CN212535022U CN202020415599.6U CN202020415599U CN212535022U CN 212535022 U CN212535022 U CN 212535022U CN 202020415599 U CN202020415599 U CN 202020415599U CN 212535022 U CN212535022 U CN 212535022U
Authority
CN
China
Prior art keywords
building engineering
fixedly connected
house building
hanging basket
cable wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020415599.6U
Other languages
Chinese (zh)
Inventor
刘军安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020415599.6U priority Critical patent/CN212535022U/en
Application granted granted Critical
Publication of CN212535022U publication Critical patent/CN212535022U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a house building engineering's construction string basket relates to house building engineering equipment technical field, specifically is a house building engineering's construction string basket, including the hydraulic stem, the upper surface of hydraulic stem is provided with servo motor, servo motor's output fixedly connected with band pulley, the fixed surface of band pulley is connected with main cable wire, the one end fixedly connected with material case of main cable wire, the surperficial swing joint of main cable wire has the pulley, the lower surface of hydraulic stem has automatic take-up reel and support frame from a left side to the right side swing joint in proper order, the inside fixedly connected with pressure spring of support frame. This house building engineering's construction string basket makes this a construction string basket for house building engineering's security performance improve greatly, and vice cable wire makes the material case receive the common pulling force of three direction under the user state to improve the stability of material case, increased the security of during operation.

Description

Construction hanging basket for house building engineering
Technical Field
The utility model relates to a housing construction engineering equipment technical field specifically is a housing construction engineering's construction string basket.
Background
The construction hanging basket is a main device for segmented construction of a prestressed concrete continuous beam, a T-shaped steel structure and a cantilever beam, and can be called as a hanging basket in building construction, wherein the hanging basket is a construction machine for high-altitude operation in construction engineering, acts on curtain wall installation and outer wall cleaning, the hanging basket is a novel high-altitude operation device capable of replacing a traditional scaffold, can reduce labor intensity and improve work efficiency and can be repeatedly used, the use of the construction hanging basket gradually becomes a trend, the hanging basket is widely accepted in high-altitude operation such as outer wall construction, curtain wall installation, heat preservation construction, outer wall maintenance and cleaning of high-rise multi-storey buildings, and can be used for operation of projects such as large tank bodies, bridges, dams and the like, but the existing construction hanging basket has the problems of single width distance and poor safety in the construction process.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a house building engineering's construction string basket has solved the problem that proposes in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a house building engineering's construction hanging basket, includes the hydraulic stem, the upper surface of hydraulic stem is provided with servo motor, servo motor's output fixedly connected with band pulley, the fixed surface of band pulley is connected with main cable wire, the one end fixedly connected with material case of main cable wire, the surperficial swing joint of main cable wire has the pulley, the lower surface of hydraulic stem has automatic take-up reel and support frame from a left side to the right side swing joint in proper order, the inside fixedly connected with compression spring of support frame.
Optionally, the bottom end of the pressure spring is fixedly connected with a transmission rod.
Optionally, one end of the transmission rod is fixedly connected with a protection pad.
Optionally, the surface of the automatic take-up reel is fixedly connected with an auxiliary steel cable.
Optionally, one end of the auxiliary steel cable is fixedly connected with the material tank.
(III) advantageous effects
The utility model provides a house building engineering's construction string basket possesses following beneficial effect:
this house building engineering's construction string basket makes this a safety performance who is used for house building engineering's construction string basket improve greatly, and vice cable wire makes the material case under the user state, receives the common pulling force of three direction to improved the stability of material case, increased the security of during operation, compression spring through self the compression that resets avoids the material case to rise and strikes the hydraulic stem at the excessive speed, leads to the hydraulic stem to receive to shake the back aversion.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is an enlarged schematic structural diagram of a point a in fig. 1 according to the present invention.
In the figure: 1. a hydraulic lever; 2. a servo motor; 3. a pulley; 4. a main wire rope; 5. a material box; 6. a pulley; 7. an automatic take-up reel; 8. a support frame; 9. a pressure spring; 10. a transmission rod; 11. a protective pad; 12. a secondary wire rope.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 2, the present invention provides a technical solution: a construction hanging basket for housing construction engineering comprises a hydraulic rod 1, wherein a servo motor 2 is arranged on the upper surface of the hydraulic rod 1, a belt wheel 3 is fixedly connected to the output end of the servo motor 2, a main steel cable 4 is fixedly connected to the surface of the belt wheel 3, a material box 5 is fixedly connected to one end of the main steel cable 4, a pulley 6 is movably connected to the surface of the main steel cable 4, an automatic winding disc 7 and a support frame 8 are sequentially and movably connected to the lower surface of the hydraulic rod 1 from left to right, a pressure spring 9 is fixedly connected to the inside of the support frame 8, a transmission rod 10 is fixedly connected to the bottom end of the pressure spring 9, a protection pad 11 is fixedly connected to one end of the transmission rod 10, an auxiliary steel cable 12 is fixedly connected to the surface of the automatic winding disc 7, one end of the auxiliary steel cable 12 is fixedly connected to the material box 5, the main steel cable 4 is driven by the servo motor 2 to, the auxiliary steel cable 12 enables the material box 5 to be subjected to common pulling force in three directions in a use state, so that the stability of the material box 5 is improved, the safety of work is improved, the material box 5 touches the protective pad 11 after rising and is conducted to the pressure spring 9 through the transmission rod 10, the pressure spring 9 is reset and compressed through the pressure spring, the phenomenon that the material box 5 rises to quickly impact the hydraulic rod 1 is avoided, and the hydraulic rod 1 is enabled to shift after being vibrated.
The electrical components presented in the document are all electrically connected with an external master controller and 220V mains, and the master controller can be a conventional known device controlled by a computer or the like.
To sum up, this house building engineering's construction string basket, during the use, make this a construction string basket for house building engineering's security performance improve greatly, vice cable wire 12 makes material case 5 receive the common pulling force of three direction under the user state to improve material case 5's stability, increased the security of during operation, compression spring 9 through self that resets avoids material case 5 to rise and strikes hydraulic stem 1 at the excessive speed, leads to hydraulic stem 1 to receive to shake the back and shifts.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. The utility model provides a house building engineering's construction hanging basket, includes hydraulic stem (1), its characterized in that: the upper surface of hydraulic stem (1) is provided with servo motor (2), output fixedly connected with band pulley (3) of servo motor (2), the fixed surface of band pulley (3) is connected with main cable wire (4), the one end fixedly connected with material case (5) of main cable wire (4), the surperficial swing joint of main cable wire (4) has pulley (6), the lower surface of hydraulic stem (1) has automatic take-up reel (7) and support frame (8) from a left side to the right side swing joint in proper order, the inside fixedly connected with pressure spring (9) of support frame (8).
2. The construction hanging basket for house building engineering according to claim 1, characterized in that: the bottom end of the pressure spring (9) is fixedly connected with a transmission rod (10).
3. The construction hanging basket for house building engineering according to claim 2, characterized in that: one end of the transmission rod (10) is fixedly connected with a protective pad (11).
4. The construction hanging basket for house building engineering according to claim 1, characterized in that: and the surface of the automatic winding roll (7) is fixedly connected with an auxiliary steel cable (12).
5. The construction hanging basket for house building engineering according to claim 4, characterized in that: one end of the auxiliary steel cable (12) is fixedly connected with the material box (5).
CN202020415599.6U 2020-03-27 2020-03-27 Construction hanging basket for house building engineering Expired - Fee Related CN212535022U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020415599.6U CN212535022U (en) 2020-03-27 2020-03-27 Construction hanging basket for house building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020415599.6U CN212535022U (en) 2020-03-27 2020-03-27 Construction hanging basket for house building engineering

Publications (1)

Publication Number Publication Date
CN212535022U true CN212535022U (en) 2021-02-12

Family

ID=74523730

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020415599.6U Expired - Fee Related CN212535022U (en) 2020-03-27 2020-03-27 Construction hanging basket for house building engineering

Country Status (1)

Country Link
CN (1) CN212535022U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112482725A (en) * 2021-02-07 2021-03-12 烟台工程职业技术学院(烟台市技师学院) Scaffold capable of transporting materials

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112482725A (en) * 2021-02-07 2021-03-12 烟台工程职业技术学院(烟台市技师学院) Scaffold capable of transporting materials

Similar Documents

Publication Publication Date Title
CN212535022U (en) Construction hanging basket for house building engineering
CN111071910A (en) A balancing unit for tower crane hoist and mount material
CN220376298U (en) Hanging basket lifting device
CN218581149U (en) Building construction lift platform
CN205314523U (en) Hanging basket for building
CN216583666U (en) Construction elevator of downward installation
CN213062880U (en) Building construction safety device
CN213923842U (en) Wallboard lifting device in assembled
CN205932998U (en) Building tower crane with safe hanging flower basket
CN214498332U (en) Novel construction hanging basket
CN211007605U (en) Construction hanging basket
CN210855056U (en) Novel movable arm crane for hoisting steel wire rope winding system
CN210140398U (en) Multifunctional suspension equipment for mechanical engineering
CN216737493U (en) Winch for construction engineering hanging basket
CN208980193U (en) The curtain wall hanging apparatus of anticollision
CN213015293U (en) Scaffold frame that building engineering used
CN214141316U (en) ALC partition wall installation device
CN206844619U (en) A kind of safety-type building hanging basket
CN215564339U (en) Hanging basket with oblique climbing orientation device
CN211078293U (en) High-altitude hoisting prefabricated part symmetrical equipment
CN215626387U (en) Outer wall repairing and hoisting device
CN218598224U (en) Portable movable underground cavern crown anchor cable lowering device
CN211733663U (en) Building hoisting device
CN218264859U (en) Hanging basket structure for building exterior wall decoration
CN216840525U (en) Safety device for architectural decoration

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210212