CN110965760A - Top construction device used in large-space building - Google Patents
Top construction device used in large-space building Download PDFInfo
- Publication number
- CN110965760A CN110965760A CN201911410915.9A CN201911410915A CN110965760A CN 110965760 A CN110965760 A CN 110965760A CN 201911410915 A CN201911410915 A CN 201911410915A CN 110965760 A CN110965760 A CN 110965760A
- Authority
- CN
- China
- Prior art keywords
- plate
- box body
- construction device
- close
- space building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 24
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 28
- 229910052742 iron Inorganic materials 0.000 claims description 14
- 238000005192 partition Methods 0.000 claims description 10
- 239000000463 material Substances 0.000 abstract description 22
- 238000000034 method Methods 0.000 abstract description 15
- 238000009435 building construction Methods 0.000 description 3
- TVEXGJYMHHTVKP-UHFFFAOYSA-N 6-oxabicyclo[3.2.1]oct-3-en-7-one Chemical compound C1C2C(=O)OC1C=CC2 TVEXGJYMHHTVKP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/001—Safety or protective measures against falling down relating to scaffoldings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention belongs to the field of construction devices, in particular to a top construction device for a large-space building, which aims at solving the problem that when some materials are hoisted in the prior art, the materials are directly placed on a tray and are easy to fall or spill in the hoisting process, so that the safety of the building in the construction process is affected. The lifting device is good in practicability, can prevent materials from falling off in the lifting process, improves the safety in the lifting process, and is convenient to take and place the materials in the box body.
Description
Technical Field
The invention relates to the technical field of construction devices, in particular to a top construction device for a large-space building.
Background
Through retrieval, the top construction equipment in being used for big space building that the bulletin number is CN208899840U discloses, including bottom sprag platform, two horizontal poles and two sets of hanging parts, two sets of bottoms that hang the piece set up both ends around bottom sprag platform respectively, two sets of hanging parts are the symmetry setting, two fixed settings of horizontal pole are at the top in the building, the top of two sets of hanging parts articulates respectively on two horizontal poles, this top construction equipment has simple structure, low cost in being used for big space building, hang advantages such as convenience and security performance height.
When being under construction to top in the big space building, need hoist and mount some materials to construction equipment on, because the material is directly placed on the tray, the material takes place to drop or spill easily at the in-process of hoist and mount, influences the security among the building construction process.
Disclosure of Invention
The invention aims to solve the problem that in the prior art, when some materials are hoisted, the materials are directly placed on a tray, and the materials are easy to fall or spill in the hoisting process, so that the safety in the building construction process is affected, and the provided top construction device for the large-space building is used for solving the problem that the safety in the building construction process is affected.
In order to achieve the purpose, the invention adopts the following technical scheme:
a top construction device used in a large space building comprises a placing box body, wherein a taking hole is formed in the front side of the placing box body, two sliding grooves are formed in the front side of the placing box body, sliding plates are arranged in the sliding grooves in a sliding mode, the same partition plate is welded on one side, close to each other, of the two sliding plates, the partition plate is contacted with the opening of the taking hole, two baffle holes are formed in the inner wall, far away from each other, of the two sliding grooves, baffle plates are arranged in the baffle holes in a sliding mode, the same side plate is welded on one side of the two corresponding baffle plates, a plurality of springs are welded on one side, close to each other, of the two side plates, one ends, close to each other, of the two springs on the same horizontal axis are respectively welded on the two sides of the placing box body, transverse plates are welded on the tops, a, the two transverse plates are hinged to hinge plates on one sides close to each other, a vertical groove is formed in the inner wall of the top of the square cavity, an iron plate is arranged in the vertical groove in a sliding mode, one sides, close to each other, of the two hinge plates are hinged to the two sides of the iron plate respectively, a built-in box body is fixedly connected to the inner wall of the bottom of the square cavity, a traction hole is formed in the top of the built-in box body, the traction hole is penetrated through the bottom of the iron plate, and an electromagnet is fixedly.
Preferably, the top of placing the box is equipped with the lifting rope, the bottom fixedly connected with lifting hook of lifting rope, the top fixedly connected with rings of placing the box, rings hang on the lifting hook, to placing the box and hoist.
Preferably, the handle is welded on the front side of the partition plate, the control switch is fixedly connected on the front side of the handle, and the control switch is electrically connected with the electromagnet.
Preferably, the number of the springs on the same side plate is three, so that the side plates can be restored to the original positions.
Preferably, the two hinge plates are symmetrically arranged, and the two hinge plates are obliquely arranged.
Preferably, the bottom of the baffle plate positioned below is in contact with the top of the sliding plate to limit the sliding plate.
In the invention, the top construction device for the large-space building is provided with the placing box body, materials are placed in the placing box body, the materials can be prevented from falling off in the hoisting process, the safety in the hoisting process is improved, when the materials are hoisted to a certain height, a control switch is turned on when a worker needs to take out the materials, the electromagnet is started to adsorb the iron plate, the iron plate drives the hinged plate to rotate, the hinged plate drives the transverse plate to move, the transverse plate drives the side plate to move, the side plate stretches the spring, the lower baffle is separated from the sliding plate, the handle is pulled at the moment, the handle drives the baffle to move, the sliding plate is contacted with the inner wall of the top of the chute, then the control switch is turned off, the spring drives the side plate to move due to the elasticity of the spring, the top of the upper, carry on spacingly to the slide, get at this moment and take the hole and expose, the staff takes the material of placing in the box through getting, easy operation is convenient, and the security performance is better.
The lifting device is good in practicability, can prevent materials from falling off in the lifting process, improves the safety in the lifting process, and is convenient to take and place the materials in the box body.
Drawings
Fig. 1 is a schematic structural view of a roof construction device for a large space building according to the present invention;
fig. 2 is a schematic structural view of a portion a of a roof construction apparatus for a large space building according to the present invention;
fig. 3 is a schematic structural view of a part B of a roof construction device for a large space building according to the present invention.
In the figure: 1. placing the box body; 2. a slide plate; 3. a partition plate; 4. a baffle plate; 5. a side plate; 6. a spring; 7. a transverse plate; 8. an iron plate; 9. a hinge plate; 10. a box body is arranged inside; 11. an electromagnet; 12. a lifting rope; 13. a hook; 14. a lifting ring.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1-3, a top construction device for large space buildings comprises a placing box body 1, a taking hole is arranged at the front side of the placing box body 1, two sliding grooves are arranged at the front side of the placing box body 1, sliding plates 2 are arranged in the sliding grooves in a sliding manner, one side, close to each other, of each sliding plate 2 is welded with the same partition plate 3, each partition plate 3 is contacted with the opening of the taking hole, two baffle holes are respectively arranged on the inner wall of one side, away from each other, of each sliding groove, a baffle plate 4 is arranged in each baffle hole in a sliding manner, one side, corresponding to each baffle plate 4, of each baffle plate 5 is welded with the same side plate 5, one side, close to each side, of each two side plates 5 is welded with a plurality of springs 6, one ends, close to each other, of the two springs 6 on the same horizontal axis are, all seted up the cross bore on the both sides inner wall in square cavity, diaphragm 7 slidable mounting is in the cross bore, two diaphragm 7 one side that is close to each other all articulated slab 9, vertical slot has been seted up on the top inner wall in square cavity, slidable mounting has iron plate 8 in the vertical slot, one side that two articulated slab 9 are close to each other is articulated mutually with iron plate 8's both sides respectively, fixedly connected with embeds box body 10 on the bottom inner wall in square cavity, the traction hole has been seted up at the top of embeds box body 10, the traction hole is run through to iron plate 8's bottom, fixedly connected with electro-magnet 11 on the bottom inner wall of embeds box body 10.
In this embodiment, the top of placing box 1 is equipped with lifting rope 12, and the bottom fixedly connected with lifting hook 13 of lifting rope 12 places the top fixedly connected with rings 14 of box 1, and rings 14 hang on lifting hook 13, to placing box 1 and hoist.
In this embodiment, the handle is welded to the front side of the partition board 3, and the control switch is fixedly connected to the front side of the handle and electrically connected to the electromagnet 11.
In this embodiment, the number of the springs 6 on the same side plate 5 is three, so that the side plate 5 can be restored to the original position.
In this embodiment, the two hinge plates 9 are symmetrically arranged, and the two hinge plates 9 are obliquely arranged.
In this embodiment, the bottom of the baffle 4 located below contacts with the top of the slide plate 2 to limit the slide plate 2.
In the invention, when the material lifting device is used, the material is placed in the placing box body 1 through the placing box body 1, the material can be prevented from falling off in the lifting process, the safety in the lifting process is improved, when the material is lifted to a certain height and needs to be taken out by a worker, the control switch is turned on, the electromagnet 11 is started, the electromagnet 11 supplies power through the storage battery, the electromagnet 11 adsorbs the iron plate 8, the iron plate 8 drives the hinged plate 9 to rotate, the hinged plate 9 drives the transverse plates 7 to move, the two transverse plates 7 move towards the directions away from each other, the transverse plates 7 drive the side plates 5 to move, the side plates 5 stretch the springs 6, the side plates 5 drive the baffle plates 4 to move, the baffle plates 4 below are separated from the sliding plates 2, the handles are pulled at the moment, the handles drive the baffle plates 3 to move, the baffle plates 3 drive the sliding plates 2, then close control switch, spring 6 this moment because the elasticity of self drives curb plate 5 and removes for the top of the baffle 4 of top contacts with the bottom of slide 2, and is spacing to slide 2, gets to take the hole to expose this moment, and the staff takes the material of placing in the box 1 through getting to take the hole, and easy operation is convenient, and the security performance is better.
While there have been shown and described what are at present considered the fundamental principles and essential features of the invention and its advantages, it will be apparent to those skilled in the art that the invention is not limited to the details of the foregoing exemplary embodiments, but is capable of other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.
Claims (6)
1. A top construction device used in a large-space building comprises a placing box body (1) and is characterized in that a taking hole is formed in the front side of the placing box body (1), two sliding grooves are formed in the front side of the placing box body (1), sliding plates (2) are arranged in the sliding grooves in a sliding mode, one side, close to each other, of each sliding plate (2) is welded with the same partition plate (3), each partition plate (3) is in contact with the opening of the taking hole, two baffle plate holes are formed in the inner wall, far away from each other, of each sliding groove, a baffle plate (4) is arranged in each baffle plate hole in a sliding mode, one side of each corresponding baffle plate (4) is welded with the same side plate (5), one side, close to each other, of each side plate (5) is welded with a plurality of springs (6), one ends, close to each other, of, diaphragm (7) have all been welded at one side top that two curb plates (5) are close to each other, place and seted up the square cavity on box (1), the cross bore has all been seted up on the both sides inner wall in square cavity, diaphragm (7) slidable mounting is in the cross bore, one side that two diaphragm (7) are close to each other all articulated slab (9), vertical slot has been seted up on the top inner wall in square cavity, slidable mounting has iron plate (8) in the vertical slot, one side that two articulated slab (9) are close to each other is articulated mutually with the both sides of iron plate (8) respectively, fixedly connected with embeds box body (10) on the bottom inner wall in square cavity, the traction hole has been seted up at the top of embeds box body (10), the traction hole is run through to the bottom of iron plate (8), fixedly connected with electro-magnet.
2. The top construction device for the large space building as claimed in claim 1, wherein a lifting rope (12) is arranged above the placing box body (1), a lifting hook (13) is fixedly connected to the bottom end of the lifting rope (12), a lifting ring (14) is fixedly connected to the top of the placing box body (1), and the lifting ring (14) is hung on the lifting hook (13).
3. The top construction device in a large space building as claimed in claim 1, wherein a handle is welded to the front side of the partition plate (3), a control switch is fixedly connected to the front side of the handle, and the control switch is electrically connected to the electromagnet (11).
4. A roof construction device in a large space building according to claim 1, characterised in that the number of springs (6) on the same side plate (5) is three.
5. A roof construction device for use in a large space building according to claim 1 wherein two hinged panels (9) are arranged symmetrically and two hinged panels (9) are arranged obliquely.
6. A roof construction device for use in a large space building according to claim 1 wherein the bottom of the lower baffle plate (4) is in contact with the top of the skid plate (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911410915.9A CN110965760B (en) | 2019-12-31 | 2019-12-31 | Top construction device used in large-space building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911410915.9A CN110965760B (en) | 2019-12-31 | 2019-12-31 | Top construction device used in large-space building |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110965760A true CN110965760A (en) | 2020-04-07 |
CN110965760B CN110965760B (en) | 2024-03-29 |
Family
ID=70037814
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911410915.9A Active CN110965760B (en) | 2019-12-31 | 2019-12-31 | Top construction device used in large-space building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110965760B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114426239A (en) * | 2021-12-28 | 2022-05-03 | 山西路桥集团隰吉高速公路有限公司 | Hoisting structure for highway construction |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3991842A (en) * | 1975-07-25 | 1976-11-16 | Chicago Bridge & Iron Company | Movable vacuum secured apparatus for inclined or vertical surfaces |
GB1579774A (en) * | 1977-10-25 | 1980-11-26 | Sgb Group Ltd | Working platforms or stagings |
JP2000073602A (en) * | 1998-09-02 | 2000-03-07 | Ishii Iron Works Co Ltd | Inside tank side plate construction method of double shell tank |
CN207608206U (en) * | 2017-12-14 | 2018-07-13 | 西安科技大学 | A kind of bridge construction reinforcing bar boom hoisting |
CN208166407U (en) * | 2018-05-21 | 2018-11-30 | 李文敏 | A kind of housing construction hanging apparatus |
CN208543451U (en) * | 2018-03-26 | 2019-02-26 | 山东法尔消防科技服务有限公司 | A kind of fire protection tool placing box |
CN209692238U (en) * | 2019-05-13 | 2019-11-26 | 张树凯 | A kind of railway communication line upkeep job platform |
CN209797386U (en) * | 2019-04-29 | 2019-12-17 | 青岛温泉建设集团有限公司 | Construction machinery lift platform convenient to use |
CN212336676U (en) * | 2019-12-31 | 2021-01-12 | 广西建工集团第五建筑工程有限责任公司 | Top construction device used in large-space building |
-
2019
- 2019-12-31 CN CN201911410915.9A patent/CN110965760B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3991842A (en) * | 1975-07-25 | 1976-11-16 | Chicago Bridge & Iron Company | Movable vacuum secured apparatus for inclined or vertical surfaces |
GB1579774A (en) * | 1977-10-25 | 1980-11-26 | Sgb Group Ltd | Working platforms or stagings |
JP2000073602A (en) * | 1998-09-02 | 2000-03-07 | Ishii Iron Works Co Ltd | Inside tank side plate construction method of double shell tank |
CN207608206U (en) * | 2017-12-14 | 2018-07-13 | 西安科技大学 | A kind of bridge construction reinforcing bar boom hoisting |
CN208543451U (en) * | 2018-03-26 | 2019-02-26 | 山东法尔消防科技服务有限公司 | A kind of fire protection tool placing box |
CN208166407U (en) * | 2018-05-21 | 2018-11-30 | 李文敏 | A kind of housing construction hanging apparatus |
CN209797386U (en) * | 2019-04-29 | 2019-12-17 | 青岛温泉建设集团有限公司 | Construction machinery lift platform convenient to use |
CN209692238U (en) * | 2019-05-13 | 2019-11-26 | 张树凯 | A kind of railway communication line upkeep job platform |
CN212336676U (en) * | 2019-12-31 | 2021-01-12 | 广西建工集团第五建筑工程有限责任公司 | Top construction device used in large-space building |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114426239A (en) * | 2021-12-28 | 2022-05-03 | 山西路桥集团隰吉高速公路有限公司 | Hoisting structure for highway construction |
CN114426239B (en) * | 2021-12-28 | 2024-06-11 | 山西路桥集团隰吉高速公路有限公司 | Hoisting structure for expressway construction |
Also Published As
Publication number | Publication date |
---|---|
CN110965760B (en) | 2024-03-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204497630U (en) | A kind of highly compatible for circuit breaker and porcelain vase overturns car | |
CN103693534A (en) | Single-phase comprehensive intelligent hanging basket | |
CN110965760A (en) | Top construction device used in large-space building | |
CN204281061U (en) | A kind of can the combined sling of automatic releasing hook | |
CN212336676U (en) | Top construction device used in large-space building | |
CN211500022U (en) | Pole burying device for electric pole | |
CN113148860B (en) | Multifunctional pole hoisting device | |
CN207330132U (en) | A kind of suspension hook | |
CN211813287U (en) | Stacker walking safety device | |
CN209957238U (en) | Multi-arm crane for building | |
CN205500619U (en) | Vapour is repaiied with portable jack -up shallow | |
CN210340124U (en) | Scroll handling equipment of convenient centre gripping | |
CN201189597Y (en) | Portable electric welder movable case | |
CN210692985U (en) | Grounding wire assembling and disassembling device | |
CN203998745U (en) | The tower machine suspension hook disconnected rope anti-drop device of rushing to summit | |
CN207719623U (en) | A kind of novel distribution cabinet of mounting plate easy disassembly | |
CN202321981U (en) | Semi-automatic conversion device for lifting hook between 1 multiplying power and 2 multiplying power of movable-arm type tower crane | |
CN206927494U (en) | The height limitator of hoisting machinery | |
CN207588326U (en) | Breaker pushes vehicle | |
CN102642018B (en) | Steel ladle cover | |
CN207243277U (en) | A kind of unit switchs hoisting tool special | |
CN201161868Y (en) | Multifunctional lifted crane | |
CN213950412U (en) | Pneumatic loop wheel machine convenient to remove | |
CN206611069U (en) | A kind of power distribution cabinet that can be lifted | |
CN216836758U (en) | Assembled building material lifting device of high stability |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Country or region after: China Address after: No. 167, Donghuan Avenue, Liuzhou City, Guangxi Zhuang Autonomous Region Applicant after: Guangxi construction engineering Fifth Construction Engineering Group Co.,Ltd. Address before: No. 167, Donghuan Avenue, Liuzhou City, Guangxi Zhuang Autonomous Region Applicant before: THE FIFTH CONSTRUCTION ENGINEERING COMPANY OF GUANGXI CONSTRUCTION ENGINEERING Group Country or region before: China |
|
CB02 | Change of applicant information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |