CN218581149U - Building construction lift platform - Google Patents
Building construction lift platform Download PDFInfo
- Publication number
- CN218581149U CN218581149U CN202222568927.8U CN202222568927U CN218581149U CN 218581149 U CN218581149 U CN 218581149U CN 202222568927 U CN202222568927 U CN 202222568927U CN 218581149 U CN218581149 U CN 218581149U
- Authority
- CN
- China
- Prior art keywords
- pulley
- steel wire
- fixedly connected
- bearing frame
- hanging basket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009435 building construction Methods 0.000 title abstract description 11
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 50
- 239000010959 steel Substances 0.000 claims abstract description 50
- 238000010276 construction Methods 0.000 claims abstract description 30
- 238000004804 winding Methods 0.000 claims abstract description 5
- 230000001174 ascending effect Effects 0.000 claims 1
- 206010040007 Sense of oppression Diseases 0.000 abstract 1
- 238000000034 method Methods 0.000 abstract 1
- 239000011435 rock Substances 0.000 description 3
- 239000000463 material Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B50/00—Energy efficient technologies in elevators, escalators and moving walkways, e.g. energy saving or recuperation technologies
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
The utility model relates to a building construction lifting platform, which comprises a bearing frame, a hanging basket and a coupler; the rear end of the cross beam of the bearing frame is provided with a balancing weight, and the middle of the cross beam of the bearing frame is fixedly connected with a motor; the output end of the motor is fixedly connected with a lifting steel wire cable through a winding roll, and the front end of the bearing frame is fixedly connected with a first pulley; through the cooperation between the fixed pulley pipe of construction hanging flower basket lift platform and the fixed steel wire hawser, when construction lift platform when going up and down and the in-process of workman construction operation, when the platform received the unbalanced power oppression in each aspect, thereby hanging flower basket lift platform's movable roller and fixed roller will come from the unbalanced power in each aspect and convey to the fixed steel wire hawser that passes on thereby make the platform keep relative stability, improve construction operation's efficiency and safety guarantee.
Description
Technical Field
The utility model belongs to high altitude building construction field, specific building construction lift platform that says so.
Background
At present, the steel pipe scaffold fully covered with the outer wall is mainly used for the construction operation of the high-altitude outer wall, but the construction speed is relatively low, the cost is relatively high, so that the construction operation is carried out by using the lifting construction lifting platform construction hanging basket on certain construction operation.
When installing current construction lift platform, at first install the bearing frame to the balcony, install the balancing weight at bearing frame crossbeam rear end, install the motor in the middle of the crossbeam, crossbeam front end installation pulley is good with motor output take-up reel and is connect the lift steel wire to be connected to the hanging flower basket crossbeam, connects bearing frame crossbeam and hanging flower basket with the insurance steel wire again.
Because current traditional high altitude construction lift platform only has functions such as lift and insurance, nevertheless can receive strong wind weather or other unstable factors influence when lift and construction and lead to the platform to rock everywhere, easily cause lifting steel wire and pulley to break away from, and then directly influence workman's construction operation's safety.
Therefore, a building construction lifting platform is provided for solving the problems.
SUMMERY OF THE UTILITY MODEL
In order to make up the defects of the prior art and solve the problems, the building construction lifting platform is provided.
The utility model provides a technical scheme that its technical problem adopted is: the utility model relates to a building construction lifting platform, which comprises a bearing frame, a hanging basket and a coupler; the rear end of the cross beam of the bearing frame is provided with a balancing weight, and the middle of the cross beam of the bearing frame is fixedly connected with a motor; the output end of the motor is fixedly connected with a lifting steel wire cable through a winding roll, and the front end of the bearing frame is fixedly connected with a first pulley; the lifting steel wire cables are connected to the first pulley in a sliding manner; the bottom end of the lifting steel wire cable is fixedly connected to the hanging basket, and the front end of the cross beam of the bearing frame is fixedly connected with a cable fixing lock; the fixed steel wire cable penetrates through the cable fixing lock; the fixed steel wire cable penetrates through the side wall of the hanging basket; the coupler is provided with a counter weight below in a corresponding way, and the front end of the coupler is connected with a fixed steel wire cable.
Preferably, a third pulley is fixedly connected to the side wall of the hanging basket; and a second pulley is movably connected to the position, close to the third pulley, of the upward side wall of the hanging basket.
Preferably, a J-shaped sliding groove is formed in the hanging basket corresponding to the second pulley; the second pulley is connected in the J-shaped sliding groove in a sliding mode through a central shaft.
Preferably, the middle part of the fixed steel wire cable vertically penetrates between the second pulley and the third pulley.
Preferably, a pulley fixing lock is externally connected to the J-shaped sliding groove; screw holes are formed in the pulley fixing lock corresponding to the second pulley and the third pulley.
Preferably, the screw is externally and internally connected with a screw, and the second pulley penetrates through the pulley through the screw to be fixedly locked and fixedly connected to the hanging basket.
The beneficial effects of the utility model reside in that:
through the matching between the fixed pulley pipe and the fixed steel wire cable of the construction hanging basket lifting platform, when the construction lifting platform is lifted and is subjected to unbalanced force in all aspects during the construction operation of workers, the movable roller and the fixed roller of the hanging basket lifting platform transmit the unbalanced force in all aspects to the passing fixed steel wire cable, so that the platform is kept relatively stable, and the efficiency and the safety guarantee of the construction operation are improved; when rising construction lift platform lift hawser and go wrong, hanging flower basket pulley and fixed steel wire hawser also can guarantee the platform about steady cooperation steel wire hawser and motor guarantee the safe lift rescue of platform, the assembly pulley of hanging flower basket platform adopts double pulley can also reduce the wearing and tearing to wire rope moreover.
Drawings
For the sake of better clarity, the technical solutions in the embodiments of the present invention will be described more clearly and completely, and the drawings of the technology in the embodiments of the present invention will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without any creative effort. In the drawings:
fig. 1 is a perspective view of the present invention;
fig. 2 is a rear view of the present invention;
fig. 3 is a cross-sectional view of the middle side of the present invention;
FIG. 4 is an enlarged view of the point A of the present invention;
FIG. 5 is an enlarged view of the point B of the present invention;
illustration of the drawings: 1. a bearing frame; 3. a motor; 4. fixing a steel wire cable; 5. a lifting steel wire cable; 6. a hanging basket; 7. a counterweight block; 8. a coupler; 9. a cable fixing lock; 11. a first pulley; 13. a second pulley; 14. a third pulley; 15. the pulley is fixed and locked.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person skilled in the art without making creative efforts belong to the protection scope of the present invention.
Specific examples are given below.
Referring to fig. 1-5, a lifting platform for building construction includes a bearing frame 1, a hanging basket 6 and a coupler 8; the rear end of the cross beam of the bearing frame 1 is provided with a balancing weight 7, and the middle of the cross beam of the bearing frame 1 is fixedly connected with a motor 3; the output end of the motor 3 is fixedly connected with a lifting steel wire cable 5 through a winding roll, and the front end of the bearing frame 1 is fixedly connected with a first pulley 11; the lifting steel wire cables 5 are all connected to the first pulley 11 in a sliding manner; the bottom end of the lifting steel wire cable 5 is fixedly connected to the hanging basket 6, and the front end of the cross beam of the bearing frame 1 is fixedly connected with a cable fixing lock 9; the fixed steel wire cable 4 penetrates through the cable fixing lock 9; the fixed steel wire cable 4 penetrates through the side wall of the hanging basket 6; a balancing weight 7 is correspondingly arranged below the coupler 8, and the front end of the coupler 8 is connected with a fixed steel wire cable 4.
When the lifting platform works, the traditional high-altitude building construction lifting platform only has the functions of lifting, safety and the like, but can be affected by strong wind weather or other unstable factors during lifting and construction to cause the platform to shake around, so that the lifting steel wires are easy to be separated from the pulleys, and the safety of construction operation of workers is directly affected; in the device, 3 output ends of the motor through the rigid coupling on the bearing frame 1 slowly rotate the take-up reel to put down the lifting steel wire cable rope 5, the hanging basket 6 begins to slowly descend, when the hanging basket 6 rocks, because the fixed steel wire cable rope 4 runs through with the hanging basket 6, utilize the fixed steel wire cable rope 4 promptly, can be under the influence of strong wind weather or other unstable factors, keep the hanging basket 6 difficult to produce rocking in the left and right directions, and then avoided lifting steel wire cable rope 5 to break away from with a pulley 11, the security of high altitude construction is improved.
Preferably, a third pulley 14 is fixedly connected to the side wall of the hanging basket 6; the side wall of the hanging basket 6 is movably connected with a second pulley 13 at a position close to a third pulley 14.
When the hanging basket is in operation, the second pulley 13 and the third pulley 14 are close to each other, so that the shaking of the hanging basket 6 is absorbed by the steel wire cable fixed in the middle of the pulleys.
Preferably, a J-shaped sliding groove is formed in the hanging basket 6 corresponding to the second pulley 13; the second pulley 13 is connected in the J-shaped sliding groove in a sliding manner through a central shaft.
In operation, the second pulley 13 is pushed into the "J" groove, which brings the second pulley 13 into close proximity with the third pulley 14, thereby trapping the fixed wire cable 4 between the second pulley 13 and the third pulley 14.
Preferably, the middle part of the fixed steel wire cable 4 vertically penetrates between the second pulley 13 and the third pulley 14.
When the hanging basket 6 shakes, the second pulley 13 and the third pulley 14 can release force on the fixed steel wire cable, so that the working stability of the platform of the hanging basket 6 is improved; wherein the coupler 8 is prior art and will not be described herein.
Preferably, a pulley fixing lock 15 is externally connected with the J-shaped sliding groove; and the pulley fixing lock 15 is provided with screw holes corresponding to the second pulley 13 and the third pulley 14.
When the device works, the second pulley 13 is pushed to the bottom of the J-shaped groove after the fixed steel wire cable 4 is connected, and then the pulley fixing lock 15 is locked with the second pulley 13 and the third pulley 14.
Preferably, the screw hole is internally and externally connected with a screw, and the second pulley 13 is fixedly connected to the hanging basket 6 through a pulley fixing lock 15 penetrated by the screw.
When the lifting device works, the fixed lock, the pulley screw hole and the hanging basket 6 are locked by the screws in the air, and the pulley can not be dislocated and the like when the lifting device is lifted and rocked.
The working principle is as follows:
because the existing traditional high-altitude building construction lifting platform only has the functions of lifting, safety and the like, the lifting platform can shake around due to the influence of strong wind weather or other unstable factors during lifting and construction, the lifting steel wire is easy to be separated from the pulley, and the safety of construction operation of workers is directly influenced; in the device, a winding roll is slowly rotated by the output end of a motor 3 fixedly connected to a bearing frame 1 to put down a lifting steel wire cable 5, a hanging basket 6 begins to slowly descend, when the hanging basket 6 shakes, the hanging basket 6 is kept not to shake in the left and right directions easily due to the fact that a fixed steel wire cable 4 is penetrated through the hanging basket 6, namely the fixed steel wire cable 4 is utilized, and under the influence of strong wind weather or other unstable factors, the lifting steel wire cable 5 is prevented from being separated from a first pulley 11, and safety of high-altitude operation is improved;
through fixing the fixed lock 9 of 4 upper end connecting cable ropes of fixed steel wire hawser, utilize the fixed lock 9 of hawser to fix No. two pulleys 13, cooperation lower extreme connects subaerial coupler 8, makes fixed steel wire hawser 4 run through perpendicularly No. two and No. three supports, and No. two pulleys 13 and No. three pulleys 14 can let out the power on fixed steel wire hawser when hanging flower basket 6 rocks, have improved the job stabilization nature of hanging flower basket 6 platform.
In the description herein, references to the description of "one embodiment," "an example," "a specific example," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention.
Claims (6)
1. The utility model provides a construction lift platform which characterized in that: comprises a bearing frame (1), a hanging basket (6) and a coupler (8); the rear end of a cross beam of the bearing frame (1) is provided with a balancing weight (7), and the middle of the cross beam of the bearing frame (1) is fixedly connected with a motor (3); the output end of the motor (3) is fixedly connected with a lifting steel wire cable (5) through a winding roll, and the front end of the bearing frame (1) is fixedly connected with a first pulley (11); the lifting steel wire cables (5) are connected to the first pulley (11) in a sliding manner; the bottom end of the lifting steel wire cable (5) is fixedly connected to the hanging basket (6), and the front end of the cross beam of the bearing frame (1) is fixedly connected with a cable fixing lock (9); a balancing weight (7) is correspondingly arranged below the coupler (8), and the front end of the coupler (8) is connected with and fixed with a steel wire cable (4); the fixed steel wire cable (4) penetrates through the cable fixing lock (9); the fixed steel wire cable (4) penetrates through the side wall of the hanging basket (6).
2. The construction lifting platform of claim 1, wherein: a third pulley (14) is fixedly connected to the side wall of the hanging basket (6); the side wall of the hanging basket (6) is movably connected with a second pulley (13) at a position close to the third pulley (14) in an ascending way.
3. The construction lifting platform of claim 2, wherein: a J-shaped sliding groove is formed in the hanging basket (6) corresponding to the second pulley (13); the second pulley (13) is connected in the J-shaped sliding groove in a sliding manner through a central shaft.
4. The construction lifting platform of claim 3, wherein: the middle part of the fixed steel wire cable (4) vertically penetrates between the second pulley (13) and the third pulley (14).
5. The construction lifting platform of claim 4, wherein: a pulley fixing lock (15) is externally connected with the J-shaped sliding groove; and screw holes are formed in the pulley fixing lock (15) corresponding to the second pulley (13) and the third pulley (14).
6. The construction lifting platform of claim 5, wherein: and a screw is externally connected in the screw hole, and the second pulley (13) is fixedly connected on the hanging basket (6) through a pulley fixing lock (15) penetrated by the screw.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202222568927.8U CN218581149U (en) | 2022-09-26 | 2022-09-26 | Building construction lift platform |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202222568927.8U CN218581149U (en) | 2022-09-26 | 2022-09-26 | Building construction lift platform |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN218581149U true CN218581149U (en) | 2023-03-07 |
Family
ID=85366424
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202222568927.8U Expired - Fee Related CN218581149U (en) | 2022-09-26 | 2022-09-26 | Building construction lift platform |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN218581149U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116290718A (en) * | 2023-03-17 | 2023-06-23 | 马菊翠 | Construction safety hanging basket and control method thereof |
-
2022
- 2022-09-26 CN CN202222568927.8U patent/CN218581149U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116290718A (en) * | 2023-03-17 | 2023-06-23 | 马菊翠 | Construction safety hanging basket and control method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101734560B (en) | High-altitude dismantling method of inside-climbing tower crane for towering structure construction | |
| CN101898728B (en) | Auxiliary cargo boom for crane | |
| CN111847267B (en) | A cantilever crane | |
| CN214879488U (en) | Tubular pile overturning and hoisting device | |
| CN218581149U (en) | Building construction lift platform | |
| CN204624961U (en) | Automatic decoupling spreader for high-altitude hoisting of steel column beams | |
| CN210620079U (en) | Crane with high safety performance | |
| CN212612035U (en) | Height lifting device of bridge girder erection machine | |
| CN217232672U (en) | Safe type aluminum alloy hanging flower basket for construction | |
| CN220283436U (en) | Hoisting mechanism, wind power device thereof and full-automatic tower crane | |
| CN209835486U (en) | High-rise hoisting equipment | |
| CN213011671U (en) | Lightweight simple vertical transportation equipment | |
| CN215626385U (en) | Curtain wall unit hoisting system | |
| CN218539120U (en) | High altitude curtain wall glass hoist device | |
| CN206487129U (en) | Safety hanging cradle for industrial premises Construction of Steel Structure | |
| CN209925151U (en) | Impeller assembly butt joint auxiliary device of wind generating set | |
| CN204281093U (en) | A kind of bont improving the lifting velocity that attached arm hangs and cylinder hangs | |
| CN211733774U (en) | Liftable suspension mechanism for high-altitude operation hanging basket | |
| CN113401809A (en) | Curtain wall unit body hoisting system | |
| CN216105498U (en) | Elevator shaft with special hanging basket | |
| CN207312978U (en) | A kind of Super High boom-type tower crane hand-held C-type beam and climb band device | |
| CN215479320U (en) | High material hoisting device for construction of security | |
| CN212198271U (en) | Moment self-adaptive device of cantilever crane | |
| CN220056261U (en) | Wind-force early warning stabilizing system of electric hanging basket | |
| CN222976518U (en) | Telegraph pole convenient to climb |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230307 |