to claim 1, wherein: one side of the water stop bar (6) far away from the embedded section (5) is provided with a separation blade (11), and the cross section of the separation blade (11) is larger than that of the water stop bar (6).
8. A coupling structure of a precast beam and a precast slab according to claim 1, wherein: and a holding part (10) is arranged on one side of the embedded section bar (5) far away from the water stop bar (6).
CN202020959347.XU 2020-05-29 2020-05-29 Connecting structure of precast beam and precast slab Active CN212613061U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020959347.XU CN212613061U (en) 2020-05-29 2020-05-29 Connecting structure of precast beam and precast slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020959347.XU CN212613061U (en) 2020-05-29 2020-05-29 Connecting structure of precast beam and precast slab

Publications (1)

Publication Number Publication Date
CN212613061U true CN212613061U (en) 2021-02-26

Family

ID=74749884

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020959347.XU Active CN212613061U (en) 2020-05-29 2020-05-29 Connecting structure of precast beam and precast slab

Country Status (1)

Country Link
CN (1) CN212613061U (en)

Similar Documents

Publication Publication Date Title
CN201661086U (en) Fully-prefabricated assembled integral reinforced concrete house
CN113186985B (en) Anti-seepage treatment method for basement bottom plate construction joint
CN206888506U (en) The cast-in-place system of formwork structure and shear wall of shear wall angle node
CN109797716B (en) Anti-leakage aqueduct and construction method thereof
CN113481944B (en) Construction method of dam surface hole connection girder supporting structure
CN202689047U (en) Waterproof structure applied to construction joint in fabricated tube section of immersed tube
CN212613061U (en) Connecting structure of precast beam and precast slab
CN211080608U (en) Floor post-cast strip water stop structure
CN205954707U (en) Leading enclosed construction in basement outer wall post -cast strip
CN209989847U (en) Shear force wall post-cast strip prefabricated plate closing device
CN104818670B (en) The water proof structure of high speed railway fragments-free concrete bridge continuous concrete guidance tape system
CN213653384U (en) Fabricated concrete structure culvert gate with local anti-corrosion coating
CN216973894U (en) Integrated prefabricated floor suitable for assembled toilet
CN210263452U (en) Waterproof structure of prefabricated external wall panel window hole
CN210127554U (en) Fire-proof plugging construction structure for large-hole electric well bridge
CN109138467B (en) Water interception component and construction method thereof
CN217896911U (en) Semi-integral prefabricated caisson of micro-landing board toilet
CN214329886U (en) Prefabricated waterproof bank template structure that returns
CN217232344U (en) Prefabricated floor slab component structure of bathroom
CN214784389U (en) Water flow lane changing transition device between new and old pipelines
CN106854918B (en) The general pre-stress hollow pan tile of the flat roof superstructure of ne-leakage
CN217079098U (en) Prefabricated caisson component structure of toilet
CN217974502U (en) Basement post-cast strip retaining wall structure
CN209837789U (en) Prefabricated toilet caisson structure
CN216475644U (en) Post-cast strip closes water construction structures

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant