CN212128685U - Be suitable for narrow and small space of subway underground line and overhead line track section kludge of striding line - Google Patents

Be suitable for narrow and small space of subway underground line and overhead line track section kludge of striding line Download PDF

Info

Publication number
CN212128685U
CN212128685U CN202020361043.3U CN202020361043U CN212128685U CN 212128685 U CN212128685 U CN 212128685U CN 202020361043 U CN202020361043 U CN 202020361043U CN 212128685 U CN212128685 U CN 212128685U
Authority
CN
China
Prior art keywords
main beam
supporting legs
track
line
track panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020361043.3U
Other languages
Chinese (zh)
Inventor
徐明发
郑康海
段德荣
卢龙华
吴超
钱琨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Civil Engineering Co Ltd of CREC
Huahai Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
Shanghai Civil Engineering Co Ltd of CREC
Huahai Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Civil Engineering Co Ltd of CREC, Huahai Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC filed Critical Shanghai Civil Engineering Co Ltd of CREC
Priority to CN202020361043.3U priority Critical patent/CN212128685U/en
Application granted granted Critical
Publication of CN212128685U publication Critical patent/CN212128685U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The utility model relates to the technical field of engineering technology construction, in particular to a cross-track panel assembling machine suitable for a narrow space of a subway underground line and an overhead line and a construction method thereof, which comprises a main beam and supporting legs, and is characterized in that the main beam and the supporting legs are assembled in modules, the main beam comprises a main beam structure and a main beam connecting beam, the main beam structure is horizontally and transversely arranged on the upper part of the whole structure of a track laying machine, the front and the rear ends of the left and the right sides of the main beam structure are respectively connected through the main beam connecting beam, and the lower surfaces of the rear end parts of the left; the supporting legs comprise a left assembly and a right assembly, and each assembly comprises 2 supporting legs and a connecting supporting leg beam; the driving travelling mechanism of the cart comprises a screw rod adjusting mechanism, a wheel box, a driving wheel set and a driving mechanism; the lower beam connects the supporting legs and the traveling mechanism, and a modular track laying machine is adopted to assemble and hoist the track panel to manually spread the track panel, so that the loss rate of manually spread track materials is reduced, and the construction quality is improved.

Description

Be suitable for narrow and small space of subway underground line and overhead line track section kludge of striding line
Technical Field
The utility model relates to an engineering technology construction technical field is a be suitable for narrow and small space of subway underground line and overhead line overline section of track kludge particularly.
Background
Urban rail transit engineering elevated line ground traffic is convenient, is convenient for carry out rail material transportation and hoist and mount construction operation, and general elevated locations all adopt scattered shop method to carry out the track construction, hangs the rail material to the bridge floor on, and the manual work is transported to materials such as rail, sleeper, fastener, reinforcing bar to laying the location, and it needs a large amount of constructors. If a lake or a section with heavy traffic or a ground traffic can not reach the section, the transfer distance of the rail material on the bridge floor is long, the construction efficiency is low, and the material can be seriously damaged in the transfer process of the rail material.
The scale of the subway construction in China is continuously enlarged, and the quality and the progress of the subway track laying construction are all very critical. Because the transfer of the underground line site is discontinuous, the section with the conditions can not be subjected to pavement construction operation, a large amount of manual work is adopted for scattered pavement construction at present, the loss of the underground line scattered pavement construction material in the transportation process is serious, the construction quality is poor, and the construction progress is slow.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to solve the not enough of prior art, provide a be suitable for narrow and small space of subway underground line and overhead line overline section of track kludge.
In order to achieve the purpose, the overline track panel assembling machine suitable for the narrow space of the subway underground line and the overhead line is designed, and the overline track panel assembling machine comprises a main beam and supporting legs and is characterized in that the main beam and the supporting legs are assembled in a sub-module mode, the main beam comprises a main beam structure and a main beam connecting beam, the main beam structure is horizontally and transversely arranged on the upper portion of the integral structure of the track laying machine, the front end and the rear end of the left side and the right side of the main beam structure are respectively connected through the main beam connecting beam, and the lower surfaces; the supporting legs comprise a left assembly and a right assembly, and each assembly comprises 2 supporting legs and a connecting supporting leg beam; the driving travelling mechanism of the cart comprises a screw rod adjusting mechanism, a wheel box, a driving wheel set and a driving mechanism; the lower beam connects the supporting legs with the walking mechanism.
Vertical crawling ladders are arranged on the supporting legs.
The lower beam is provided with a cable drum.
The generator platform is arranged on the walking mechanism, so that the generator platform can move left and right on the main beam structure, and the bottom of the generator platform is connected with the trolley to control the trolley to move vertically.
Compared with the prior art, the utility model, its advantage lies in:
1. the modular track laying machine is adopted for assembling and hoisting the track panel, so that the loss rate of the manually scattered track laying materials is reduced, and the construction quality is improved;
2. the construction is carried out in a narrow space of a subway underground line by adopting a 'modularized' track laying machine construction method, the 'manual scattered laying' operation is changed into 'mechanical track laying construction', the construction efficiency is improved, and the damage of track materials and the investment of a large amount of labor force are reduced;
3. the track panel assembling machine is suitable for assembling track panels in narrow space of overhead lines and underground lines in a modularized mode, the middle modules of the main beams and the supporting legs are disassembled when the underground lines exist, the requirement of the underground line clearance can be met, and the application range is wide;
4. adopt overhead line section of track assembly machine can carry out section of track equipment and hoist and mount construction and do, can realize the left and right line of main track and organize and hoist and mount operation simultaneously, 2 section of track kludge control systems adopt PLC control, can realize double-machine allies oneself with accuse, hoists the section of track to the flatbed in step, reduces operating personnel quantity, improves the security of hoist and mount.
Drawings
FIG. 1 is a front view of an overhead line overline track panel assembling machine
FIG. 2 is a side view of the overhead line overline track panel assembling machine
FIG. 3(a) is a front and side view of the main beam
FIG. 3(b) is a front and side view of a leg
FIG. 3(c) is a front and side view of the traveling mechanism of the cart
FIG. 4 is a plan view of an overhead line track panel assembly
FIG. 5 is an assembled front view of an overhead line overline track panel
FIG. 6 is a schematic view of the rail panel being hoisted to a rail flatbed for transportation;
FIG. 7 is a schematic plan view of track panel assembly in a narrow space of a subway line
FIG. 8 is an assembled front view of a track panel in a narrow space of a subway line
FIG. 9 is a schematic view of the transportation of the track panel hanging on the track platform
In the figure: 1. the main beam 1-1, the main beam connecting beam 2, the main beam platform 3, the trolley 4, the supporting legs 4-1, the ladder stand 4-2, the handrail 5, the lower beam 6, the cart travelling mechanism 7, the generator platform 8, the cable drum 9, the viaduct 10, the track panel 11, the track flat car 12, the cab 13, the ladder stand 14, the upper beam 15, the wheel set 16, the control box 17, the track panel assembly schematic diagram 18, the underground line rectangular tunnel 19 and the underground line narrow space track panel assembly plane schematic diagram.
Detailed Description
The structure and principle of such a device will be apparent to those skilled in the art from the following further description of the invention with reference to the accompanying drawings. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Example 1
Referring to fig. 1 and 2, the overhead line overline track panel assembling machine mainly comprises a main beam 1, a main beam platform and trolley power supply 2, a hoisting trolley 3, supporting legs 4, a lower cross beam 5, a driving trolley travelling mechanism 6, a cable drum 8, an electrical system, a driven trolley travelling mechanism 6, a generator platform 7 and the like.
Referring to fig. 3(a, b and c), the main beam (1) comprises a main beam 1 and a main beam connecting beam 1-1, the main beam is horizontally and transversely arranged at the upper part of the whole structure of the track laying machine, the front end and the rear end of the left side and the right side of the main beam are respectively connected through the main beam connecting beam 1-1, and the lower surfaces of the rear end parts of the left side and the right side of the main beam are connected with the supporting legs 4; the supporting leg 4 comprises a left side and a right side which are 2 assemblies, and the assembly 1 comprises 2 supporting legs and a connecting supporting leg beam; the cart driving travelling mechanism 6 comprises a screw rod adjusting mechanism, a wheel box, a driving wheel set and a driving mechanism; the lower beam 5 connects the supporting legs 4 with the walking mechanism; the lifting trolley 3 adopts a speed reducer XWD4-43,
Figure BDA0002419256730000041
360mm driving wheel set, 2 XJM 3t winch, hoisting trolley frame and steel wire rope
Figure BDA0002419256730000042
16-1670, hook assembly, pinion gear z 19, m 8 (m)
Figure BDA0002419256730000043
55) And the like.
EXAMPLE 2
Referring to fig. 4, according to the survey conducted on the construction site, under the overhead line, a lake exists on the ground, the traffic on the ground is complex, the distance between the roads is long, and more than 3 kilometers, a temporary track panel assembly site 17 needs to be arranged, namely, a temporary track panel assembly platform is arranged on the bridge floor. The ground line is convenient for transportation, and can meet the requirements of storing and hoisting ground rail materials.
Referring to fig. 4, the layout of the bridge deck track panel assembly site reasonably arranges the areas of track panel assembly, steel rail storage, sleeper storage, fasteners, steel bar semi-finished products and the like according to the size of the bridge deck of the overhead line. And after planning a bridge deck track panel assembly field, installing and debugging the overhead line track panel assembly machine, and using the overhead line track panel assembly machine after acceptance check is qualified.
Referring to fig. 5, the overhead line rail material is hoisted into the bridge floor by adopting a truck crane, the rail panel assembly machine is adopted for hoisting the rail in place, and the sleeper, the fastener and other materials are transported in place by adopting a forklift. And (4) arranging the distance between sleepers and installing fasteners according to the design requirement during track panel assembly, and transporting the track panels to a construction area after the track panels are inspected to be qualified.
EXAMPLE 3
Referring to fig. 6, track panel hoisting and cross-line transverse moving construction: after the track panel is assembled, the 2 track panel assembling machines are matched for use, and the track panel is hoisted to a storage area or a rail car to be transported to a construction operation surface. If the track panel is assembled by adopting the left line, the track panel is hoisted by adopting cross-line transverse moving when the track panel is stored or transported by the right line.
And hoisting the assembled track panel to a plane vehicle through a track panel assembling machine, dragging the track panel by a track vehicle, transporting the track panel to the position near the to-be-paved area, hoisting the track panel to a to-be-paved construction site by using a track paving machine, and finally erecting a track panel construction integral track bed by using a steel rail support frame (or support pier combination). And circularly carrying out next-stage track bed construction after the transportation of the constructed track panel is finished, and circularly ensuring the track panel assembly and mechanical track laying construction operation in sequence.
Example 4
Referring to fig. 7, the line along the line is investigated, rail material transportation and application and use which meet the construction requirements when the station end well is not closed are met, and rail material transportation and equipment installation are performed after the agreement of an owner. An temporary track panel assembling site is arranged, namely a temporary track panel assembling platform is arranged in a narrow space underground at the end of a station. The ground transportation is convenient and the requirements of storing and hoisting the ground rail materials can be ensured around the station end well. According to the narrow space of the underground line at the end of the station, areas such as track panel assembly, steel rail storage, sleeper storage, fasteners, steel bar semi-finished products and the like are reasonably arranged.
Referring to fig. 1 and 2, the modularized track laying machine is transported to a station end well to be hoisted into the ground for assembly, the main beam 1 and the support leg 4 are disassembled from the middle connection module, and the track panel assembling machine is installed and the station end underground space meets the limit requirement.
Referring to fig. 8, the underground railway material is obtained by hoisting and unloading rails, sleepers, fasteners and other rail materials to the underground railway by a crane, and then assembling the track panel 10 by a track panel assembling machine. The track panel 10 is assembled by a track panel assembling machine to hoist the steel rail in place, and the materials such as sleepers, fasteners and the like are transported in place by a forklift.
Referring to fig. 9, the assembled track panel is hoisted to a flat car through a track panel assembling machine, the track panel is towed by the track car and transported to the vicinity of the section to be paved, the track panel is hoisted to a construction site to be paved through a track paving machine, and finally, a track panel construction integral track bed is erected through a steel rail supporting frame (or a support pier combination). And circularly carrying out next-stage track bed construction after the transportation of the constructed track panel is finished, and circularly ensuring the track panel assembly and mechanical track laying construction operation in sequence.

Claims (4)

1. The assembling machine comprises a main beam and supporting legs, and is characterized in that the main beam and the supporting legs are assembled in a sub-module mode, the main beam comprises a main beam structure and a main beam connecting beam, the main beam structure is horizontally and transversely arranged on the upper portion of the overall structure of the track laying machine, the front end and the rear end of the left side and the right side of the main beam structure are respectively connected through the main beam connecting beam, and the lower surfaces of the rear end portions of the left side and the right side of the main beam structure are connected with the supporting legs; the supporting legs comprise a left assembly and a right assembly, and each assembly comprises 2 supporting legs and a connecting supporting leg beam; the driving travelling mechanism of the cart comprises a screw rod adjusting mechanism, a wheel box, a driving wheel set and a driving mechanism; the lower beam connects the supporting legs with the walking mechanism.
2. The assembling machine suitable for the narrow space of the underground line and the overhead line overline track panel of the subway according to claim 1, which is characterized in that: and the supporting legs are provided with vertical crawling ladders.
3. The assembling machine suitable for the narrow space of the underground line and the overhead line overline track panel of the subway according to claim 1, which is characterized in that: and a cable drum is arranged on the lower cross beam.
4. The assembling machine suitable for the narrow space of the underground line and the overhead line overline track panel of the subway according to claim 1, which is characterized in that: the crane trolley is connected to the bottom of the generator platform, and the crane trolley is controlled to move vertically.
CN202020361043.3U 2020-03-20 2020-03-20 Be suitable for narrow and small space of subway underground line and overhead line track section kludge of striding line Active CN212128685U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020361043.3U CN212128685U (en) 2020-03-20 2020-03-20 Be suitable for narrow and small space of subway underground line and overhead line track section kludge of striding line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020361043.3U CN212128685U (en) 2020-03-20 2020-03-20 Be suitable for narrow and small space of subway underground line and overhead line track section kludge of striding line

Publications (1)

Publication Number Publication Date
CN212128685U true CN212128685U (en) 2020-12-11

Family

ID=73672424

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020361043.3U Active CN212128685U (en) 2020-03-20 2020-03-20 Be suitable for narrow and small space of subway underground line and overhead line track section kludge of striding line

Country Status (1)

Country Link
CN (1) CN212128685U (en)

Similar Documents

Publication Publication Date Title
CN106638687B (en) A kind of accurate quick-assembling technique of precast assembly pipe gallery
US8595879B2 (en) Bridge beam placement system and apparatus
JP7193172B2 (en) Floor slab erection machine
CN102102317A (en) Method for laying mixed passenger and freight jointless track and bridge erecting machine for erecting railway T-beam
CN110230261B (en) Mounting construction method for upper frame beam of double-layer synchronous beam
CN103726421A (en) Height and span adjustable track paver for metro construction
CN207498754U (en) A kind of novel track-laying machine of city track traffic engineering
CN109930435A (en) Straddle-type monorail PC track beam construction method in a kind of circular cross section tunnel
KR102040602B1 (en) Construct Method of Subway Rail Track Panel
CN113622310A (en) Method for transporting beam and frame beam suitable for small-radius curve section
CN111270577A (en) Assembly machine suitable for narrow space of subway underground line and overhead line cross-track section and construction method thereof
CN104746432B (en) The feasible bridge guidance tape in plate-beam transports installs car
CN210366808U (en) Lifting and dismantling device for rail walking
CN108625270A (en) Nose girder gantry crane installs bridge prefabrication box girder construction method
CN211256692U (en) Transport beam structure of newly-built upper bridge on current bridge
CN212128685U (en) Be suitable for narrow and small space of subway underground line and overhead line track section kludge of striding line
CN110565531B (en) Construction channel structure and installation method
CN215591798U (en) Curtain wall plate traction transfer device for tower crane dismantling part
CN108130864B (en) Integrally-assembled bridge whole-span beam transportation and erection equipment
CN111636914A (en) Construction method for integrating transportation and erection of straddle type monorail PC track beam in circular-section tunnel
CN106320181A (en) Construction method for installing precast beam slabs by adopting bridge girder erection machine
CN205474639U (en) A rail travelling bogie that is used for bridge floor railway to lay rail welding rail production line
CN111139742B (en) Method for mounting and dismounting highway bridge girder erection machine
CN210066384U (en) Urban rail scattered paving method mechanical construction equipment
CN114508052A (en) Pier-beam assembly type integrated construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant