CN212503607U - Panel lifting frame for construction - Google Patents
Panel lifting frame for construction Download PDFInfo
- Publication number
- CN212503607U CN212503607U CN202021047169.XU CN202021047169U CN212503607U CN 212503607 U CN212503607 U CN 212503607U CN 202021047169 U CN202021047169 U CN 202021047169U CN 212503607 U CN212503607 U CN 212503607U
- Authority
- CN
- China
- Prior art keywords
- fixed
- bottom plate
- roof
- construction
- panel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a panel lifting frame for construction, comprising a base plate, the fixed roof that is provided with in top of bottom plate, four corners department between bottom plate and the roof is the fixed support column that is provided with all, both sides are located all fixed many spinal branchs vaulting poles that are provided with between the support column about the top of bottom plate, the upper end four corners department of roof has all welded the fixed block, four the upper end of fixed block is all fixed and is provided with the wire rope, the fixed handling post that is provided with in upper end central authorities department of roof, the fixed first rings that are provided with in upper end of handling post. Through the cooperation that sets up first rings, handling post, fixed block, steel cable rope, bottom plate, roof, support column and bracing piece and use, solved current construction and used panel lifting frame can't convenient shipment panel, and can't convenient fixed problem.
Description
Technical Field
The utility model belongs to the technical field of the building, especially, relate to a panel lifting frame for construction.
Background
The building construction refers to production activities in the engineering construction implementation stage, is a construction process of various buildings, and can also be a process of changing various lines on a design drawing into a real object at a specified place, and comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like, and the place of the construction operation is called a building construction site or a construction site.
Need use the overhead hoist to carry out the handling to panel in the building work progress, panel handling in-process staff often need carry panel, carries the overhead hoist below, then uses the steel cable rope to bind panel, then the handling, and panel handling process takes place the slope easily, or drops, has certain danger.
SUMMERY OF THE UTILITY MODEL
The problem to prior art exists, the utility model provides a panel lifting frame for construction, removal lifting frame that can be convenient ships panel, then convenient fixed, the handling, and has more safeguard measure, avoids lifting ring or handling post fracture to cause the accident, has solved current panel lifting frame for construction's the removal of being not convenient for and has shipped panel, bindes comparatively loaded down with trivial details, has reduced the problem of the device's practicality.
The utility model discloses a realize like this, comprising a base plate, the fixed roof that is provided with in top of bottom plate, four corners department between bottom plate and the roof is the fixed support column that is provided with all, the top left and right sides of bottom plate is located all fixed many spinal branchs vaulting poles that are provided with between the support column, the fixed block, four are all welded in the upper end four corners department of roof the upper end of fixed block is the fixed steel cable rope that is provided with all, the fixed handling post that is provided with in upper end central authorities department of roof, the fixed first rings that are provided with in upper end of handling.
As the utility model discloses preferred, four the top of steel cable rope all with first rings fixed connection.
As the utility model discloses it is preferred, the external fixation of first rings is provided with second rings, the lower extreme and the handling post fixed connection of second rings.
As the utility model discloses it is preferred, the position that the up end left and right sides of bottom plate corresponds the bracing piece all is seted up flutedly, the position that the terminal surface of roof corresponds the bracing piece all runs through and has seted up the through-hole, the length of bracing piece is greater than the distance between bottom plate and the roof, many the equal joint of bracing piece is in the recess of bottom plate and the through-hole of roof.
As the utility model discloses it is preferred, the lower extreme four corners department of bottom plate has all welded the universal wheel, four the universal wheel is the rectangle and arranges.
As the utility model discloses it is preferred, the both sides are all fixed rope, four of being provided with of the left and right sides of lateral wall around the bottom plate the equal fixedly connected with couple in top of fixed rope, the position that the lateral wall lower extreme corresponds fixed rope around the roof is fixed solid fixed ring, four all with the solid fixed ring joint that corresponds.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a cooperation that sets up first rings, handling post, fixed block, steel cable rope, bottom plate, roof, support column and bracing piece is used, has solved current construction and has used panel lifting frame unable convenient shipment panel, and unable convenient fixed problem.
2. The utility model discloses a set up wire rope and first rings fixed connection, can be so that the more steady handling of whole handling frame rises, avoid handling first rings and the handling frame to break off after the post fracture simultaneously, and then cause the accident, increase the security.
3. The utility model discloses a set up the second rings, can be so that first rings and the unexpected damage of handling post or fracture, can also make second rings continue work, avoid the emergence accident, make handling efficiency higher simultaneously.
4. The utility model discloses a set up through-hole and recess, can play the effect of joint bracing piece for the bracing piece can be installed in a flexible way, dismantle, when needs shipment great panel, can extract the bracing piece temporarily, makes the use that whole device can be more nimble, ships panel, carries out the handling.
5. The utility model discloses a set up the universal wheel, can make the staff make the convenient removal of lifting frame through the universal wheel that sets up, and then remove near panel, and then make its shipment panel that can be convenient, then carry out the handling with panel.
6. The utility model discloses a set up solid fixed ring, fixed rope and couple, can be so that the staff can fix panel through fixed the couple and solid fixed ring can be realized fixing panel in panel shipment back, avoid panel to drop from the front and back side of lifting frame.
Drawings
Fig. 1 is a schematic view of an overall structure provided by an embodiment of the present invention;
fig. 2 is an enlarged view of a point a in fig. 1 according to an embodiment of the present invention;
fig. 3 is a schematic structural view of the support rod provided by the embodiment of the present invention after being pulled out;
in the figure: 1. a base plate; 101. a groove; 2. a top plate; 201. a through hole; 3. a support pillar; 4. a support bar; 5. a fixed block; 6. a steel cable; 7. hoisting the column; 8. a first hanging ring; 9. a second hoisting ring; 10. a fixing ring; 11. fixing a rope; 12. hooking; 13. a universal wheel.
Detailed Description
In order to further understand the contents, features and effects of the present invention, the following embodiments are illustrated and described in detail with reference to the accompanying drawings.
The structure of the present invention will be described in detail with reference to the accompanying drawings.
As shown in fig. 1 to 3, the embodiment of the utility model provides a pair of panel lifting frame for construction, including bottom plate 1, the fixed roof 2 that is provided with in top of bottom plate 1, four corners department between bottom plate 1 and the roof 2 is all fixed and is provided with support column 3, both sides are located and all fixedly are provided with many spinal branchs vaulting pole 4 between the support column 3 about the top of bottom plate 1, fixed block 5 has all been welded in the upper end four corners department of roof 2, the upper end of four fixed blocks 5 is all fixed and is provided with steel cable rope 6, the fixed handling post 7 that is provided with in upper end central authorities department of roof 2, the fixed first rings 8 that are provided with in upper end of.
Referring to fig. 1, 2 and 3, the top ends of the four steel cables 6 are all fixedly connected with a first hanging ring 8.
Adopt above-mentioned scheme: through setting up wire rope 6 and first rings 8 fixed connection, can be so that the more steady handling of whole handling frame rises, avoid handling 7 fracture back first rings 8 of post and handling frame to break away from simultaneously, and then cause the accident, increase the security.
Referring to fig. 1, 2 and 3, a second hanging ring 9 is fixedly arranged outside the first hanging ring 8, and the lower end of the second hanging ring 9 is fixedly connected with the lifting column 7.
Adopt above-mentioned scheme: through setting up second rings 9, can be so that first rings 8 and handling post 7 accident damage or fracture, can also make second rings 9 continue work, avoid the emergence accident, make handling efficiency higher simultaneously.
Referring to fig. 1 and 3, the upper end face of the bottom plate 1 is provided with a groove 101 at the left and right sides corresponding to the position of the support rod 4, the end face of the top plate 2 is provided with a through hole 201 through the position corresponding to the support rod 4, the length of the support rod 4 is greater than the distance between the bottom plate 1 and the top plate 2, and the support rods 4 are all clamped in the groove 101 of the bottom plate 1 and the through hole 201 of the top plate 2.
Adopt above-mentioned scheme: through setting up through-hole 201 and recess 101, can play the effect of joint bracing piece 4 for bracing piece 4 can be installed in a flexible way, dismantlement, when needs shipment great panel, can extract bracing piece 4 temporarily, makes the use that whole device can be more nimble, ships panel, carries out the handling.
Referring to fig. 1 and 3, universal wheels 13 are welded to four corners of the lower end of the bottom plate 1, and the four universal wheels 13 are arranged in a rectangular shape.
Adopt above-mentioned scheme: through setting up universal wheel 13, can be so that the staff makes the convenient removal of lifting frame through the universal wheel 13 that sets up, and then remove near panel, and then make its shipment panel that can be convenient, then carry out the handling with panel.
Referring to fig. 1 and 3, the left side and the right side of the front side wall and the rear side wall of the bottom plate 1 are fixedly provided with fixing ropes 11, the top ends of the four fixing ropes 11 are fixedly connected with hooks 12, the positions of the lower ends of the front side wall and the rear side wall of the top plate 2, which correspond to the fixing ropes 11, are fixedly provided with fixing rings 10, and the four hooks 12 are connected with the corresponding fixing rings 10 in a clamping manner.
Adopt above-mentioned scheme: through setting up solid fixed ring 10, fixed rope 11 and couple 12, can be so that the staff can realize fixing panel through fixing couple 12 and solid fixed ring 10 after panel shipment, avoid panel to drop from the front and back side of lifting frame.
The utility model discloses a theory of operation:
when using, the staff can be with near panel of the convenient removal of handling frame through the universal wheel 13 that sets up, open couple 12, ship panel, then couple 12 and solid fixed ring 10 are connected, realization that can be convenient is fixed panel, avoids handling in-process panel to drop, connects first rings 8 through second rings 9 and the steel cable rope 6 that sets up, can guarantee overhead hoist's security, avoids handling post 7 accidental damage or fracture emergence accident danger.
In summary, the following steps: this sheet material lifting frame for construction, through setting up first rings 8, second rings 9, handling post 7, the wire rope 6, roof 2, bottom plate 1, support column 3, solid fixed ring 10, fixed rope 11 and couple 12's cooperation use, removal lifting frame that can be convenient ships panel shipment, then convenient fixed, the handling, and more safeguard measure has been solved current sheet material lifting frame for construction's the not convenient for remove shipment panel, it is comparatively loaded down with trivial details to bind, the problem of the practicality of the device has been reduced.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a panel lifting frame for construction, includes bottom plate (1), its characterized in that: the fixed roof (2) that is provided with in top of bottom plate (1), four corners department between bottom plate (1) and roof (2) all fixes being provided with support column (3), both sides are located all fixed many spinal branch vaulting poles (4) of being provided with between support column (3) about the top of bottom plate (1), fixed block (5), four are all welded in the upper end four corners department of roof (2) the upper end of fixed block (5) is all fixed and is provided with steel cable rope (6), the fixed handling post (7) that is provided with in upper end central authorities department of roof (2), the fixed first rings (8) that are provided with in upper end of handling post (7).
2. A panel lifting frame for construction as claimed in claim 1, wherein: the top ends of the four steel cables (6) are fixedly connected with the first lifting ring (8).
3. A panel lifting frame for construction as claimed in claim 1, wherein: and a second lifting ring (9) is fixedly arranged outside the first lifting ring (8), and the lower end of the second lifting ring (9) is fixedly connected with the lifting column (7).
4. A panel lifting frame for construction as claimed in claim 1, wherein: the position that both sides correspond bracing piece (4) about the up end of bottom plate (1) all sets up fluted (101), the position that the terminal surface of roof (2) corresponds bracing piece (4) all runs through and has seted up through-hole (201), the length of bracing piece (4) is greater than the distance between bottom plate (1) and roof (2), many the equal joint of bracing piece (4) is in recess (101) of bottom plate (1) and through-hole (201) of roof (2).
5. A panel lifting frame for construction as claimed in claim 1, wherein: the universal wheels (13) are welded at four corners of the lower end of the bottom plate (1), and the universal wheels (13) are arranged in a rectangular shape.
6. A panel lifting frame for construction as claimed in claim 1, wherein: the utility model discloses a roof, including bottom plate (1), lateral wall around bottom plate (1) the left and right sides all fixed rope (11) that are provided with, four the equal fixedly connected with couple (12) in top of fixed rope (11), the position that lateral wall lower extreme corresponds fixed rope (11) around roof (2) is all fixed ring (10) that is provided with, four couple (12) all with the solid fixed ring (10) joint that corresponds.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021047169.XU CN212503607U (en) | 2020-06-09 | 2020-06-09 | Panel lifting frame for construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021047169.XU CN212503607U (en) | 2020-06-09 | 2020-06-09 | Panel lifting frame for construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212503607U true CN212503607U (en) | 2021-02-09 |
Family
ID=74394535
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021047169.XU Expired - Fee Related CN212503607U (en) | 2020-06-09 | 2020-06-09 | Panel lifting frame for construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212503607U (en) |
-
2020
- 2020-06-09 CN CN202021047169.XU patent/CN212503607U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206692235U (en) | A kind of steel structure dome lifts by crane erecting device | |
CN104631810A (en) | High-altitude movable hanging basket system and construction method thereof | |
CN208734109U (en) | A kind of steel roof joist safety rope hanging apparatus | |
CN105421748A (en) | Anchoring device of cantilever scaffold | |
CN212503607U (en) | Panel lifting frame for construction | |
CN109537863A (en) | Operating platform support frame and operating platform | |
CN107587711A (en) | A kind of regularization assembled overhanging protection canopy and its assembly method | |
CN111827648A (en) | Construction device and method for down-supporting type overhanging scaffold | |
CN107381376B (en) | Device and method for hoisting by utilizing curtain wall embedded part | |
CN201339311Y (en) | Turning plate device of hanging rack | |
CN209686833U (en) | Operating platform support frame and operating platform | |
CN2216104Y (en) | Hanging lift scaffold | |
CN209722771U (en) | A kind of bridge construction Hanging Basket | |
CN205973582U (en) | Simple and easy hoisting accessory of cable cover plate | |
CN205224571U (en) | Anchor of builder's jack | |
CN210396225U (en) | Exempt from to set up and tear concrete floor equipment open | |
CN216272669U (en) | Overlength flexible material hoist device | |
CN212428008U (en) | Lower supporting type overhanging scaffold construction device | |
CN212077651U (en) | Bent cap staple bolt installation device | |
CN212336694U (en) | Connecting device for embedded steel pipe and scaffold cross rod | |
CN108756254A (en) | The installation method of cantilever frame platform and cantilever frame | |
CN217517805U (en) | Cantilever hidden beam structure convenient to install | |
CN216918357U (en) | Hoisting device utilizing building internal structure | |
CN216275273U (en) | Assembled mould pier shaft operation platform that turns over | |
CN218208455U (en) | Auxiliary device is fixed in construction electrical construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210209 |