CN212506529U - Mounting structure of barrel pump - Google Patents

Mounting structure of barrel pump Download PDF

Info

Publication number
CN212506529U
CN212506529U CN202020522394.8U CN202020522394U CN212506529U CN 212506529 U CN212506529 U CN 212506529U CN 202020522394 U CN202020522394 U CN 202020522394U CN 212506529 U CN212506529 U CN 212506529U
Authority
CN
China
Prior art keywords
barrel
pump
bag pump
vertical
mounting structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020522394.8U
Other languages
Chinese (zh)
Inventor
王正初
余伟平
余鸿刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taizhou University
Original Assignee
Taizhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taizhou University filed Critical Taizhou University
Priority to CN202020522394.8U priority Critical patent/CN212506529U/en
Application granted granted Critical
Publication of CN212506529U publication Critical patent/CN212506529U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The utility model belongs to the technical field of mounting structures of barrel bag pumps, in particular to a mounting structure of a barrel bag pump, which comprises a vertical barrel bag pump; the mounting structure of vertical cartridge bag pump includes: the pit body is dug out from the ground downwards and used for placing the lower part of the vertical barrel bag pump; the metal barrel body is supported on the peripheral side of the pit body, and the part of the vertical barrel bag pump entering the pit body is not contacted with the pit body and the metal barrel body; fixed square steel, fixed square steel are settled in the top of the hole body, and vertical section of thick bamboo bag pump is settled on fixed square steel, the utility model provides a simple structure and stable section of thick bamboo bag pump's mounting structure.

Description

Mounting structure of barrel pump
Technical Field
The utility model belongs to the technical field of the mounting structure of barrel bag pump, refer in particular to a mounting structure of barrel bag pump.
Background
The barrel bag pump is an important industrial process pump, is widely used in refineries, petrochemical plants, power plants, low-temperature engineering, pipeline pressurization, offshore oil production platforms and liquefied gas engineering, and is the heart of modern industrial processes. Traditional barrel bag pump installation need earlier dig great hole body subaerial, then consolidate the hole body through the mode of laying bricks or cast-in-place mode, and the engineering volume is very big, wastes time and energy, and the cost is very high.
Disclosure of Invention
The utility model aims at providing a simple structure and stable mounting structure of section of thick bamboo bag pump.
The purpose of the utility model is realized like this:
a mounting structure of a barrel bag pump comprises a vertical barrel bag pump; the mounting structure of vertical cartridge bag pump includes:
the pit body is dug out from the ground downwards and used for placing the lower part of the vertical barrel bag pump;
the metal barrel body is supported on the peripheral side of the pit body, and the part of the vertical barrel bag pump entering the pit body is not contacted with the pit body and the metal barrel body;
the fixed square steel is arranged above the pit body, and the vertical barrel pump is arranged on the fixed square steel.
At least two cement base bodies are arranged on the peripheral sides of the pit body, foundation bolts are arranged in the cement base bodies, and the fixed square steel is fixed on the foundation bolts.
The foundation bolt is provided with a bending part, and the bending part is arranged in the cement matrix.
The periphery of the vertical barrel bag pump is provided with an annular convex edge, and the vertical barrel bag pump is erected on the fixed square steel through the annular convex edge.
And the bolt penetrates through the annular convex edge and is fixed on the fixed square steel.
And backfilling the gap between the metal barrel body and the pit body.
And a waterproof and antirust coating is arranged on the outer side of the vertical barrel pump extending into the pit body.
Compared with the prior art, the utility model outstanding and profitable technological effect is:
1. the utility model discloses a metal barrel body carries out the week side support of pit body, selects suitable metal barrel body according to the size of the vertical barrel bag pump of reality, and the workman installs conveniently. The specific installation mode is as follows: firstly digging out a pit body, then placing the pit body into a metal barrel body, and finally backfilling a gap between the metal barrel body and the pit body by using soil around the metal barrel body. The metal barrel body does not support the vertical barrel bag pump, the vertical barrel bag pump is supported by the fixed square steel, so that the metal barrel body can be kept on the periphery of the pit body without lateral soil collapse, and the metal barrel body can achieve the function and has a certain cold insulation function.
2. The utility model discloses a for let stable arrangement of fixed square steel subaerial pit body week side is provided with two at least cement base members, is provided with rag bolt in the cement base member, and fixed square steel is fixed rag bolt is last. The reinforcing of the mounting structure is carried out through the cement matrix, thereby ensuring the stability of the structure. And, in order to let the stability that rag bolt and cement base member an organic whole were pour, be provided with the portion of bending in rag bolt's below, strengthen the stability of being connected between rag bolt and the base member.
3. The utility model discloses a week side of vertical barrel bag pump is provided with the protruding edge of annular, and vertical barrel bag pump erects on fixed square steel through the protruding edge of annular, utilizes the protruding edge of annular of vertical barrel bag pump to realize effectual settling on fixed square steel, and the connected mode of face contact can let fixed square steel effectively and even undertake vertical barrel bag pump self gravity, is difficult for taking place the phenomenon of vertical barrel bag pump side direction slope.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
fig. 2 is an enlarged schematic view of a portion a of fig. 1.
In the figure: 1-vertical barrel pump; 10-annular convex edge; 2-fixing square steel; 3-the ground; 31-a pit body; 4-a metal barrel body; 5-a cement matrix; 6-foundation bolts; 61-bending part; 7-bolt; 8-nut.
Detailed Description
The invention will be further described with reference to the following detailed description of embodiments, with reference to the accompanying drawings, in which figures 1-2 show:
a mounting structure of a barrel bag pump comprises a vertical barrel bag pump 1; the mounting structure of the vertical cartridge pump 1 comprises:
a pit body 31, wherein the pit body 31 is dug downwards from the ground 3, and the pit body 31 is used for placing the lower part of the vertical barrel bag pump 1;
a metal tub 4, the metal tub 4 being supported on the circumferential side of the pit body 31, and a portion of the vertical pouch pump 1 entering the pit body 31 not being in contact with the pit body 31 and the metal tub 4;
the fixed square steel 2 is arranged above the pit body 31, and the vertical barrel pump 1 is arranged on the fixed square steel 2. The metal barrel body 4 supports the periphery of the pit body 31, and the metal barrel body 4 is selected according to the size of the actual vertical barrel pump 1, so that the installation of workers is convenient. The specific installation mode is as follows: firstly, digging out the pit body 31, then placing the metal barrel body 4, and finally backfilling the gap between the metal barrel body 4 and the pit body 31 by using the surrounding soil. The vertical barrel pump 1 is not supported by the metal barrel body 4, the vertical barrel pump 1 is supported by the fixed square steel 2, so that the metal barrel body 4 can be kept on the periphery of the pit body 31 without lateral soil collapse, and the metal barrel body 4 can achieve the function and has a certain cold insulation function.
At least two cement matrixes 5 are arranged on the peripheral side of the pit body 31, preferably, two cement matrixes 5 are arranged below each fixed square steel 2, the two cement matrixes 5 are respectively supported on two sides of the fixed square steel 2, foundation bolts 6 are arranged in the cement matrixes 5, and the fixed square steel 2 is fixed on the foundation bolts 6. The reinforcement of the mounting structure is carried out by the cement matrix 5, thus ensuring the stability of the structure. In addition, in order to stabilize the integral casting of the anchor bolt 6 and the cement base 5, a bent portion 61 is provided below the anchor bolt 6, so that the connection stability between the anchor bolt 6 and the cement base 5 is enhanced.
The periphery of the vertical type barrel bag pump 1 is provided with an annular convex edge 10, and the vertical type barrel bag pump 1 is erected on the fixed square steel 2 through the annular convex edge 10. The annular convex edge 10 of the vertical barrel bag pump 1 is effectively arranged on the fixed square steel 2, the fixed square steel 2 can effectively and uniformly bear the self gravity of the vertical barrel bag pump 1 in a surface contact connection mode, and the phenomenon that the vertical barrel bag pump 1 inclines laterally is not easy to occur. The bolt 7 passes through the annular flange 10 and is fixed on the fixed square steel 2.
And backfilling the gap between the metal barrel body 4 and the pit body 31.
Stretch into in the pit body 31 the vertical barrel bag pump 1 outside is provided with waterproof antirust coating, sprays waterproof antirust coating through week side at vertical barrel bag pump 1 and protects, avoids vertical barrel bag pump to be corroded, and waterproof antirust coating can market material wantonly all can, as long as can realize waterproof rust-resistant can.
The above-mentioned embodiment is only the preferred embodiment of the present invention, and does not limit the protection scope of the present invention according to this, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (7)

1. A mounting structure of a barrel bag pump comprises a vertical barrel bag pump (1); the method is characterized in that: the mounting structure of the vertical barrel pump (1) comprises:
the pit body (31) is dug out downwards from the ground (3), and the pit body (31) is used for placing the lower part of the vertical barrel bag pump (1);
the metal barrel body (4), the metal barrel body (4) is supported on the peripheral side of the pit body (31), and the part of the vertical barrel pump (1) entering the pit body (31) is not contacted with the pit body (31) and the metal barrel body (4);
the vertical type barrel pump is characterized by comprising fixed square steel (2), wherein the fixed square steel (2) is arranged above the pit body (31), and the vertical type barrel pump (1) is arranged on the fixed square steel (2).
2. The mounting structure of a cartridge-bag pump according to claim 1, wherein: at least two cement base bodies (5) are arranged on the peripheral sides of the pit body (31), foundation bolts (6) are arranged in the cement base bodies (5), and the fixed square steel (2) is fixed on the foundation bolts (6).
3. The mounting structure of a cartridge-bag pump according to claim 2, wherein: the foundation bolt (6) is provided with a bending part (61), and the bending part (61) is arranged in the cement base body (5).
4. The mounting structure of a cartridge-bag pump according to claim 1, wherein: the periphery of the vertical barrel bag pump (1) is provided with an annular convex edge (10), and the vertical barrel bag pump (1) is erected on the fixed square steel (2) through the annular convex edge (10).
5. The mounting structure of a cartridge-bag pump according to claim 4, wherein: the bolt (7) passes through the annular convex edge (10) and is fixed on the fixed square steel (2).
6. The mounting structure of a cartridge-bag pump according to claim 1, wherein: and backfilling the gap between the metal barrel body (4) and the pit body (31).
7. The mounting structure of a cartridge-bag pump according to claim 1, wherein: and a waterproof and antirust coating is arranged on the outer side of the vertical barrel pump (1) extending into the pit body (31).
CN202020522394.8U 2020-04-10 2020-04-10 Mounting structure of barrel pump Expired - Fee Related CN212506529U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020522394.8U CN212506529U (en) 2020-04-10 2020-04-10 Mounting structure of barrel pump

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020522394.8U CN212506529U (en) 2020-04-10 2020-04-10 Mounting structure of barrel pump

Publications (1)

Publication Number Publication Date
CN212506529U true CN212506529U (en) 2021-02-09

Family

ID=74430323

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020522394.8U Expired - Fee Related CN212506529U (en) 2020-04-10 2020-04-10 Mounting structure of barrel pump

Country Status (1)

Country Link
CN (1) CN212506529U (en)

Similar Documents

Publication Publication Date Title
CN110374820B (en) Combined type ring cylinder buoyancy tank foundation structure and construction method thereof
CN104631433B (en) The construction technology of box-shaped steel plate occlusion diaphragm wall structural system
CN111236294A (en) Combined cylinder structure fan foundation
CN205676882U (en) A kind of novel supporting construction
CN107288156B (en) Construction method of underground special-shaped water pool
CN212506529U (en) Mounting structure of barrel pump
CN204163095U (en) A kind of foundation structure of building and combined member thereof
CN100507166C (en) Method for refitting base of vertical type oil tank made from steel through method of preset
CN201671104U (en) Combined tower type crane base
CN204282390U (en) For the steel concrete-steel structure mixing gravity type foundation of offshore wind farm
CN214460340U (en) Concrete pile for bridge construction
CN105155573A (en) Offshore wind turbine barrel-in-barrel foundation
CN212001231U (en) Steel constructs bridge stand and connects foundation structure
CN107829428A (en) A kind of variable diameters bamboo joint type mortar pile
CN103981881B (en) A kind of foundation structure of building and construction method thereof
CN106013213A (en) Offshore wind power pile foundation capable of increasing unit capacity and using method thereof
CN206204985U (en) A kind of environment-friendly type assembled grouting behind shaft or drift lining steel cylinder pile foundation
CN204645826U (en) A kind of assembling Air Filter braced structures
CN202266065U (en) Heliostat pillar
CN201908303U (en) Square frame-shaped steel cavity concrete cast-in-situ well sinking protecting wall
CN216108524U (en) Foundation pit soil nailing wall slope-setting supporting structure
CN217651834U (en) Immersed tube type foundation structure
CN115162824B (en) Installation and construction method of carbonization tower
CN220686043U (en) Static-load anti-floating pile head physical anchoring device
CN215763691U (en) Pipe frame structure for erecting pipeline in river

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210209

CF01 Termination of patent right due to non-payment of annual fee