CN212609147U - Wind cable anchoring system of cable crane tower - Google Patents
Wind cable anchoring system of cable crane tower Download PDFInfo
- Publication number
- CN212609147U CN212609147U CN202021853581.0U CN202021853581U CN212609147U CN 212609147 U CN212609147 U CN 212609147U CN 202021853581 U CN202021853581 U CN 202021853581U CN 212609147 U CN212609147 U CN 212609147U
- Authority
- CN
- China
- Prior art keywords
- cable
- tower
- anchor
- fixed
- pulley
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000004873 anchoring Methods 0.000 title claims abstract description 23
- 238000009423 ventilation Methods 0.000 claims abstract description 18
- 229910000831 Steel Inorganic materials 0.000 claims description 11
- 239000010959 steel Substances 0.000 claims description 11
- 238000010276 construction Methods 0.000 abstract description 15
- 230000007613 environmental effect Effects 0.000 abstract description 2
- 230000005484 gravity Effects 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model relates to a cable tower wind cable anchoring system, the sidespan side of both sides cable tower sets up an anchorage respectively, and every cable tower top is provided with the anchor roof beam, is connected with back wind cable between anchorage and anchor roof beam, and the midspan of two cable towers is connected with the ventilation cable between the side, and ventilation cable one end snap-on is on the anchor roof beam at a cable tower top, and the other end is fixed through the top of the tower anchor roof beam of cable coaster with another cable tower. The utility model discloses a cable is transferred to unilateral anchor, single-ended, and construction speed is fast, has shortened and has transferred the cable time, has practiced thrift construction cost by a wide margin, receives construction site environmental restriction little, and the anchor dependable performance, can satisfy the site operation requirement.
Description
Technical Field
The utility model belongs to the technical field of the bridge construction, concretely relates to adopt cable crane to carry out anchor structure of cable tower wind cable when long span construction for the straightness adjustment of hanging down of cable tower and keep the cable tower stable.
Background
The construction of the large-span steel structure bridge usually adopts a cable crane to hoist the steel truss. The cable of cable loop wheel machine operation supports on the cable tower of both sides, and cable tower height is higher, will bear great wind-load, can exert great horizontal pulling force to the cable tower when cable loop wheel machine operation simultaneously, for keeping the stability and the straightness that hangs down of cable tower, needs effectively to fix the cable tower with cable wind cable. Usually, wind cables are arranged on two sides of a cable tower, one end of each wind cable is anchored on the cable tower, and the other end of each wind cable is anchored on a ground anchor. The ground anchor generally adopts gravity type anchorage, because bulky, area is big, and cable tower both sides all set up the anchorage and not only can receive the construction site limitation sometimes, and construction cost is high moreover, and the accent cable is long for a time, influences the construction progress.
SUMMERY OF THE UTILITY MODEL
The utility model aims at the above-mentioned problem, a system and construction method that cable crane cable tower wind cable carries out the anchor is provided, can anchor the wind cable fast, adjust the cable tower straightness that hangs down to reduce construction cost as far as possible.
The utility model discloses a cable hanger cable tower wind cable anchoring system, the sidespan side of both sides cable tower sets up an anchorage respectively, and every cable tower top is provided with the anchor roof beam, is connected with back wind cable, its characterized in that between anchorage and anchor roof beam: and one end of the ventilation cable is directly fixed on the anchoring beam at the top of one cable tower, and the other end of the ventilation cable is fixed with the tower top anchoring beam of the other cable tower through a cable pulley.
The utility model discloses set up the anchorage in the side of striding of every cable tower, the side of striding of two cable towers adopts the ventilation cable taut, saves two anchorages than current anchor system, and the advantage is unilateral anchor, single-ended accent cable, and construction speed is fast, has shortened and has transferred the cable time, has practiced thrift construction cost by a wide margin, receives construction site environmental constraint little, and the anchor dependable performance, and the security is high, can satisfy the site operation requirement.
Drawings
Fig. 1 is an elevation view of the anchoring system of the present invention;
fig. 2 is a plan view of the anchoring system of the present invention;
FIG. 3 is a schematic view of the configuration of the vent cable connected to the overhead anchor beam by the cable block;
fig. 4 is a schematic structural view of the direct connection of the ventilation cable and the tower top anchoring beam.
Detailed Description
As shown in fig. 1 and 2, the utility model discloses a cable tower wind cable anchor system sets up an anchorage 2 respectively in the sidespan side of both sides cable tower 1, and every cable tower top is provided with anchor beam 3, and anchorage 2 is connected with back wind cable 4 with anchor beam 3 within a definite time, is connected with between the midspan side of two cable towers and leads to wind cable 5, lead to wind cable 5 one end snap-on the anchor beam at a cable tower top, the other end is fixed through the top of the tower anchor beam of cable coaster 6 with another cable tower.
The rear wind cable is made of steel stranded wires, and the ventilation cable is made of steel wire ropes.
As shown in fig. 3 and 4, the cable adjusting pulley 6 comprises a first fixed pulley 61 and a second fixed pulley 62 connected through a connecting plate, and a first movable pulley 63 and a second movable pulley 64 connected through a connecting plate, wherein the first fixed pulley 61 is connected with the anchoring beam 3 at the top of the cable tower through a fixed steel cable 65, and the second fixed pulley 62 is connected with the second movable pulley 64 through a cable adjusting steel cable 66; one end of the ventilation cable 5 directly fixed with the anchoring beam is fixed by a rope clamp 7 after passing around the tower top anchoring beam, and the other end of the ventilation cable 5 is fixed by the rope clamp 7 after passing around a first movable pulley 63 of the cable adjusting pulley.
The concrete construction method of the wind cable anchoring system of the cable crane tower comprises the following steps:
(1) anchors 2 are respectively arranged on the side span sides of cable towers 1 at two sides, an anchoring beam 3 is arranged at the top of each cable tower, a rear wind cable 4 is connected between the anchor 2 and the anchoring beam 3 at the top of the tower, one end of the rear wind cable 4 is permanently anchored with the anchor, and the other end of the rear wind cable is temporarily anchored with the anchoring beam at the top of the tower;
(2) connecting a cable adjusting pulley 6 on an anchoring beam at the top of a cable tower, wherein the cable adjusting pulley 6 comprises a first fixed pulley 61 and a second fixed pulley 62 which are connected through a connecting plate, and a first movable pulley 62 and a second movable pulley 64 which are connected through the connecting plate, the first fixed pulley is connected with the anchoring beam at the top of the cable tower through a fixed steel wire rope 65, and the second fixed pulley is connected with the second movable pulley through a cable adjusting steel wire rope 66;
(3) one end of the ventilation cable 5 is wound around the anchoring beam at the top of the other cable tower and is fixed by a rope clamp 7; the other end of the ventilation cable is pulled to the top of a cable tower provided with a cable adjusting pulley 6 by a traction cable, and the ventilation cable is fixed by a rope clamp 7 after passing through a first movable pulley 63 of the cable adjusting pulley;
(4) synchronously tensioning the rear wind cables 3 of the two cable towers by adopting a hydraulic jack at the tops of the two cable towers 1, and adjusting the distance between the second fixed pulley 62 and the second movable pulley 64 by tightening a cable adjusting steel wire rope 66 on the cable adjusting pulley 6 while tensioning the rear wind cables, thereby tensioning the ventilation cable 5; and adjusting the verticality of the wind cable and the ventilation cable to meet the design requirement, enabling the two sides of the cable tower to be stressed consistently, and keeping balance and verticality.
Claims (2)
1. The utility model provides a cable crane cable tower wind cable anchor system, the sidespan side of both sides cable tower sets up an anchorage respectively, and every cable tower top is provided with the anchor roof beam, is connected with back wind cable, its characterized in that between anchorage and anchor roof beam: and one end of the ventilation cable is directly fixed on the anchoring beam at the top of one cable tower, and the other end of the ventilation cable is fixed with the tower top anchoring beam of the other cable tower through a cable pulley.
2. The cable hoist tower cable anchoring system of claim 1, wherein: the cable adjusting pulley comprises a first fixed pulley and a second fixed pulley which are connected through a connecting plate, and a first movable pulley and a second movable pulley which are connected through a connecting plate, wherein the first fixed pulley is connected with an anchoring beam at the top of the cable tower through a fixed steel wire rope, and the second fixed pulley is connected with the second movable pulley through a cable adjusting steel wire rope; one end of the ventilation cable, which is directly fixed with the anchor beam, winds around the tower top anchor beam and then is fixed by a rope clamp, and the other end of the ventilation cable winds around the first movable pulley of the cable adjusting pulley and then is fixed by the rope clamp.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021853581.0U CN212609147U (en) | 2020-08-30 | 2020-08-30 | Wind cable anchoring system of cable crane tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021853581.0U CN212609147U (en) | 2020-08-30 | 2020-08-30 | Wind cable anchoring system of cable crane tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212609147U true CN212609147U (en) | 2021-02-26 |
Family
ID=74705703
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021853581.0U Expired - Fee Related CN212609147U (en) | 2020-08-30 | 2020-08-30 | Wind cable anchoring system of cable crane tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212609147U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111924720A (en) * | 2020-08-30 | 2020-11-13 | 中交第四公路工程局有限公司 | Wind cable anchoring system of cable crane tower and construction method |
-
2020
- 2020-08-30 CN CN202021853581.0U patent/CN212609147U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111924720A (en) * | 2020-08-30 | 2020-11-13 | 中交第四公路工程局有限公司 | Wind cable anchoring system of cable crane tower and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111924720A (en) | Wind cable anchoring system of cable crane tower and construction method | |
CN102444086B (en) | Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge | |
CN100543235C (en) | The method and system of erecting steel trusses by stay cable auxiliary complete cantilever | |
CN202090286U (en) | Traction system suitable for self-anchored type double cable plane suspension bridge | |
CN101224856A (en) | Long-span load-carrying cable lifting machine and mounting method therefor | |
CN104060540B (en) | A kind of cable of space cable suspension bridge false stull and construction method for hanging thereof | |
CN201172597Y (en) | Wide span heavy-load cable hoisting machine | |
CN106758767B (en) | A kind of suspension bridge segmented cat road and its construction method | |
CN201106155Y (en) | Inclined guy cable auxiliary full cantaliver crane trussed steel beam device | |
CN212670303U (en) | Stay cable beam end mounting structure | |
CN220283391U (en) | Cable hanging system | |
CN212609147U (en) | Wind cable anchoring system of cable crane tower | |
CN110939069B (en) | Construction method of suspension bridge catwalk | |
CN212025936U (en) | Equipment for mounting continuous steel strand stay cable at tower end of cable-stayed bridge | |
CN201330377Y (en) | Suspension rope towing device | |
CN209779465U (en) | main tower erects cable-stay bridge's string cable construction system that changes | |
CN114104989B (en) | Cable buckle integrated tower wind cable system of large-span cable crane and construction method | |
CN209128888U (en) | Anchor head traction device after a kind of suspension bridge dorsal funciculus | |
CN107673239B (en) | Cable crane tower self-balancing system and installation method thereof | |
CN106968178B (en) | Construction method for main beam of cable-stayed suspension bridge | |
CN212358014U (en) | Single-span cable hoisting device for hoisting suspension bridge girder | |
CN211498489U (en) | Mountain area highway bridge bent cap prestressed steel strand stretch-draw construction operation rack | |
CN219508376U (en) | Device for erecting super-long and super-heavy stay cable | |
CN109113354B (en) | Whole-course cableway type windproof real-time pulled cable wind system and construction method thereof | |
CN209619862U (en) | A kind of hoist cable arch rib installation support frame big suitable for environmental restrictions |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210226 |