CN212503411U - 一种倒u型预应力编束的布线装置 - Google Patents
一种倒u型预应力编束的布线装置 Download PDFInfo
- Publication number
- CN212503411U CN212503411U CN202020489384.9U CN202020489384U CN212503411U CN 212503411 U CN212503411 U CN 212503411U CN 202020489384 U CN202020489384 U CN 202020489384U CN 212503411 U CN212503411 U CN 212503411U
- Authority
- CN
- China
- Prior art keywords
- wiring pipe
- main wiring
- pipe
- main
- auxiliary
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
- 238000009954 braiding Methods 0.000 title description 2
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 28
- 239000010959 steel Substances 0.000 claims abstract description 28
- 238000000034 method Methods 0.000 description 19
- 238000010276 construction Methods 0.000 description 3
- 238000009941 weaving Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
Images
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
一种倒U型预应力编束的布线装置,包括布线管,布线管位于外侧墙体、内侧墙体之间,且在外侧墙体上开有入口;布线管包括辅助布线管A、辅助布线管B、主布线管A、主布线管B,其中辅助布线管A、辅助布线管B与主布线管A、主布线管B绑扎在一起,主布线管A、主布线管B固定在支架上,在内侧墙体上布置钢束行走滚轮,钢束行走滚轮包括两个垂直布置的滚轮。其中辅助布线管A、辅助布线管B通过钢丝与主布线管A、主布线管B绑扎在一起。主布线管A、主布线管B通过卡扣固定在支架上。
Description
技术领域
本技术涉及布线装置领域,具体涉及一种倒U型预应力编束的布线装置。
背景技术
我国自主研发设计的三代核电技术“华龙一号”在内层安全壳中设置了倒U型预应力钢束,倒U型钢束共计94束,每束由55根1x7公称直径15.7mm的钢绞线组成,整体重量在10t左右,施工工艺为整体牵引。在整个牵引穿束前需要进行编束工序、牵引头处理工序,为了确保各道工序在时间上能够很好的衔接,避免部分工种出现等靠现象,需要确保编束工艺能够顺畅,进度满足后续工序的需求。
编束是通过围绕在廊道内侧的编束管道将55根钢绞线编制成完整的钢束。施工中面临两方面的问题:1)由于钢绞线数量多、钢束长度较长(超200m)、管道直径与钢束直径接近,导致最初的单管道编束钢绞线卡顿严重,一般情况下穿到40余根的时候,就会出现卡顿,严重制约了后续工序的连续性,由于卡顿后需要将卡住的钢绞线拽出报废,这需要耗费较多时间,并浪费材料。2)根据现场施工经验统计,编束工序需要时间6~8小时,穿束工序一般在3~4小时,并且下一次编束需要待穿束工序将钢束拖离布线管道后才能再进行,也就意味着,逐根编束无法满足穿束的需求,编束和穿束需要相互等待。针对此,现场制作了两大两小四个布线管道来解决上述两个问题,保障了编束的流畅,很好的匹配了穿束各道工序的时间差。
实用新型内容
本实用新型的目的在于:保障倒U型预应力编束顺畅,避免布线过程中频繁出现卡顿,提升编束效率,让编束与穿束两道工序在时间上能够很好的衔接。
本实用新型的技术方案如下:一种倒U型预应力编束的布线装置,包括布线管,布线管位于外侧墙体、内侧墙体之间,且在外侧墙体上开有入口;
布线管包括辅助布线管A、辅助布线管B、主布线管A、主布线管B,其中辅助布线管A、辅助布线管B与主布线管A、主布线管B绑扎在一起,主布线管A、主布线管B固定在支架上,
在内侧墙体上布置钢束行走滚轮,钢束行走滚轮包括两个垂直布置的滚轮。
其中辅助布线管A、辅助布线管B通过钢丝与主布线管A、主布线管B绑扎在一起。
主布线管A、主布线管B通过卡扣固定在支架上。
支架共计48个。
支架均匀的通过预埋在混凝土中的卡规固定。
辅助布线管A、辅助布线管B的入口均在同一位置。
本实用新型的显著效果在于:
1)编束过程中不会在出现卡顿,大大提升了工效,节约了钢绞线材料。
2)两套布线管道,可以保障编束连续作业,同时也保障了后续的穿束工序连续。
3)有利于预应力廊道作业专业化分工,编束和穿束工序达到严格的分离,同时彼此在时间上匹配良好。
4)由于不会出现卡顿和反复对钢绞线进行拖拽,避免了在拖拽过程中损坏钢绞线的质量。
附图说明
图1为本实用新型所述的倒U型预应力编束的布线装置俯视示意图;
图2为图1的AA视图;
图中:1入口、2外侧墙体、3内侧墙体、4布线管、5辅助布线管A、6辅助布线管B、7主布线管A、8主布线管B、9卡扣、10支架、11钢束行走滚轮
具体实施方式
一种倒U型预应力编束的布线装置,如图1所示,包括布线管4,布线管4位于外侧墙体2、内侧墙体3之间,且在外侧墙体2上开有入口1,
如图1所示,布线管4包括辅助布线管A5、辅助布线管B6、主布线管A7、主布线管B8,其中辅助布线管A5、辅助布线管B6通过钢丝与主布线管A7、主布线管B8绑扎在一起,主布线管A7、主布线管B8通过卡扣9固定在支架10上,支架10共计48个,均匀的通过预埋在混凝土中的卡规固定。
在内侧墙体3上布置钢束行走滚轮11,钢束行走滚轮11包括两个垂直布置的滚轮,
辅助布线管A5、辅助布线管B6的入口均在同一位置,这一做法是为了保障穿束机的位置固定,避免反复移动影响工效。而辅助布线管A5、辅助布线管B6的终点错开约2m左右的距离,确保两套布线管的钢绞线出管道的时候不会交叉缠绕。
Claims (6)
1.一种倒U型预应力编束的布线装置,其特征在于:包括布线管(4),布线管(4)位于外侧墙体(2)、内侧墙体(3)之间,且在外侧墙体(2)上开有入口(1);
布线管(4)包括辅助布线管A(5)、辅助布线管B(6)、主布线管A(7)、主布线管B(8),其中辅助布线管A(5)、辅助布线管B(6)与主布线管A(7)、主布线管B(8)绑扎在一起,主布线管A(7)、主布线管B(8)固定在支架(10)上,
在内侧墙体(3)上布置钢束行走滚轮(11),钢束行走滚轮(11)包括两个垂直布置的滚轮。
2.根据权利要求1所述的一种倒U型预应力编束的布线装置,其特征在于:其中辅助布线管A(5)、辅助布线管B(6)通过钢丝与主布线管A(7)、主布线管B(8)绑扎在一起。
3.根据权利要求1所述的一种倒U型预应力编束的布线装置,其特征在于:主布线管A(7)、主布线管B(8)通过卡扣(9)固定在支架(10)上。
4.根据权利要求3所述的一种倒U型预应力编束的布线装置,其特征在于:支架(10)共计48个。
5.根据权利要求4所述的一种倒U型预应力编束的布线装置,其特征在于:支架(10)均匀的通过预埋在混凝土中的卡规固定。
6.根据权利要求1所述的一种倒U型预应力编束的布线装置,其特征在于:辅助布线管A(5)、辅助布线管B(6)的入口均在同一位置。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020489384.9U CN212503411U (zh) | 2020-04-07 | 2020-04-07 | 一种倒u型预应力编束的布线装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020489384.9U CN212503411U (zh) | 2020-04-07 | 2020-04-07 | 一种倒u型预应力编束的布线装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212503411U true CN212503411U (zh) | 2021-02-09 |
Family
ID=74431834
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020489384.9U Withdrawn - After Issue CN212503411U (zh) | 2020-04-07 | 2020-04-07 | 一种倒u型预应力编束的布线装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212503411U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111517170A (zh) * | 2020-04-07 | 2020-08-11 | 福建福清核电有限公司 | 一种倒u型预应力编束的布线装置 |
-
2020
- 2020-04-07 CN CN202020489384.9U patent/CN212503411U/zh not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111517170A (zh) * | 2020-04-07 | 2020-08-11 | 福建福清核电有限公司 | 一种倒u型预应力编束的布线装置 |
CN111517170B (zh) * | 2020-04-07 | 2024-08-09 | 福建福清核电有限公司 | 一种倒u型预应力编束的布线装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212503411U (zh) | 一种倒u型预应力编束的布线装置 | |
CN113756201B (zh) | 一种t构连续梁预应力钢绞线穿束方法及其穿束装置 | |
CN108149932B (zh) | 用于预应力钢绞线穿束的穿束装置及其穿束方法 | |
CN102354926A (zh) | 大截面导线张力架线施工方法 | |
CN106081836A (zh) | 竖井首绳和尾绳更换方法 | |
CN105568856B (zh) | 一种稀索斜拉桥索梁同步施工方法 | |
CN103410125A (zh) | 整体式u型锚索预埋孔道及其安装方法 | |
CN106087759B (zh) | 一种预应力钢束穿线装置及预应力钢束的穿线方法 | |
CN111517170A (zh) | 一种倒u型预应力编束的布线装置 | |
CN115045512B (zh) | 一种核电站预应力超长环向钢束整体穿束装置及方法 | |
CN114645619B (zh) | 核电站安全壳Gamma钢束钢绞线整体牵引的施工方法 | |
CN106012834B (zh) | 一种空间扭曲曲线异型反对称钢主塔内支撑及张拉系统 | |
CN205114690U (zh) | 旧线回收装置 | |
CN207192577U (zh) | 狭窄空间管道吊运夹具导流引导装置 | |
CN211228143U (zh) | 一种钢绞线梳编装置 | |
CN205975368U (zh) | 一种预应力钢束穿线装置 | |
CN112482227B (zh) | 一种矮塔斜拉桥穿索系统及其方法 | |
CN103184799A (zh) | 预应力钢绞线穿装专用钢梳及其使用方法 | |
HU189019B (en) | Method and production line for producing supporting meshes serving for mine supporting purpose | |
CN107938517B (zh) | 一种斜拉桥预应力混凝土梁环锚施工方法 | |
CN214573360U (zh) | 一种钢绞线对位穿束装置 | |
CN215405640U (zh) | 一种悬浇箱梁纵向预应力筋总体穿束牵引系统 | |
CN201075612Y (zh) | 线缆敷设器 | |
CN220434257U (zh) | 一种高空预应力水平钢束的整体牵引装置 | |
CN111509623A (zh) | 电缆穿管敷设用输送装置及电缆穿管敷设方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20210209 Effective date of abandoning: 20240809 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20210209 Effective date of abandoning: 20240809 |