CN212335849U - Municipal works road enclosure facility - Google Patents

Municipal works road enclosure facility Download PDF

Info

Publication number
CN212335849U
CN212335849U CN202020767221.2U CN202020767221U CN212335849U CN 212335849 U CN212335849 U CN 212335849U CN 202020767221 U CN202020767221 U CN 202020767221U CN 212335849 U CN212335849 U CN 212335849U
Authority
CN
China
Prior art keywords
road
enclosure
pavement
fence
well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020767221.2U
Other languages
Chinese (zh)
Inventor
高昕
贾桂莲
戴宗翰
吴敌
杜满良
付晔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inner Mongolia Guangtai Luqiao Environment Industry Co ltd
Original Assignee
Inner Mongolia Guangtai Luqiao Environment Industry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inner Mongolia Guangtai Luqiao Environment Industry Co ltd filed Critical Inner Mongolia Guangtai Luqiao Environment Industry Co ltd
Priority to CN202020767221.2U priority Critical patent/CN212335849U/en
Application granted granted Critical
Publication of CN212335849U publication Critical patent/CN212335849U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The application discloses a municipal engineering road enclosure facility, which comprises an underground shaft, a pavement surface and a road guardrail arranged beside the pavement surface, wherein the road guardrail consists of a stand column fence surface and a cross beam fence surface and is formed into an enclosure structure, and the underground shaft is positioned in the enclosure structure; a special well marble surface is laid between the enclosing structure and the pavement surface, and greening platforms are arranged on two sides of the special well marble surface. The utility model discloses integrated pavement, greenbelt, underground shaft and road guardrail in an organic whole, pavement and well independent action, nevertheless possess the reflection brightness of greenbelt again on every side, intercommunication between well and the pavement possesses the isolation door that opens and shuts simultaneously, improves municipal works's construction effect greatly.

Description

Municipal works road enclosure facility
Technical Field
The application relates to the technical field of municipal installation, in particular to a municipal engineering road enclosure facility.
Background
Municipal construction engineering often involves many-sided road administration construction, for example, road guardrail facility, and the present domestic common sidewalk guardrail is the aluminum alloy frame molding that adopts, adopts to dispatch from the factory and processes into envelope, installs afterwards in urban road both sides.
The road centralized construction needs construction of pedestrian roads, greening roads and underground shafts, and in the current municipal road construction, the construction of the facilities are dispersed, the underground shafts are installed to hinder the use of the sidewalks, and the functions are not centralized.
SUMMERY OF THE UTILITY MODEL
The main aim of this application provides a municipal works road enclosure facility to solve present problem.
In order to achieve the above object, the present application provides the following techniques:
a municipal engineering road enclosure facility comprises an underground shaft, a pavement surface and a road guardrail arranged beside the pavement surface, wherein the road guardrail consists of a stand column enclosure surface and a cross beam enclosure surface and is formed into an enclosure structure, and the underground shaft is positioned in the enclosure structure; a special well marble surface is laid between the enclosing structure and the pavement surface, and greening platforms are arranged on two sides of the special well marble surface.
The utility model discloses integrated pavement, greenbelt, underground shaft and road guardrail in an organic whole, pavement and well independent action, nevertheless possess the reflection brightness of greenbelt again on every side, intercommunication between well and the pavement possesses the isolation door that opens and shuts simultaneously, improves municipal works's construction effect greatly.
As shown in figures 1, 2 and 3 of the drawings,
a municipal works road enclosure facility, including underground well, pavement surface and road guardrail set up in pavement surface side of pavement, the road guardrail is formed by enclosure surface of the pillar stand and enclosure surface of the crossbeam, adopt the steel pipe welding to get final product, the subsequent lacquering treatment, the gold paint of spraying of this place, improve the ornamental effect, the enclosure structure of enclosure surface and crossbeam enclosure surface welding forming, the underground well locates in the enclosure structure, the underground well is built on road surface, connect the underground passage, the deodorant treatment; lay the special reason stone face of well between enclosing structure and pavement and lay the face, adopt black reason stone to lay, when needs installation, maintenance underground shaft, from pavement lay the face to go to black reason stone road can, simultaneously, visitor or city resident can stand in stone face department, be close to the rail and vwatch road environment. Greening platforms are arranged on two sides of the marble surface special for the hoistway, the height is high, flowers and trees are planted on the greening platforms, and the whole main body is bright in modeling.
Furthermore, the enclosing structure is arranged along the pavement surface of the sidewalk at intervals, is positioned between two adjacent greening platforms, and is provided with an extending surface of the pavement surface of the sidewalk.
As shown in figure 1, the enclosing structure is arranged along the pavement surface at intervals of 400-800mm and is positioned in a space between two adjacent greening tables, and the extending surface of the pavement surface is paved in the space.
Furthermore, concrete foundations are arranged on two sides of the underground shaft, reinforced concrete blocks are embedded in the concrete foundations, and the lower ends of the fence surfaces of the stand columns are fixed in the reinforced concrete blocks.
Concrete foundation is as road surface foundation layer, is convenient for install underground well and support the road surface, and the steel reinforcement cage is built to formwork in advance, builds and finishes, welds stand rail surface lower extreme on the steel reinforcement cage, pours the shaping at last, and is integrative firm.
Furthermore, a plain soil layer is laid on the concrete foundation surface, a greening straw mat is arranged on the plain soil layer, and the enclosing structure is 150mm away from the greening straw mat.
And filling soil in the later period of the plain soil layer, wherein the soil is used for greening construction of the flower nursery, the ornamental effect is improved, and after the soil is installed, the enclosing structure is kept 150mm away from the greening grass bed.
Furthermore, a slide rod is arranged on the upright post fence surface on the right side surface of the enclosing structure, fence opening and closing doors are hung on the slide rod, and each fence opening and closing door corresponds to one enclosing structure.
The utility model discloses take and establish the door that opens and shuts of keeping apart one, will enclose the underground well in the closed structure and lay the face with the pavement and separate, weld a slide bar on the right flank of stand rail surface, the setting one push-and-pull door that corresponds, same shaping spout, during the installation, the rail open and shut a lock can on the slide bar, install in advance. In order to remind passers-by, a warning board is nailed on the back surface of the opening and closing door of the fence.
Compared with the prior art, this application can bring following technological effect:
1. the utility model discloses concentrate construction pavement, underground well and afforestation facility and road enclosure, concentrate pavement, underground well and afforestation facility on the sideline that road enclosure is located, pavement and afforestation road shine each other, and underground well is in the hidden engineering, makes whole road look succinct, the function is independent and disperse;
2. the road enclosing infrastructure and the municipal foundation are enclosed, and the road enclosing infrastructure has good interactivity.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this application, serve to provide a further understanding of the application and to enable other features, objects, and advantages of the application to be more apparent. The drawings and their description illustrate the embodiments of the invention and do not limit it. In the drawings:
fig. 1 is a top plan view of the present invention;
FIG. 2 is a cross-sectional view of FIG. 1;
FIG. 3 is a side view of FIG. 1;
in the figure: 1. crossbeam rail surface, 2, road guardrail, 3, stand rail surface, 4, underground well, 5, afforestation platform, 6, the special reason stone surface of well, 7, pavement surface, 8, plain soil layer, 9, concrete ground, 10, reinforced concrete piece, 11, slide bar, 12, rail door, 13, warning sign.
Detailed Description
In order to make the technical solutions better understood by those skilled in the art, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only partial embodiments of the present application, but not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
It should be noted that the terms "first," "second," and the like in the description and claims of this application and in the drawings described above are used for distinguishing between similar elements and not necessarily for describing a particular sequential or chronological order. It should be understood that the data so used may be interchanged under appropriate circumstances such that embodiments of the application described herein may be used. Furthermore, the terms "comprises," "comprising," and "having," and any variations thereof, are intended to cover a non-exclusive inclusion, such that a process, method, system, article, or apparatus that comprises a list of steps or elements is not necessarily limited to those steps or elements expressly listed, but may include other steps or elements not expressly listed or inherent to such process, method, article, or apparatus.
In this application, the terms "upper", "lower", "left", "right", "front", "rear", "top", "bottom", "inner", "outer", "middle", "vertical", "horizontal", "lateral", "longitudinal", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings. These terms are used primarily to better describe the present application and its embodiments, and are not used to limit the indicated devices, elements or components to a particular orientation or to be constructed and operated in a particular orientation.
Moreover, some of the above terms may be used to indicate other meanings besides the orientation or positional relationship, for example, the term "on" may also be used to indicate some kind of attachment or connection relationship in some cases. The specific meaning of these terms in this application will be understood by those of ordinary skill in the art as appropriate.
In addition, the term "plurality" shall mean two as well as more than two.
It should be noted that the embodiments and features of the embodiments in the present application may be combined with each other without conflict. The present application will be described in detail below with reference to the embodiments with reference to the attached drawings.
Example 1
A municipal engineering road enclosure facility comprises an underground shaft 4, a pavement surface 7 and a road guardrail 2 arranged beside the pavement surface 7, wherein the road guardrail 2 consists of a stand column fence surface 3 and a cross beam fence surface 1 and is formed into an enclosure structure, and the underground shaft 4 is positioned in the enclosure structure; a special well marble surface 6 is paved between the enclosing structure and the pavement paving surface 7, and greening platforms 5 are arranged on two sides of the special well marble surface 6.
The utility model discloses integrated pavement, greenbelt, underground shaft and road guardrail in an organic whole, pavement and well independent action, nevertheless possess the reflection brightness of greenbelt again on every side, intercommunication between well and the pavement possesses the isolation door that opens and shuts simultaneously, improves municipal works's construction effect greatly.
As shown in figures 1, 2 and 3 of the drawings,
a municipal works road enclosure facility, including underground well 4, pavement surface 7 and road guardrail 2 set up in pavement surface 7 side, the road guardrail 2 is formed by column fence surface 3 and crossbeam fence surface 1, adopt the steel pipe welding to form, the postplating is processed, the gold paint of spraying of this place, improve the ornamental effect, column fence surface 3 and crossbeam fence surface 1 weld and form into enclosing the structure, underground well 4 locates in enclosing the structure, underground well 4 is built on road surface, connect the underground passage, deodorant treatment; lay the special reason stone face 6 of well between enclosing structure and pavement surface 7, adopt black reason stone to lay, when needs installation, maintenance underground shaft, from pavement surface 7 turn to black reason stone road can, simultaneously, visitor or city resident can stand in reason stone face department, are close to the rail and vwatch road environment. Greening platforms 5 are arranged on two sides of the special stone-like surface 6 for the hoistway, have height, and plant flowers and trees are planted on the greening platforms, so that the whole main body is bright.
Furthermore, the enclosing structure is arranged along the pavement surface 7 at intervals, is positioned between two adjacent greening platforms 5, and is provided with an extending surface of the pavement surface 7.
As shown in figure 1, the enclosing structures are arranged along the pavement surface 7 at intervals of 400-800mm and positioned in the space between two adjacent greening tables 5, and the extending surface of the pavement surface 7 is paved in the space.
Furthermore, concrete foundations 9 are arranged on two sides of the underground hoistway 4, reinforced concrete blocks 10 are embedded in the concrete foundations, and the lower ends of the upright post fence surfaces 3 are fixed in the reinforced concrete blocks 10.
Concrete foundation 9 is convenient for install underground well 4 and support the road surface as road surface foundation layer, and the steel reinforcement cage is built to formwork in advance, builds and finishes, welds 3 lower extremes of stand rail surface on the steel reinforcement cage, pours the shaping at last, and is integrative firm.
Furthermore, a plain soil layer 8 is paved on the surface of the concrete foundation 9, a greening straw mat is arranged on the plain soil layer, and the enclosing structure is 150mm away from the greening straw mat.
And filling soil in the 8 th later stage of the plain soil layer for flower nursery greening construction, improving the ornamental effect, and keeping the enclosing structure 150mm away from the greening grass bed after installation.
Furthermore, a slide rod 11 is arranged on the upright post fence surface 3 on the right side surface of the enclosing structure, fence opening and closing doors 12 are hung on the slide rod, and each fence opening and closing door 12 corresponds to one enclosing structure.
The utility model discloses take and establish the door that opens and shuts of keeping apart one, will enclose underground well 4 in the closed structure and pavement and lay face 7 and separate, weld a slide bar 11 on the right flank of stand rail surface 3, the setting of correspondence is push-and-pull door one, same shaping spout, during the installation, rail open and shut door 12 lock on slide bar 11 can, install in advance. In order to remind passers-by, a warning board 13 is nailed on the back of the fence opening and closing door 12.
The above description is only a preferred embodiment of the present application and is not intended to limit the present application, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, improvement and the like made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims (5)

1. A municipal engineering road enclosure facility comprises an underground shaft (4), a sidewalk laying surface (7) and a road guardrail (2) arranged beside the sidewalk laying surface (7), and is characterized in that the road guardrail (2) consists of a column fence surface (3) and a beam fence surface (1) and is formed into an enclosing structure, and the underground shaft (4) is positioned in the enclosing structure; a special well marble surface (6) is paved between the enclosing structure and the pavement surface (7), and greening platforms (5) are arranged on two sides of the special well marble surface (6).
2. A municipal road containment facility according to claim 1, wherein the enclosure is spaced along the sidewalk-laying surface (7) and between two adjacent green beds (5) with an extension of the sidewalk-laying surface (7).
3. A municipal works road enclosure according to claim 1 or 2, wherein concrete foundations (9) are provided on both sides of the underground shaft (4), reinforced concrete blocks (10) are embedded therein, and the lower ends of the upright fence surfaces (3) are fixed in the reinforced concrete blocks (10).
4. A municipal works road containment facility according to claim 3, wherein the concrete foundation (9) is faced with a layer of plain soil (8) over which green sod is laid, the enclosure being 150mm from the green sod.
5. A municipal works road enclosure according to claim 4, wherein the upright fence surface (3) on the right side of the enclosure is provided with slide bars (11) on which the fence doors (12) are hung, each fence door (12) corresponding to a single enclosure.
CN202020767221.2U 2020-05-11 2020-05-11 Municipal works road enclosure facility Expired - Fee Related CN212335849U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020767221.2U CN212335849U (en) 2020-05-11 2020-05-11 Municipal works road enclosure facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020767221.2U CN212335849U (en) 2020-05-11 2020-05-11 Municipal works road enclosure facility

Publications (1)

Publication Number Publication Date
CN212335849U true CN212335849U (en) 2021-01-12

Family

ID=74079829

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020767221.2U Expired - Fee Related CN212335849U (en) 2020-05-11 2020-05-11 Municipal works road enclosure facility

Country Status (1)

Country Link
CN (1) CN212335849U (en)

Similar Documents

Publication Publication Date Title
US5533835A (en) Railroad crossing signal foundation and method of producing and erecting the same
CN109610484A (en) Intercept water side slope of embankment ecological protection and construction method
CN212335849U (en) Municipal works road enclosure facility
RU113291U1 (en) PROTECTIVE DECORATIVE FENCING
JPS5940979B2 (en) Multi-level building structure
CN2789360Y (en) Green vegetation building
CN102979026A (en) Sidewalk having top cover and semi-prefabricated building method thereof
CN216712852U (en) Central separation strip steel cylinder concrete guardrail for mountain highway
CN207552833U (en) A kind of elevated bridge basal perimeter ground road structure
DE602004011690T2 (en) MULTIFUNCTIONAL BUILDING COMPLEX
DE2916637A1 (en) Plant growth and noise screen system - has troughs supporting vegetation and conveying noise to humus underneath
US20040067104A1 (en) High-security guard rail system
RU116548U1 (en) FENCE "BASTION"
CA2259874A1 (en) A device for road protection and method of obtaining such a device
Daviau et al. Excavation at Khirbat al-Mudayna and Survey in the Wādī ath-Thamad: Preliminary Report of the 2008, 2010 and 2011 seasons
CN219527732U (en) Multifunctional common ditch access hole component transformation module
KR102184486B1 (en) variable-type prefabricated flower bed for retaining walls for apartment house
CN212957787U (en) Corridor frame with scenic spot spraying effect
DE102013100758B4 (en) Prefabricated element element and method for building a structure
KR102398526B1 (en) Landscape sculptures and construction methods for structurally modeling them
CN202644343U (en) Sidewalk with head covers
CN201090047Y (en) Wood construction landscape isolated gate
CN220977652U (en) Integral prefabricated polymer pedestrian arch bridge
CN219260620U (en) Stealthy ecological tree pool of ancient and famous tree steel construction
CN114934468A (en) Rubble retaining wall anti-collision railing structure and construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210112