CN212175852U - Prefabricated piping lane - Google Patents
Prefabricated piping lane Download PDFInfo
- Publication number
- CN212175852U CN212175852U CN201922124021.5U CN201922124021U CN212175852U CN 212175852 U CN212175852 U CN 212175852U CN 201922124021 U CN201922124021 U CN 201922124021U CN 212175852 U CN212175852 U CN 212175852U
- Authority
- CN
- China
- Prior art keywords
- pipe gallery
- prefabricated
- tube bank
- top plate
- piping lane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a prefabricated piping lane, include: a pipe gallery body for with concrete base fixed connection, the pipe gallery body is provided with the opening that is used for making the tube bank get into. The utility model provides a prefabricated pipe gallery, at the in-process of construction, under the condition that runs into the unable disconnection of tube bank or hardly break off, set up the concrete base in the lower part of tube bank at first, treat after the intensity of concrete base satisfies the requirement, with prefabricated pipe gallery opening back-off down on the concrete base, make the tube bank get into by the opening part of pipe gallery body, avoid cutting the tube bank and wait the operation, can be applicable to the condition that the tube bank is difficult to break off or can not break off.
Description
Technical Field
The utility model relates to an engineering construction technical field, more specifically say, relate to a prefabricated piping lane.
Background
Prefabricated piping lane among the prior art is mostly the font structure of returning, and at the in-process of construction, the tube bank penetrates by the font piping lane of returning, and some tube banks are difficult to the disconnection or can not break off, and the tube bank can't directly penetrate prefabricated piping lane under this kind of circumstances, has brought a great deal of inconvenience and puzzlement for the work progress.
In summary, how to provide a prefabricated pipe gallery suitable for a pipe bundle which cannot be disconnected is an urgent problem to be solved by those skilled in the art.
SUMMERY OF THE UTILITY MODEL
In view of this, the object of the present invention is to provide a prefabricated pipe rack provided with an opening for the entry of a pipe bundle, suitable for a pipe bundle that cannot be disconnected.
In order to achieve the above object, the present invention provides the following technical solutions:
a prefabricated pipe gallery comprising: a piping lane body for with concrete foundation fixed connection, the piping lane body is provided with the opening that is used for making the tube bank get into.
Preferably, the cross section of the pipe gallery body is of an inverted U-shaped structure; the tube bundle enters from the opening of the inverted U-shaped structure.
Preferably, the inverted U-shaped structure comprises a top plate and side walls symmetrically arranged at two sides of the top plate in the width direction, and the side walls are arranged perpendicular to the top plate;
the top plate and the side wall are of an integrated structure
Preferably, a reinforcing rib is arranged at the joint of the top plate and the side wall.
Preferably, the bottom of lateral wall is provided with be used for with the first cementation of fissures that the concrete foundation is connected, so that the piping lane body is fixed to be set up.
Preferably, the inner surface and the outer surface of the lower portion of the side wall are both provided with second pouring seams used for being connected with the concrete base, and the second pouring seams are uniformly distributed along the length direction of the side wall.
Preferably, the width dimension of the tube lane body is the same as the height dimension thereof.
The utility model provides a pair of prefabricated piping lane, include: a pipe gallery body for with concrete base fixed connection, the pipe gallery body is provided with the opening that is used for making the tube bank get into.
In the in-process that uses, under the condition that runs into the unable disconnection of tube bank or hardly break off, can set up the opening at the piping lane body, at the in-process of construction, at first set up the concrete base in the lower part of tube bank, treat after the intensity of concrete base satisfies the requirement, with prefabricated piping lane opening back-off downwards on the concrete base, make the tube bank get into by the opening part of piping lane body, avoid cutting the tube bank etc. operation, can be applicable to the condition that the tube bank is difficult to the disconnection or can not break off.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the provided drawings without creative efforts.
Fig. 1 is a schematic cross-sectional view of a specific embodiment of a prefabricated pipe gallery provided by the present invention;
figure 2 is the utility model provides a prefabricated piping lane's specific embodiment's terminal surface muscle picture.
In FIGS. 1-2:
1 is the piping lane body, 2 is the concrete foundation.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The core of the utility model is to provide a prefabricated piping lane, the piping lane body is provided with the opening that is used for making the tube bank get into, can be applicable to the difficult disconnection of tube bank or the condition that can not break off.
Referring to fig. 1-2, fig. 1 is a schematic cross-sectional view of an embodiment of a prefabricated pipe gallery according to the present invention; figure 2 is the utility model provides a prefabricated piping lane's specific embodiment's terminal surface muscle picture.
This embodiment provides a prefabricated piping lane, includes: a pipe gallery body 1 for with 2 fixed connection of concrete foundation, pipe gallery body 1 is provided with the opening that is used for making the tube bank get into.
It should be noted that, the tube lane body 1 is generally cylindrical, and the tube bundle can be threaded through one side of the tube lane body 1, but when the tube lane body 1 is disposed at a non-end position of the tube bundle, and the tube bundle is in a structure that is not easily broken or can not be broken, for example: natural gas pipelines, petroleum pipelines, etc., in which case it is necessary to provide the pipe gallery body 1 with openings for the entry of the pipe bundles; of course, the specific size of the opening needs to be determined according to actual conditions so as to meet the requirement that the tube bundle can enter, and the openings with different sizes can be arranged on the tube bundles with different sizes.
The setting direction of opening can set up in the lower part of piping lane body 1, also can set up and be used for the side, for the convenience of construction, can set up the opening in the lower part.
It should be further explained that, because the length of the tube bundle is generally long, the length of the single-section prefabricated tube lane needs to be determined according to the actual situation, which is not described herein.
In the in-process that uses, under the condition that runs into the unable disconnection of tube bank or hardly break off, can set up the opening at piping lane body 1, at the in-process of construction, at first set up concrete base 2 in the lower part of tube bank, then place the tube bank on concrete base 2's upper portion, treat after concrete base 2's intensity satisfies the requirement, with prefabricated piping lane opening back-off down on concrete base 2, make the tube bank get into by the opening part of piping lane body 1, avoid cutting the tube bank and wait the operation, can be applicable to the condition that the tube bank is difficult to the disconnection or can not break off.
In this embodiment, the opening must run through the length direction of the prefabricated pipe gallery so that the tube bundle can directly enter the prefabricated pipe gallery through the opening without being cut off.
What need explain is, because prefabricated piping lane needs a plurality of continuous use at the in-process that uses, in the installation, in length direction, be provided with certain clearance between the adjacent prefabricated piping lane to satisfy prefabricated piping lane expend with heat and contract with cold's nature requirement.
Because the size of tube bank along length direction is general comparatively even, consequently when setting up the opening, can set up the opening into the same rectangle of width size, after the shape is simplified simultaneously, also make things convenient for the processing of prefabricated piping lane, can be with the one-time casting shaping of prefabricated piping lane.
On the basis of above-mentioned embodiment, for convenient processing, further simplify the shape of prefabricated pipe gallery, can set up prefabricated pipe gallery into the structure of the U-shaped of cross section for the inversion, and in the installation, the opening part entering of U-shaped structure is followed by the tube bank, and concrete foundation 2 construction is accomplished after promptly, with prefabricated pipe gallery opening upside down in concrete foundation 2.
In the process of construction, as shown in fig. 1, in order to make prefabricated pipe gallery and concrete foundation 2 firmly connected, can set up at concrete foundation 2 and be used for with the side complex recess of U-shaped structure, when the construction, insert corresponding recess respectively with the side of prefabricated pipe gallery.
On the basis of the above embodiment, the inverted U-shaped structure includes a top plate and side walls symmetrically disposed at both sides of the top plate in the width direction, the side walls are perpendicular to the top plate, and the top plate and the side walls are of an integrated structure.
Preferably, the two side walls have the same length and the same cross-sectional dimension.
Preferably, the top plate is provided with a steel bar hanging ring so as to facilitate installation.
On the basis of the above embodiment, in order to increase the overall strength of the pipe gallery body 1, a reinforcing rib may be provided at the joint of the top plate and the side wall.
As shown in fig. 2, of course, a reinforcing rib may be provided inside the pipe gallery body 1, and the reinforcing rib may be a steel bar structure or other structures meeting the requirements, and is specifically determined according to actual conditions, and is not described herein again.
On the basis of the above embodiment, in order to enable firm connection between the pipe gallery body 1 and the concrete base 2, a first pouring seam for connecting with the concrete base 2 may be provided at the bottom of the side wall.
In the construction process, after the strength of the concrete base 2 meets the requirement, the prefabricated pipe gallery is reversely buckled on the concrete base 2, and then the gap between the prefabricated pipe gallery and the concrete base 2 is filled with C35 fine-stone concrete for filling, and the prefabricated pipe gallery can be sand stone materials meeting the requirement of other models. The in-process of pouring into the pea gravel concrete has partial pea gravel concrete to get into first crack pouring, and after the concrete solidifies, the concrete after solidifying just can link together prefabricated piping lane and concrete base 2, makes the two firmly set up.
On the basis of the above embodiment, in order to further increase the firmness between prefabricated pipe gallery and concrete foundation 2, can all set up the second cementation of fissures that is used for being connected with concrete foundation 2 at the internal surface of lateral wall lower part and surface, and the second cementation of fissures is along the length direction evenly distributed of lateral wall.
In the in-process of construction, after concrete foundation 2's intensity reached the requirement, with prefabricated pipe gallery back-off on concrete foundation 2, then it is solid to fill up C35 pea gravel concrete in the space department between prefabricated pipe gallery and concrete foundation 2, the in-process of pouring into pea gravel concrete, has partial pea gravel concrete to get into the second crack of pouring, after the concrete solidifies, concrete after solidifying just can link together prefabricated pipe gallery and concrete foundation 2, makes the two firmly set up.
It should be noted that the size, shape and depth of the first pouring joint and the second pouring joint need to be determined according to the use requirement of the prefabricated pipe gallery and the construction environment, and are not described herein.
On the basis of the above-mentioned embodiment, in order to make the prefabricated pipe gallery convenient to process and manufacture, the width dimension of the pipe gallery body 1 and the height dimension thereof can be made the same.
In another embodiment, the thickness of the top plate of the pipe gallery is 250mm, the height of the side wall is 2.5m, and the width is 2.5 m; the thickness of the side wall is 250 mm; an inverted trapezoidal groove used for being matched with the side wall of the prefabricated pipe gallery is formed in the concrete base 2, before the fine aggregate concrete is not poured, the gap between the side wall and the upper surface of the inverted trapezoidal groove in the concrete base 2 is 60mm, and the thickness of the upper surface of the side edge in the inverted trapezoidal groove is 150 mm; of course, the prefabricated pipe gallery can also be set to other sizes, which are determined according to actual conditions and are not described herein.
It should be noted that, in the present application, the first and second pouring seams mentioned in the first and second pouring seams are only used for distinguishing the different positions, and are not sequentially distinguished.
The embodiments in the present description are described in a progressive manner, each embodiment focuses on differences from other embodiments, and the same and similar parts among the embodiments are referred to each other. The utility model provides an arbitrary compound mode of all embodiments all is in this utility model's a protection scope, does not do here and gives unnecessary details.
It is right above the utility model provides a prefabricated piping lane has carried out detailed introduction. The principles and embodiments of the present invention have been explained herein using specific examples, and the above descriptions of the embodiments are only used to help understand the method and its core ideas of the present invention. It should be noted that, for those skilled in the art, without departing from the principle of the present invention, the present invention can be further modified and modified, and such modifications and modifications also fall within the protection scope of the appended claims.
Claims (6)
1. A prefabricated pipe gallery, comprising: the pipe rack comprises a pipe rack body (1) fixedly connected with a concrete base (2), wherein the pipe rack body (1) is provided with an opening for enabling a pipe bundle to enter;
the cross section of the pipe gallery body (1) is of an inverted U-shaped structure; the tube bundle enters from the opening of the inverted U-shaped structure.
2. The prefabricated pipe gallery of claim 1, wherein the inverted U-shaped structure includes a top plate and side walls symmetrically disposed on both sides of the top plate in a width direction, and the side walls are disposed perpendicular to the top plate;
the top plate and the side wall are of an integrated structure.
3. The prefabricated pipe gallery of claim 2, wherein the top plate is provided with reinforcing ribs at a junction with the side walls.
4. Prefabricated pipe gallery according to claim 2, characterized in that the bottom of the side walls is provided with a first pouring slit for connection with the concrete foundation (2) for the fixed arrangement of the pipe gallery body (1).
5. Prefabricated pipe gallery according to claim 2, characterized in that the lower inner and outer surfaces of the side walls are provided with second pouring seams for connection with the concrete foundation (2), which second pouring seams are evenly distributed along the length of the side walls.
6. Prefabricated pipe gallery according to any of claims 1 to 5, characterized in that the width dimension of the pipe gallery body (1) is the same as its height dimension.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922124021.5U CN212175852U (en) | 2019-12-02 | 2019-12-02 | Prefabricated piping lane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922124021.5U CN212175852U (en) | 2019-12-02 | 2019-12-02 | Prefabricated piping lane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212175852U true CN212175852U (en) | 2020-12-18 |
Family
ID=73762953
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922124021.5U Active CN212175852U (en) | 2019-12-02 | 2019-12-02 | Prefabricated piping lane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212175852U (en) |
-
2019
- 2019-12-02 CN CN201922124021.5U patent/CN212175852U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101807785A (en) | Prefabricated assembled cable trench and installation method thereof | |
CN108678220A (en) | A kind of concrete shear force wall of steel bar template integrative installation technology | |
CN106150523A (en) | A kind of Railway Tunnel ditch cable trench integral mold plate construction | |
CN212175852U (en) | Prefabricated piping lane | |
CN210857596U (en) | Prefabricated assembly type non-reinforced concrete shear wall | |
CN110424573B (en) | Prefabricated assembled type reinforced-free concrete shear wall and construction method thereof | |
CN105672113B (en) | A kind of Wavelike steel webplate lower flange steel reinforced concrete combines cage structure and construction method | |
CN209129163U (en) | A kind of steel board easy for construction and vertically pull muscle bridging arrangement | |
CN106400668A (en) | Combined shear connector for corrugated steel web and corrugated steel base plate and construction method | |
CN213979273U (en) | Two-in-one basement side wall and bottom plate joint waterproof structure | |
CN206581282U (en) | Diaphram wall Ω type milling joints | |
CN205637571U (en) | Do not have outside secret building wall who is detained pipe and pour template | |
CN213952977U (en) | Anti-leakage structure and pouring mold | |
CN211523526U (en) | Embedded part structure of industrial building masonry wall | |
CN211286164U (en) | Self-compaction regeneration block concrete superimposed shear wall | |
CN211171994U (en) | Occlusive pile and diaphragm wall combined foundation pit supporting structure | |
CN207156081U (en) | A kind of prefabricated box -beam internal model anti-floating system | |
CN105421338B (en) | Splicing structure for vertical connection of prefabricated underground continuous wall | |
CN205421329U (en) | Contrary coincide underground continuous wall that does of a core section of thick bamboo | |
CN214272452U (en) | Built-in heat preservation composite wall insulation board | |
CN205242442U (en) | Contrary underground continuous wall that does of a core section of thick bamboo | |
CN205276143U (en) | Restore collapse steel -concrete structure at position of public road bridge abutment top | |
CN108612126A (en) | A kind of Reinforced Concrete Retaining Walls setting-up of construction joint method for determining position | |
CN215094522U (en) | A pipeline for prefabricated wall occupies pore-forming | |
CN210216516U (en) | Rubber waterstop fixing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |