CN212197587U - Concrete suspension tank for water conservancy construction - Google Patents
Concrete suspension tank for water conservancy construction Download PDFInfo
- Publication number
- CN212197587U CN212197587U CN202020262514.5U CN202020262514U CN212197587U CN 212197587 U CN212197587 U CN 212197587U CN 202020262514 U CN202020262514 U CN 202020262514U CN 212197587 U CN212197587 U CN 212197587U
- Authority
- CN
- China
- Prior art keywords
- water conservancy
- conservancy construction
- support frame
- support
- jar body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model relates to a concrete bucket for water conservancy construction belongs to water conservancy construction equipment field, and it includes a jar body, the jar body is including cylinder portion and conical portion, cylinder portion and conical portion are linked together mutually, the top of cylinder portion is provided with a plurality of lugs, the bottom of the jar body is provided with the support frame, be provided with discharge mechanism on the support frame, discharge mechanism is located the below of conical portion and is linked together with the opening of conical portion, discharge mechanism includes ejection of compact support and discharging pipe, the fixed setting of ejection of compact support is on the support frame, the middle part of ejection of compact support is provided with the support ring, the discharging pipe rotates and sets up in the support ring. The utility model discloses have the effect of the ejection of compact scope of the improvement jar body of being convenient for.
Description
Technical Field
The utility model belongs to the technical field of the technique of water conservancy construction device and specifically relates to a concrete bucket for water conservancy construction is related to.
Background
The hydro-junction is an organic complex formed by constructing hydraulic buildings for controlling and governing water flow, arranging the hydraulic buildings at reasonable positions, and mutually matching and coordinating the hydraulic buildings according to related national regulations by taking engineering measures on a river channel for developing and utilizing river hydraulic resources, thereby realizing hydraulic tasks. Including water retaining structures and water release structures. A representative form of a retaining structure is called a dam. It can be divided into earth dam, gravity dam, concrete face rockfill dam and arch dam. With the gradual development of economy, the number of dams is increasing day by day, and in the dam construction process, the concrete suspension tank is the indispensable construction equipment in the step of concreting.
The existing Chinese patent with the publication number of CN208251636U discloses a concrete suspension tank, and the key points of the technical scheme are as follows: the device comprises a first tank body with a rectangular cross section and a feeding hole at the upper end, a second tank body with the upper end in butt joint and fixed connection with the bottom end of the first tank body, a discharging hole with the upper end in butt joint and fixed connection with a lower conical opening of the second tank body, and a discharging device which is positioned in the middle of the discharging hole and is in sliding connection with the discharging hole; the second jar of body is the rectangle cone, the discharge gate is circular barrel.
The above prior art solutions have the following drawbacks: above-mentioned technical scheme the concrete is whole to fall out subaerially from the discharge gate of the second jar of body bottom when the ejection of compact, and the ejection of compact scope is little, leads to the work progress inconvenient.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims to provide a concrete hangs jar for water conservancy construction has the ejection of compact scope's of the improvement jar body of being convenient for advantage.
The utility model aims at realizing through the following technical scheme:
the utility model provides a concrete bucket for water conservancy construction, includes a jar body, jar body includes cylinder portion and conical portion, cylinder portion and conical portion communicate mutually, the top of cylinder portion is provided with a plurality of lugs, the bottom of jar body is provided with the support frame, be provided with discharge mechanism on the support frame, discharge mechanism is located the below of conical portion and is linked together with the opening of conical portion, discharge mechanism includes discharging support and discharging pipe, discharging support is fixed to be set up on the support frame, discharging support's middle part is provided with the support ring, the discharging pipe rotates and sets up in the support ring.
Through adopting above-mentioned technical scheme, put down after hoisting the jar body to the assigned position, the support frame supports the jar body, and during the pouring, the staff changes ejection of compact position through rotating the discharging pipe to improve the ejection of compact scope of the jar body, so that going on of work progress.
Utility model's further set up to: the top of discharging pipe is provided with the conical disk, the conical disk is located the outside of conical portion.
Through adopting above-mentioned technical scheme, set up the conical disk through the top at the discharging pipe to make the conical disk be located the outside of conical portion, avoided the concrete to a certain extent at ejection of compact in-process on unrestrained ground.
The utility model discloses a further set up to: both sides of the discharge pipe are provided with pull rings, and pull ropes are arranged on the pull rings.
Through adopting above-mentioned technical scheme, set up the pull ring through the both sides at the discharging pipe to set up the haulage rope on the pull ring, the staff of the discharging pipe left and right sides makes the discharging pipe rotate left or right through the pulling haulage rope, thereby changes the position of the concrete material that falls out, so that the construction in later stage.
The utility model discloses a further set up to: the support frame is provided with a containing ring for the traction rope to pass through.
Through adopting above-mentioned technical scheme, accomodate the ring through setting up on the support frame, carry out the in-process of hoist and mount to the jar body, penetrate the haulage rope in the accomodate ring on the support frame to tie up the haulage rope on the support frame, realize the fixed to the discharging pipe position, thereby avoided hoist and mount in-process discharging pipe to take place to rotate and bump with the support frame to a certain extent.
The utility model discloses a further set up to: and the left side and the right side of the discharge pipe on the support frame are both provided with anti-collision plates.
Through adopting above-mentioned technical scheme, set up crashproof board through the left and right sides at the support frame, avoided the in-process discharging pipe of pulling discharging pipe to a certain extent and taken place rigid collision with the support frame and lead to wearing and tearing.
The utility model discloses a further set up to: the one end that the jar body was kept away from to the discharging pipe is provided with flexible pipe, flexible pipe cover is established in the outside of discharging pipe, be provided with the locating lever on the flexible pipe, it has a plurality of locating holes that supply the locating lever to insert to establish to distribute along self length direction on the outer wall of discharging pipe.
Through adopting above-mentioned technical scheme, set up flexible pipe through the one end of keeping away from the jar body at the discharging pipe to set up the locating lever on flexible pipe, through changing the position of flexible pipe on the discharging pipe, and insert the locating lever and establish in the locating hole that corresponds the position, realize the fixed to the telescopic link position, further made things convenient for the regulation to ejection of compact position.
The utility model discloses a further set up to: the locating lever is a threaded rod, and the locating hole is a threaded hole.
Through adopting above-mentioned technical scheme, through setting up the locating lever into the threaded rod to open the locating hole and establish to the screw hole, make the location more reliable, thereby improve overall structure's stability.
The utility model discloses a further set up to: the bottom of the support frame is provided with a rubber gasket.
Through adopting above-mentioned technical scheme, set up the rubber gasket through the bottom at the support frame, avoided to a certain extent to place the jar body and caused destruction to ground when ground.
To sum up, the utility model discloses a following beneficial technological effect:
1. the utility model discloses a be provided with discharge mechanism on the support frame, rotate the discharging pipe and set up on discharging support, change ejection of compact position through rotating the discharging pipe to improve the ejection of compact scope of the jar body, so that going on of work progress.
2. The utility model discloses a set up the pull ring in the both sides of discharging pipe to set up the haulage rope on the pull ring, the staff of the discharging pipe left and right sides makes the discharging pipe rotate left or right through the pulling haulage rope, thereby changes the position of the concrete material that falls out, so that the construction in later stage.
3. The utility model discloses an one end of keeping away from the jar body at the discharging pipe sets up flexible pipe to set up the locating lever on flexible pipe, through changing the position of flexible pipe on the discharging pipe, and insert the locating lever and establish in the locating hole that corresponds the position, realize the fixed to the telescopic link position, further made things convenient for the regulation to ejection of compact position.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment of the present invention.
FIG. 2 is a schematic structural view of a tapping pipe according to an embodiment of the invention.
In the figure, 1, a tank body; 11. a cylindrical portion; 111. lifting lugs; 12. a conical portion; 2. a support frame; 21. a receiving ring; 22. an anti-collision plate; 23. a rubber gasket; 3. a discharging mechanism; 31. a discharging support; 311. a support ring; 32. a discharge pipe; 321. a pull ring; 322. a hauling rope; 323. positioning holes; 33. a conical disk; 34. a telescopic pipe; 341. and (5) positioning the rod.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
As shown in fig. 1, for the utility model discloses a concrete bucket for water conservancy construction, including jar body 1, jar body 1 includes cylinder portion 11 and conical portion 12, and cylinder portion 11 and conical portion 12 are linked together, and the top of cylinder portion 11 is provided with a plurality of lugs 111 to hoist and mount, the welding has support frame 2 on the lateral wall of jar body 1, and the bottom of support frame 2 is provided with rubber gasket 23, causes destruction to ground when avoiding placing jar body 1 on ground.
As shown in fig. 1 and fig. 2, be provided with discharge mechanism 3 on support frame 2, discharge mechanism 3 is located the below of conical portion 12 and is linked together with the opening of conical portion 12, discharge mechanism 3 includes discharging support 31 and discharging pipe 32, discharging support 31 welds on support frame 2, the middle part of discharging support 31 is provided with support ring 311, discharging pipe 32 rotates and sets up in support ring 311, when falling the material, the staff changes ejection of compact position through rotating discharging pipe 32, thereby improve the ejection of compact scope of jar body 1, so that the work progress of work progress.
As shown in fig. 1 and fig. 2, a conical disc 33 is disposed on the top of the discharging pipe 32, the conical disc 33 is located outside the conical portion 12, so as to increase the material receiving range, thereby preventing concrete from scattering on the ground in the discharging process to a certain extent, an extension pipe 34 is disposed at one end of the discharging pipe 32 away from the tank body 1, the extension pipe 34 is sleeved outside the discharging pipe 32, a positioning rod 341 is disposed on the extension pipe 34, a plurality of positioning holes 323 for the positioning rod 341 to be inserted into are distributed on the outer wall of the discharging pipe 32 along the length direction of the extension pipe, the positioning rod 341 is inserted into the positioning hole 323 at the corresponding position by changing the position of the extension pipe 34 on the discharging pipe 32, thereby fixing the position of the extension pipe, and further facilitating the adjustment of the discharging. In this embodiment, the positioning rod 341 is a threaded rod, and the positioning hole 323 is a threaded hole, so that the positioning is more reliable.
As shown in FIG. 2, pull rings 321 are disposed on two sides of the extension tube 34, a pull rope 322 is disposed on the pull rings 321, and workers on the left and right sides of the discharge tube 32 can rotate the discharge tube 32 leftwards or rightwards by pulling the pull rope 322, so as to change the position of the falling concrete material, and facilitate later construction.
As shown in fig. 1, the supporting frame 2 and the left and right sides that are located the discharging pipe 32 are provided with crashproof board 22, the in-process discharging pipe 32 that has avoided pulling discharging pipe 32 to a certain extent takes place the rigidity collision with supporting frame 2 and leads to wearing and tearing, still the welding has the storage ring 21 that supplies haulage rope 322 to pass on the supporting frame 2, carry out the in-process of hoist and mount to the jar body 1, penetrate the haulage rope 322 in the storage ring 21 on the supporting frame 2, then tie up the haulage rope 322 on supporting frame 2, the realization is fixed discharging pipe 32 position, thereby avoided hoist and mount in-process discharging pipe 32 to a certain extent and take place to rotate and collide with supporting frame 2.
The implementation principle of the embodiment is as follows: put down after hoisting jar body 1 to the assigned position, support frame 2 supports jar body 1, and during the pouring, the staff changes ejection of compact position through rotating discharging pipe 32 to improve jar body 1's ejection of compact scope, so that going on of work progress.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.
Claims (8)
1. The utility model provides a concrete bucket for water conservancy construction, includes jar body (1), jar body (1) is including cylinder portion (11) and conical part (12), cylinder portion (11) and conical part (12) are linked together, the top of cylinder portion (11) is provided with a plurality of lugs (111), the bottom of jar body (1) is provided with support frame (2), its characterized in that: be provided with discharge mechanism (3) on support frame (2), discharge mechanism (3) are located the below of conical portion (12) and are linked together with the opening of conical portion (12), discharge mechanism (3) are including ejection of compact support (31) and discharging pipe (32), ejection of compact support (31) are fixed to be set up on support frame (2), the middle part of ejection of compact support (31) is provided with support ring (311), discharging pipe (32) rotate to set up in support ring (311).
2. The concrete bucket for water conservancy construction according to claim 1, characterized in that: the top of the discharge pipe (32) is provided with a conical disc (33), and the conical disc (33) is located on the outer side of the conical part (12).
3. The concrete bucket for water conservancy construction according to claim 1, characterized in that: both sides of the discharge pipe (32) are provided with pull rings (321), and pull ropes (322) are arranged on the pull rings (321).
4. The concrete bucket for water conservancy construction according to claim 3, characterized in that: the support frame (2) is provided with an accommodating ring (21) for the traction rope (322) to pass through.
5. The concrete bucket for water conservancy construction according to claim 3, characterized in that: and anti-collision plates (22) are arranged on the support frame (2) and positioned on the left side and the right side of the discharge pipe (32).
6. The concrete bucket for water conservancy construction according to claim 1, characterized in that: one end, far away from the tank body (1), of the discharge pipe (32) is provided with a telescopic pipe (34), the telescopic pipe (34) is sleeved outside the discharge pipe (32), a positioning rod (341) is arranged on the telescopic pipe (34), and a plurality of positioning holes (323) for the positioning rod (341) to be inserted are distributed in the outer wall of the discharge pipe (32) along the length direction of the outer wall.
7. The concrete bucket for water conservancy construction according to claim 6, characterized in that: the positioning rod (341) is a threaded rod, and the positioning hole (323) is a threaded hole.
8. The concrete bucket for water conservancy construction according to claim 1, characterized in that: the bottom of the support frame (2) is provided with a rubber gasket (23).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020262514.5U CN212197587U (en) | 2020-03-05 | 2020-03-05 | Concrete suspension tank for water conservancy construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020262514.5U CN212197587U (en) | 2020-03-05 | 2020-03-05 | Concrete suspension tank for water conservancy construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212197587U true CN212197587U (en) | 2020-12-22 |
Family
ID=73821293
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020262514.5U Active CN212197587U (en) | 2020-03-05 | 2020-03-05 | Concrete suspension tank for water conservancy construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212197587U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112796323A (en) * | 2021-01-28 | 2021-05-14 | 中国水利水电第九工程局有限公司 | Auxiliary device for warehousing of fixed cable crane and construction method |
-
2020
- 2020-03-05 CN CN202020262514.5U patent/CN212197587U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112796323A (en) * | 2021-01-28 | 2021-05-14 | 中国水利水电第九工程局有限公司 | Auxiliary device for warehousing of fixed cable crane and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE112010000017T5 (en) | Closed departure and arrival device for a shield tunneling machine | |
CN202220340U (en) | Underwater concreting conduit | |
CN212197587U (en) | Concrete suspension tank for water conservancy construction | |
CN102286987A (en) | Gravity-type foundation structure for maritime equipment engineering and construction method thereof | |
CN106276056B (en) | Multi-segmental combined type earthwork perpendicular lifting apparatus | |
CN102102365B (en) | Slurry protection wall bored pile concrete casting device | |
CN108560545A (en) | The construction method of the anti-collapse hole of rotary digging stake and anti-collapse aperture apparatus | |
CN209538258U (en) | A kind of construction equipment for replacing bored concrete pile | |
CN113981961B (en) | Ship-type pile planting method for deepwater bare rock | |
CN108373100A (en) | Detacher, hoisting appliance and its construction method for transferring steel reinforcement cage | |
CN109098178A (en) | A kind of concrete-spouting plant | |
CN111236234A (en) | Hole cleaning system and hole cleaning method for cast-in-place pile | |
CN210597280U (en) | Cast-in-situ anti-floating protective plate for hole digging pile | |
CN208201877U (en) | The constructing device of the underwater back cover of large-area deep foundation pit is carried out using small hopper | |
CN209538187U (en) | Deep basal pit interlocking pile bore forming structure | |
CN210369938U (en) | A can have enough to meet need sleeve for pouring stake core | |
CN203438406U (en) | Chute device for concrete mixing station discharge | |
CN209384226U (en) | A kind of Manual hole pile digging device in shifting sand layers | |
CN109025306A (en) | Concreting buffering vertical slip cylinder in civil construction | |
CN216807759U (en) | Hoisting device | |
CN219993149U (en) | Self-compacting concrete pouring bucket | |
CN217267464U (en) | Reverse construction method steel-pipe column hoist and mount appurtenance | |
CN116084421B (en) | Construction method of permeable anti-collision pier | |
CN215906785U (en) | Device for accurately pouring concrete poured by excavator, excavator bucket and excavator | |
CN221545650U (en) | Sand bag backfilling device for underground diaphragm wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |