CN212224145U - Highway bridge drainage device - Google Patents
Highway bridge drainage device Download PDFInfo
- Publication number
- CN212224145U CN212224145U CN202020454095.5U CN202020454095U CN212224145U CN 212224145 U CN212224145 U CN 212224145U CN 202020454095 U CN202020454095 U CN 202020454095U CN 212224145 U CN212224145 U CN 212224145U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- fixedly connected
- box body
- box
- drainage device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a public road bridge roof beam drainage device, the power distribution box comprises a box body, the opening has been opened to the front side of box, the equal fixedly connected with connecting rod in both sides of box inner chamber, swing joint has first pipeline between two connecting rods, the front side of first pipeline extends to the open-ended inner chamber, the front side fixedly connected with filter plate of first pipeline inner chamber, the top fixedly connected with reset spring of first pipeline, reset spring's top and box fixed connection, the rear side of first pipeline is provided with the second pipeline. The utility model discloses a set up box, outlet pipe, filter plate, mounting panel, connecting rod, first honeycomb duct, opening, first pipeline, second honeycomb duct, carousel, screw flabellum, pivot, reset spring, water conservancy diversion piece, second pipeline, connect the cooperation of rope and dead lever and use, possess and can prevent drainage device and block up, use manpower sparingly, reduced personnel's working strength's advantage.
Description
Technical Field
The utility model relates to a public road bridge roof beam technical field specifically is a public road bridge roof beam drainage device.
Background
The highway bridge engineering refers to the whole work of planning, designing, constructing, maintaining and repairing the structure of a highway across water areas, valleys and all traffic channels, wherein a highway line passes through water areas such as rivers, estuaries, lakes, reservoirs, irrigation canals and the like, or crosses over deep valley zones with large height differences or crosses over other traffic lines, and bridges are required to be erected for keeping smooth traffic. In busy urban areas, elevated roads consisting of viaducts are sometimes required.
Once the accumulated water is generated on the highway bridge in rainy days, the running of vehicles can be influenced, wheels are easy to slip, and the brake is unstable, so that traffic accidents occur, the accumulated water generated on the road surface is caused by the blockage of the drainage device, the existing drainage device needs to be manually dredged after being blocked, the labor intensity of personnel is increased, the dredging efficiency is low, and the water on the road surface cannot be timely drained.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a public road bridge roof beam drainage device possesses and can prevent that drainage device from blockking up, uses manpower sparingly, has reduced personnel's working strength's advantage, has solved current drainage device and can not dredge by oneself, has increased personnel intensity of labour, dredges the problem of inefficiency.
In order to achieve the above object, the utility model provides a following technical scheme: a highway bridge drainage device comprises a box body, wherein an opening is formed in the front side of the box body, connecting rods are fixedly connected to two sides of an inner cavity of the box body, a first pipeline is movably connected between the two connecting rods, the front side of the first pipeline extends to the inner cavity of the opening, a filter screen plate is fixedly connected to the front side of the inner cavity of the first pipeline, a reset spring is fixedly connected to the top of the first pipeline, the top of the reset spring is fixedly connected with the box body, a second pipeline is arranged on the rear side of the first pipeline, the rear side of the second pipeline penetrates to the rear side of the box body, first guide pipes are communicated with two sides of the top of the front side of the box body, the rear side of each first guide pipe penetrates to the inner cavity of the box body and is communicated with a second guide pipe, a rotating shaft is arranged at the bottom of each second guide pipe, and two sides of the rotating shaft are respectively movably, the surface of pivot is equipped with screw flabellum and carousel respectively, the right side fixedly connected with of carousel connects the rope, connect one side and the first pipeline fixed connection that the carousel was kept away from to the rope, the bottom intercommunication of box inner chamber has the outlet pipe, the equal fixedly connected with mounting panel in both sides of box.
Preferably, the bottoms of the two sides of the inner cavity of the box body are fixedly connected with flow guide blocks, and the joint of the surface of the rotating shaft and the box body is movably connected through a first bearing.
Preferably, one side of the connecting rod, which is close to the first pipeline, is movably connected with the first pipeline through a second bearing, and the surface of the second pipeline is fixedly connected with the box body.
Preferably, the top of the second pipeline is fixedly connected with a fixing rod, and the top of the fixing rod is fixedly connected with the box body.
Preferably, the rear side of the top of the first flow guide pipe is fixedly connected with the top of the inner cavity of the box body through a first fixed block, the rear side of the second flow guide pipe is fixedly connected with the rear side of the inner cavity of the box body through a second fixed block, and the propeller fan blades are located under the second flow guide pipe.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a set up box, outlet pipe, filter plate, mounting panel, connecting rod, first honeycomb duct, opening, first pipeline, second honeycomb duct, carousel, screw flabellum, pivot, reset spring, water conservancy diversion piece, second pipeline, connect the cooperation of rope and dead lever and use, possess and can prevent drainage device and block up, use manpower sparingly, reduced personnel's working strength's advantage, be worth promoting.
2. The utility model can facilitate sundries and accumulated water to flow out of the box body by arranging the flow guide block;
the second pipeline can be reinforced by arranging the fixing rod;
the first bearing is arranged, so that the rotating shaft can be conveniently installed;
the first pipeline can be movably connected with the connecting rod by arranging the second bearing;
through setting up first fixed block and second fixed block, can consolidate first honeycomb duct and second honeycomb duct.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a front sectional view of the structure of the present invention;
fig. 3 is a left side sectional view of the structure of the present invention.
In the figure: the device comprises a box body 1, a water outlet pipe 2, a filter screen plate 3, a mounting plate 4, a connecting rod 5, a first flow guide pipe 6, an opening 7, a first pipeline 8, a second flow guide pipe 9, a rotary table 10, propeller blades 11, a rotating shaft 12, a reset spring 13, a flow guide block 14, a second pipeline 15, a connecting rope 16 and a fixing rod 17.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to be referred must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "connected", and the like are to be construed broadly, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The utility model provides a box 1, outlet pipe 2, filter plate 3, mounting panel 4, connecting rod 5, first honeycomb duct 6, opening 7, first pipeline 8, second honeycomb duct 9, carousel 10, screw flabellum 11, pivot 12, reset spring 13, water conservancy diversion piece 14, second pipeline 15, connect parts such as rope 16 and dead lever 17 and be the general standard or the parts that technical personnel in the field know, its structure and principle all can learn through the technical manual or learn through conventional experimental method for technical personnel in the field.
Referring to fig. 1-3, a highway bridge drainage device comprises a box body 1, an opening 7 is opened at the front side of the box body 1, connecting rods 5 are fixedly connected to both sides of the inner cavity of the box body 1, a first pipeline 8 is movably connected between the two connecting rods 5, the front side of the first pipeline 8 extends to the inner cavity of the opening 7, a filter screen plate 3 is fixedly connected to the front side of the inner cavity of the first pipeline 8, a return spring 13 is fixedly connected to the top of the first pipeline 8, the top of the return spring 13 is fixedly connected with the box body 1, a second pipeline 15 is arranged at the rear side of the first pipeline 8, the rear side of the second pipeline 15 penetrates to the rear side of the box body 1, first guide pipes 6 are communicated to both sides of the top of the front side of the box body 1, the rear side of the first guide pipes 6 penetrates to the inner cavity of the box body 1 and is communicated with a second guide pipe 9, a rotating shaft 12 is arranged at the bottom of the second guide pipe, the surface of the rotating shaft 12 is respectively sleeved with a propeller fan blade 11 and a rotary table 10, the right side of the rotary table 10 is fixedly connected with a connecting rope 16, one side of the connecting rope 16, far away from the rotary table 10, is fixedly connected with a first pipeline 8, the bottom of the inner cavity of the box body 1 is communicated with a water outlet pipe 2, and two sides of the box body 1 are fixedly connected with mounting plates 4;
the bottoms of the two sides of the inner cavity of the box body 1 are fixedly connected with flow guide blocks 14, and the joint of the surface of the rotating shaft 12 and the box body 1 is movably connected through a first bearing;
one side of the connecting rod 5 close to the first pipeline 8 is movably connected with the first pipeline 8 through a second bearing, and the surface of the second pipeline 15 is fixedly connected with the box body 1;
the top of the second pipeline 15 is fixedly connected with a fixed rod 17, and the top of the fixed rod 17 is fixedly connected with the box body 1;
the rear side of the top of the first flow guide pipe 6 is fixedly connected with the top of the inner cavity of the box body 1 through a first fixed block, the rear side of the second flow guide pipe 9 is fixedly connected with the rear side of the inner cavity of the box body 1 through a second fixed block, and the propeller fan blades 11 are positioned right below the second flow guide pipe 9;
by arranging the flow guide block 14, sundries and accumulated water can flow out of the box body 1 conveniently;
the second pipeline 15 can be reinforced by arranging the fixing rod 17;
the installation of the rotating shaft 12 can be facilitated by arranging the first bearing;
the first pipeline 8 and the connecting rod 5 can be movably connected by arranging a second bearing;
through setting up first fixed block and second fixed block, can consolidate first honeycomb duct 6 and second honeycomb duct 9.
When the device is used, the opening 7 is aligned with a water outlet of a highway bridge, the device is fixed through an expansion bolt, accumulated water on the road surface in rainy days flows out through the first pipeline 8 and the second pipeline 15, when the filter screen plate 3 is blocked by sundries on the road surface, the water level on the surface of the box body 1 rises, when the water level rises to the pipe orifice of the first guide pipe 6, the accumulated water flows into the box body 1 through the first guide pipe 6 and the second guide pipe 9, then the propeller fan blade 11 is impacted, the propeller fan blade 11 is impacted to drive the rotating shaft 12 to rotate, the rotating shaft 12 drives the rotating disc 10 to rotate, the rotating disc 10 enables the first pipeline 8 to rotate downwards through the connecting rope 16, the reset spring 13 is stretched, the first pipeline 8 rotates downwards, the accumulated water flows into the bottom of the inner cavity of the box body 1, meanwhile, the sundries on the surface of the filter screen plate 3 flow into the bottom of the inner cavity of the box body, reset spring 13 contracts and makes first pipeline 8 reset, and ponding can flow out through second pipeline 15 again like this, and this device can prevent to block up, and the surface ponding of in time discharging reduces personnel working strength.
In summary, the following steps: this public road bridge roof beam drainage device, through box 1, outlet pipe 2, filter plate 3, mounting panel 4, connecting rod 5, first honeycomb duct 6, opening 7, first pipeline 8, second honeycomb duct 9, carousel 10, screw flabellum 11, pivot 12, reset spring 13, water conservancy diversion piece 14, second pipeline 15, connect 16 and the dead lever 17's of rope cooperation to use, solved current drainage device and can not dredge by oneself, increased personnel intensity of labour, the problem of dredging inefficiency.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. The utility model provides a public road bridge roof beam drainage device, includes box (1), its characterized in that: an opening (7) is formed in the front side of the box body (1), connecting rods (5) are fixedly connected to the two sides of the inner cavity of the box body (1), a first pipeline (8) is movably connected between the two connecting rods (5), the front side of the first pipeline (8) extends to the inner cavity of the opening (7), a filter screen plate (3) is fixedly connected to the front side of the inner cavity of the first pipeline (8), a reset spring (13) is fixedly connected to the top of the first pipeline (8), the top of the reset spring (13) is fixedly connected with the box body (1), a second pipeline (15) is arranged on the rear side of the first pipeline (8), the rear side of the second pipeline (15) penetrates through the rear side of the box body (1), first guide pipes (6) are communicated with the two sides of the top of the front side of the box body (1), and second guide pipes (9) are communicated with the rear side of the first guide pipes (6), the bottom of second honeycomb duct (9) is provided with pivot (12), the both sides of pivot (12) respectively with the both sides swing joint of box (1) inner chamber, the surface of pivot (12) is overlapped respectively and is equipped with screw flabellum (11) and carousel (10), the right side fixedly connected with of carousel (10) is connected rope (16), connect one side and first pipeline (8) fixed connection that carousel (10) were kept away from in rope (16), the bottom intercommunication of box (1) inner chamber has outlet pipe (2), the equal fixedly connected with mounting panel (4) in both sides of box (1).
2. A road bridge drainage device according to claim 1, wherein: the bottom of the two sides of the inner cavity of the box body (1) is fixedly connected with a flow guide block (14), and the joint of the surface of the rotating shaft (12) and the box body (1) is movably connected through a first bearing.
3. A road bridge drainage device according to claim 1, wherein: one side of the connecting rod (5) close to the first pipeline (8) is movably connected with the first pipeline (8) through a second bearing, and the surface of the second pipeline (15) is fixedly connected with the box body (1).
4. A road bridge drainage device according to claim 1, wherein: the top of the second pipeline (15) is fixedly connected with a fixing rod (17), and the top of the fixing rod (17) is fixedly connected with the box body (1).
5. A road bridge drainage device according to claim 1, wherein: the rear side at first honeycomb duct (6) top and the top of box (1) inner chamber pass through first fixed block fixed connection, the rear side of second honeycomb duct (9) passes through second fixed block fixed connection with the rear side of box (1) inner chamber, screw flabellum (11) are located under second honeycomb duct (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020454095.5U CN212224145U (en) | 2020-03-31 | 2020-03-31 | Highway bridge drainage device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020454095.5U CN212224145U (en) | 2020-03-31 | 2020-03-31 | Highway bridge drainage device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212224145U true CN212224145U (en) | 2020-12-25 |
Family
ID=73905681
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020454095.5U Active CN212224145U (en) | 2020-03-31 | 2020-03-31 | Highway bridge drainage device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212224145U (en) |
-
2020
- 2020-03-31 CN CN202020454095.5U patent/CN212224145U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210529817U (en) | Sponge city construction is with recessed formula greenery patches rainwater collection device | |
CN107101144A (en) | A kind of street lamp with water-collecting irrigation function | |
CN212224145U (en) | Highway bridge drainage device | |
CN213173619U (en) | River course rubbish intercepting device that municipal works were used | |
CN211006218U (en) | Water accumulation structure is prevented with road to hydraulic design | |
CN218814208U (en) | Drainage diverging device for water supply and drainage engineering | |
CN208430430U (en) | A kind of highway bridge road surface drainage device | |
CN212714507U (en) | Convenient drainage device for urban viaduct | |
CN109469153A (en) | Double flowing tube rainwater-collecting and processing and utilizing system | |
CN213900330U (en) | Water supply and drainage pipeline device that prevents blockking up of municipal construction | |
CN211815310U (en) | Drainage roadbed structure of town road | |
CN210507030U (en) | Prevent highway engineering drainage canal of jam | |
CN203769039U (en) | Rainwater storage and drainage system for urban road | |
CN219637672U (en) | Bridge floor and bridge drainage structures of ponding prevent | |
CN111851410A (en) | Hydraulic engineering ecological slope protection and construction method | |
CN114673233A (en) | Integrated form intelligence well | |
CN215629353U (en) | Drainage device for road and bridge | |
CN215715717U (en) | Municipal road engineering sponge city biological detention ditch | |
CN218479273U (en) | Rain and sewage pipe network drainage system | |
CN113584992B (en) | Curb for urban road with linkage clearance drainage structures | |
CN214116887U (en) | Town road drainage structures | |
CN216275214U (en) | Highway bridge drainage structures | |
CN212270666U (en) | Drainage structures for public road bridge roof beam | |
CN221000687U (en) | Multi-angle warning device for municipal construction | |
CN220643902U (en) | Highway bridge maintenance concrete repair device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |