CN212253115U - Indoor unit hoisting conversion layer support of air conditioner - Google Patents

Indoor unit hoisting conversion layer support of air conditioner Download PDF

Info

Publication number
CN212253115U
CN212253115U CN202020549818.XU CN202020549818U CN212253115U CN 212253115 U CN212253115 U CN 212253115U CN 202020549818 U CN202020549818 U CN 202020549818U CN 212253115 U CN212253115 U CN 212253115U
Authority
CN
China
Prior art keywords
conversion layer
vertical frame
indoor unit
frame
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020549818.XU
Other languages
Chinese (zh)
Inventor
李海尧
任国杰
董浩
李邦国
杨志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North Engineering Co Ltd of China Railway Construction Engineering Group Co Ltd
Original Assignee
North Engineering Co Ltd of China Railway Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North Engineering Co Ltd of China Railway Construction Engineering Group Co Ltd filed Critical North Engineering Co Ltd of China Railway Construction Engineering Group Co Ltd
Priority to CN202020549818.XU priority Critical patent/CN212253115U/en
Application granted granted Critical
Publication of CN212253115U publication Critical patent/CN212253115U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Other Air-Conditioning Systems (AREA)

Abstract

The utility model belongs to the technical field of the technique of machine hoist and mount in the air conditioning and specifically relates to a machine conversion layer support hoists in air conditioning is located between floor and the air conditioning machine, and the conversion layer support is fixed to be set up in the floor below, and the machine hangs through the jib and connects the below at the conversion layer support in the air conditioning, the conversion layer support includes horizontal stand and vertical frame, and the upper end fixed connection of vertical frame is in the below of floor, and the horizontal stand is fixed to be set up in the below of vertical frame, machine jib upper end and horizontal stand fixed connection in the air conditioning. In the process of installing the air-conditioning indoor unit, the position span and the height of the vertical frame convenient to install are firstly measured, the length of the vertical frame and the length of the horizontal frame are determined according to the measuring result, the conversion layer support can be ensured to avoid the existing pipelines and circuits in the suspended ceiling, then the hanger rod of the air-conditioning indoor unit is fixed on the horizontal frame, the difficulty of installing the air-conditioning indoor unit can be greatly reduced, and the horizontal frame and the vertical frame can also support the pipelines and circuits in the suspended ceiling.

Description

Indoor unit hoisting conversion layer support of air conditioner
Technical Field
The utility model belongs to the technical field of the technique of machine hoist and mount in the air conditioning and specifically relates to a floor support is changeed in machine hoist and mount in air conditioning.
Background
In public places such as shopping malls, can install central air conditioning usually, indoor chance is installed in the furred ceiling to reach good air conditioning effect.
In the prior art, an indoor unit of an air conditioner is fixed and supported by a hanger rod, and the upper end of the hanger rod is fixed on a floor slab. The shortcomings of the prior art are that the installation position of the indoor unit is planned and completed, in the actual installation process, before the indoor unit of the air conditioner is installed, pipelines and lines in the suspended ceiling are arranged more, the difficulty of fixing and arranging the suspension rod on the floor slab in the complex pipelines and lines is high, the hoisting of the indoor unit of the air conditioner is often influenced, and the installation difficulty is high.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims at providing a quick-witted hoist and mount conversion layer support in air conditioning has reduced the effect of the machine installation degree of difficulty in the air conditioning.
The above utility model discloses an above-mentioned utility model purpose can realize through following technical scheme:
the utility model provides a machine hoist and mount conversion layer support in air conditioning, is located between floor and the machine in the air conditioning, and the conversion layer support is fixed to be set up in the floor below, and the machine hangs the below at the conversion layer support through the jib in the air conditioning, the conversion layer support includes horizontal stand and vertical frame, and the upper end fixed connection of vertical frame is in the below of floor, and the horizontal stand is fixed to be set up in the below of vertical frame, machine jib upper end and horizontal stand fixed connection in the air conditioning.
By adopting the technical scheme, in the process of installing the air-conditioning indoor unit, the position span and the height of the vertical frame convenient to install are firstly measured, the length of the vertical frame and the length of the horizontal frame are determined according to the measurement result, the conversion layer support is ensured to be capable of avoiding the existing pipelines and circuits in the suspended ceiling, and then the suspender of the air-conditioning indoor unit is fixed on the horizontal frame, so that the installation difficulty of the air-conditioning indoor unit can be greatly reduced, and the horizontal frame and the vertical frame can also support the pipelines and circuits in the suspended ceiling.
The present invention may be further configured in a preferred embodiment as: a plurality of mounting holes are formed in the horizontal frame, and the mounting holes are evenly arranged at intervals.
By adopting the technical scheme, in the installation process of the suspender of the indoor air conditioner, the installation holes at different positions on the horizontal frame can be selected to install the suspender, so that the position of the indoor air conditioner is ensured to be at the preset position.
The present invention may be further configured in a preferred embodiment as: the mounting hole is a long round hole, and the length direction of the mounting hole is the same as that of the horizontal frame.
By adopting the technical scheme, the suspender of the indoor air conditioner can be properly moved in the long round hole in the process of installing the suspender of the indoor air conditioner on the horizontal frame, the installation position of the suspender is finely adjusted, and the accuracy of the installation position of the indoor air conditioner is ensured.
The present invention may be further configured in a preferred embodiment as: the conversion layer support further comprises an angle plate, the two sides of the angle plate are perpendicular to each other, the vertical frame is fixedly connected with the floor slab through the angle plate, the two sides of the angle plate are respectively attached to the vertical side of the vertical frame and the lower surface of the floor slab, and the angle plate, the floor slab and the vertical frame are fixed through bolts.
Through adopting above-mentioned technical scheme, utilize the scute to fix vertical frame and floor, simple to operate, stability is high to material cost is lower.
The present invention may be further configured in a preferred embodiment as: the vertical frame is fixedly connected with the floor slab through at least two angle plates, and the two angle plates are respectively positioned on two sides of the vertical edge of the vertical frame.
Through adopting above-mentioned technical scheme, can further promote the stability that vertical frame and floor are connected.
The present invention may be further configured in a preferred embodiment as: the horizontal frame is fixedly connected with the vertical frame through an angle plate, and two sides of the angle plate are respectively attached to the horizontal frame and the vertical frame and fixedly connected through bolts.
Through adopting above-mentioned technical scheme, utilize the scute, can stably connect vertical rack and horizontal stand, guarantee the holistic stability of conversion layer support.
The present invention may be further configured in a preferred embodiment as: the horizontal frame and the vertical frame are angle steels.
Through adopting above-mentioned technical scheme, can promote the intensity of horizontal bracket and vertical frame to promote the whole intensity of bearing of conversion layer support.
The present invention may be further configured in a preferred embodiment as: the specifications of the horizontal frame, the vertical frame and the angle plate are the same, and the horizontal frame, the vertical frame and the angle plate are all provided with mounting holes.
By adopting the technical scheme, the specifications of the horizontal frame, the vertical frame and the angle plate are the same, the raw materials are the same, and in the process of intercepting the horizontal frame and the vertical frame with specific lengths, the leftover materials can be used as the angle plate, so that the utilization rate of the materials is improved.
To sum up, the utility model discloses following technological effect has:
1. by arranging the conversion layer support between the suspender and the floor slab, the suspender can avoid pipelines in the suspended ceiling, and the difficulty of installing an indoor unit of the air conditioner is reduced;
2. the angle plate is arranged to connect the vertical frame and the floor slab, so that the effect of improving the installation stability and strength of the vertical slab is achieved;
3. the horizontal frame, the vertical frame and the angle plate are made of materials with the same specification in an intercepting mode, and the effect of improving the material utilization rate is achieved.
Drawings
FIG. 1 is a schematic three-dimensional structure of a conversion layer support;
FIG. 2 is an enlarged view of FIG. 1 taken at detail A;
fig. 3 is an enlarged view of a portion B in fig. 2.
In the figure, 1, horizontal shelf; 2. a vertical frame; 4. mounting holes; 5. a gusset is provided.
Detailed Description
As shown in fig. 1, this embodiment describes a support for lifting a transfer floor of an indoor unit of an air conditioner, which is located between a floor and the indoor unit of the air conditioner, the support for lifting the transfer floor is fixedly disposed below the floor, and the indoor unit of the air conditioner is suspended below the support for lifting the transfer floor by a suspension rod. After setting up like this, the conversion layer support can be installed alone, with the conversion layer support mounting in the place that the pipeline is less relatively in the furred ceiling, later with the jib of air conditioning indoor set install the below at the conversion layer support to reach the purpose of dodging the pipeline, reduce the installation degree of difficulty.
The structure of conversion layer support has a variety, and in this embodiment, as shown in fig. 1, the conversion layer support includes horizontal bracket 1 and vertical bracket 2, and the upper end fixed connection of vertical bracket 2 is in the below of floor, and horizontal bracket 1 is fixed to be set up in the below of vertical bracket 2, and air conditioning indoor set jib upper end and horizontal bracket 1 fixed connection. When the conversion layer support is installed, the position span and the height of the vertical frame 2 convenient to install are measured at first, the length of the vertical frame 2 and the length of the horizontal frame 1 are determined according to the measuring result, the conversion layer support is guaranteed to be capable of avoiding existing pipelines and lines in a suspended ceiling, and quick installation is achieved. After the horizontal frame 1 and the vertical frame 2 are installed, the upper end of a suspender of the indoor unit of the air conditioner is fixed at a proper position of the horizontal frame 1, and finally the indoor unit of the air conditioner is installed.
As shown in fig. 1, in order to adjust the position of the boom mounted on the horizontal frame 1, a plurality of mounting holes 4 may be formed on the horizontal frame 1, and the mounting holes 4 are uniformly spaced. At the moment, in the installation process of the suspender of the indoor unit of the air conditioner, the suspender can be installed by selecting the installation holes 4 at different positions on the horizontal frame 1, and then the suspender and the horizontal frame 1 are fixed through bolts and the like, so that the position of the indoor unit of the air conditioner is ensured to be at the preset position.
As shown in fig. 1, the mounting hole 4 may be an oblong hole, and the longitudinal direction of the mounting hole 4 is the same as the longitudinal direction of the horizontal shelf 1. At this time, in the process of installing the suspender of the air-conditioning indoor unit on the horizontal frame, the suspender can be moved in the installation hole 4 properly, the installation position of the suspender is finely adjusted, and the accuracy of the installation position of the air-conditioning indoor unit is ensured.
As shown in fig. 1, in this embodiment, in order to ensure the stability of the transfer floor support, two vertical frames 2 are provided, one horizontal frame 1 is provided, two ends of the horizontal frame 1 are fixedly connected to the lower end of the vertical frame 2, and as shown in fig. 2 and 3, the vertical frame 2 and the floor slab, and the vertical frame 2 and the horizontal frame 1 are connected by an angle plate 5. As shown in fig. 2, two sides of the angle plate 5 are perpendicular to each other, when the vertical frame 2 and the floor slab are connected, two sides of the angle plate 5 are respectively attached to the vertical side of the vertical frame 2 and the lower surface of the floor slab, and the angle plate 5, the floor slab and the vertical frame 2 are fixed through bolts; as shown in fig. 3, when the vertical frame 2 and the horizontal frame 1 are connected, two sides of the angle plate 5 are respectively attached to the vertical side of the vertical frame 2 and the horizontal side of the horizontal frame 1 and fixed by bolts, so as to ensure the convenience and stability of the connection of the vertical frame 2 with the floor and the horizontal frame 1, and the cost is also low. And after setting up the conversion layer support like this, the pipeline in the furred ceiling also can support through the horizontal stand, promotes the stability of placing of pipeline in the furred ceiling.
As shown in fig. 2, when the vertical frame 2 is connected to the floor, it is preferable to fixedly connect two angle plates 5, and the two angle plates 5 are respectively located at two sides of the vertical side of the vertical frame 2 to further enhance the connection strength between the vertical frame 2 and the floor.
As shown in fig. 1, in order to improve the structural strength of the transfer floor bracket, angle steel can be used as the vertical frame 2 and the horizontal frame 1, so that the cost is low, and the structural strength is strong. Further, after the angle steel is used, as shown in fig. 2 and 3, the horizontal frame 1, the vertical frame 2, and the angle plate 5 may be made of the same standard angle steel, and the horizontal frame 1, the vertical frame 2, and the angle plate 5 may be provided with the mounting holes 4. At the moment, the horizontal frame 1, the vertical frame 2 and the angle plate 5 are identical in specification and same in raw material, and in the process of cutting the horizontal frame 1 and the vertical frame 2 with specific lengths, leftover materials can be used as the angle plate 5, so that the utilization rate of materials is improved.
The installation process of this embodiment is:
firstly, observing the space in a suspended ceiling at the installation position of an indoor unit of the air conditioner, selecting the position avoiding the pipeline in the suspended ceiling to install the vertical frames 2, calculating the distance between the vertical frames 2 and the height of the vertical frames 2 avoiding the pipeline, and intercepting the vertical frames 2 and the horizontal frames 1 with corresponding lengths according to the calculated numerical value. The vertical frame 2 is fixed below a floor slab by using the angle plate 5, then the horizontal frame 1 is installed and fixed by using the angle plate 5, then the suspender of the indoor unit of the air conditioner is installed in the installation hole 4 of the horizontal rod 1, the position of the suspender is finely adjusted, then the suspender is fixed with the horizontal frame 1, and finally the indoor unit of the air conditioner is installed.
The embodiments of the present invention are preferred embodiments of the present invention, and the scope of the present invention is not limited by these embodiments, so: all equivalent changes made according to the structure, shape and principle of the invention are covered by the protection scope of the invention.

Claims (8)

1. The utility model provides a machine conversion layer support is transferred in hoist and mount of air conditioning, its characterized in that is located between floor and the machine in the air conditioning, and the conversion layer support is fixed to be set up in the floor below, and the machine in the air conditioning hangs the below at the conversion layer support through the jib, the conversion layer support includes horizontal bracket (1) and vertical (2), and the upper end fixed connection of vertical (2) is in the below of floor, and horizontal bracket (1) is fixed to be set up in the below of vertical (2), machine jib upper end and horizontal bracket (1) fixed connection in the air conditioning.
2. The air conditioner indoor unit hoisting conversion layer bracket as claimed in claim 1, wherein the horizontal frame (1) is provided with a plurality of mounting holes (4), and the mounting holes (4) are uniformly spaced.
3. The air conditioner indoor unit lifting conversion layer bracket as claimed in claim 2, wherein the mounting hole (4) is an oblong hole, and the length direction of the mounting hole (4) is the same as the length direction of the horizontal frame (1).
4. The indoor unit hoisting transfer layer bracket of the air conditioner as claimed in claim 2, further comprising an angle plate (5), wherein two sides of the angle plate (5) are perpendicular to each other, the vertical frame (2) is fixedly connected with the floor slab through the angle plate (5), two sides of the angle plate (5) are respectively attached to the vertical side of the vertical frame (2) and the lower surface of the floor slab, and the angle plate (5) is fixed with the floor slab and the vertical frame (2) through bolts.
5. The air conditioning indoor unit hoisting transfer layer bracket as claimed in claim 4, wherein the vertical frame (2) is fixedly connected with the floor by at least two angle plates (5), and the two angle plates (5) are respectively arranged at two sides of the vertical edge of the vertical frame (2).
6. The air conditioning indoor unit hoisting conversion layer bracket as claimed in claim 4, wherein the horizontal frame (1) and the vertical frame (2) are also fixedly connected by an angle plate (5), and two sides of the angle plate (5) are respectively attached to the horizontal frame (1) and the vertical frame (2) and fixedly connected by bolts.
7. The indoor unit lifting conversion layer bracket of the air conditioner as claimed in any one of claims 4 to 6, wherein the horizontal bracket (1) and the vertical bracket (2) are angle steel.
8. The air conditioning indoor unit hoisting conversion layer bracket as claimed in claim 7, wherein the horizontal frame (1), the vertical frame (2) and the angle plate (5) have the same specification, and the horizontal frame (1), the vertical frame (2) and the angle plate (5) are provided with mounting holes (4).
CN202020549818.XU 2020-04-15 2020-04-15 Indoor unit hoisting conversion layer support of air conditioner Active CN212253115U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020549818.XU CN212253115U (en) 2020-04-15 2020-04-15 Indoor unit hoisting conversion layer support of air conditioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020549818.XU CN212253115U (en) 2020-04-15 2020-04-15 Indoor unit hoisting conversion layer support of air conditioner

Publications (1)

Publication Number Publication Date
CN212253115U true CN212253115U (en) 2020-12-29

Family

ID=74002775

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020549818.XU Active CN212253115U (en) 2020-04-15 2020-04-15 Indoor unit hoisting conversion layer support of air conditioner

Country Status (1)

Country Link
CN (1) CN212253115U (en)

Similar Documents

Publication Publication Date Title
CN203359755U (en) Assembly and lifting integrated device for anode plate
CN212253115U (en) Indoor unit hoisting conversion layer support of air conditioner
CN103663302B (en) L-type portal installation frame
CN109132843B (en) The installation method of super-section metal bellows in a kind of vertical shaft
CN204534892U (en) A kind of Bidirectional adjustable air conditioner support
CN203865931U (en) Hoisting combination tool of distribution transformer
CN201458567U (en) Special angle square for profile steel trolley conductor bracket installation
CN210316214U (en) Assembled steel construction building dysmorphism post
CN204230807U (en) A kind of power cable crane span structure supporting structure being easy to regulate
CN204495448U (en) A kind of steel billet meausring apparatus of steel rolling production-line
CN104729644A (en) Online weighing device for steel billets
CN212101668U (en) Novel switch board installation auxiliary frame
CN210979060U (en) PIS screen adjusting bracket
CN210717856U (en) Support is used in air conditioner installation
CN212271652U (en) High-speed railway simply supported case roof beam contact net built-in fitting positioner
CN109826448B (en) Lifting, hoisting and positioning device for concrete wall panel
CN209310800U (en) A kind of total station damping device for constructing tunnel
CN106764075A (en) For the shaped steel Two bors d's oeuveres combined bracket that electrical and mechanical comprehensive pipeline is installed
CN207759864U (en) A kind of building hoist offset wall-attached supporting seat device
CN202014346U (en) Outdoor-type floor mounting support without fixation for base stations
CN107700854B (en) Steel plate wall sliding installation device and installation method for super high-rise core tube
CN219268418U (en) Step type line-connecting support frame
CN221194420U (en) Temporary pipeline supporting device
CN215716656U (en) Simple overhanging gutter aluminum plate mounting bracket
CN218616344U (en) Large-span rigid contact net suspension mounting device for station

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant