CN212535009U - Operation stores pylon for civil engineering - Google Patents

Operation stores pylon for civil engineering Download PDF

Info

Publication number
CN212535009U
CN212535009U CN202020384549.6U CN202020384549U CN212535009U CN 212535009 U CN212535009 U CN 212535009U CN 202020384549 U CN202020384549 U CN 202020384549U CN 212535009 U CN212535009 U CN 212535009U
Authority
CN
China
Prior art keywords
block
connecting block
civil engineering
rod
screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020384549.6U
Other languages
Chinese (zh)
Inventor
王文仲
王磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liu Yuexing
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020384549.6U priority Critical patent/CN212535009U/en
Application granted granted Critical
Publication of CN212535009U publication Critical patent/CN212535009U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model belongs to the technical field of the operation stores pylon, specifically be an operation stores pylon is used in civil engineering, including locating piece and telescopic link, the locating piece right-hand member is provided with the reference column, first screw has been seted up to the locating piece left end, the locating piece left end is provided with the horizontal pole, the horizontal pole right-hand member is provided with first connecting block, the external screw thread has been seted up in the first connecting block outside, first connecting block and first screw screwed connection. The utility model discloses a first screw on the locating piece and the first connecting block screwed connection of horizontal pole right-hand member to be provided with the fixed block on the horizontal pole, through the second connecting block screwed connection of second screw and telescopic link upper end has all been seted up at both ends about the fixed block, can effectually increase the link plate and reciprocate length, the operator of being convenient for places article, be favorable to more practical use civil engineering to use the operation stores pylon, comparatively practical is fit for extensively promoting and using.

Description

Operation stores pylon for civil engineering
Technical Field
The utility model relates to an operation stores pylon technical field specifically is an operation stores pylon is used in civil engineering.
Background
At present, in a multi-storey industrial factory building mainly based on a concrete shear wall and a floor slab structure, an outer wall construction platform is mostly erected by scaffold steel pipes, the construction method consumes more manpower, materials and working hours, and the site safety civilized construction also consumes more manpower and material resources. With the progress of the construction method, the hanging rack hung on the outer wall is a trend as a construction platform, and how to realize the safety, high efficiency and low cost of the hanging rack is the key of whether the hanging rack is used or not.
In the process of implementing the invention, the inventor finds that at least the following problems in the prior art are not solved: however, in civil engineering construction in the existing market, the operation is often required on the outer wall surface, a large number of construction tools are required to be carried, and common workers can only carry on the back, so that the burden is large.
Therefore, we provide an operation stores pylon for civil engineering, through the first screw on the locating piece and the first connecting block screwed connection of horizontal pole right-hand member to be provided with the fixed block on the horizontal pole, through the second connecting block screwed connection of second screw and telescopic link upper end has all been seted up at both ends about the fixed block, can effectually increase the link plate length of reciprocating, the operator of being convenient for places article, is favorable to more practical use operation stores pylon for civil engineering.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an operation stores pylon is used in civil engineering has solved the problem that proposes in the background art.
In order to achieve the above object, the utility model provides a following technical scheme: an operation hanging rack for civil construction comprises a positioning block and a telescopic rod;
the right end of the positioning block is provided with a positioning column, the left end of the positioning block is provided with a first screw hole, the left end of the positioning block is provided with a cross rod, the right end of the cross rod is provided with a first connecting block, the outer side of the first connecting block is provided with an external thread, the first connecting block is in threaded connection with the first screw hole, the cross rod is provided with a fixed block, and the middle parts of the upper end and the lower end of the fixed block are provided with second screw holes;
the telescopic link upper end is provided with the second connecting block, the external screw thread has been seted up to second connecting block lateral wall, the second connecting block respectively with two sets of second screw spiral connections, the welding of telescopic link lower extreme has the link plate.
As an optimal implementation mode of the utility model, the piston hole has all been seted up to the link plate lower extreme left and right sides, and is two sets of equal swing joint has the peg on the piston hole.
As an optimal implementation manner of the utility model, the dog has all been welded at peg upper end both ends, the dog cross-sectional area is far greater than the piston bore cross-sectional area.
As an optimal implementation mode of the utility model, the spout has been seted up in the middle of the lateral wall before the horizontal pole, swing joint has the slider in the spout, lateral wall and fixed block back lateral wall weld each other before the slider.
As an optimal implementation manner of the present invention, the bottom end of the upper rod of the telescopic rod is provided with the spring buckle, the lower rod of the telescopic rod is provided with the positioning hole from top to bottom, and corresponds to the spring buckle.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a first screw on the locating piece and the first connecting block screwed connection of horizontal pole right-hand member to be provided with the fixed block on the horizontal pole, through the second connecting block screwed connection of second screw and telescopic link upper end has all been seted up at both ends about the fixed block, can effectually increase the link plate and reciprocate length, the operator of being convenient for places article, be favorable to more practical use civil engineering to use the operation stores pylon.
2. The utility model discloses a be equipped with the peg, the piston hole has all been seted up in the link plate lower extreme left and right sides, and equal swing joint has the peg on two sets of piston holes to both ends all are provided with the dog bigger than the peg about the peg, can make the peg can all hang article no matter at horizontal pole lower extreme or upper end, are favorable to more practical use civil engineering to be used the operation stores pylon.
3. The utility model discloses a be equipped with the slider, seted up the spout in the middle of the lateral wall before the horizontal pole, and swing joint has the slider in the spout, can control in the spout through the slider, can effectually increase the length that removes about the link plate, be favorable to more practical use civil engineering construction with the operation stores pylon.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
fig. 1 is a schematic view of the overall structure of the operation hanger for civil engineering of the present invention;
fig. 2 is the utility model discloses civil engineering is with fixed knot of operation stores pylon constructs the schematic diagram.
In the figure: 1. positioning blocks; 2. a positioning column; 3. a first screw hole; 4. a cross bar; 5. a first connection block; 6. a fixed block; 7. a second screw hole; 8. a telescopic rod; 9. a second connecting block; 10. hanging the plate; 11. A piston bore; 12. a hanging rod; 13. a chute; 14. a slider; 15. positioning holes; 16. a spring buckle; 17. and a stop block.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
In the description of the present invention, it should be noted that, unless explicitly stated or limited otherwise, the terms "mounted," "connected" and "disposed" are to be interpreted broadly, and may be, for example, fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed; the utility model discloses in provide only supply the reference with the model of electrical apparatus. For those skilled in the art, different types of electrical appliances with the same function can be replaced according to actual use conditions, and for those skilled in the art, the specific meaning of the above terms in the present invention can be understood in specific situations.
Referring to fig. 1-2, the present invention provides a technical solution: an operation hanging rack for civil construction comprises a positioning block 1 and a telescopic rod 8;
the right end of the positioning block 1 is provided with a positioning column 2, the left end of the positioning block 1 is provided with a first screw hole 3, the left end of the positioning block 1 is provided with a cross rod 4, the right end of the cross rod 4 is provided with a first connecting block 5, the outer side of the first connecting block 5 is provided with an external thread, the first connecting block 5 is in screw connection with the first screw hole 3, the cross rod 4 is provided with a fixed block 6, and the middle of the upper end and the lower end of the fixed block 6 are both provided with a second screw hole 7;
8 upper ends of telescopic link are provided with second connecting block 9, the external screw thread has been seted up to second connecting block 9 lateral wall, second connecting block 9 respectively with 7 screwed connection of two sets of second screw, the welding of 8 lower extremes of telescopic link has link plate 10.
In this embodiment, please refer to fig. 1 and 2, the first screw hole 33 on the positioning block 1 is in threaded connection with the first connecting block 5 at the right end of the cross rod 4, the fixing block 6 is arranged on the cross rod 4, and the second screw hole 7 and the second connecting block 9 at the upper end of the telescopic rod 8 are both arranged at the upper end and the lower end of the fixing block 6, so that the vertical movement length of the hanging plate 10 can be effectively increased, an operator can place articles conveniently, and the operation hanging rack for civil engineering construction is more practical.
Piston holes 11 are formed in the left side and the right side of the lower end of the hanging plate 10, and hanging rods 12 are movably connected to the two groups of piston holes 11.
The two ends of the upper end of the hanging rod 12 are both welded with stoppers 17, and the cross-sectional area of each stopper 17 is far larger than that of the piston hole 11.
In this embodiment, referring to fig. 1 and 2, by providing the hanging rod 12, the piston holes 11 are formed on the left and right sides of the lower end of the hanging plate 12, the hanging rods 12 are movably connected to the two sets of piston holes 11, and the stoppers 17 larger than the piston holes 11 are disposed at the upper and lower ends of the hanging rod 12, so that the hanging rod 12 can hang objects at the lower end or the upper end of the cross rod 4, which is beneficial to more practical use of the operation hanging rack for civil engineering construction.
The middle of the front side wall of the cross rod 4 is provided with a sliding groove 13, a sliding block 14 is movably connected in the sliding groove 13, and the front side wall of the sliding block 14 is welded with the rear side wall of the fixed block 6.
The bottom end of the upper rod of the telescopic rod 8 is provided with a spring buckle 16, and the lower rod of the telescopic rod 8 is provided with a positioning hole from top to bottom and corresponds to the spring buckle 16.
In this embodiment, please refer to fig. 1 and 2, a sliding chute 13 is formed in the middle of the front side wall of the cross bar 4 by arranging a sliding block 14, the sliding block 14 is movably connected in the sliding chute 13, and the sliding block 14 can move left and right in the sliding chute 13, so that the left and right movement length of the hanging plate can be effectively increased, and the hanging plate is more practical to use for civil engineering.
When an operation stores pylon is used in civil engineering, earlier the device removes appointed place through the user, and fix fixed block 6 on appointed ground through the hammer, and make reference column 2 get into in the wall completely, then at 5 threaded connection of first connecting block through first screw 3 and horizontal pole 4 right-hand member, and second connecting block 9 and the second screw 7 threaded connection of fixed block 6 lower extreme at telescopic link 8 upper end, it can to pass through peg 12 at the link plate 10 at the heavy object that will place at last (if need with article when moving about, only need through telescopic link 8 drive slider 14 remove about spout 13 can, and move up slowly along with the construction, can through 7 threaded connection with the second connecting block 9 of telescopic link 8 and the second screw of fixed block 6 upper end can).
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (5)

1. The utility model provides an operation stores pylon for civil engineering which characterized in that: comprises a positioning block (1) and a telescopic rod (8);
the right end of the positioning block (1) is provided with a positioning column (2), the left end of the positioning block (1) is provided with a first screw hole (3), the left end of the positioning block (1) is provided with a cross rod (4), the right end of the cross rod (4) is provided with a first connecting block (5), the outer side of the first connecting block (5) is provided with an external thread, the first connecting block (5) is spirally connected with the first screw hole (3), the cross rod (4) is provided with a fixed block (6), and the middle parts of the upper end and the lower end of the fixed block (6) are respectively provided with a second screw hole (7);
the telescopic link (8) upper end is provided with second connecting block (9), the external screw thread has been seted up to second connecting block (9) lateral wall, second connecting block (9) respectively with two sets of second screw (7) threaded connection, telescopic link (8) lower extreme welding has link plate (10).
2. The operational hanger for civil engineering according to claim 1, wherein: piston holes (11) are formed in the left side and the right side of the lower end of the hanging plate (10), and hanging rods (12) are movably connected to the two groups of piston holes (11).
3. The operational hanger for civil engineering according to claim 2, wherein: both ends of the upper end of the hanging rod (12) are welded with check blocks (17), and the cross sectional area of each check block (17) is far larger than that of the piston hole (11).
4. The operational hanger for civil engineering according to claim 1, wherein: the middle of the front side wall of the cross rod (4) is provided with a sliding groove (13), a sliding block (14) is movably connected in the sliding groove (13), and the front side wall of the sliding block (14) is welded with the rear side wall of the fixed block (6).
5. The operational hanger for civil engineering according to claim 1, wherein: the telescopic rod is characterized in that a spring buckle (16) is arranged at the bottom end of the upper rod of the telescopic rod (8), and the lower rod of the telescopic rod (8) is provided with positioning holes from top to bottom and corresponds to the spring buckle (16) mutually.
CN202020384549.6U 2020-03-24 2020-03-24 Operation stores pylon for civil engineering Active CN212535009U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020384549.6U CN212535009U (en) 2020-03-24 2020-03-24 Operation stores pylon for civil engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020384549.6U CN212535009U (en) 2020-03-24 2020-03-24 Operation stores pylon for civil engineering

Publications (1)

Publication Number Publication Date
CN212535009U true CN212535009U (en) 2021-02-12

Family

ID=74524430

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020384549.6U Active CN212535009U (en) 2020-03-24 2020-03-24 Operation stores pylon for civil engineering

Country Status (1)

Country Link
CN (1) CN212535009U (en)

Similar Documents

Publication Publication Date Title
CN206143633U (en) Ligature platform of simple and easy high mound steel reinforcement cage
CN212535009U (en) Operation stores pylon for civil engineering
CN206844320U (en) A kind of prefabricated reinforced concrete column beam-to-column joint structure
CN106284852A (en) A kind of reinforcing bar connector of plane position adjustable
CN203603515U (en) Tool type protective guard
CN206693661U (en) A kind of novel carbon fiber cloth beam reinforcement structure
CN202936996U (en) Wall connecting piece for scaffold
CN204418658U (en) Integrated hydraulic creeping formwork periphery protection unit
CN104032836A (en) Tendon connecting joint for connecting buckling-restrained steel plate wall with concrete frame
CN208618838U (en) A kind of safety device
CN214424210U (en) Foundation ditch construction support for railway engineering
CN205976580U (en) Guardrail bar instrument anchor structure is prevented to superelevation layer steel construction
CN202055509U (en) Upright rod installation structure of directly-inserted scaffold
CN201794305U (en) Supporting device for elevator shaft mold
CN204782018U (en) Constructional steel constructs conveying frame
CN205036079U (en) Hang hand hydraulic pressure floor braced system of column type
CN102979458A (en) Rock wall beam oblique surface smooth blasting punching guiding and positioning device
CN210262920U (en) Multi-functional water conservancy slope protection net
CN209799025U (en) Steel construction that stability is high
CN202731261U (en) Movable scaffold with adjustable height
CN201268918Y (en) Concealed column vertical reinforced bar with frame structure
CN218990858U (en) Portable hanging flower basket device
CN206418747U (en) A kind of construction coherent-wall scaffolding cantilever arrangement
CN207109614U (en) A kind of Hanging Basket for building
CN104481127A (en) Rigidly-connected and high-strength die plate supporting system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230601

Address after: No. 39, Xiabaiyanggou Village, Laopo Town, Junan County, Linyi City, Shandong Province, 276600

Patentee after: Liu Yuexing

Address before: 510000 Zhonghai Xiangyuan International Hotel, Haizhu District, Guangzhou City, Guangdong Province

Patentee before: Wang Lei