CN108560545A - The construction method of the anti-collapse hole of rotary digging stake and anti-collapse aperture apparatus - Google Patents

The construction method of the anti-collapse hole of rotary digging stake and anti-collapse aperture apparatus Download PDF

Info

Publication number
CN108560545A
CN108560545A CN201810505147.4A CN201810505147A CN108560545A CN 108560545 A CN108560545 A CN 108560545A CN 201810505147 A CN201810505147 A CN 201810505147A CN 108560545 A CN108560545 A CN 108560545A
Authority
CN
China
Prior art keywords
rotary digging
cylinder
digging stake
collapse hole
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810505147.4A
Other languages
Chinese (zh)
Other versions
CN108560545B (en
Inventor
李果徽
谭建国
祝斌
薛碧松
陈广
陈驰
陈强
秦康伟
赵镇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201810505147.4A priority Critical patent/CN108560545B/en
Publication of CN108560545A publication Critical patent/CN108560545A/en
Application granted granted Critical
Publication of CN108560545B publication Critical patent/CN108560545B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • E02D5/68Mould-pipes or other moulds for making bulkheads or elements thereof
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The present invention relates to a kind of construction method of anti-collapse hole of rotary digging stake and anti-collapse aperture apparatus, include the following steps in setting position construction rotary digging stake;When rotary digging pile driving construction to the easy region that collapse hole occurs, a setpoint distance is excavated to the easy region that collapse hole occurs;The cylinder that one outer diameter is less than rotary digging stake bore is provided;Cylinder is put into rotary digging stake, and the bottom of cylinder is placed in the region that collapse hole easily occurs, and an annular gap is formed between the periphery and the side wall of rotary digging stake of cylinder;Into annular gap, casting concrete is in one section of dado structure of formation on the side wall of rotary digging stake;Cylinder is taken out out of rotary digging stake, continues to excavate downwards rotary digging stake to a setpoint distance, cylinder is reentered into rotary digging stake, and pour and to form one section of new dado structure, repeat the step until rotary digging stake by the easy region that collapse hole occurs;And rotary digging stake is excavated until rotary digging pile driving construction is completed.

Description

The construction method of the anti-collapse hole of rotary digging stake and anti-collapse aperture apparatus
Technical field
The present invention relates to the realm of building construction, the construction method of espespecially a kind of anti-collapse hole of rotary digging stake and anti-collapse aperture apparatus.
Background technology
Rotary digging stake generally refers to the pile-type constructed by rotary drilling rig, full name rotary digging drilling hole bored concrete pile, abbreviation rotary digging in engineering Stake.It is of less demanding to worker's number due to the use of mechanical work, prodigious labour cost can be saved.After Spiral digging machine pore-forming, in height Under water level water-rich sand layer geological conditions, it is low to be easy to cause one-tenth porosity, the problems such as undergauge, slag inclusion, pile bottom sediment is blocked up.Water-rich sand layer For sand grain content up to 30% or more, void ratio is big, and water content is big, has the characteristics that mobility is big, bearing capacity is small, self-stability is poor.It is rich Water sand layer is easy to settle due to generating land movement because excavating.
When rotary digging stake collapse hole, traditional way is such way waste for completely backfilling concrete backfill to collapse hole position Concrete and construction efficiency is low.
Invention content
It is an object of the invention to overcome the deficiencies of existing technologies, the construction method of a kind of anti-collapse hole of rotary digging stake and anti-is provided Collapse hole device solves the problems, such as to waste concrete in the prior art and construction efficiency is low.
Realizing the technical solution of above-mentioned purpose is:
The present invention provides a kind of construction method of the anti-collapse hole of rotary digging stake, includes the following steps:
In setting position construction rotary digging stake;
When the rotary digging pile driving construction to the easy region that collapse hole occurs, a setting is excavated to the easy region that collapse hole occurs Distance;
The cylinder that one outer diameter is less than the rotary digging stake bore is provided;
The cylinder is put into the rotary digging stake, and the bottom of the cylinder is placed in the easy region that collapse hole occurs It is interior, it is formed with an annular gap between the periphery of the cylinder and the side wall of the rotary digging stake;
Into the annular gap, casting concrete is in one section of dado structure of formation on the side wall of the rotary digging stake;
The cylinder is taken out out of described rotary digging stake, continuation excavates downwards the rotary digging stake to a setpoint distance, by institute It states cylinder to be reentered into the rotary digging stake, and pours and to form one section of new dado structure, repeat the step until the rotary digging Stake passes through the easy region that collapse hole occurs;And
The rotary digging stake is excavated until the rotary digging pile driving construction is completed.
The construction method of the anti-collapse hole of rotary digging stake of the present invention further improvement lies in that, the cylinder is inserted in the rotary digging During in stake, by the center overlapping of axles of the central shaft of the cylinder and the rotary digging stake.
The construction method of the anti-collapse hole of rotary digging stake of the present invention further improvement lies in that, the cross of top to the bottom of the cylinder It is gradually reduced to sectional area.
The construction method of the anti-collapse hole of rotary digging stake of the present invention further improvement lies in that, poured in an annular gap mixed During solidifying soil, casting concrete to the top of the cylinder.
The construction method of the anti-collapse hole of rotary digging stake of the present invention further improvement lies in that, the top of the cylinder is equipped with sealing Lid.
The construction method of the anti-collapse hole of rotary digging stake of the present invention further improvement lies in that, the sealing cover be pyramid type lid.
The construction method of the anti-collapse hole of rotary digging stake of the present invention further improvement lies in that, the top of the cylinder is equipped with connection Ring.
The present invention also provides a kind of anti-collapse aperture apparatus of the construction method for the anti-collapse hole of rotary digging stake, including:
Outer diameter is less than rotary digging stake bore and for being inserted in the rotary digging stake and positioned at the cylinder in the region that collapse hole easily occurs Body stays between the cylinder and the side wall of the rotary digging stake and sets an annular gap;And
Pour one section of dado structure in an annular gap.
The present invention for the anti-collapse hole of rotary digging stake construction method anti-collapse aperture apparatus further improvement lies in that, the cylinder Top be equipped with sealing cover.
The present invention for the anti-collapse hole of rotary digging stake construction method anti-collapse aperture apparatus further improvement lies in that, the cylinder Top be equipped with connection ring.
The construction method of the anti-collapse hole of rotary digging stake of the present invention and the advantageous effect of anti-collapse aperture apparatus:
Cylinder by being positioned in rotary digging stake and being placed in the region that collapse hole easily occurs by the present invention, using concreting Stayed between rotary digging stake and cylinder in the annular gap set, formed one section of dado structure to prevent collapse hole, i.e., in rotary digging stake four Monday encloses a small range and forms concrete guard wall structure, prevents collapse hole, cylinder from being occupied during casting concrete certain It has saved resource the problem of avoiding entire anti-collapse hole all casting concretes and form waste and has improved construction efficiency in space. Dado structure can be taken off cylinder after being formed, continue to excavate rotary digging stake downwards, cylinder can reuse, easy for installation.
Description of the drawings
Fig. 1 is the sectional view of the Construction State of the construction method of the anti-collapse hole of rotary digging stake of the present invention.
Fig. 2 is the vertical view of Fig. 1.
Fig. 3 is the schematic diagram of the anti-collapse aperture apparatus of the present invention.
Specific implementation mode
The invention will be further described in the following with reference to the drawings and specific embodiments.
Refering to fig. 1, it is shown that the sectional view of the Construction State of the construction method of the anti-collapse hole of rotary digging stake of the present invention.Fig. 2 is Fig. 1 Vertical view.As depicted in figs. 1 and 2, the construction method of the anti-collapse hole of rotary digging stake of the present invention includes the following steps:
In setting position construction rotary digging stake 10;
When the construction of rotary digging stake 10 to the easy region that collapse hole occurs, a setpoint distance is excavated to the easy region that collapse hole occurs;
The cylinder 20 that one outer diameter is less than 10 bore of rotary digging stake is provided;
Cylinder 20 is put into rotary digging stake 10, and the bottom of cylinder 20 is placed in the region that collapse hole easily occurs, cylinder 20 An annular gap is formed between periphery and the side wall of rotary digging stake 10;
Into annular gap, casting concrete is in one section of dado structure of formation on the side wall of rotary digging stake 10;
Cylinder 20 is taken out out of rotary digging stake 10, continues to excavate 10 to one setpoint distance of rotary digging stake downwards, by 20 weight of cylinder Newly be put into rotary digging stake 10, and pour and to form one section of new dado structure, repeat the step until rotary digging stake 10 by easy hair The region of raw collapse hole;
Rotary digging stake 10 is excavated until the construction of rotary digging stake 10 is completed.
The present invention is poured by cylinder being positioned in rotary digging stake and is placed in the region that collapse hole easily occurs using concrete It builds in the annular gap stayed and set between rotary digging stake and cylinder, forms one section of dado structure to prevent collapse hole, i.e., in rotary digging stake Four Mondays enclosed a small range and form concrete guard wall structure, prevented collapse hole, cylinder from being occupied during casting concrete centainly Space saved resource the problem of avoiding entire anti-collapse hole all casting concretes and form waste and improved construction effect Rate.Dado structure can be taken off cylinder after being formed, continue to excavate rotary digging stake downwards, cylinder can reuse, easy for installation.
One better embodiment of the construction method as the anti-collapse hole of rotary digging stake of the present invention easily occurs in the present embodiment Mainly there are water-rich sand layer geologic province and backfill region in the region of collapse hole.The sand grain content of water-rich sand layer is up to 30% or more, hole For gap than big, water content is big, has the characteristics that mobility is big, bearing capacity is small, self-stability is poor.Water-rich sand layer is easy to generate soil because excavating Position is moved and is settled.Backfill refers in engineering construction, after completing the below grounds engineerings such as basis, then returns the soil tamped, Therefore equally also has the characteristics that the problems such as bearing capacity is small, self-stability is poor, is easy to happen collapse hole.Easily occur collapse hole region not with This is limited, and further includes the soil layer of other self-stabilities difference.
One better embodiment of the construction method as the anti-collapse hole of rotary digging stake of the present invention, rotary digging stake is inserted in by cylinder 20 During in 10, by the center overlapping of axles of the central shaft of cylinder 20 and rotary digging stake 10, the side of such cylinder 20 and rotary digging stake 10 The even width set everywhere in an annular gap is stayed between wall, prevent the uneven thickness for subsequently pouring the dado structure 30 to be formed and Cause the effect of anti-collapse hole bad.
Specifically, cylinder 20 is steadily hung to the surface of rotary digging stake 10, cylinder 20 is slowly put into the need of rotary digging stake 10 The position to be backfilled, and the distance between the side wall of cylinder 20 and rotary digging stake 10 is strictly controlled, avoid the decline in cylinder 20 The problem of cylinder 20 collides the side wall of rotary digging stake 10 and damages rotary digging stake 10 occurs in journey.
One better embodiment of the construction method as the anti-collapse hole of rotary digging stake of the present invention, top to the bottom of cylinder 20 Lateral cross-sectional area is gradually reduced, and cylinder is subsequently lifted to taking-up upwards to facilitate.Cylinder 20 is inserted in the mistake in rotary digging stake 10 Cheng Zhong, the top of cylinder 20 are less than the top of rotary digging stake 10.The length of cylinder 20 is less than the depth of rotary digging stake 10, makes cylinder in this way The material cost of body 20 is few, is moved easily and installs cylinder 20.
One better embodiment of the construction method as the anti-collapse hole of rotary digging stake of the present invention, pours mixed in an annular gap During solidifying soil, casting concrete to the top of cylinder 20.Pour to form one section of dado structure in the bottom of rotary digging stake 10 30, it is supported with being reinforced to the bottom of rotary digging stake 10, prevents collapse hole.The depth of the length and dado structure 30 of certain specific cylinder 20 Degree is depending on the needs of practical rotary digging stake 10.
One better embodiment of the construction method as the anti-collapse hole of rotary digging stake of the present invention, refering to Fig. 3, it is shown that the present invention The schematic diagram of anti-collapse aperture apparatus.In conjunction with shown in Fig. 1 to Fig. 3, the top of cylinder 20 is equipped with sealing cover 21.In the present embodiment, close Capping 21 is pyramid type lid.
The top of cylinder 20 is equipped with connection ring 22, for being connected with tower crane, for lifting and moving cylinder 20.In this implementation In example, connection ring 22 has 4, and 4 connection rings 22 are symmetrical arranged, and ensures the balance of cylinder 20 during facilitating lifting cylinder 20 Property.
Specifically, it is using steel wire rope, tower crane that cylinder 20 is steady after manufactured cylinder 20 is transported to scene by lorry It slings, when wire rope handling should determine that the center of gravity of cylinder 20, lifting rope are hitched securely, then by 20 slow raising of cylinder, it is necessary to keep cylinder 20 Balance.Recycle tower crane that cylinder 20 is steadily hung to the surface of rotary digging stake 10, cylinder 20, which is slowly put into rotary digging stake 10, needs Position is backfilled, and strictly control cylinder 20 avoids the generation cylinder 20 during declining from touching at a distance from the side wall of rotary digging stake 10 The problem of hitting rotary digging stake 10.
After the completion of cylinder 20 is placed, the casting concrete between cylinder 20 and rotary digging stake 10 waits for concrete initial set, reaches shape After effect at anti-collapse hole, cylinder 20 is slowly sling, then puts to designated position and waits reusing.
The present invention also provides a kind of anti-collapse aperture apparatus of the construction method for the anti-collapse hole of rotary digging stake, including outer diameter to be less than 10 bore of rotary digging stake and the cylinder 20 for being inserted in rotary digging stake 10 and being located at the region that collapse hole easily occurs, cylinder 20 and rotary digging It is stayed between the side wall of stake 10 and sets an annular gap;And pour one section of dado structure 30 in an annular gap.
Cylinder 20 is made using steel plate, steel plate thickness 3.6mm.Top surrounding draw ring is processed into 20mm thickness radiuses 100mm Semicircle shape connection ring 22, the link as steel wire rope.According to the size of live rotary digging stake, process in advance various sizes of Cylinder 20.
The top of one better embodiment of the construction method as the anti-collapse hole of rotary digging stake of the present invention, cylinder 20 is equipped with sealing Lid 21.The top of cylinder 20 is equipped with connection ring 22.
The construction method of the anti-collapse hole of rotary digging stake of the present invention and having the beneficial effect that for anti-collapse aperture apparatus:
The present invention is poured by cylinder being positioned in rotary digging stake and is placed in the region that collapse hole easily occurs using concrete It builds in the annular gap stayed and set between rotary digging stake and cylinder, forms one section of dado structure to prevent collapse hole, i.e., in rotary digging stake Four Mondays enclosed a small range and form concrete guard wall structure, prevented collapse hole, cylinder from being occupied during casting concrete centainly Space saved resource the problem of avoiding entire anti-collapse hole all casting concretes and form waste and improved construction effect Rate.Dado structure can be taken off cylinder after being formed, continue to excavate rotary digging stake downwards, cylinder can reuse, easy for installation.
The present invention has been described in detail with reference to the accompanying drawings, those skilled in the art can be according to upper It states and bright many variations example is made to the present invention.Thus, certain details in embodiment should not constitute limitation of the invention, this Invention will be using the range that the appended claims define as protection scope of the present invention.

Claims (10)

1. a kind of construction method of the anti-collapse hole of rotary digging stake, which is characterized in that include the following steps:
In setting position construction rotary digging stake;
When the rotary digging pile driving construction to the easy region that collapse hole occurs, to the easy region that collapse hole occurs excavate a setting away from From;
The cylinder that one outer diameter is less than the rotary digging stake bore is provided;
The cylinder is put into the rotary digging stake, and the bottom of the cylinder is placed in the easy region that collapse hole occurs, institute It states and is formed with an annular gap between the periphery of cylinder and the side wall of the rotary digging stake;
Into the annular gap, casting concrete is in one section of dado structure of formation on the side wall of the rotary digging stake;
The cylinder is taken out out of described rotary digging stake, continuation excavates downwards the rotary digging stake to a setpoint distance, by the cylinder Body is reentered into the rotary digging stake, and is poured and to be formed one section of new dado structure, repeats the step until the rotary digging stake is logical Cross the easy region that collapse hole occurs;And
The rotary digging stake is excavated until the rotary digging pile driving construction is completed.
2. the construction method of the anti-collapse hole of rotary digging stake as described in claim 1, which is characterized in that be inserted in the cylinder described During in rotary digging stake, by the center overlapping of axles of the central shaft of the cylinder and the rotary digging stake.
3. the construction method of the anti-collapse hole of rotary digging stake as described in claim 1, which is characterized in that the top of the cylinder to bottom Lateral cross-sectional area be gradually reduced.
4. the construction method of the anti-collapse hole of rotary digging stake as described in claim 1, which is characterized in that poured in an annular gap During building concrete, casting concrete to the top of the cylinder.
5. the construction method of the anti-collapse hole of rotary digging stake as described in claim 1, which is characterized in that the top of the cylinder is equipped with close Capping.
6. the construction method of the anti-collapse hole of rotary digging stake as claimed in claim 5, which is characterized in that the sealing cover is pyramid type Lid.
7. the construction method of the anti-collapse hole of rotary digging stake as described in claim 1, which is characterized in that the top of the cylinder, which is equipped with, to be connected Connect ring.
8. a kind of anti-collapse aperture apparatus of construction method for the anti-collapse hole of rotary digging stake as described in claim 1, which is characterized in that Including:
Outer diameter is less than rotary digging stake bore and for being inserted in the rotary digging stake and positioned at the cylinder in the region that collapse hole easily occurs, institute It states to stay between cylinder and the side wall of the rotary digging stake and sets an annular gap;And
Pour one section of dado structure in an annular gap.
9. the anti-collapse aperture apparatus for the construction method of the anti-collapse hole of rotary digging stake as claimed in claim 8, which is characterized in that described The top of cylinder is equipped with sealing cover.
10. the anti-collapse aperture apparatus for the construction method of the anti-collapse hole of rotary digging stake as claimed in claim 8, which is characterized in that institute The top for stating cylinder is equipped with connection ring.
CN201810505147.4A 2018-05-24 2018-05-24 Construction method for preventing hole collapse of rotary digging pile and hole collapse preventing device Active CN108560545B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810505147.4A CN108560545B (en) 2018-05-24 2018-05-24 Construction method for preventing hole collapse of rotary digging pile and hole collapse preventing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810505147.4A CN108560545B (en) 2018-05-24 2018-05-24 Construction method for preventing hole collapse of rotary digging pile and hole collapse preventing device

Publications (2)

Publication Number Publication Date
CN108560545A true CN108560545A (en) 2018-09-21
CN108560545B CN108560545B (en) 2020-10-27

Family

ID=63539542

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810505147.4A Active CN108560545B (en) 2018-05-24 2018-05-24 Construction method for preventing hole collapse of rotary digging pile and hole collapse preventing device

Country Status (1)

Country Link
CN (1) CN108560545B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914415A (en) * 2019-03-31 2019-06-21 吴凤明 A kind of embedded slurry spreading device of the electric pole based on the multidirectional expansion of spiral
CN110700247A (en) * 2019-09-27 2020-01-17 中冶交通建设集团有限公司 Construction method for cast-in-place pile to penetrate through quicksand layer
CN111395332A (en) * 2020-03-30 2020-07-10 胡美玲 Rotary excavating and anchor cable construction method for hard rock stratum
CN115341533A (en) * 2022-08-30 2022-11-15 中铁九桥工程有限公司 Drilling construction method for cast-in-place pile in easily collapsed stratum

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000226981A (en) * 1999-02-08 2000-08-15 Nittoc Constr Co Ltd Execution of earth-retaining work for shaft
DE19921363A1 (en) * 1999-05-10 2000-11-23 Rag Ag Support unit for use in a shaft or hollow vertical chamber, comprises flexible sleeve and spreading unit which can open the sleeve out
CN201943067U (en) * 2011-02-25 2011-08-24 四川省第一建筑工程公司 Glaze retaining wall structure of artificially digging pile hole
CN203440824U (en) * 2013-09-23 2014-02-19 国家电网公司 Wall-protecting mold board for artificially excavating electric pole pit
CN103603344A (en) * 2013-12-06 2014-02-26 中冶建工集团有限公司 Rotary drilling and pile filling construction method capable of preventing hole collapse
CN103982187A (en) * 2014-05-26 2014-08-13 马莎 Sinking drum reinforcing device for shaft construction
CN105002915A (en) * 2015-07-21 2015-10-28 中厦建设集团有限公司 Construction method of steel casing guard wall of manual hole digging pile
CN205330673U (en) * 2015-09-24 2016-06-22 四川省华蓥山煤业股份有限公司李子垭煤矿 Coal founds eye and pours device down
CN106192995A (en) * 2016-07-11 2016-12-07 中铁上海工程局集团有限公司 A kind of apparatus for work about caisson mechanical hole building and construction method thereof
CN106677787A (en) * 2016-12-27 2017-05-17 中冶集团武汉勘察研究院有限公司 Vertical shaft restoration and reinforcement structure and restoration and reinforcement construction method
JP2017082513A (en) * 2015-10-29 2017-05-18 大亜ソイル株式会社 Cast-in-place concrete pile and construction method thereof
CN206396746U (en) * 2016-12-29 2017-08-11 中铁建设集团有限公司 A kind of Large-diameter Manual Excavation Pile
CN208309581U (en) * 2018-05-24 2019-01-01 中国建筑第八工程局有限公司 Anti-collapse aperture apparatus

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000226981A (en) * 1999-02-08 2000-08-15 Nittoc Constr Co Ltd Execution of earth-retaining work for shaft
DE19921363A1 (en) * 1999-05-10 2000-11-23 Rag Ag Support unit for use in a shaft or hollow vertical chamber, comprises flexible sleeve and spreading unit which can open the sleeve out
CN201943067U (en) * 2011-02-25 2011-08-24 四川省第一建筑工程公司 Glaze retaining wall structure of artificially digging pile hole
CN203440824U (en) * 2013-09-23 2014-02-19 国家电网公司 Wall-protecting mold board for artificially excavating electric pole pit
CN103603344A (en) * 2013-12-06 2014-02-26 中冶建工集团有限公司 Rotary drilling and pile filling construction method capable of preventing hole collapse
CN103982187A (en) * 2014-05-26 2014-08-13 马莎 Sinking drum reinforcing device for shaft construction
CN105002915A (en) * 2015-07-21 2015-10-28 中厦建设集团有限公司 Construction method of steel casing guard wall of manual hole digging pile
CN205330673U (en) * 2015-09-24 2016-06-22 四川省华蓥山煤业股份有限公司李子垭煤矿 Coal founds eye and pours device down
JP2017082513A (en) * 2015-10-29 2017-05-18 大亜ソイル株式会社 Cast-in-place concrete pile and construction method thereof
CN106192995A (en) * 2016-07-11 2016-12-07 中铁上海工程局集团有限公司 A kind of apparatus for work about caisson mechanical hole building and construction method thereof
CN106677787A (en) * 2016-12-27 2017-05-17 中冶集团武汉勘察研究院有限公司 Vertical shaft restoration and reinforcement structure and restoration and reinforcement construction method
CN206396746U (en) * 2016-12-29 2017-08-11 中铁建设集团有限公司 A kind of Large-diameter Manual Excavation Pile
CN208309581U (en) * 2018-05-24 2019-01-01 中国建筑第八工程局有限公司 Anti-collapse aperture apparatus

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
于春丽等: "人工挖孔桩应用技术", 《科技信息》 *
陈梅: "人工挖孔桩不同土质层护壁结构设计及施工技术", 《工程建设》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914415A (en) * 2019-03-31 2019-06-21 吴凤明 A kind of embedded slurry spreading device of the electric pole based on the multidirectional expansion of spiral
CN109914415B (en) * 2019-03-31 2020-11-13 莆田城厢振达宸贸易有限公司 Telegraph pole burying and slurry spreading device based on spiral multidirectional expansion
CN110700247A (en) * 2019-09-27 2020-01-17 中冶交通建设集团有限公司 Construction method for cast-in-place pile to penetrate through quicksand layer
CN111395332A (en) * 2020-03-30 2020-07-10 胡美玲 Rotary excavating and anchor cable construction method for hard rock stratum
CN115341533A (en) * 2022-08-30 2022-11-15 中铁九桥工程有限公司 Drilling construction method for cast-in-place pile in easily collapsed stratum
CN115341533B (en) * 2022-08-30 2023-08-11 中铁九桥工程有限公司 Drilling construction method for easy-collapse stratum cast-in-situ pile

Also Published As

Publication number Publication date
CN108560545B (en) 2020-10-27

Similar Documents

Publication Publication Date Title
CN108560545A (en) The construction method of the anti-collapse hole of rotary digging stake and anti-collapse aperture apparatus
CN208309581U (en) Anti-collapse aperture apparatus
CN108560542B (en) Waste tire coated building slag bidirectional reinforcement and construction method thereof
CN111395330B (en) Construction method for concrete cast-in-situ bored pile complete steel casing penetrating through underground gallery
CN104612179B (en) Through the construction method of the diaphram wall of super thick silty sand ground
CN104480929B (en) A kind of pile wall interaction construction method that interlocking pile is applied to permanent outer wall of basement
CN107620311A (en) A kind of mud off pore-creating filling pile prevents the method that aperture casing sinks
CN109695250A (en) A kind of deep soft soil layer major diameter open caisson construction method
CN112878332A (en) Basement elevator shaft sump construction structure and method thereof
CN113502828B (en) Processing method for early warning of deep foundation pit
CN209538258U (en) A kind of construction equipment for replacing bored concrete pile
CN203160254U (en) Pit support structure
CN108396761A (en) The non-fully pile foundation cushion cap and production method under precipitation state inside a kind of foundation pit
CN207109804U (en) A kind of quick spreading structure configuration of soft soil foundation bored concrete pile
CN108179759A (en) The underwater drill core slotting of driftway is without bottom sealing method
JP3453664B2 (en) Shaft construction method
CN107476293A (en) A kind of quick spreading structure of soft soil foundation bored concrete pile configures and its spreading method
CN206736920U (en) A kind of internal-expansion type pipe drawing device
CN214832836U (en) Caisson type underground garage construction equipment
JP2012062660A (en) Pile head treatment method and pile head treatment apparatus for cast-in-place concrete pile
CN208907224U (en) Pile foundation underwater grouting concrete prevents plugging device
CN208280156U (en) The non-fully pile foundation cushion cap under precipitation state inside a kind of foundation pit
JP2001241287A (en) Construction method of shaft, assembly method of structural body used for construction method, and assembly device used for assembly method
CN218932867U (en) Construction structure of caisson with bottom at water collection pit and elevator shaft
CN106149709A (en) Pre-poured stake and pile making method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant