CN212507516U - Device that non-excavation construction both ends work hole was strutted is exclusively used in - Google Patents

Device that non-excavation construction both ends work hole was strutted is exclusively used in Download PDF

Info

Publication number
CN212507516U
CN212507516U CN202020705379.7U CN202020705379U CN212507516U CN 212507516 U CN212507516 U CN 212507516U CN 202020705379 U CN202020705379 U CN 202020705379U CN 212507516 U CN212507516 U CN 212507516U
Authority
CN
China
Prior art keywords
steel sheet
sheet piles
vertical
rod
row
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020705379.7U
Other languages
Chinese (zh)
Inventor
倪宾
张健
徐永华
邱峰
王健荣
张晓静
朱永刚
唐晓东
周一之
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jiayou Municipal Construction Co ltd
Original Assignee
Shanghai Jiayou Municipal Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiayou Municipal Construction Co ltd filed Critical Shanghai Jiayou Municipal Construction Co ltd
Priority to CN202020705379.7U priority Critical patent/CN212507516U/en
Application granted granted Critical
Publication of CN212507516U publication Critical patent/CN212507516U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model provides a device special for supporting working pits at two ends of trenchless construction, which comprises a positioner, a cross brace component, two rows of steel sheet piles and vertical strakes, wherein one end of each steel sheet pile is provided with a sharp corner part, the steel sheet piles are symmetrically arranged, each row of steel sheet piles are equidistant and parallel, the outer side of each row of steel sheet piles is provided with one vertical strake, the two rows of steel sheet piles are connected through the cross brace component, and the cross brace component is of a telescopic structure; the utility model has the advantages that: the device mainly comprises three parts, namely steel sheet piles, vertical column plates and a cross bracing assembly, wherein two rows of steel sheet piles are fixed with the two vertical column plates, the stress area of the transverse supporting force of the vertical column plates is increased, the width of the cross bracing assembly is adjustable, and the steel sheet piles and the vertical column plates are guaranteed to have enough strength to support a soil body; the installation is quick simple and convenient, does not influence the usage space of the ware instrument of expanding back, has sufficient intensity and rigidity, makes constructor personal safety obtain effective guarantee.

Description

Device that non-excavation construction both ends work hole was strutted is exclusively used in
Technical Field
The utility model relates to a capital construction field especially relates to a device that non-excavation construction both ends work hole was strutted is exclusively used in.
Background
In the laying construction of the electric MPP protection tube in the horizontal directional drilling technology, a working pit needs to be arranged in front of a working well, when the depth of the working pit exceeds 1.5m, the working pit needs to be supported according to relevant standards of capital construction of a power company, and the conventional horizontal directional drilling has irregular working pit supporting modes and great potential safety hazards.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a device that non-excavation construction both ends work hole was strutted is exclusively used in.
In order to realize the purpose, the technical scheme of the utility model is that:
the device special for supporting the working pits at two ends of non-excavation construction is characterized by comprising a positioner, a cross brace component, steel sheet piles and vertical row plates, wherein the steel sheet piles are distributed in two rows, one end of each steel sheet pile is provided with a pointed part, the projection of the pointed part is in a right-angled triangular shape, the two rows of steel sheet piles are symmetrically arranged, each row of steel sheet piles are arranged at equal intervals and in parallel, the outer side of each row of steel sheet piles is provided with one vertical row plate, the vertical row plates are arranged along the length direction vertical to the steel sheet piles, each vertical row plate connects one row of steel sheet piles into an integral structure, the two rows of steel sheet piles are connected through the cross brace component, the cross brace component is of a telescopic structure and comprises an outer fixing rod and an inner telescopic rod, the inner telescopic rod is connected with the outer fixing rod in a sliding manner, and the inner telescopic rod and the outer fixing rod are fixed through U-shaped pin rods, the inner telescopic rod and the outer fixed rod are locked through a limiting nut matched with a locking nut, positioning pieces are welded on each steel sheet pile at equal intervals along the length direction, and two ends of the cross brace assembly are positioned by the positioning pieces.
Furthermore, the outer fixing rod is provided with a long-strip-shaped outer positioning hole, the outer positioning hole extends along the length direction of the outer fixing rod, the inner telescopic rod is provided with an inner positioning hole matched with the outer positioning hole in size, and one end of the U-shaped pin rod is inserted into the outer positioning hole and the inner positioning hole.
Furthermore, a pair of three-leaf nuts are arranged on two sides of the U-shaped pin rod and fixed to the outer positioning hole and the inner positioning hole through locking nuts.
Further, the setting element includes the L template, the vertical part and the steel sheet pile fixed connection of L template, the horizontal part of L template is run through from top to bottom and is equipped with U type screw rod, the one end of U type screw rod is passed through hexagon nut and is locked on the L template, U type screw rod radially runs through outer dead lever and the setting of interior telescopic link.
The utility model has the advantages that: the device mainly comprises three parts, namely steel sheet piles, vertical column plates and a cross bracing assembly, wherein two rows of steel sheet piles are fixed with the two vertical column plates, the stress area of the transverse supporting force of the vertical column plates is increased, the width of the cross bracing assembly is adjustable, and the steel sheet piles and the vertical column plates are guaranteed to have enough strength to support a soil body; the installation is quick, simple and convenient, the use space of the back expander tool is not influenced, and the strength and the rigidity are sufficient, so that the personal safety of constructors is effectively guaranteed; the vertical column plates are hollow, and the whole weight is light.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic top view of the present invention;
fig. 3 is a schematic side view of the present invention;
fig. 4 is a schematic structural view of the cross brace assembly of the present invention;
fig. 5 is a schematic structural view of the vertical strake of the present invention.
Reference numerals:
1 vertical strake 2 steel sheet pile 3 stull subassembly 4 back and expand ware 5 closed angle portion 6 internal expansion pole 7 external fixation pole
11 horizontal plate 12 vertical plate 13 inclined connecting plate
31 three-leaf nut 32U-shaped pin rod 33U-shaped screw 34 hexagonal nut 35L-shaped plate.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the accompanying drawings, and obviously, the described embodiments are some, but not all embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model discloses a device that non-excavation construction both ends work hole was strutted is exclusively used in, as shown in figure 1, including locator, stull subassembly 3, steel sheet pile 2 and perpendicular strake 1, steel sheet pile 2 distributes and is two rows, each the one end of steel sheet pile 2 is equipped with sharp bight 5, the projection of sharp bight 5 is the right angle triangle-shaped form, and two rows of steel sheet pile 2 mutual symmetries set up, each row 2 equidistant and parallel arrangement of steel sheet pile, each row the outside of steel sheet pile 2 is equipped with one and erects strake 1, erect strake 1 along the length direction setting of perpendicular to steel sheet pile 2, each erect strake 1 and connect one row of steel sheet pile 2 and be a body structure.
As shown in fig. 2 and 3, two rows connect through stull subassembly 3 between the steel sheet pile 2, stull subassembly 3 is extending structure, stull subassembly 3 includes outer dead lever 7 and interior telescopic link 6, interior telescopic link 6 and outer dead lever 7 sliding connection, it is fixed through U type pin pole between interior telescopic link 6 and the outer dead lever 7, lock through stop nut cooperation lock nut between interior telescopic link 6 and the outer dead lever 7, each steel sheet pile 2 has welded the setting element along length direction equidistance, the both ends of stull subassembly 3 are fixed a position by the setting element to steel sheet pile is fixed in to U type screw rod, nut.
When the working pit supporting device is implemented, the width of the excavated working pit is required to be within the range of 1.5-3.2m before the working pit supporting device is used, and planes on two sides of the working pit are basically vertical and parallel, are flat and have no unevenness.
Before the steel sheet pile 2 is pressed into the bottom of the working pit, underground pipelines (pipeline instruments or other special equipment) are retested at the bottom of the working pit, and after confirming that no pipelines exist within 1m of the depth of the pressed part of the steel sheet pile 2, the steel sheet pile 2 is pressed in.
When the steel sheet piles 2 are pressed in, the vertical row plates 1 can be placed in two inner side faces close to the working pit, the sharp corners of the steel sheet piles 2 face downwards, the steel sheet piles are slowly driven into/pressed into the ground by using a hammer or equipment, the pressing-in depth is 30-60cm, in order to facilitate the fixation of the cross brace assembly 3, the steel sheet piles 2 on two sides are correspondingly driven, the opposite steel sheet piles 2 are in the same vertical face, and the positioning pieces are kept on the same horizontal plane.
Preferably, one vertical strake plate 1 is fixed by two steel sheet piles 2, the distance between the two steel sheet piles 2 is 60-120cm, the vertical strake plate 1 is respectively placed into the steel sheet piles 2 at two sides of the working pit, the vertical placement or the horizontal placement is based on the specific depth of the working pit, the left end and the right end are aligned, and the supporting position of the cross support component 3 considers that the largest back expander passes through the effective space of the working pit formed by supporting in the construction process.
Roughly adjusting the inner telescopic rod 6 on the transverse strut component 3 to the corresponding support width, inserting the U-shaped pin rod into the positioning hole of the inner telescopic rod 6, adjusting the limiting nut to a certain position, screwing the locking nut to lock, completing the fixation of one group of steel sheet piles 2, and repeatedly roughly adjusting the telescopic rod on the other transverse strut component 3 until the other group of steel sheet piles 2 are fixed.
As shown in fig. 3, the support positions of the wales are set such that the maximum back-reamer 4 can pass through the effective space of the work pit formed by the supports during construction.
As shown in fig. 4, the outer fixing rod 7 is provided with an elongated outer positioning hole, the outer positioning hole extends along the length direction of the outer fixing rod 7, the inner telescopic rod 6 is provided with an inner positioning hole matched with the outer positioning hole in size, one end of the U-shaped pin rod 32 is inserted into the outer positioning hole and the inner positioning hole, two sides of the U-shaped pin rod 32 are provided with a pair of three-leaf nuts 31, the three-leaf nuts 31 are fixed in the outer positioning hole and the inner positioning hole through locking nuts, and the U-shaped pin rod 32 is limited by the three-leaf nuts 31 at two sides and then locked by the locking nuts.
As shown in fig. 4, the positioning element includes an L-shaped plate 35, a vertical portion of the L-shaped plate 35 is fixedly connected with the steel sheet pile 2, a U-shaped screw 33 penetrates through a horizontal portion of the L-shaped plate 35, one end of the U-shaped screw 33 is locked on the L-shaped plate 35 through a hexagon nut 34, and the U-shaped screw 33 penetrates through the inner telescopic rod 6 and the outer fixing rod 7 in the radial direction.
Preferably, as shown in fig. 5, perpendicular strake 1 is "field" word structure, perpendicular strake 1 includes three diaphragm 11 and three riser 12, the fretwork of the four places of perpendicular strake 1 is equipped with two oblique connecting plate 13 respectively, and upper and lower adjacent four oblique connecting plate 13 connects and is the rhombus structure, and hollow and be equipped with field word, rhombus bearing structure's perpendicular strake 1 and compare solid board and both lightened weight, also guarantee sufficient intensity.
The supporting dosage is as follows:
(1) the standard supporting dosage of 10 holes and the following single working pit of 10 holes is as follows: 4 steel sheet piles, 2 vertical strakes and 2 transverse bracing assemblies.
(2) The standard supporting dosage of a single working pit with more than 10 holes is as follows: 8 steel sheet piles, 4 vertical strakes and 4 transverse bracing assemblies.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention.

Claims (4)

1. The device special for supporting the working pits at two ends of non-excavation construction is characterized by comprising a positioner, a cross brace component, steel sheet piles and vertical row plates, wherein the steel sheet piles are distributed in two rows, one end of each steel sheet pile is provided with a pointed part, the projection of the pointed part is in a right-angled triangular shape, the two rows of steel sheet piles are symmetrically arranged, each row of steel sheet piles are arranged at equal intervals and in parallel, the outer side of each row of steel sheet piles is provided with one vertical row plate, the vertical row plates are arranged along the length direction vertical to the steel sheet piles, each vertical row plate connects one row of steel sheet piles into an integral structure, the two rows of steel sheet piles are connected through the cross brace component, the cross brace component is of a telescopic structure and comprises an outer fixing rod and an inner telescopic rod, the inner telescopic rod is connected with the outer fixing rod in a sliding manner, and the inner telescopic rod and the outer fixing rod are fixed through U-shaped pin rods, the inner telescopic rod and the outer fixed rod are locked through a limiting nut matched with a locking nut, positioning pieces are welded on each steel sheet pile at equal intervals along the length direction, and two ends of the cross brace assembly are positioned by the positioning pieces.
2. A work pit supporting apparatus as claimed in claim 1, in which the outer fixing rod is provided with an elongate outer locating hole extending along the length of the outer fixing rod, the inner telescopic rod is provided with an inner locating hole sized to fit the outer locating hole, and one end of the U-shaped pin rod is inserted into the outer locating hole and the inner locating hole.
3. A work pit supporting device as claimed in claim 1, wherein a pair of three-leaf nuts are provided on either side of the U-shaped pin, the three-leaf nuts being secured to the outer and inner locating holes by means of locking nuts.
4. The device of claim 1, wherein the positioning member comprises an L-shaped plate, a vertical part of the L-shaped plate is fixedly connected with the steel sheet pile, a U-shaped screw rod penetrates through the horizontal part of the L-shaped plate vertically, one end of the U-shaped screw rod is locked on the L-shaped plate through a hexagon nut, and the U-shaped screw rod penetrates through the outer fixing rod and the inner telescopic rod in the radial direction.
CN202020705379.7U 2020-04-30 2020-04-30 Device that non-excavation construction both ends work hole was strutted is exclusively used in Active CN212507516U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020705379.7U CN212507516U (en) 2020-04-30 2020-04-30 Device that non-excavation construction both ends work hole was strutted is exclusively used in

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020705379.7U CN212507516U (en) 2020-04-30 2020-04-30 Device that non-excavation construction both ends work hole was strutted is exclusively used in

Publications (1)

Publication Number Publication Date
CN212507516U true CN212507516U (en) 2021-02-09

Family

ID=74444828

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020705379.7U Active CN212507516U (en) 2020-04-30 2020-04-30 Device that non-excavation construction both ends work hole was strutted is exclusively used in

Country Status (1)

Country Link
CN (1) CN212507516U (en)

Similar Documents

Publication Publication Date Title
CN111576902A (en) Device that non-excavation construction both ends work hole was strutted is exclusively used in
CN210603852U (en) Full-assembly type steel structure reaction frame
CN211714015U (en) House building structure built in underground space
CN217480405U (en) Assembled steel construction building
CN214738099U (en) A supporting device for ground foundation ditch construction
CN212507516U (en) Device that non-excavation construction both ends work hole was strutted is exclusively used in
CN110793871A (en) Integral self-balancing masonry integral shear test device
CN109779247A (en) The formwork erection device and construction method of steel column cornerite
CN210887226U (en) Civil engineering assembled pit foundation supporting device
CN216305853U (en) Adjustable drill rod dismounting and fixing device
CN216339588U (en) Foundation pit supporting beam structure
CN216142382U (en) Scaffold fixing fastener and scaffold system based on H-shaped stand column
CN213597400U (en) Elevator shaft
CN209704012U (en) The formwork erection device of steel column cornerite
CN219710298U (en) Novel anchor rod static pressure pile construction structure
CN216916201U (en) Multipurpose building platform for highway engineering
CN114607045B (en) Welding-free construction protection shed purline connecting device and installation method
CN219470907U (en) Bored concrete pile steel reinforcement cage strutting arrangement
CN110924431A (en) Comprehensive pipe gallery faces limit protector
CN113719098B (en) Through-wall overhanging I-steel and use method thereof
CN220118128U (en) Adjustable small-section tunnel drilling and blasting operation platform
CN216445974U (en) Connecting structure of steel structure column and steel reinforcement cage
CN221219777U (en) Fast-assembling protection component in entrance to a cave
CN217268086U (en) Steel structural component bolted connection structure
CN220807317U (en) Civil engineering pipeline placer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant