CN205314523U - Hanging basket for building - Google Patents

Hanging basket for building Download PDF

Info

Publication number
CN205314523U
CN205314523U CN201521018857.2U CN201521018857U CN205314523U CN 205314523 U CN205314523 U CN 205314523U CN 201521018857 U CN201521018857 U CN 201521018857U CN 205314523 U CN205314523 U CN 205314523U
Authority
CN
China
Prior art keywords
ratchet
rotating shaft
suspension platform
hanging basket
motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521018857.2U
Other languages
Chinese (zh)
Inventor
刘红秀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China University of Science and Technology
Original Assignee
North China University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China University of Science and Technology filed Critical North China University of Science and Technology
Priority to CN201521018857.2U priority Critical patent/CN205314523U/en
Application granted granted Critical
Publication of CN205314523U publication Critical patent/CN205314523U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

本实用新型的目的在于提供一种建筑用吊篮,包括悬吊平台,所述悬吊平台的两个侧壁上均安装有固定架,且两个固定架高度相同,所述固定架上配有动滑轮,所述悬吊平台上安装有箱体,所述箱体内通过固定杆安装有棘轮机构,所述棘轮机构包括棘轮、棘爪和摇杆,所述棘轮的两端上安装有转轴a和转轴b,所述转轴a的另一端安装有定滑轮,所述转轴b的另一端连接电机的输出端,所述电机通过支撑杆安装在箱体内,所述箱体的内部安装有控制平台、逆变器和蓄电池,通过安装有电机、定滑轮和棘轮机构,有效的解决了发生停电时,装置停留在半空中无法复位的问题,并且通过安装有棘轮机构,在不使用定滑轮时起到卡位作用。

The purpose of this utility model is to provide a hanging basket for construction, which includes a suspension platform. Fixing frames are installed on the two side walls of the suspension platform, and the heights of the two fixing frames are the same. There is a moving pulley, a box is installed on the suspension platform, and a ratchet mechanism is installed in the box through a fixed rod. The ratchet mechanism includes a ratchet, a pawl and a rocker, and a rotating shaft a is installed on both ends of the ratchet. and the rotating shaft b, the other end of the rotating shaft a is equipped with a fixed pulley, the other end of the rotating shaft b is connected to the output end of the motor, the motor is installed in the box through a support rod, and a control platform is installed inside the box , inverter and battery, through the installation of motor, fixed pulley and ratchet mechanism, it effectively solves the problem that the device stays in mid-air and cannot be reset when a power failure occurs, and through the installation of ratchet mechanism, it can be activated when the fixed pulley is not used. to the card position.

Description

一种建筑用吊篮A hanging basket for construction

技术领域 technical field

本实用新型涉及建筑技术领域,具体为一种建筑用吊篮。 The utility model relates to the technical field of construction, in particular to a hanging basket for construction.

背景技术 Background technique

吊篮是建筑工程高空作业的建筑机械,作用于幕墙安装,外墙清洗。吊篮是一种能够替代传统脚手架,可减轻劳动强度,提高工作效率,并能够重复使用的新型高处作业设备。建筑吊篮的使用已经逐渐成为一种趋势,在高层多层高建筑的外墙施工、幕墙安装、保温施工和维修清洗外墙等高出作业中得到广泛认可,同时可用于大型罐体、桥梁和大坝等工程的作业。使用本产品,可免搭脚手架。使施工成本降低,施工费用为传统脚手架的28%,而且工作效率大幅提高。吊篮操作灵活,移位容易,方便实用,安全可靠。建筑用吊篮普遍用于高空作业,因为其工作地点在高空,所以如果发生停电,就会导致装置停留在半空中无法复位,吊篮内人员无法撤离,现有吊篮工作时控制移动的方式分为人力控制和电力控制两种,但人力控制移动慢,电力控制能耗大。 The hanging basket is a construction machine used for high-altitude operations in construction projects. It is used for curtain wall installation and exterior wall cleaning. The hanging basket is a new type of high-altitude operation equipment that can replace traditional scaffolding, reduce labor intensity, improve work efficiency, and can be reused. The use of building hanging baskets has gradually become a trend, and it has been widely recognized in high-rise operations such as exterior wall construction, curtain wall installation, thermal insulation construction, maintenance and cleaning of exterior walls of high-rise multi-storey buildings, and can be used for large tanks, bridges, etc. and dams and other projects. Using this product can avoid scaffolding. The construction cost is reduced, the construction cost is 28% of the traditional scaffolding, and the work efficiency is greatly improved. The hanging basket is flexible in operation, easy to shift, convenient and practical, safe and reliable. Construction hanging baskets are generally used for high-altitude operations, because their working places are high-altitude, so if a power failure occurs, the device will stay in mid-air and cannot be reset, and the people in the hanging basket cannot be evacuated. The existing way of controlling movement when the hanging basket is working It is divided into two types: human control and electric control, but human control moves slowly, and electric control consumes a lot of energy.

实用新型内容 Utility model content

本实用新型的目的在于提供一种建筑用吊篮,以解决上述背景技术中提出的问题。 The purpose of this utility model is to provide a hanging basket for construction to solve the problems raised in the above-mentioned background technology.

为实现上述目的,本实用新型提供如下技术方案:包括悬吊平台,所述悬吊平台的两个侧壁上均安装有固定架,且两个固定架高度相同,所述固定架上配有动滑轮,所述悬吊平台上安装有太阳能电池板,所述悬吊平台上安装有箱体,所述箱体内通过固定杆安装有棘轮机构,所述棘轮机构包括棘轮、棘爪和摇杆,所述棘爪的一端活动安装在摇杆上,所述棘爪的另一端活动卡接于棘轮的锯齿,且棘爪和棘轮配合使用,所述棘轮的两端上安装有转轴a和转轴b,所述转轴a的另一端安装有定滑轮,所述转轴b的另一端连接电机的输出端的转子,所述电机通过支撑杆安装在箱体内,所述箱体的内部分别安装有控制平台、逆变器和蓄电池,所述电机的输入端连接控制平台的输出端,所述控制平台通过电导体连接到逆变器,所述逆变器分别通过电导体连接到蓄电池和太阳能电池板。 In order to achieve the above purpose, the utility model provides the following technical solutions: including a suspension platform, the two side walls of the suspension platform are equipped with fixing frames, and the height of the two fixing frames is the same, and the fixing frames are equipped with A movable pulley, a solar panel is installed on the suspended platform, a box is installed on the suspended platform, a ratchet mechanism is installed in the box through a fixed rod, and the ratchet mechanism includes a ratchet, a pawl and a rocking bar. One end of the ratchet is movably mounted on the rocker, and the other end of the ratchet is movably engaged with the sawtooth of the ratchet, and the ratchet and the ratchet are used together, and the two ends of the ratchet are equipped with a rotating shaft a and a rotating shaft b , the other end of the rotating shaft a is equipped with a fixed pulley, the other end of the rotating shaft b is connected to the rotor at the output end of the motor, the motor is installed in the box through a support rod, and the inside of the box is respectively equipped with a control platform, Inverter and storage battery, the input end of the motor is connected to the output end of the control platform, the control platform is connected to the inverter through electrical conductors, and the inverter is respectively connected to the storage battery and the solar panel through electrical conductors.

优选的,所述悬吊平台的底板上方铺有防滑层。 Preferably, an anti-slip layer is laid on the bottom plate of the suspension platform.

优选的,所述悬吊平台的表面涂有防锈层。 Preferably, the surface of the suspension platform is coated with an anti-rust layer.

优选的,所述箱体内安装有漏电断路器。 Preferably, an earth leakage circuit breaker is installed in the box.

与现有技术相比,本实用新型的有益效果是:该建筑用吊篮通过安装有电机、定滑轮和棘轮机构,有效的解决了发生停电时,装置停留在半空中无法复位的问题,并且通过安装有棘轮机构,使定滑轮只能朝一个方向旋转,并且在不使用定滑轮时起到卡位作用,该吊篮的电力由太阳能转变,大大地节省了能源,通过安装漏电断路器,使设备漏电时及时的自动切断电源,有效的解决了漏电问题,通过将悬吊平台的表面喷涂防锈层,减慢设备的损耗,增加了设备的使用年限。 Compared with the prior art, the utility model has the beneficial effects that: the building hanging basket is equipped with a motor, a fixed pulley and a ratchet mechanism, which effectively solves the problem that the device stays in midair and cannot be reset when a power failure occurs, and By installing a ratchet mechanism, the fixed pulley can only rotate in one direction, and it can be locked when the fixed pulley is not used. The power of the hanging basket is converted by solar energy, which greatly saves energy. By installing a leakage circuit breaker, When the equipment leaks electricity, it can automatically cut off the power supply in time, which effectively solves the leakage problem. By spraying the surface of the suspension platform with an anti-rust layer, the loss of equipment is slowed down and the service life of the equipment is increased.

附图说明 Description of drawings

图1为本实用新型结构示意图; Fig. 1 is a structural representation of the utility model;

图2为本实用新型的箱体内部结构示意图; Fig. 2 is a schematic diagram of the internal structure of the cabinet of the present utility model;

图3为本实用新型的棘轮结构的左视图; Fig. 3 is the left view of the ratchet structure of the present utility model;

图中:1、悬吊平台,2、固定架,3、动滑轮,4、箱体,5、棘轮机构,51、棘轮,52、棘爪,53、摇杆,6、控制平台,7、逆变器,8、蓄电池,9、转轴a,10、转轴b,11、定滑轮,12、电机,13、太阳能电池板,14、防滑层,15、防锈层,16、漏电断路器。 Among the figure: 1, suspension platform, 2, fixed frame, 3, movable pulley, 4, box, 5, ratchet mechanism, 51, ratchet, 52, ratchet, 53, rocking bar, 6, control platform, 7, reverse Transformer, 8, battery, 9, rotating shaft a, 10, rotating shaft b, 11, fixed pulley, 12, motor, 13, solar panel, 14, anti-skid layer, 15, rust-proof layer, 16, earth leakage circuit breaker.

具体实施方式 detailed description

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。 The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

请参阅图1-3,本实用新型提供一种技术方案:一种建筑用吊篮,包括悬吊平台1,所述悬吊平台1的两个侧壁上均安装有固定架2,且两个固定架2高度相同,所述固定架2上配有动滑轮3,所述悬吊平台1上安装有太阳能电池板13,所述悬吊平台1上安装有箱体4,所述箱体4内通过固定杆安装有棘轮机构5,所述棘轮机构包括棘轮51、棘爪52和摇杆53,所述棘爪52的一端活动安装在摇杆53上,所述棘爪52的另一端活动卡接于棘轮51的锯齿,且棘爪52和棘轮51配合使用,所述棘轮51的两端上安装有转轴a9和转轴b10,所述转轴a9的另一端安装有定滑轮11,所述转轴b10的另一端连接电机12的输出端的转子,所述电机12通过支撑杆安装在箱体4内,所述箱体4的内部分别安装有控制平台6、逆变器7和蓄电池8,所述电机12的输入端连接控制平台6的输出端,所述控制平台6通过电导体连接到逆变器7,所述逆变器7分别通过电导体连接到蓄电池8和太阳能电池板13,通过安装定滑轮12,有效的解决了发生停电时,装置停留在半空中无法复位的问题,该吊篮的电力由太阳能转变,大大地节省了能源。 Please refer to Figures 1-3, the utility model provides a technical solution: a hanging basket for construction, including a suspension platform 1, fixed frames 2 are installed on the two side walls of the suspension platform 1, and the two The two fixed frames 2 have the same height, and the fixed frame 2 is equipped with a movable pulley 3, and a solar panel 13 is installed on the suspended platform 1, and a box 4 is installed on the suspended platform 1, and the box 4 A ratchet mechanism 5 is installed inside through a fixed rod, and the ratchet mechanism includes a ratchet 51, a ratchet 52 and a rocking bar 53. One end of the ratchet 52 is movably mounted on the rocker 53, and the other end of the ratchet 52 is movable. Clamped on the sawtooth of the ratchet 51, and the ratchet 52 is used in conjunction with the ratchet 51. The two ends of the ratchet 51 are equipped with a rotating shaft a9 and a rotating shaft b10, and the other end of the rotating shaft a9 is equipped with a fixed pulley 11. The rotating shaft The other end of b10 is connected to the rotor of the output end of the motor 12, the motor 12 is installed in the box body 4 through the support rod, and the inside of the box body 4 is respectively equipped with a control platform 6, an inverter 7 and a storage battery 8, and the The input end of the motor 12 is connected to the output end of the control platform 6, and the control platform 6 is connected to the inverter 7 through an electric conductor, and the inverter 7 is respectively connected to the storage battery 8 and the solar panel 13 through an electric conductor. The fixed pulley 12 effectively solves the problem that the device stays in mid-air and cannot be reset when a power failure occurs. The electric power of the hanging basket is transformed by solar energy, which greatly saves energy.

所述悬吊平台1的底板上方铺有防滑层14,通过铺设有防滑层14,使工人在高空作业时更加安全。 An anti-slip layer 14 is laid above the bottom plate of the suspension platform 1, and the anti-slip layer 14 is laid to make workers safer when working at heights.

所述悬吊平台1的表面涂有防锈层15,防止因金属腐蚀造成不必要的安全隐患,同时也增大了使用年限。 The surface of the suspension platform 1 is coated with an anti-rust layer 15 to prevent unnecessary safety hazards caused by metal corrosion and increase the service life at the same time.

所述箱体4内安装有漏电断路器16,通过安装漏电断路器16,使设备漏电时及时的自动切断电源,有效的解决了漏电问题。 A leakage circuit breaker 16 is installed in the box body 4. By installing the leakage circuit breaker 16, the power supply can be automatically cut off in time when the equipment leaks electricity, which effectively solves the leakage problem.

工作原理:正常使用时,设备通过定滑轮12的绳索来控制移动,当停电时,会导致设备无法通过动滑轮3将设备拉至复位处,这时由备用的定滑轮12将设备拉至复位处。 Working principle: In normal use, the device moves through the rope of the fixed pulley 12. When the power is off, the device cannot be pulled to the reset position through the movable pulley 3. At this time, the spare fixed pulley 12 pulls the device to the reset position. .

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。 Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes and modifications can be made to these embodiments without departing from the principle and spirit of the present invention , replacements and modifications, the scope of the present utility model is defined by the appended claims and their equivalents.

Claims (4)

1. a hanging basket for building, comprise suspension platform (1), it is characterized in that: two sidewalls of described suspension platform (1) are all provided with anchor (2), and two anchors (2) are highly identical, described anchor (2) is furnished with travelling block (3), described suspension platform (1) is provided with solar panel (13), described suspension platform (1) is provided with casing (4), by fixed link, ratchet mechanism (5) is installed in described casing (4), described ratchet mechanism comprises ratchet (51), ratchet (52) and rocking bar (53), one end of described ratchet (52) is movably arranged on rocking bar (53), the other end active card of described ratchet (52) is connected to the sawtooth of ratchet (51), and ratchet (52) and ratchet (51) with the use of, the two ends of described ratchet (51) are provided with rotating shaft a (9) and rotating shaft b (10), the other end of described rotating shaft a (9) is provided with fixed pulley (11), the other end of described rotating shaft b (10) connects the rotor of the output terminal of motor (12), described motor (12) is arranged in casing (4) by support bar, the inside of described casing (4) is separately installed with parametric controller (6), invertor (7) and store battery (8), the output terminal of input terminus connection control platform (6) of described motor (12), described parametric controller (6) is connected to invertor (7) by electric conductor, described invertor (7) is connected to store battery (8) and solar panel (13) respectively by electric conductor.
2. one according to claim 1 hanging basket for building, it is characterised in that: it is covered with non-skid finish (14) above the base plate of described suspension platform (1).
3. one according to claim 1 hanging basket for building, it is characterised in that: the surface of described suspension platform (1) scribbles rustproof layer (15).
4. one according to claim 1 hanging basket for building, it is characterised in that: residual current circuit breaker (16) is installed in described casing (4).
CN201521018857.2U 2015-12-07 2015-12-07 Hanging basket for building Expired - Fee Related CN205314523U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521018857.2U CN205314523U (en) 2015-12-07 2015-12-07 Hanging basket for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521018857.2U CN205314523U (en) 2015-12-07 2015-12-07 Hanging basket for building

Publications (1)

Publication Number Publication Date
CN205314523U true CN205314523U (en) 2016-06-15

Family

ID=56315325

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521018857.2U Expired - Fee Related CN205314523U (en) 2015-12-07 2015-12-07 Hanging basket for building

Country Status (1)

Country Link
CN (1) CN205314523U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528953A (en) * 2019-09-02 2019-12-03 湖南永爱生物科技有限公司 A kind of communications tower of anti-climbing solar energy
CN113027109A (en) * 2021-03-25 2021-06-25 安徽建筑大学城市建设学院 Hanging basket lifting device for building exterior wall reconstruction
CN114508228A (en) * 2022-03-25 2022-05-17 山东金隆节能设备科技有限公司 Hanging basket system and application thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528953A (en) * 2019-09-02 2019-12-03 湖南永爱生物科技有限公司 A kind of communications tower of anti-climbing solar energy
CN113027109A (en) * 2021-03-25 2021-06-25 安徽建筑大学城市建设学院 Hanging basket lifting device for building exterior wall reconstruction
CN114508228A (en) * 2022-03-25 2022-05-17 山东金隆节能设备科技有限公司 Hanging basket system and application thereof

Similar Documents

Publication Publication Date Title
CN205314523U (en) Hanging basket for building
CN103086278A (en) Sliding type gantry crane and application thereof
CN202026034U (en) Overhead wire insulation wire lifter for 10-kilovolt circuit
CN103434914A (en) Trolley conductor energy storage type construction elevator
CN202575753U (en) Slidable gantry crane
CN208226492U (en) A kind of plugging cable bridge
CN106927335B (en) Sliding contact line automatic cleaning system for circularly operating construction elevator and construction method
CN202524282U (en) Device for preventing frequency converter from power shaking
CN107840255A (en) A double-arm safety tower crane
CN201234081Y (en) 220kV bus support column porcelain bottle inspection rack
CN103500966B (en) 66kv disconnecting switch is to pipe bus charged disconnecting lead-in wire method
CN204549923U (en) The mobile mast-up of a kind of chemical equipment overhaul
CN203445481U (en) 66kV isolating switch set replacement special spreader
CN106517044A (en) Special later guarantee vehicle based on power supply
CN206712336U (en) Shaft tower cable platform work protective cradle
CN104242813A (en) Power supply structure for direct-current transmission line on-line monitoring device
CN115636355A (en) Maintenance device and method applied to power supply equipment
CN203827239U (en) Super capacitor energy-storing elevator discharge control protection circuit
CN207150030U (en) Fixture for the only cross-arm shaft tower replacing insulator under electrified of 110kV straight lines
CN208500293U (en) A kind of electric power overhaul Liftable type hardware frame
CN202651689U (en) Optical cable line construction spanning frame
CN203339566U (en) A limited track cabin for live working
CN221747798U (en) Foot pedal ladder for high-altitude operation
CN204243604U (en) A tool for hanging the phase sequence sign of the busbar tower with electricity
CN201247925Y (en) Safety hanging stair for maintaining cable terminal

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160615

Termination date: 20161207