CN212336676U - Top construction device used in large-space building - Google Patents
Top construction device used in large-space building Download PDFInfo
- Publication number
- CN212336676U CN212336676U CN201922479298.XU CN201922479298U CN212336676U CN 212336676 U CN212336676 U CN 212336676U CN 201922479298 U CN201922479298 U CN 201922479298U CN 212336676 U CN212336676 U CN 212336676U
- Authority
- CN
- China
- Prior art keywords
- plate
- box body
- close
- construction device
- space building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model belongs to the construction equipment field, especially, a be used for top construction equipment in big space building, when to some materials of current hoist and mount, because the material is directly placed on the tray, the material takes place to drop or spill easily at the in-process of hoist and mount, influences the security problem among the building work progress, the scheme is put forward now, it is including placing the box, the front side of placing the box is opened and is equipped with the access hole, and the front side of placing the box is opened and is equipped with two spouts, and slidable mounting has the slide in the spout, and one side welding that two slides are close to each other has same baffle, and the baffle contacts with the opening of access hole, has all seted up two baffle holes on the one side inner wall that two spouts were kept away from each other, and the downthehole slidable mounting. The utility model discloses the practicality is good, can avoid the material to drop at the in-process of hoist and mount, improves the security of hoist and mount in-process to conveniently get and take the material of placing the box.
Description
Technical Field
The utility model relates to a construction equipment technical field especially relates to a be used for interior top construction equipment of big space building.
Background
Through retrieval, the top construction equipment in being used for big space building that the bulletin number is CN208899840U discloses, including bottom sprag platform, two horizontal poles and two sets of hanging parts, two sets of bottoms that hang the piece set up both ends around bottom sprag platform respectively, two sets of hanging parts are the symmetry setting, two fixed settings of horizontal pole are at the top in the building, the top of two sets of hanging parts articulates respectively on two horizontal poles, this top construction equipment has simple structure, low cost in being used for big space building, hang advantages such as convenience and security performance height.
When being under construction to top in the big space building, need hoist and mount some materials to construction equipment on, because the material is directly placed on the tray, the material takes place to drop or spill easily at the in-process of hoist and mount, influences the security among the building construction process.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving when having some materials of hoist and mount among the prior art, because the material is directly placed on the tray, the material takes place to drop or spill easily at the in-process of hoist and mount, influences the security shortcoming in the building work progress, and the interior top construction equipment of big space building that proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a top construction device used in a large space building comprises a placing box body, wherein a taking hole is formed in the front side of the placing box body, two sliding grooves are formed in the front side of the placing box body, sliding plates are arranged in the sliding grooves in a sliding mode, the same partition plate is welded on one side, close to each other, of the two sliding plates, the partition plate is contacted with the opening of the taking hole, two baffle holes are formed in the inner wall, far away from each other, of the two sliding grooves, baffle plates are arranged in the baffle holes in a sliding mode, the same side plate is welded on one side of the two corresponding baffle plates, a plurality of springs are welded on one side, close to each other, of the two side plates, one ends, close to each other, of the two springs on the same horizontal axis are respectively welded on the two sides of the placing box body, transverse plates are welded on the tops, a, one side that two diaphragms are close to each other all articulates there is the articulated slab, has seted up vertical slot on the top inner wall in square cavity, and slidable mounting has iron plate in the vertical slot, and one side that two articulated slabs are close to each other is articulated mutually with the both sides of iron plate respectively, and fixedly connected with embeds the box body on the bottom inner wall in square cavity, and the traction hole has been seted up at the top of the built-in box body, and the traction hole is run through to the bottom of iron plate, and fixedly connected with electro-magnet on the bottom inner.
Preferably, the top of placing the box is equipped with the lifting rope, the bottom fixedly connected with lifting hook of lifting rope, the top fixedly connected with rings of placing the box, rings hang on the lifting hook, to placing the box and hoist.
Preferably, the handle is welded on the front side of the partition plate, the control switch is fixedly connected on the front side of the handle, and the control switch is electrically connected with the electromagnet.
Preferably, the number of the springs on the same side plate is three, so that the side plates can be restored to the original positions.
Preferably, the two hinge plates are symmetrically arranged, and the two hinge plates are obliquely arranged.
Preferably, the bottom of the baffle plate positioned below is in contact with the top of the sliding plate to limit the sliding plate.
In the utility model, the top construction device for large space building can prevent the material from falling off in the hoisting process by arranging the placing box body, the safety in the hoisting process is improved, when the material needs to be taken out by workers when the material is hoisted to a certain height, the control switch is turned on, the electromagnet is started, the electromagnet adsorbs the iron plate, the iron plate drives the hinged plate to rotate, the hinged plate drives the transverse plate to move, the transverse plate drives the side plate to move, the side plate stretches the spring, the lower baffle is separated from the sliding plate, the handle is pulled at the moment, the handle drives the baffle to move, the sliding plate is contacted with the inner wall of the top of the chute, then the control switch is turned off, the spring drives the side plate to move due to the elasticity of the spring, the top of the upper baffle is contacted with the bottom of the sliding plate, carry on spacingly to the slide, get at this moment and take the hole and expose, the staff takes the material of placing in the box through getting, easy operation is convenient, and the security performance is better.
The utility model discloses the practicality is good, can avoid the material to drop at the in-process of hoist and mount, improves the security of hoist and mount in-process to conveniently get and take the material of placing the box.
Drawings
Fig. 1 is a schematic structural view of a top construction device for a large space building according to the present invention;
fig. 2 is a schematic structural diagram of a part a of a top construction device for a large space building according to the present invention;
fig. 3 is a schematic structural diagram of a part B of the top construction device for large space buildings according to the present invention.
In the figure: 1. placing the box body; 2. a slide plate; 3. a partition plate; 4. a baffle plate; 5. a side plate; 6. a spring; 7. a transverse plate; 8. an iron plate; 9. a hinge plate; 10. a box body is arranged inside; 11. an electromagnet; 12. a lifting rope; 13. a hook; 14. a lifting ring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a top construction device for large space buildings comprises a placing box body 1, a taking hole is arranged at the front side of the placing box body 1, two sliding grooves are arranged at the front side of the placing box body 1, sliding plates 2 are arranged in the sliding grooves in a sliding manner, one side, close to each other, of each sliding plate 2 is welded with the same partition plate 3, each partition plate 3 is contacted with the opening of the taking hole, two baffle holes are respectively arranged on the inner wall of one side, away from each other, of each sliding groove, a baffle plate 4 is arranged in each baffle hole in a sliding manner, one side, corresponding to each baffle plate 4, of each baffle plate 5 is welded with the same side plate 5, one side, close to each side, of each two side plates 5 is welded with a plurality of springs 6, one ends, close to each other, of the two springs 6 on the same horizontal axis are, all seted up the cross bore on the both sides inner wall in square cavity, diaphragm 7 slidable mounting is in the cross bore, two diaphragm 7 one side that is close to each other all articulates there is articulated slab 9, vertical slot has been seted up on the top inner wall in square cavity, slidable mounting has iron plate 8 in vertical slot, one side that two articulated slab 9 are close to each other is articulated mutually with iron plate 8's both sides respectively, fixedly connected with embeds box body 10 on the bottom inner wall in square cavity, the traction hole has been seted up at the top of embeds box body 10, the traction hole is run through to iron plate 8's bottom, fixedly connected with electro-magnet 11 on the bottom inner wall of embeds box.
In this embodiment, the top of placing box 1 is equipped with lifting rope 12, and the bottom fixedly connected with lifting hook 13 of lifting rope 12 places the top fixedly connected with rings 14 of box 1, and rings 14 hang on lifting hook 13, to placing box 1 and hoist.
In this embodiment, the handle is welded to the front side of the partition board 3, and the control switch is fixedly connected to the front side of the handle and electrically connected to the electromagnet 11.
In this embodiment, the number of the springs 6 on the same side plate 5 is three, so that the side plate 5 can be restored to the original position.
In this embodiment, the two hinge plates 9 are symmetrically arranged, and the two hinge plates 9 are obliquely arranged.
In this embodiment, the bottom of the baffle 4 located below contacts with the top of the slide plate 2 to limit the slide plate 2.
In the utility model, when in use, the placing box body 1 is arranged, materials are placed in the placing box body 1 to avoid the materials from falling off in the hoisting process, the safety in the hoisting process is improved, when the materials are hoisted to a certain height, when workers need to take out the materials, the control switch is turned on, the electromagnet 11 is started, the electromagnet 11 is powered by the storage battery, the electromagnet 11 adsorbs the iron plate 8, the iron plate 8 drives the hinged plate 9 to rotate, the hinged plate 9 drives the transverse plate 7 to move, so that the two transverse plates 7 move towards the direction away from each other, the transverse plate 7 drives the side plate 5 to move, the side plate 5 stretches the spring 6, the side plate 5 drives the baffle 4 to move, the baffle 4 below is separated from the sliding plate 2, the handle is pulled at the moment, the handle drives the baffle 3 to move, the baffle 3 drives the sliding, make slide 2 and the top inner wall of spout contact, then close control switch, spring 6 drives curb plate 5 and removes this moment because the elasticity of self for the top of the baffle 4 of top contacts with the bottom of slide 2, carries on spacingly to slide 2, gets this moment and takes the hole to expose, and the staff takes the material of placing in the box 1 through getting to take the hole, and easy operation is convenient, and the security performance is better.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.
Claims (6)
1. A top construction device used in a large-space building comprises a placing box body (1) and is characterized in that a taking hole is formed in the front side of the placing box body (1), two sliding grooves are formed in the front side of the placing box body (1), sliding plates (2) are arranged in the sliding grooves in a sliding mode, one side, close to each other, of each sliding plate (2) is welded with the same partition plate (3), each partition plate (3) is in contact with the opening of the taking hole, two baffle plate holes are formed in the inner wall, far away from each other, of each sliding groove, a baffle plate (4) is arranged in each baffle plate hole in a sliding mode, one side of each corresponding baffle plate (4) is welded with the same side plate (5), one side, close to each other, of each side plate (5) is welded with a plurality of springs (6), one ends, close to each other, of, diaphragm (7) have all been welded at one side top that two curb plates (5) are close to each other, place and seted up the square cavity on box (1), the cross bore has all been seted up on the both sides inner wall in square cavity, diaphragm (7) slidable mounting is in the cross bore, one side that two diaphragm (7) are close to each other all articulates there is articulated slab (9), vertical slot has been seted up on the top inner wall in square cavity, slidable mounting has iron plate (8) in vertical slot, one side that two articulated slab (9) are close to each other is articulated mutually with the both sides of iron plate (8) respectively, fixedly connected with embeds box body (10) on the bottom inner wall in square cavity, the traction hole has been seted up at the top of embeds box body (10), the traction hole is run through to the bottom of iron plate (8), fixedly connected with electro.
2. The top construction device for the large space building as claimed in claim 1, wherein a lifting rope (12) is arranged above the placing box body (1), a lifting hook (13) is fixedly connected to the bottom end of the lifting rope (12), a lifting ring (14) is fixedly connected to the top of the placing box body (1), and the lifting ring (14) is hung on the lifting hook (13).
3. The top construction device in a large space building as claimed in claim 1, wherein a handle is welded to the front side of the partition plate (3), a control switch is fixedly connected to the front side of the handle, and the control switch is electrically connected to the electromagnet (11).
4. A roof construction device in a large space building according to claim 1, characterised in that the number of springs (6) on the same side plate (5) is three.
5. A roof construction device for use in a large space building according to claim 1 wherein two hinged panels (9) are arranged symmetrically and two hinged panels (9) are arranged obliquely.
6. A roof construction device for use in a large space building according to claim 1 wherein the bottom of the lower baffle plate (4) is in contact with the top of the skid plate (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922479298.XU CN212336676U (en) | 2019-12-31 | 2019-12-31 | Top construction device used in large-space building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922479298.XU CN212336676U (en) | 2019-12-31 | 2019-12-31 | Top construction device used in large-space building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212336676U true CN212336676U (en) | 2021-01-12 |
Family
ID=74064323
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922479298.XU Expired - Fee Related CN212336676U (en) | 2019-12-31 | 2019-12-31 | Top construction device used in large-space building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212336676U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110965760A (en) * | 2019-12-31 | 2020-04-07 | 广西建工集团第五建筑工程有限责任公司 | Top construction device used in large-space building |
-
2019
- 2019-12-31 CN CN201922479298.XU patent/CN212336676U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110965760A (en) * | 2019-12-31 | 2020-04-07 | 广西建工集团第五建筑工程有限责任公司 | Top construction device used in large-space building |
CN110965760B (en) * | 2019-12-31 | 2024-03-29 | 广西建工第五建筑工程集团有限公司 | Top construction device used in large-space building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210074447U (en) | Rainproof type block terminal | |
CN212336676U (en) | Top construction device used in large-space building | |
CN210150057U (en) | Concrete retarder storage rack | |
CN110965760B (en) | Top construction device used in large-space building | |
CN211283651U (en) | Lifting device for municipal road well lid | |
CN210034934U (en) | Warning screen with external protection box body | |
CN215594810U (en) | Construction work platform is built in room | |
CA2515710A1 (en) | Hoist for construction material | |
CN116252892A (en) | Anti-theft device of new energy battery for storage battery car | |
CN211310754U (en) | Municipal administration is with well lid moving subassembly | |
CN211872446U (en) | A turning device for assembled passageway of crossing street | |
CN209957238U (en) | Multi-arm crane for building | |
CN205016877U (en) | Switch board that can hoist | |
CN208500236U (en) | A kind of aluminium alloy crane convenient for conveying | |
CN209740651U (en) | Supplementary mapping device of three-dimensional topography in city | |
CN209668611U (en) | Hydraulic cylinder cylinder barrel stone tongs | |
CN208345616U (en) | A kind of construction mini foldable hydraulic crane | |
CN208895175U (en) | A kind of anti-splash steel-making bucket | |
CN207699017U (en) | A kind of electromagnetism row with warning lamp is hung | |
CN202321981U (en) | Semi-automatic conversion device for lifting hook between 1 multiplying power and 2 multiplying power of movable-arm type tower crane | |
CN203638496U (en) | Mechanical hanging dual-box drop-bottom garbage station equipment | |
CN221037421U (en) | Sedimentation monitoring device for foundation below main crane for large hoisting operation | |
CN211420896U (en) | Railway pier top surrounding hanging basket safe operation platform | |
CN203624817U (en) | Hanging device of synthetic fiber lifting belt | |
CN202591592U (en) | Steel ladle cover |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: No. 167, Donghuan Avenue, Liuzhou City, Guangxi Zhuang Autonomous Region Patentee after: Guangxi construction engineering Fifth Construction Engineering Group Co.,Ltd. Address before: 545006 No. 167, east ring Avenue, Liuzhou City, Liuzhou City, Guangxi Zhuang Autonomous Region Patentee before: THE FIFTH CONSTRUCTION ENGINEERING COMPANY OF GUANGXI CONSTRUCTION ENGINEERING Group |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210112 |