CN110965760B - Top construction device used in large-space building - Google Patents

Top construction device used in large-space building Download PDF

Info

Publication number
CN110965760B
CN110965760B CN201911410915.9A CN201911410915A CN110965760B CN 110965760 B CN110965760 B CN 110965760B CN 201911410915 A CN201911410915 A CN 201911410915A CN 110965760 B CN110965760 B CN 110965760B
Authority
CN
China
Prior art keywords
box body
plates
plate
sliding
welded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201911410915.9A
Other languages
Chinese (zh)
Other versions
CN110965760A (en
Inventor
黄宗权
李旭民
董旭东
毛琼
李超慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Construction Engineering Fifth Construction Engineering Group Co ltd
Original Assignee
Guangxi Construction Engineering Fifth Construction Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Construction Engineering Fifth Construction Engineering Group Co ltd filed Critical Guangxi Construction Engineering Fifth Construction Engineering Group Co ltd
Priority to CN201911410915.9A priority Critical patent/CN110965760B/en
Publication of CN110965760A publication Critical patent/CN110965760A/en
Application granted granted Critical
Publication of CN110965760B publication Critical patent/CN110965760B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/001Safety or protective measures against falling down relating to scaffoldings

Abstract

The invention belongs to the field of construction devices, in particular to a top construction device for a large-space building, which aims at solving the problem that when a plurality of materials are hoisted in the prior art, the materials are directly placed on a tray, and fall or spill easily occurs in the hoisting process to influence the safety in the building construction process. The invention has good practicality, can avoid the material from falling in the hoisting process, improves the safety in the hoisting process, and is convenient for taking and placing the material in the box body.

Description

Top construction device used in large-space building
Technical Field
The invention relates to the technical field of construction devices, in particular to a construction device for the inner top of a large-space building.
Background
Through retrieving, the top construction equipment in the large space building that the bulletin number of authorizing is CN208899840U discloses, including bottom sprag platform, two horizontal poles and two sets of hanging, the bottom that two sets of hanging set up respectively at bottom sprag platform's front and back both ends, two sets of hanging are the symmetry setting, and two horizontal poles are fixed to be set up at the top in the building, and the top that two sets of hanging hung respectively articulates on two horizontal poles, should be used for the top construction equipment in the large space building have simple structure, low cost, hang advantages such as convenient and the security performance height.
When constructing the top in the large space building, need hoist and mount some materials to construction equipment, because the material is directly placed on the tray, the material takes place to drop or spill easily at the in-process of hoist and mount, influences the security in the building work progress.
Disclosure of Invention
The invention aims to solve the problem that the safety of the building construction process is affected because materials are easy to fall or spill in the hoisting process because the materials are directly placed on a tray when some materials are hoisted in the prior art.
In order to achieve the above purpose, the present invention adopts the following technical scheme:
a top construction equipment in large space building, including placing the box, the front side of placing the box has been seted up and has been got the hole of putting, two spouts have been seted up to the front side of placing the box, sliding mounting has been seted up the slide in the spout, one side welding that two slides are close to each other has same baffle, the baffle contacts with the opening of getting the hole of putting, two baffle holes have all been seted up on the inner wall of one side that two spouts kept away from each other, sliding mounting has the baffle in the baffle hole, same curb plate has been welded to one side of corresponding two baffles, a plurality of springs have all been welded to one side that two curb plates are close to each other, the one side top that two curb plates are close to each other has all been welded the diaphragm, square cavity has all been seted up on the inner wall of one side that two curb plates are close to each other, perpendicular groove has been seted up on the inner wall of square cavity, the inner wall of two sides that are close to each other has the bottom of articulated box in the fixed box of the bottom of the articulated box of placing of iron plate, the bottom of the fixed box is placed to the bottom of the articulated box in the bottom of the inner wall that is placed in the articulated box of the bottom of the side that two sides that is close to each other on the curb plate, the bottom of placing the box.
Preferably, a lifting rope is arranged above the placement box body, a lifting hook is fixedly connected to the bottom end of the lifting rope, a lifting ring is fixedly connected to the top of the placement box body, the lifting ring is hung on the lifting hook, and the placement box body is lifted.
Preferably, the front side of the partition plate is welded with a handle, and the front side of the handle is fixedly connected with a control switch which is electrically connected with the electromagnet.
Preferably, the number of springs on the same side plate is three, so that the side plate can be restored to the original position.
Preferably, the two hinge plates are symmetrically arranged and the two hinge plates are obliquely arranged.
Preferably, the bottom of the baffle plate positioned below is contacted with the top of the sliding plate, and the sliding plate is subjected to limit treatment.
According to the construction device for the top in the large-space building, the placement box body is arranged, materials are placed in the placement box body, the materials can be prevented from falling in the lifting process, the safety in the lifting process is improved, when a worker needs to take out the materials when lifting to a certain height, the control switch is turned on, the electromagnet is started, the electromagnet adsorbs an iron plate, the iron plate drives the hinged plate to rotate, the hinged plate drives the transverse plate to move, the transverse plate drives the side plate to move, the side plate stretches the spring to enable the baffle below to be separated from the sliding plate, the handle is pulled at the moment, the baffle is driven to move by the handle, the sliding plate is enabled to be in contact with the top inner wall of the sliding groove, then the control switch is turned off, the spring drives the side plate to move due to the self elasticity, the top of the baffle above is enabled to be in contact with the bottom of the sliding plate, the sliding plate is limited, the taking hole is exposed at the moment, the worker takes the materials in the placement box body through the taking hole, the operation is simple and convenient, and the safety performance is good.
The invention has good practicality, can avoid the material from falling in the hoisting process, improves the safety in the hoisting process, and is convenient for taking and placing the material in the box body.
Drawings
FIG. 1 is a schematic view of a construction apparatus for roof construction in a large-space building according to the present invention;
FIG. 2 is a schematic view of the construction of part A of a roof construction apparatus for large-space buildings according to the present invention;
fig. 3 is a schematic structural view of a portion B of a roof construction apparatus for a large-space building according to the present invention.
In the figure: 1. placing a box body; 2. a slide plate; 3. a partition plate; 4. a baffle; 5. a side plate; 6. a spring; 7. a cross plate; 8. an iron plate; 9. a hinged plate; 10. a box body is arranged in the box body; 11. an electromagnet; 12. a hanging rope; 13. a lifting hook; 14. and (5) hanging rings.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments.
Referring to fig. 1-3, a top construction device for large-space buildings comprises a placing box body 1, a taking and placing hole is formed in the front side of the placing box body 1, two sliding grooves are formed in the front side of the placing box body 1, sliding plates 2 are slidably installed in the sliding grooves, one baffle plate 3 is welded on one side, close to each other, of the two sliding plates 2, the baffle plate 3 is contacted with an opening of the taking and placing hole, two baffle plate holes are formed in the inner wall of one side, far away from each other, of the two sliding grooves, baffle plates 4 are slidably installed in the baffle plate holes, one side, close to each other, of the two corresponding baffle plates 4 is welded with the same side plate 5, a plurality of springs 6 are welded on one side, close to each other, of the two springs 6 on the same horizontal axis are respectively welded on two sides of the placing box body 1, the top of one side of each side plate 5, which is close to each other, is welded with a transverse plate 7, a square cavity is formed in the placing box body 1, transverse holes are formed in the inner walls of two sides of the square cavity, the transverse plates 7 are slidably mounted in the transverse holes, one side of each side plate 7, which is close to each other, is hinged with a hinge plate 9, a vertical groove is formed in the inner wall of the top of each square cavity, an iron plate 8 is slidably mounted in the vertical groove, one side of each hinge plate 9, which is close to each other, is hinged with two sides of the iron plate 8, a built-in box body 10 is fixedly connected to the inner wall of the bottom of each square cavity, a traction hole is formed in the top of the built-in box body 10, the bottom of each iron plate 8 penetrates through the traction hole, and an electromagnet 11 is fixedly connected to the inner wall of the bottom of the built-in box body 10.
In this embodiment, a lifting rope 12 is arranged above the placement box body 1, a lifting hook 13 is fixedly connected to the bottom end of the lifting rope 12, a lifting ring 14 is fixedly connected to the top of the placement box body 1, and the lifting ring 14 is hung on the lifting hook 13 to hoist the placement box body 1.
In this embodiment, a handle is welded to the front side of the partition board 3, and a control switch is fixedly connected to the front side of the handle and electrically connected to the electromagnet 11.
In this embodiment, the number of springs 6 on the same side plate 5 is three, so that the side plate 5 can be restored to its original position.
In this embodiment, two hinge plates 9 are symmetrically arranged, and two hinge plates 9 are obliquely arranged.
In this embodiment, the bottom of the baffle 4 located below contacts the top of the slide plate 2, and performs a limit process on the slide plate 2.
According to the invention, when the lifting box is used, materials are placed in the placing box 1 through the placing box 1, the materials can be prevented from falling in the lifting process, the safety in the lifting process is improved, when the lifting is carried out to a certain height, a worker needs to take out the materials, the control switch is turned on, the electromagnet 11 is started, the electromagnet 11 supplies power through the storage battery, the electromagnet 11 adsorbs the iron plates 8, the iron plates 8 drive the hinged plates 9 to rotate, the hinged plates 9 drive the transverse plates 7 to move, the two transverse plates 7 move in the directions far away from each other, the transverse plates 7 drive the side plates 5 to move, the side plates 5 stretch the springs 6, the side plates 5 drive the baffle plates 4 to move, the baffle plates 4 below are separated from the sliding plates 2, the handle is pulled at the moment, the baffle plates 3 drive the sliding plates 2 to move, the sliding plates 2 are contacted with the top inner walls of the sliding grooves, the springs 6 drive the side plates 5 to move due to the elasticity of the self-elasticity, the tops of the baffle plates 4 are contacted with the bottoms of the sliding plates 2, the sliding plates 2 are limited, the taking holes are exposed, the taking holes of the worker is easy to take the materials through the box 1, and the lifting box is safe and convenient to take the materials.
While the fundamental and principal features of the invention and advantages of the invention have been shown and described, it will be apparent to those skilled in the art that the invention is not limited to the details of the foregoing exemplary embodiments, but may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present disclosure describes embodiments, not every embodiment is provided with a separate embodiment, and that this description is provided for clarity only, and that the disclosure is not limited to the embodiments described in detail below, and that the embodiments described in the examples may be combined as appropriate to form other embodiments that will be apparent to those skilled in the art.

Claims (3)

1. The top construction device for the large-space building comprises a placing box body (1), and is characterized in that a taking and placing hole is formed in the front side of the placing box body (1), two sliding grooves are formed in the front side of the placing box body (1), sliding plates (2) are slidably installed in the sliding grooves, one side, close to each other, of each sliding plate (2) is welded with the same partition plate (3), the partition plates (3) are in contact with the opening of the taking and placing hole, and two baffle holes are formed in the inner wall of one side, far away from each other, of each sliding groove; a baffle (4) is arranged in the baffle hole in a sliding way, and the bottom of the baffle (4) positioned below is contacted with the top of the sliding plate (2); one side of each corresponding two baffles (4) is welded with the same side plate (5), one side, close to each other, of each two side plates (5) is welded with a plurality of springs (6), and the number of the springs (6) positioned on the same side plate (5) is three; one ends of two springs (6) which are positioned on the same horizontal axis and close to each other are respectively welded on two sides of the placement box body (1), transverse plates (7) are welded on the tops of one sides of the two side plates (5) which are close to each other, square cavities are formed in the placement box body (1), transverse holes are formed in the inner walls of two sides of each square cavity, and the transverse plates (7) are slidably arranged in the transverse holes; two articulated plates (7) all articulate and have articulated slab (9) in one side that is close to each other, two articulated slab (9) symmetry sets up, two articulated slab (9) slope sets up, vertical groove has been seted up on the top inner wall in square cavity, sliding fit has iron plate (8) in the vertical groove, one side that two articulated slab (9) are close to each other articulates with the both sides of iron plate (8) respectively, fixedly connected with built-in box body (10) on the bottom inner wall in square cavity, traction hole has been seted up at the top of built-in box body (10), traction hole is run through to the bottom of iron plate (8), fixedly connected with electro-magnet (11) on the bottom inner wall of built-in box body (10).
2. The construction device for the top in the large-space building according to claim 1, wherein a lifting rope (12) is arranged above the placement box body (1), a lifting hook (13) is fixedly connected to the bottom end of the lifting rope (12), a lifting ring (14) is fixedly connected to the top of the placement box body (1), and the lifting ring (14) is hung on the lifting hook (13).
3. The construction device for the inner top of the large-space building according to claim 1, wherein a handle is welded on the front side of the partition board (3), and a control switch is fixedly connected on the front side of the handle and is electrically connected with the electromagnet (11).
CN201911410915.9A 2019-12-31 2019-12-31 Top construction device used in large-space building Active CN110965760B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911410915.9A CN110965760B (en) 2019-12-31 2019-12-31 Top construction device used in large-space building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911410915.9A CN110965760B (en) 2019-12-31 2019-12-31 Top construction device used in large-space building

Publications (2)

Publication Number Publication Date
CN110965760A CN110965760A (en) 2020-04-07
CN110965760B true CN110965760B (en) 2024-03-29

Family

ID=70037814

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911410915.9A Active CN110965760B (en) 2019-12-31 2019-12-31 Top construction device used in large-space building

Country Status (1)

Country Link
CN (1) CN110965760B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3991842A (en) * 1975-07-25 1976-11-16 Chicago Bridge & Iron Company Movable vacuum secured apparatus for inclined or vertical surfaces
GB1579774A (en) * 1977-10-25 1980-11-26 Sgb Group Ltd Working platforms or stagings
JP2000073602A (en) * 1998-09-02 2000-03-07 Ishii Iron Works Co Ltd Inside tank side plate construction method of double shell tank
CN207608206U (en) * 2017-12-14 2018-07-13 西安科技大学 A kind of bridge construction reinforcing bar boom hoisting
CN208166407U (en) * 2018-05-21 2018-11-30 李文敏 A kind of housing construction hanging apparatus
CN208543451U (en) * 2018-03-26 2019-02-26 山东法尔消防科技服务有限公司 A kind of fire protection tool placing box
CN209692238U (en) * 2019-05-13 2019-11-26 张树凯 A kind of railway communication line upkeep job platform
CN209797386U (en) * 2019-04-29 2019-12-17 青岛温泉建设集团有限公司 Construction machinery lift platform convenient to use
CN212336676U (en) * 2019-12-31 2021-01-12 广西建工集团第五建筑工程有限责任公司 Top construction device used in large-space building

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3991842A (en) * 1975-07-25 1976-11-16 Chicago Bridge & Iron Company Movable vacuum secured apparatus for inclined or vertical surfaces
GB1579774A (en) * 1977-10-25 1980-11-26 Sgb Group Ltd Working platforms or stagings
JP2000073602A (en) * 1998-09-02 2000-03-07 Ishii Iron Works Co Ltd Inside tank side plate construction method of double shell tank
CN207608206U (en) * 2017-12-14 2018-07-13 西安科技大学 A kind of bridge construction reinforcing bar boom hoisting
CN208543451U (en) * 2018-03-26 2019-02-26 山东法尔消防科技服务有限公司 A kind of fire protection tool placing box
CN208166407U (en) * 2018-05-21 2018-11-30 李文敏 A kind of housing construction hanging apparatus
CN209797386U (en) * 2019-04-29 2019-12-17 青岛温泉建设集团有限公司 Construction machinery lift platform convenient to use
CN209692238U (en) * 2019-05-13 2019-11-26 张树凯 A kind of railway communication line upkeep job platform
CN212336676U (en) * 2019-12-31 2021-01-12 广西建工集团第五建筑工程有限责任公司 Top construction device used in large-space building

Also Published As

Publication number Publication date
CN110965760A (en) 2020-04-07

Similar Documents

Publication Publication Date Title
CN110965760B (en) Top construction device used in large-space building
CN212336676U (en) Top construction device used in large-space building
CN201288023Y (en) Portable lifting device of electric power apparatus
CN211850741U (en) A safe hanging flower basket for high-rise outer wall fitment construction
CN211283651U (en) Lifting device for municipal road well lid
CN216007726U (en) Building construction lift platform
CN210340124U (en) Scroll handling equipment of convenient centre gripping
CN209668611U (en) Hydraulic cylinder cylinder barrel stone tongs
CN210759347U (en) Mounting equipment
CN209957238U (en) Multi-arm crane for building
CN210973656U (en) Big data machine case equipment conveyer
CN207243277U (en) A kind of unit switchs hoisting tool special
CN209350270U (en) Manipulator pulldown takes the fixed device of tire
CN206611069U (en) A kind of power distribution cabinet that can be lifted
CN207719623U (en) A kind of novel distribution cabinet of mounting plate easy disassembly
CN207608206U (en) A kind of bridge construction reinforcing bar boom hoisting
CN217498625U (en) Movable well lid opening and closing device capable of preventing smashing injury
CN211813287U (en) Stacker walking safety device
CN215208349U (en) Municipal administration well lid perk device
CN220519925U (en) Solar lifting appliance
CN220351477U (en) Stable crane
CN215008630U (en) Indirect hanging-dismounting clamp
CN215402620U (en) Special stop gear of grab bucket balancing stand
CN214299006U (en) Balance arm of tower crane
CN220412586U (en) Auxiliary hoisting equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Guo jiahuodiqu after: Zhong Guo

Address after: No. 167, Donghuan Avenue, Liuzhou City, Guangxi Zhuang Autonomous Region

Applicant after: Guangxi construction engineering Fifth Construction Engineering Group Co.,Ltd.

Address before: No. 167, Donghuan Avenue, Liuzhou City, Guangxi Zhuang Autonomous Region

Applicant before: THE FIFTH CONSTRUCTION ENGINEERING COMPANY OF GUANGXI CONSTRUCTION ENGINEERING Group

Guo jiahuodiqu before: Zhong Guo

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant