CN203624817U - Hanging device of synthetic fiber lifting belt - Google Patents

Hanging device of synthetic fiber lifting belt Download PDF

Info

Publication number
CN203624817U
CN203624817U CN201320772776.6U CN201320772776U CN203624817U CN 203624817 U CN203624817 U CN 203624817U CN 201320772776 U CN201320772776 U CN 201320772776U CN 203624817 U CN203624817 U CN 203624817U
Authority
CN
China
Prior art keywords
suspension ring
hanging
synthetic fiber
hanging ring
suspension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320772776.6U
Other languages
Chinese (zh)
Inventor
黄仲远
叶机林
张彩萍
吴庆国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SANBIAN SCI-TECH Co Ltd
Original Assignee
SANBIAN SCI-TECH Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SANBIAN SCI-TECH Co Ltd filed Critical SANBIAN SCI-TECH Co Ltd
Priority to CN201320772776.6U priority Critical patent/CN203624817U/en
Application granted granted Critical
Publication of CN203624817U publication Critical patent/CN203624817U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model relates to a hanging device and discloses a hanging device of a synthetic fiber lifting belt. The hanging device comprises a cross beam (1), an electric block (2) and a lifting belt hanger (3), wherein limiting devices are arranged at the top of the electric block (2) and on a lifting hook (21); the lifting belt hanger (3) comprises a first hanging ring (31), a second hanging ring (32) and a reinforcing plate (33), wherein the first hanging ring (31) is vertical to the second hanging ring (32); the reinforcing plate (33) is arranged at the lower sides of the first hanging ring (31) and the second hanging ring (32); and a hanging hole (34) is arranged at the upper side of the first hanging ring (31). According to the hanging device, the first hanging ring is vertical to the second hanging ring, so that the suspension space of the lifting belt hanger is utilized to the utmost extent; the reinforcing plate is arranged at the lower ends of the first hanging ring and the second hanging ring, so that the strength of the lifting belt hanger is improved and the service life of the hanging device of the synthetic fiber lifting belt is prolonged. Furthermore, the hanging device is compact in structure and convenient to operate.

Description

A kind of erecting by overhang of hoisting synthetic fiber belt
Technical field
The utility model relates to erecting by overhang, has related in particular to a kind of erecting by overhang of hoisting synthetic fiber belt.
Background technology
Hoisting synthetic fiber belt is due to easy to use and hung that surface of the work is injury-free has replaced conventional steel rope, be widely used in the lifting of high-power transformer device body and voltage transformer entirety, but having deposited into subject matter of hanging belt, prior art scheme is owing to there is no erecting by overhang, make hanging belt deposit difficulty, conventionally be all to leave hanging belt in a certain ground, not only take plant operations place, affect workshop attractive in appearance, and hanging belt is deposited and is easy to be polluted on ground, and then transformer body and shell are polluted.In addition there is the little shortcoming of intensity in the hook of existing erecting by overhang.
Summary of the invention
The utility model exists for hook in prior art that intensity is little, hoisting synthetic fiber belt is deposited difficult shortcoming, and a kind of erecting by overhang of hoisting synthetic fiber belt is provided.
In order to solve the problems of the technologies described above, the utility model is solved by following technical proposals:
A kind of erecting by overhang of hoisting synthetic fiber belt, comprise crossbeam, the electric block being connected with crossbeam, electric block lower end is provided with suspension hook, the hanging belt suspender being connected with suspension hook, and electric block top and suspension hook are provided with inhibiting device, hanging belt suspender comprises the first suspension ring, the second suspension ring and brace panel, the first suspension ring are mutually vertical with the second suspension ring, and brace panel is criss-cross brace panel, and brace panel is located at the downside of the first suspension ring and the second suspension ring.
Beam welding is between the steel-structure factory building column of workshop.Electric block top and suspension hook are provided with inhibiting device, and when in the time of electronic rising, the positioning plate at suspension hook place touches the stop gear at electric block top, limit switch starts, and power supply cuts off automatically, cause safety misadventure in case rush to summit when lifting.
Hanging belt suspender is formed by steel plate processing welding, and hanging, can be for the hanging lift lifting/lowering of a set of (2 or 4) hoisting synthetic fiber belt on the suspension hook of electric block.The first suspension ring on it are mutually vertical with the second suspension ring, maximize the suspension space that has used hanging belt suspender.Brace panel is criss-cross brace panel.Mutually vertical between the first suspension ring and the second suspension ring, brace panel is just arranged to and the first suspension ring and the corresponding criss-cross of the second suspension ring bottom surface shape.This structural strengthening the intensity of hanging belt suspender.Brace panel is located at the lower end of the first suspension ring, the second suspension ring, has strengthened the intensity of hanging belt suspender, thus the service life of having improved the erecting by overhang of hoisting synthetic fiber belt.
Whole system is arranged on the lifting blind area of workshop overhead traveling crane, utilizes lifting blind area, workshop, and bulky hoisting synthetic fiber belt is hung up, simple and reasonable, and the plant operations place that do not account for again attractive in appearance has solved the storage problem of fiber hanging belt.
As preferably, the first suspension ring upside is provided with hanging hole.The first suspension ring upside is provided with hanging hole and facilitates hanging belt suspender to hang on suspension hook.
As preferably, the first suspension ring are provided with the first draw-in groove, and the second suspension ring are provided with the second draw-in groove, and the first suspension ring are connected with the second suspension ring by the first draw-in groove, the second draw-in groove.The first suspension ring are connected with the second suspension ring, then are symmetrically welded by the first draw-in groove, the second draw-in groove.
As preferably, crossbeam is I-beam section crossbeam.Crossbeam selects the I-beam section with sufficient intensity to be welded between the steel-structure factory building column of workshop.
As preferably, also comprise control box, in control box, be provided with shift knob.
As preferably, electric block is connected with electric-control system.Electric-control system is connected with shift knob.
The utility model, owing to having adopted above technical scheme, has significant technique effect: the hanging belt suspender that the utility model is provided with is formed by steel plate processing welding, and hanging, can be for the hanging lift lifting/lowering of a set of hoisting synthetic fiber belt on the suspension hook of electric block.The first suspension ring of the present utility model are mutually vertical with the second suspension ring, maximize the suspension space that has used hanging belt suspender; Brace panel is located at the lower end of the first suspension ring, the second suspension ring, has strengthened the intensity of hanging belt suspender, thus the service life of having improved the erecting by overhang of hoisting synthetic fiber belt.And apparatus structure compactness, easy to operate.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the partial enlarged drawing of A in Fig. 1.
Fig. 3 is the structural representation of the first suspension ring.
Fig. 4 is the structural representation of the second suspension ring.
Fig. 5 is the structural representation of brace panel.
The toponym that in above accompanying drawing, each number designation refers to is as follows: wherein, and 1-crossbeam, 2-electric block, 21-suspension hook, 3-hanging belt suspender, the 31-the first suspension ring, the 311-the first draw-in groove, the 32-the second suspension ring, the 321-the second draw-in groove, 33-brace panel, 34-hanging hole, 4-steel-structure factory building column, 5-hoisting synthetic fiber belt.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment, the utility model is described in further detail.
Embodiment 1
An erecting by overhang for hoisting synthetic fiber belt, as Figure 1-5, comprises crossbeam 1, the electric block 2 being connected with crossbeam 1, and electric block 2 lower ends are provided with suspension hook 21, the hanging belt suspender 3 being connected with suspension hook 21.
Hanging belt suspender 3 comprises that the first suspension ring 31, the second suspension ring 32 and brace panel 33, the first suspension ring 31 are mutually vertical with the second suspension ring 32, and brace panel 33 is located at the downside of the first suspension ring 31 and the second suspension ring 32.
The first suspension ring 31 upsides are provided with hanging hole 34.The first suspension ring 31 are provided with the first draw-in groove 311, the second suspension ring 3 and are provided with the second draw-in groove 321, the first suspension ring 31 and are connected with the second suspension ring 32 by the first draw-in groove 311, the second draw-in groove 321.Brace panel 33 is criss-cross brace panel.
In control box, be provided with shift knob.Electric block 2 tops and suspension hook 21 are provided with inhibiting device, and electric block 2 is connected with electric-control system.
Crossbeam 1 selects I-beam section beam welding between steel-structure factory building column 4.When hanging, first hoisting synthetic fiber belt 5 is transported to hanging place by special floor truck, hangs on hanging belt suspender 3, crawl is opened lifting button, hoisting synthetic fiber belt 5 is risen to the height needing.Electric block 2 tops and suspension hook 21 are provided with inhibiting device, and when in the time of electronic rising, the positioning plate of suspension hook 21 touches the stop gear at electric block 2 tops, limit switch starts, and power supply cuts off automatically, in case work the safety misadventure of rushing to summit and bringing.
For preferred embodiment of the present utility model, all equalizations of doing according to the utility model claim change and modify, and all should belong to the covering scope of the utility model patent.

Claims (6)

1. the erecting by overhang of a hoisting synthetic fiber belt, comprise crossbeam (1), the electric block (2) being connected with crossbeam (1), electric block (2) lower end is provided with suspension hook (2), the hanging belt suspender (3) being connected with suspension hook (21), it is characterized in that: electric block (2) top and suspension hook (21) are provided with inhibiting device, hanging belt suspender (3) comprises the first suspension ring (31), the second suspension ring (32) and brace panel (33), the first suspension ring (31) are mutually vertical with the second suspension ring (32), brace panel (33) is criss-cross brace panel, brace panel (33) is located at the downside of the first suspension ring (31) and the second suspension ring (32).
2. the erecting by overhang of a kind of hoisting synthetic fiber belt according to claim 1, is characterized in that: the first suspension ring (31) upside is provided with hanging hole (34).
3. the erecting by overhang of a kind of hoisting synthetic fiber belt according to claim 1, it is characterized in that: the first suspension ring (31) are provided with the first draw-in groove (311), the second suspension ring (3) are provided with the second draw-in groove (321), and the first suspension ring (31) are connected with the second suspension ring (32) by the first draw-in groove (311), the second draw-in groove (321).
4. the erecting by overhang of a kind of hoisting synthetic fiber belt according to claim 1, is characterized in that: crossbeam (1) is I-beam section crossbeam.
5. the erecting by overhang of a kind of hoisting synthetic fiber belt according to claim 1, is characterized in that: also comprise control box, be provided with shift knob in control box.
6. the erecting by overhang of a kind of hoisting synthetic fiber belt according to claim 1, is characterized in that: electric block (2) is connected with electric-control system.
CN201320772776.6U 2013-11-28 2013-11-28 Hanging device of synthetic fiber lifting belt Expired - Fee Related CN203624817U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320772776.6U CN203624817U (en) 2013-11-28 2013-11-28 Hanging device of synthetic fiber lifting belt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320772776.6U CN203624817U (en) 2013-11-28 2013-11-28 Hanging device of synthetic fiber lifting belt

Publications (1)

Publication Number Publication Date
CN203624817U true CN203624817U (en) 2014-06-04

Family

ID=50811311

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320772776.6U Expired - Fee Related CN203624817U (en) 2013-11-28 2013-11-28 Hanging device of synthetic fiber lifting belt

Country Status (1)

Country Link
CN (1) CN203624817U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108260960A (en) * 2017-01-03 2018-07-10 江苏亚太吊具有限公司 Current Collector Sleave storage rack

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108260960A (en) * 2017-01-03 2018-07-10 江苏亚太吊具有限公司 Current Collector Sleave storage rack

Similar Documents

Publication Publication Date Title
CN203845689U (en) Indoor assembled large-scale equipment hoisting device
CN206219071U (en) A kind of switch cubicle installation lifting appliance
CN203624817U (en) Hanging device of synthetic fiber lifting belt
CN204342257U (en) A kind of large-scale component turning device
CN203333143U (en) Building construction basket
CN204752012U (en) Wall -hanging miniature hoist
CN202441045U (en) Rail-type electric attached lifting scaffold
CN201553586U (en) Forklift auxiliary boom
CN204384697U (en) A kind of metal plate hanging beam
CN202164037U (en) Adjustable plate hook
CN204847895U (en) Two hoisting point trolley of single reel
CN103569842A (en) Lifting appliance for gantry crane
CN204251194U (en) A kind of Novel hanging tool
CN207645633U (en) A kind of reversal hanger for Rectangular Tunnel combined type section of jurisdiction
CN206437799U (en) A kind of cheery-picker
CN206511841U (en) Spacing rubbish is hung
CN202575694U (en) Arc surface type equipment hoisting tool
CN205892490U (en) A special lifting device for concrete pipe pile hoist and mount
CN205892524U (en) A equipment lifting device for in factory building
CN205243038U (en) Simple and easy building block hoisting accessory
CN205275132U (en) Forklift lifting tool
CN203193158U (en) Movable externally-hung temporary electricity box frame
CN204441725U (en) A kind of power distribution cabinet Handling device
CN203845686U (en) Joist steel hoisting tool
CN205932938U (en) Surround to lift and hang compensating beam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140604

Termination date: 20191128

CF01 Termination of patent right due to non-payment of annual fee