CN115162824B - Installation and construction method of carbonization tower - Google Patents

Installation and construction method of carbonization tower Download PDF

Info

Publication number
CN115162824B
CN115162824B CN202211089588.3A CN202211089588A CN115162824B CN 115162824 B CN115162824 B CN 115162824B CN 202211089588 A CN202211089588 A CN 202211089588A CN 115162824 B CN115162824 B CN 115162824B
Authority
CN
China
Prior art keywords
water tank
titanium
hoisting
titanium pipe
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202211089588.3A
Other languages
Chinese (zh)
Other versions
CN115162824A (en
Inventor
朱文俊
张永海
董军
王志强
梁玉新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Chemical Engineering Second Construction Corp
Original Assignee
China Chemical Engineering Second Construction Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Chemical Engineering Second Construction Corp filed Critical China Chemical Engineering Second Construction Corp
Priority to CN202211089588.3A priority Critical patent/CN115162824B/en
Publication of CN115162824A publication Critical patent/CN115162824A/en
Application granted granted Critical
Publication of CN115162824B publication Critical patent/CN115162824B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L5/00Devices for use where pipes, cables or protective tubing pass through walls or partitions
    • F16L5/02Sealing

Abstract

The invention discloses a carbonization tower installation construction method, which belongs to the technical field of tower equipment installation, wherein a baffle and a knocking barrel for assisting in penetrating a titanium pipe are firstly processed, the titanium pipe is pre-penetrated in corresponding titanium pipe holes at two sides of a water tank, and the baffle is fixed at one side of the water tank; penetrating two O-shaped sealing rings on the other side of the water tank on a titanium pipe, then sleeving a cylinder on the titanium pipe, knocking the tail end of a knocking tube to seal, and then sleeving a thrust pad to finish the fastening of the titanium pipe of the side water tank; then the baffle plate is removed, the baffle plate is installed on one side of the water tank with the fastened titanium pipe again, and an O-shaped sealing ring and a thrust pad are continuously installed on the other side of the water tank with the unfastened titanium pipe; repeating the steps, and installing titanium pipes on all the water tanks; and finally hoisting the carbonization tower equipment in sections. According to the invention, the baffle plate is matched with the knocking barrel to knock the O-shaped sealing ring and the thrust pad, so that the penetrated titanium pipe is sealed in one plane, the construction workload can be reduced, the construction progress can be improved, and the construction quality can be ensured.

Description

Installation and construction method of carbonization tower
Technical Field
The invention relates to the technical field of tower equipment installation, in particular to a construction method for installing a carbonization tower.
Background
In the integrated project of metal magnesium, the core equipment of the carbonization workshop section of the soda device is a carbonization tower, and the number of the carbonization towers is usually dozens of, and all the carbonization towers are arranged in a carbonization plant. The carbonization tower mainly comprises 1 base, a plurality of sections of water tanks, a plurality of sections of tower rings and 1 top cover, wherein hundreds of titanium pipes need to be penetrated on the opposite side surface of one water tank, and the titanium pipes need to be penetrated in a construction site.
Because the titanium pipes penetrating into the water tank are large in number and need to be sealed, constructors have different using force when sealing the titanium pipes, and the titanium pipes are different in length after being fixed. Therefore, the progress and the tightness of the water tank for penetrating the titanium pipe are one of the key steps of construction.
Disclosure of Invention
The invention aims to provide a construction method for installing a carbonization tower, so as to at least achieve the aim of improving the construction progress.
In order to solve the technical problems, the invention adopts the technical scheme that:
a method for installing and constructing a carbonization tower comprises a plurality of water tanks, wherein two corresponding side walls of each water tank are provided with titanium pipe holes for penetrating titanium pipes, a plurality of titanium pipes penetrate through one water tank, the inner sides of the titanium pipe holes are provided with sealing grooves, and O-shaped sealing rings and thrust pads are arranged in the sealing grooves,
firstly, processing a baffle and a knocking barrel for assisting in penetrating a titanium pipe;
the baffle is provided with a bolt hole corresponding to the connecting hole on the water tank; the knocking barrel comprises a barrel and a knocking barrel pipe fixed at the rear end of the barrel, and the barrel can enter the sealing groove;
step two, the O-shaped sealing ring and the thrust pad are placed into a bucket filled with soapy water for lubrication and soaking;
step three, pre-penetrating titanium pipes into corresponding titanium pipe holes on two sides of the water tank, and fixing a baffle on one side of the water tank; penetrating an O-shaped sealing ring on the other side of the water tank on a titanium pipe, then sleeving a cylinder on the titanium pipe, knocking the tail end of a knocking pipe to seal, sequentially installing two O-shaped sealing rings, and then sleeving a thrust pad to finish the fastening of the titanium pipe of the water tank on the side; then the baffle is dismantled, the baffle is installed on one side of the water tank with the fastened titanium pipe again, and an O-shaped sealing ring and a thrust pad are continuously installed on the other side of the water tank with the unfastened titanium pipe;
step four, repeating the step three, and installing titanium pipes on all the water tanks;
and step five, hoisting the carbonization tower equipment in sections.
Furthermore, in the first step, the baffle comprises an angle steel connecting piece, a steel plate and two steel pipe connecting columns, wherein the two steel pipe connecting columns are vertically fixed on one side surface of the angle steel connecting piece, and each steel pipe connecting column is connected with one steel plate.
Further, in the first step, the tail end of the knocking tube is connected with a bearing plate.
And further, in the third step, the contact surfaces of the O-shaped sealing ring, the titanium pipe and the titanium pipe hole are lubricated by soapy water.
Further, in the third step, if the O-shaped sealing ring is not fastened, the O-shaped sealing ring is knocked again after air is released by a thin iron needle, and the thrust pad is sleeved after the sealing is confirmed to be completed.
Further, firstly, trial hoisting and then formal hoisting are carried out; assembling the hoisting section of the carbonization tower at a specified position, completing welding inspection of the lifting lug, and standing the 350t crawler crane at the specified position; after the hoisting machine rigging is suspended, hoisting by a crane, hoisting the hoisting section by 200mm away from the prefabricated platform, and continuing hoisting after the condition that the equipment, the crane, the hoisting rigging and the lifting lug are abnormal is checked; when the bottom of the hoisting section is 300mm higher than the in-place elevation, the 350t crawler crane rotates the rod 90 degrees clockwise, and after the hoisting section is positioned right above the in-place position, the hook returns, so that the hoisting section is stably in place.
According to the invention, before the water tank of the carbonization tower equipment penetrates the titanium pipe for construction, the baffle and the knocking barrel are manufactured as special tools, the baffle is fixed on the side surface of the water tank and is matched with the knocking barrel to knock the O-shaped sealing ring and the thrust pad, so that the penetrated titanium pipe is sealed in one plane, the construction workload can be reduced, the construction progress can be improved, and the construction quality can be ensured.
The invention is suitable for the sectional installation of the soda device equipment and the water tank pipe penetrating engineering construction, is particularly suitable for being used under the conditions of large equipment quantity, large water tank pipe penetrating quantity and construction site limitation, can reduce the demand of labor force, saves time and labor and reduces the overhead working amount.
Drawings
Fig. 1 is a schematic structural view of a baffle plate.
Fig. 2 is a structural schematic diagram of a knocking barrel entering into a sealing groove, wherein a dotted line box in the diagram shows a water tank and a titanium pipe as partial views.
Fig. 3 is a schematic structural diagram of the completed sealing of the O-ring and the thrust pad, and the dashed boxes in the diagram show the water tank and the titanium pipe as partial views.
In the figure, 1-angle steel connecting piece, 2-steel plate, 3-steel pipe connecting column, 4-cylinder, 5-knocking bobbin, 6-bearing plate, 7-water tank, 8-titanium pipe, 9-sealing groove, 10-O-shaped sealing ring and 11-thrust pad.
Detailed Description
In this embodiment, the carbonization tower includes a plurality of water tank 7, and it is used for wearing to establish the titanium pipe hole of titanium pipe 8 to open on the corresponding both sides wall of water tank 7, wears to establish a plurality of titanium pipes 8 in a water tank 7, and the downthehole side of titanium pipe is opened has seal groove 9, installs O type sealing washer 10 and thrust pad 11 in the seal groove 9.
The technical solution claimed in the present invention is further clearly and completely illustrated by a specific embodiment.
In the embodiment, the carbonization tower consists of 1 base, 8 water-saving tanks 7, 21 tower rings and 1 top cover, and each carbonization tower is divided into 31 sections. The titanium pipes 8 in the water tanks 7 need to be penetrated in a construction site, and the number of the titanium pipes is 312/the water-saving tanks 7, one titanium pipe 8 is matched with 4O- shaped sealing rings 10 and 2 thrust rings for sealing, the total number of 21 carbonization tower devices is 168 water tanks 7, and the number of the titanium pipes is 52416. Because the construction workload is large, the sealing property, the progress and the hoisting process of the water tank 7 after pipe penetration are the key points of construction.
Firstly, a baffle and a knocking cylinder for assisting in penetrating the titanium pipe 8 are processed, and the structures of the baffle and the knocking cylinder refer to fig. 1 and fig. 2 respectively.
The baffle includes angle steel connecting piece 1, steel sheet 2 and steel pipe spliced pole 3, and two steel pipe spliced poles 3 vertical fixation are in angle steel connecting piece 1 side surface, and every steel pipe spliced pole 3 respectively is connected with a steel sheet 2. The two ends of the angle steel connecting piece 1 of the baffle are provided with bolt holes corresponding to the connecting holes on the water tank 7. Stud and baffle use together, can dismantle the connection with baffle and 7 sides of water tank.
The knocking barrel comprises a barrel 4 and a knocking barrel pipe 5 fixed at the rear end of the barrel 4, and the barrel 4 can enter a sealing groove 9. The end of the knocking bobbin 5 is connected with a bearing plate 6. When in use, the bearing plate 6 is beaten by an axe or a hammer.
Then, the O-shaped sealing ring 10 and the thrust pad 11 are put into a bucket filled with soapy water for lubrication and soaking; several bottles of soapy water are prepared for lubricating the contact surfaces of the O-shaped sealing ring 10, the titanium pipe 8 and the titanium pipe hole during installation.
The titanium pipes 8 are pre-arranged in the corresponding titanium pipe holes at two sides of the water tank 7 in a penetrating way, and the baffle is fixed at one side of the water tank 7, so that the titanium pipes 8 are prevented from being uneven in length when being knocked and fastened. Sequentially installing two O-shaped sealing rings 10 on the other side of the water tank 7, respectively penetrating the O-shaped sealing rings 10 on the titanium tube 8 during installation, then sleeving the cylinder 4 of the knocking cylinder on the titanium tube 8, and knocking the tail end of the knocking cylinder tube 5 to seal; then, sleeving the thrust pad 11 to finish fastening the titanium pipe 8 of the side water tank 7; then the baffle plate is removed, the baffle plate is installed on one side of the water tank 7 with the fastened titanium pipe 8 again, and the O-shaped sealing ring 10 and the thrust pad 11 are continuously installed on the other side of the water tank 7 with the unfastened titanium pipe 8.
If the O-ring 10 is found to be loose, a sharp thin iron needle is used to blow air between the two O-rings 10, and the O-rings are tapped again to confirm that the seal is complete and then the thrust pads 11 are inserted.
The above is repeated, and the titanium pipes 8 on all the water tanks 7 are installed.
Treatment of foundations
When the 350t crawler crane is used for hoisting equipment, the bearing capacity per square meter is 48.8KN, 1m thick sand inclusion stones need to be backfilled to the foundation on site to meet hoisting conditions, and a roadbed box needs to be laid below the 350t crawler crane.
And after the titanium pipe 8 is installed, hoisting the carbonization tower equipment in sections.
As the carbonization plant is of a civil structure, the equipment hoisting design determines the number of segments to be hoisted and the performance of the selected crane according to the elevation of each layer of the carbonization plant. Because the field is smaller, 350t crawler crane tower type working condition is selected for actual hoisting, and conflict with civil engineering construction is reduced.
The whole hoisting process is described by taking one section (hereinafter, referred to as hoisting section) of the carbonization tower as an example.
Hoisting in a trial manner: after the hoisting section is assembled at the designated position, the welding inspection of the lifting lug is completed; after the field is processed and the field is qualified through inspection, the 350t crawler crane stands according to the designated position; after the hoisting machine rigging is suspended, the hoisting machine hoists, the hoisting section is hoisted to 200mm away from the prefabricated platform, and after the equipment, the hoisting machine, the hoisting rigging and the lifting lug are checked to be free of abnormal conditions, hoisting is continued.
Formal hoisting: and continuously lifting the 350t crawler crane, continuously lifting the hook when the bottom of the lifting section is higher than surrounding obstacles until the bottom of the lifting section is higher than the in-position elevation by 300mm, stopping rotating the rod by 90 degrees clockwise for the 350t crawler crane until the lifting section is positioned right above the in-position, and finely adjusting the arm rod and the back hook to enable the lifting section to be stably in position.

Claims (4)

1. The utility model provides a carbonizer installation construction method, the carbonizer includes a plurality of water tank, and it has the titanium tube hole that is used for wearing to establish the titanium pipe to open on the corresponding both sides wall of water tank, wears to establish a plurality of titanium pipes in a water tank, and the downthehole seal groove that opens of titanium tube is installed O type sealing washer and thrust pad in the seal groove, its characterized in that: comprises the following steps of (a) carrying out,
firstly, processing a baffle and a knocking barrel for assisting in penetrating a titanium pipe;
the baffle comprises angle steel connecting pieces, steel plates and steel pipe connecting columns, the two steel pipe connecting columns are vertically fixed on the surface of one side of each angle steel connecting piece, and each steel pipe connecting column is connected with one steel plate;
the baffle is provided with a bolt hole corresponding to the connecting hole on the water tank; the knocking barrel comprises a barrel and a knocking barrel pipe fixed at the rear end of the barrel, and the barrel can enter the sealing groove;
step two, putting the O-shaped sealing ring and the thrust pad into a bucket filled with soap water for lubrication and soaking;
step three, pre-penetrating titanium pipes into corresponding titanium pipe holes on two sides of the water tank, and fixing a baffle on one side of the water tank; penetrating an O-shaped sealing ring on the other side of the water tank on a titanium pipe, then sleeving a cylinder on the titanium pipe, knocking the tail end of a knocking pipe to seal, sequentially installing two O-shaped sealing rings, and then sleeving a thrust pad to finish the fastening of the titanium pipe of the water tank on the side; then the baffle plate is removed, the baffle plate is installed on one side of the water tank with the fastened titanium pipe again, and an O-shaped sealing ring and a thrust pad are continuously installed on the other side of the water tank with the unfastened titanium pipe; if the O-shaped sealing ring is not fastened, the O-shaped sealing ring is knocked again after air is released by a thin iron needle, and the thrust pad is sleeved after the sealing is confirmed to be finished;
step four, repeating the step three, and installing titanium pipes on all the water tanks;
and fifthly, hoisting the carbonization tower equipment in sections.
2. The installation and construction method of the carbonization tower as claimed in claim 1, wherein: in the first step, the tail end of the knocking bobbin is connected with a bearing plate.
3. The installation and construction method of the carbonization tower according to claim 2, wherein: and in the third step, the contact surface of the O-shaped sealing ring, the titanium pipe and the titanium pipe hole is lubricated by soapy water.
4. The installation and construction method of the carbonization tower as claimed in claim 1, 2 or 3, wherein: firstly, trial hoisting and then formal hoisting; assembling the hoisting section of the carbonization tower at a specified position, completing welding inspection of the lifting lug, and standing the 350t crawler crane at the specified position; after the hoisting machine rigging is suspended, hoisting by a crane, hoisting the hoisting section by 200mm away from the prefabricated platform, and continuing hoisting after the condition that the equipment, the crane, the hoisting rigging and the lifting lug are abnormal is checked; when the bottom of the hoisting section is 300mm higher than the in-place elevation, the 350t crawler crane rotates the rod 90 degrees clockwise, and after the hoisting section is positioned right above the in-place position, the hook returns, so that the hoisting section is stably in place.
CN202211089588.3A 2022-09-07 2022-09-07 Installation and construction method of carbonization tower Active CN115162824B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211089588.3A CN115162824B (en) 2022-09-07 2022-09-07 Installation and construction method of carbonization tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211089588.3A CN115162824B (en) 2022-09-07 2022-09-07 Installation and construction method of carbonization tower

Publications (2)

Publication Number Publication Date
CN115162824A CN115162824A (en) 2022-10-11
CN115162824B true CN115162824B (en) 2023-01-31

Family

ID=83481785

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211089588.3A Active CN115162824B (en) 2022-09-07 2022-09-07 Installation and construction method of carbonization tower

Country Status (1)

Country Link
CN (1) CN115162824B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB815343A (en) * 1957-02-09 1959-06-24 Hepworth Iron Co Ltd Improvements in or relating to clay piping or conduit
FR2380488A1 (en) * 1977-02-15 1978-09-08 Hamon Sobelco Sa Liq. storage tank outlet pipe seal - includes internally and externally toothed washer to retain sealing ring and grip pipe
CN1734151A (en) * 2004-08-02 2006-02-15 罗门哈斯公司 Flow through tube plug
CN203715303U (en) * 2014-02-28 2014-07-16 金川集团股份有限公司 Liquid outlet corrosion preventing device of leaching kettle
CN211782885U (en) * 2019-12-09 2020-10-27 中建安装集团有限公司 Heat exchange water tank for alkali industry
CN112376548A (en) * 2020-09-21 2021-02-19 海洋石油工程股份有限公司 Resistance device for steel pipe pile
CN114165099A (en) * 2021-11-26 2022-03-11 中化二建集团有限公司 Modular construction method of large tower

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101954566B (en) * 2010-05-19 2012-10-31 张家港市恒强冷却设备有限公司 Process for fixedly connecting titanium cooling tube in cooler and radiating fins and titanium tube plate
CN202668484U (en) * 2012-06-01 2013-01-16 重庆工业设备安装集团有限公司 Assembly tool for O-ring seal between pipe and pipe plate
CN202963941U (en) * 2012-12-07 2013-06-05 无锡化工装备有限公司(原无锡化工装备总厂) Heat exchange tube length adjusting propeller
CN202993956U (en) * 2012-12-29 2013-06-12 北京广厦环能科技有限公司 Connection structure of heat exchange tubes and tube plate of shell-and-tube heat exchanger
CN106270960B (en) * 2016-08-18 2018-10-16 哈尔滨汽轮机厂有限责任公司 A kind of plugging method for Condenser Titanium Tube
CN206981599U (en) * 2017-05-10 2018-02-09 仪征海天铝业有限公司 A kind of aluminum pipe pipe lining device
CN109084091B (en) * 2018-08-22 2022-03-04 珠海格力电器股份有限公司 Flow guide pipe assembly and water heater
CN109580107A (en) * 2018-11-14 2019-04-05 哈尔滨汽轮机厂有限责任公司 A kind of plugging method of pipe close and pipe close for blocking Condenser Titanium Tube nozzle
CN210938001U (en) * 2019-07-26 2020-07-07 郑志滨 Aluminum pipe threading device
CN211758075U (en) * 2019-10-15 2020-10-27 江苏东方瑞吉能源装备有限公司 Hydraulic expansion joint positioning device for heat exchange tube of evaporator
JP2021092312A (en) * 2019-12-09 2021-06-17 日立金属株式会社 Pipe joint and manufacturing method thereof
CN214889403U (en) * 2021-07-09 2021-11-26 安徽三建工程有限公司 Device for improving installation precision of rear sleeve
CN216743219U (en) * 2021-12-06 2022-06-14 南京普雷特钛业有限公司 Titanium pipe capable of being spliced laterally
CN114247947B (en) * 2022-01-12 2023-05-30 湘潭大学 Vacuum brazing connection method for C/C radiating fin and Ti tube

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB815343A (en) * 1957-02-09 1959-06-24 Hepworth Iron Co Ltd Improvements in or relating to clay piping or conduit
FR2380488A1 (en) * 1977-02-15 1978-09-08 Hamon Sobelco Sa Liq. storage tank outlet pipe seal - includes internally and externally toothed washer to retain sealing ring and grip pipe
CN1734151A (en) * 2004-08-02 2006-02-15 罗门哈斯公司 Flow through tube plug
CN203715303U (en) * 2014-02-28 2014-07-16 金川集团股份有限公司 Liquid outlet corrosion preventing device of leaching kettle
CN211782885U (en) * 2019-12-09 2020-10-27 中建安装集团有限公司 Heat exchange water tank for alkali industry
CN112376548A (en) * 2020-09-21 2021-02-19 海洋石油工程股份有限公司 Resistance device for steel pipe pile
CN114165099A (en) * 2021-11-26 2022-03-11 中化二建集团有限公司 Modular construction method of large tower

Also Published As

Publication number Publication date
CN115162824A (en) 2022-10-11

Similar Documents

Publication Publication Date Title
CN101538936B (en) Hydraulic slip-and-lift construction method for water tower
CN101818645B (en) Construction method for newly increasing arched open cut tunnel at railway operating line tunnel portal
CN101798816B (en) Positioning and connecting structure of tower mast type mechanical equipment and foundation
CN113356198A (en) Single-spliced channel steel anchor rod waist beam structure and using method thereof
CN111675111A (en) Boiler hoisting sling in closed plant area and construction method
CN115162824B (en) Installation and construction method of carbonization tower
CN210917394U (en) Foundation pit support pile
CN201649115U (en) Perpendicular positioning connection structure of tower mast mechanical device and foundation
CN109930610A (en) Constrained environment foundation pit adds the construction method of steel pipe mixing diagonal brace using concrete
CN113028139B (en) Combined type connector of rain and sewage pipe and construction method
CN206143801U (en) Photovoltaic case contravariant basis that adapts to multiple ambient condition
CN211621663U (en) Assembled transformer substation GIS equipment foundation
CN101936011B (en) Bayonet binding-type connection method of steel sleeve box blocks and construction method using same
CN211571515U (en) Assembled precast concrete anticollision wall component
CN209923966U (en) Assembly type steel structure tower crane foundation bearing platform capable of freely adjusting angle and position
CN206204985U (en) A kind of environment-friendly type assembled grouting behind shaft or drift lining steel cylinder pile foundation
CN203320810U (en) Steel tube concrete structure
CN106400832A (en) Environment-friendly assembling type post-grouting steel cylinder pile foundation and construction method thereof
CN217352609U (en) Municipal manhole anti-sedimentation reinforcing structure for soft soil foundation
CN111486060A (en) Fan foundation recycling scheme
CN212506529U (en) Mounting structure of barrel pump
CN110748354A (en) Construction method of assembled shield maintenance well
CN209242534U (en) A kind of building tower crane pin-connected panel pedestal
CN202787336U (en) Vertical compression resistance static load test pile head advanced treatment node of pouring pile
CN216108596U (en) Upper expanded-head cast-in-place pile foundation for steel pipe pole of power transmission line

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant