CN205474639U - A rail travelling bogie that is used for bridge floor railway to lay rail welding rail production line - Google Patents
A rail travelling bogie that is used for bridge floor railway to lay rail welding rail production line Download PDFInfo
- Publication number
- CN205474639U CN205474639U CN201620196449.4U CN201620196449U CN205474639U CN 205474639 U CN205474639 U CN 205474639U CN 201620196449 U CN201620196449 U CN 201620196449U CN 205474639 U CN205474639 U CN 205474639U
- Authority
- CN
- China
- Prior art keywords
- rail
- trolley
- welding
- production line
- fixed frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000003466 welding Methods 0.000 title claims abstract description 64
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 21
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims abstract description 65
- 229910052742 iron Inorganic materials 0.000 claims abstract description 31
- 229910000831 Steel Inorganic materials 0.000 claims description 15
- 239000010959 steel Substances 0.000 claims description 15
- 230000003014 reinforcing effect Effects 0.000 claims description 4
- 238000000034 method Methods 0.000 abstract description 7
- 230000008569 process Effects 0.000 abstract description 6
- 230000032258 transport Effects 0.000 description 20
- 238000003860 storage Methods 0.000 description 14
- 238000010276 construction Methods 0.000 description 8
- 238000009434 installation Methods 0.000 description 3
- 238000001514 detection method Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000007246 mechanism Effects 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Landscapes
- Leg Units, Guards, And Driving Tracks Of Cranes (AREA)
Abstract
本实用新型涉及一种用于桥面铁路铺设钢轨焊轨生产线的钢轨运输小车,包括一小车托架,小车托架的下部的四角分别通过滑轮支撑平台连接有导向滑轮,小车托架的下端面的前端垂直设有一固定架,固定架的下端垂直设有一三角铁,且该三角铁和小车托架分别位于固定架的左右两侧;小车托架的两侧分别焊接有三角形凸起。结构简单,方便将钢轨与小车用法兰螺栓固定为一体,在走行过程中或曲线地段,避免了钢轨移动掉落;在小车走行方向前端,小车通过三角铁能够轻松将门型筋导向小车两侧,并顺利将小车方向扶正并快速通过,使用方便,每条长轨下放置多个小车,在牵引车的牵引下能够实现对长轨的运送,并且长轨不会发生形变。
The utility model relates to a rail transport trolley used for a rail rail welding production line for laying bridge deck railways. A fixed frame is vertically arranged at the front end of the fixed frame, and a triangle iron is vertically arranged at the lower end of the fixed frame, and the triangle iron and the trolley bracket are respectively located on the left and right sides of the fixed frame; the two sides of the trolley bracket are respectively welded with triangular protrusions. The structure is simple, and it is convenient to fix the rail and the trolley as a whole with flange bolts. During the running process or in the curved section, the rail is prevented from moving and falling. It is easy to use by straightening the trolley in the right direction and passing it quickly. Multiple trolleys are placed under each long rail, and the long rail can be transported under the traction of the tractor without deformation of the long rail.
Description
技术领域 technical field
本实用新型属于道路、铁路或桥梁的建筑领域,尤其涉及一种用于桥面铁路铺设钢轨焊轨生产线的钢轨运输小车。 The utility model belongs to the construction field of roads, railways or bridges, in particular to a rail transport trolley used in a rail welding production line for bridge deck railway laying.
背景技术 Background technique
无缝线路长钢轨铺设的成熟经验一般有两种,一是采用厂焊长钢轨使用长轨铺设列车铺设后,采用移动式闪光焊机机组进行锁定焊,另一种是工地建立长钢轨焊接生产厂,采用固定闪光焊机焊接25m标准轨,再使用长轨列车运输到设计位置进行铺设。 There are generally two mature experiences in the laying of seamless line long rails. One is to use factory-welded long rails and use long rail laying trains to lay them, then use mobile flash welding machine units for locking welding, and the other is to establish long rails on site for welding. The production plant uses a fixed flash welding machine to weld the 25m standard rail, and then transports it to the design location by long-gauge train for laying.
结合轻轨项目特点,闹市区城市道路不具备长钢轨基地生产条件,没有足够的场地建设长轨基地和修建联络线,也不具备长轨列车运输条件,只能选用25m标准轨,建设25m短轨存储基地,由汽车运输至现场吊装上桥进行长钢轨焊接。根据L型道床结构形式分析,在道床浇筑完成后,L墙结构对焊接构成影响,L墙内侧距钢轨空间不足,移动焊机无法进行焊轨作业,所以不具备先施工道床,然后在道床上焊接25m钢轨形成无缝线路的条件; Combined with the characteristics of the light rail project, the urban roads in the downtown area do not have the production conditions for long rail bases, there is not enough space for the construction of long rail bases and connection lines, and the transportation conditions for long rail trains are not available. We can only choose 25m standard gauge and build 25m short gauge The storage base is transported by car to the on-site hoisting and upper bridge for long rail welding. According to the analysis of the structure of the L-shaped ballast bed, after the pouring of the ballast bed is completed, the L wall structure will affect the welding. The space between the inner side of the L wall and the rail is insufficient, and the mobile welding machine cannot perform rail welding operations. Conditions for welding 25m rails to form seamless lines;
在目前从焊接区到钢轨安装区运用吊车来对轨道进行运输,但是目前在运送长轨的时候,吊车并不能实现对长轨的运输,并且在只有一个支撑点的运输条件下会使导轨在运送的过程中发生变形。 At present, cranes are used to transport the rails from the welding area to the rail installation area, but at present, when transporting long rails, the crane cannot transport the long rails, and under the condition of only one support point, the guide rails will be in place. Deformation occurred during shipping.
实用新型内容 Utility model content
为了克服上述现有技术的缺点,本实用新型的目的在于提供一种结构简单,在焊接完长轨后,能够将长轨运输到轨道的施工地点,并且使长轨在运输中保持平行的一种钢轨焊轨生产线中的钢轨运输小车。 In order to overcome the above-mentioned shortcomings of the prior art, the purpose of this utility model is to provide a simple structure, after welding the long rail, the long rail can be transported to the construction site of the track, and the long rail can be kept parallel during transportation. A rail transport trolley in a rail welding rail production line.
为了达到上述目的,本实用新型采取的技术方案为:一种用于桥面铁路铺设钢轨焊轨生产线的钢轨运输小车中的钢轨运输小车,包括一小车托架,所述的小车托架的下部的四角分别通过滑轮支撑平台连接有导向滑轮,所述的小车托架的下端面的前端垂直设有一固定架,所述的固定架的下端垂直设有一三角铁,且该三角铁和小车托架分别位于固定架的左右两侧;所述的小车托架的两侧分别焊接有三角形凸起。 In order to achieve the above object, the technical solution adopted by the utility model is: a rail transport trolley used in the rail transport trolley of the bridge deck railway laying rail welding rail production line, including a trolley bracket, the lower part of the trolley bracket The four corners of the four corners are respectively connected with guide pulleys through the pulley support platform, and the front end of the lower end surface of the described trolley bracket is vertically provided with a fixed frame, and the lower end of the described fixed frame is vertically provided with a triangular iron, and the triangular iron and the trolley bracket are respectively located The left and right sides of the fixed frame; the two sides of the trolley bracket are respectively welded with triangular protrusions.
所述的小车托架前端与三角铁之间通过加强筋连接。 The front end of the trolley bracket and the triangle iron are connected by reinforcing ribs.
所述三角铁是由钢板切割而成的三角钢板,且该三角钢板的中部设有一圆孔。 The triangular iron is a triangular steel plate cut from a steel plate, and a round hole is arranged in the middle of the triangular steel plate.
所述的小车托架长670mm,宽445mm;所述的三角铁与固定架连接处的边的长为465mm,该边的高位460mm。 The length of the trolley bracket is 670mm, and the width is 445mm; the length of the side of the connection between the triangle iron and the fixed frame is 465mm, and the height of the side is 460mm.
所述的固定架是由方钢焊接而成的长方形钢架。 The fixed frame is a rectangular steel frame welded by square steel.
本实用新型采用以上技术方案,具有以下优点:结构简单,方便将钢轨与小车用法兰螺栓固定为一体,在走行过程中或曲线地段,避免了钢轨移动掉落;在小车走行方向前端,特意设置一个加强的三角形的三角铁,当小车前部撞向两侧门型筋时,小车通过三角铁能够轻松将门型筋导向小车两侧,并顺利将小车方向扶正并快速通过,使用方便,每条长轨下放置多个小车,在牵引车的牵引下能够实现对长轨的运送,并且长轨不会发生形变。 The utility model adopts the above technical scheme and has the following advantages: the structure is simple, and it is convenient to fix the rail and the trolley as a whole with flange bolts, and avoid the rail from moving and falling during the running process or in the curved section; A reinforced triangular triangle iron, when the front of the trolley hits the door ribs on both sides, the trolley can easily guide the door ribs to the two sides of the trolley through the triangle iron, and smoothly straighten the direction of the trolley and pass it quickly. It is easy to use and under each long rail Place multiple trolleys, and the long rails can be transported under the traction of the tractor, and the long rails will not be deformed.
附图说明 Description of drawings
图1是本实用新型中钢轨运输小车正视结构示意图; Fig. 1 is the front view structure schematic diagram of rail transport dolly in the utility model;
图2是本实用新型中钢轨运输小车俯视结构示意图; Fig. 2 is a structural schematic diagram of a top view of a rail transport trolley in the utility model;
图中:1.小车托架;2.滑轮支撑平台;3.三角形凸起;4.导向滑轮;5.固定架;6.三角铁;7.加强筋;8.圆孔。 In the figure: 1. trolley bracket; 2. pulley support platform; 3. triangular protrusion; 4. guide pulley; 5. fixed frame; 6. triangular iron;
具体实施方式 detailed description
下面结合附图和实施例对本实用新型进行详细的描述。 Below in conjunction with accompanying drawing and embodiment the utility model is described in detail.
实施例1 Example 1
如图1、2所示,一种用于桥面铁路铺设钢轨焊轨生产线的钢轨运输小车中的钢轨运输小车,包括一小车托架1,所述的小车托架1的下部的四角分别通过滑轮支撑平台2连接有导向滑轮4,所述的小车托架1的下端面的前端垂直设有一固定架5,所述的固定架5的下端垂直设有一三角铁6,且该三角铁6和小车托架1分别位于固定架5的左右两侧;所述的小车托架1的两侧分别焊接有三角形凸起3。 As shown in Figures 1 and 2, a rail transport trolley used in the rail transport trolley of the bridge deck railway laying rail welding rail production line includes a trolley bracket 1, and the four corners of the lower part of the trolley bracket 1 pass through the Pulley support platform 2 is connected with guide pulley 4, and the front end of the lower end surface of described dolly bracket 1 is vertically provided with a fixed frame 5, and the lower end of described fixed frame 5 is vertically provided with a triangle iron 6, and this triangle iron 6 and dolly support The frame 1 is located on the left and right sides of the fixed frame 5 respectively; the two sides of the trolley bracket 1 are respectively welded with triangular protrusions 3 .
小车托架1用于拖住焊接后的钢轨,行走机构为小车托架1下端通过滑轮支撑平台2连接的四个导向滑轮4,可承重800kg,以便于曲线地段能够顺利实现转向。在小车顶部托架两边位置各焊接两个三角形凸起3,方便将钢轨与小车用法兰螺栓固定为一体,在走行过程中或曲线地段,避免了钢轨移动掉落;为了解决曲线地段门型筋的干扰问题,在小车走行方向前端,特意设置一个加强的三角形的三角铁6用于防撞,当小车前部撞向两侧门型筋时,小车通过三角铁能够轻松将门型筋导向小车两侧,并顺利将小车方向扶正并快速通过。 The trolley bracket 1 is used to drag the welded rails, and the traveling mechanism is four guide pulleys 4 connected by the lower end of the trolley bracket 1 through the pulley support platform 2, which can bear 800kg, so that the steering can be smoothly realized in the curved section. Two triangular protrusions 3 are welded on both sides of the bracket on the top of the trolley, so that the rail and the trolley can be fixed together with flange bolts, and the rail is prevented from moving and falling during the running process or in the curved section; In order to solve the interference problem, a reinforced triangular triangle iron 6 is specially set up at the front end of the trolley to avoid collision. Smoothly straighten the direction of the car and pass quickly.
实施例2 Example 2
如图1、2所示,一种用于桥面铁路铺设钢轨焊轨生产线的钢轨运输小车中的钢轨运输小车,包括一小车托架1,所述的小车托架1的下部的四角分别通过滑轮支撑平台2连接有导向滑轮4,所述的小车托架1的下端面的前端垂直设有一固定架5,所述的固定架5的下端垂直设有一三角铁6,且该三角铁6和小车托架1分别位于固定架5的左右两侧;所述的小车托架1的两侧分别焊接有三角形凸起3,所述的小车托架1前端与三角铁6之间通过加强筋7连接;所述三角铁6是由钢板切割而成的三角钢板,且该三角钢板的中部设有一圆孔8; As shown in Figures 1 and 2, a rail transport trolley used in the rail transport trolley of the bridge deck railway laying rail welding rail production line includes a trolley bracket 1, and the four corners of the lower part of the trolley bracket 1 pass through the Pulley support platform 2 is connected with guide pulley 4, and the front end of the lower end surface of described dolly bracket 1 is vertically provided with a fixed frame 5, and the lower end of described fixed frame 5 is vertically provided with a triangle iron 6, and this triangle iron 6 and dolly support The frame 1 is respectively located on the left and right sides of the fixed frame 5; the two sides of the trolley bracket 1 are respectively welded with triangular protrusions 3, and the front end of the trolley bracket 1 is connected with the triangle iron 6 by a reinforcing rib 7; The triangular iron 6 is a triangular steel plate cut from a steel plate, and the middle part of the triangular steel plate is provided with a circular hole 8;
小车托架1用于拖住焊接后的钢轨,行走机构为小车托架1下端通过滑轮支撑平台2连接的四个导向滑轮4,可承重800kg,以便于曲线地段能够顺利实现转向。在小车顶部托架两边位置各焊接两个三角形凸起3,方便将钢轨与小车用法兰螺栓固定为一体,在走行过程中或曲线地段,避免了钢轨移动掉落;为了解决曲线地段门型筋的干扰问题,在小车走行方向前端,特意设置一个加强的三角形的三角铁6,当小车前部撞向两侧门型筋时,小车通过三角铁能够轻松将门型筋导向小车两侧,并顺利将小车方向扶正并快速通过;为了减轻小车的整体重量,所述三角铁6的中部设有一圆孔8;小车托架1前端与三角铁6之间通过加强筋7连接,防止在发生碰撞时三角铁6发生变形,在完成钢轨焊头超声波探伤合格后,使用小型固定式门吊将钢轨吊放至本实施例的钢轨运输小车,钢轨运输小车是多辆,等距离放在钢轨的下方,并通过法兰螺栓固定到钢轨运输小车上,使用牵引车固定后运输就位即运输到桥上施工的地方。 The trolley bracket 1 is used to drag the welded rails, and the traveling mechanism is four guide pulleys 4 connected by the lower end of the trolley bracket 1 through the pulley support platform 2, which can bear 800kg, so that the steering can be smoothly realized in the curved section. Two triangular protrusions 3 are welded on both sides of the bracket on the top of the trolley, so that the rail and the trolley can be fixed together with flange bolts, and the rail is prevented from moving and falling during the running process or in the curved section; In order to solve the interference problem, a reinforced triangular triangle iron 6 is specially set at the front end of the trolley’s traveling direction. When the front of the trolley hits the door ribs on both sides, the trolley can easily guide the gate ribs to the two sides of the trolley through the triangle iron, and smoothly guide the trolley in the direction of the trolley. Righting up and passing through quickly; in order to reduce the overall weight of the trolley, a circular hole 8 is provided in the middle part of the triangle iron 6; the front end of the trolley bracket 1 and the triangle iron 6 are connected by reinforcing ribs 7 to prevent the triangle iron 6 from being deformed when a collision occurs. After the ultrasonic flaw detection of the rail welding head is qualified, use a small fixed door crane to hoist the rail to the rail transport trolley in this embodiment. There are multiple rail transport trolleys, which are placed under the rail at equal distances and fixed by flange bolts On the rail transport trolley, use the tractor to fix it and transport it in place, that is, transport it to the construction site on the bridge.
在桥面铁路铺设的钢轨焊轨生产线中在距离焊机焊接点一侧55米的位置起,安装18米长、3-5米宽的打磨床;在打磨床边钢轨推送线上间距4-5米设置5-6个焊轨生产线滑轮组,用以推送打磨好的钢轨待焊;在打磨床至焊机焊接点之间钢轨推送线上设置6-8个焊轨生产线滑轮组,用以推送钢轨至焊接位置进行焊接。 In the rail welding production line laid on the bridge deck railway, a grinding machine with a length of 18 meters and a width of 3-5 meters is installed at a position 55 meters away from the side of the welding point of the welding machine; Set 5-6 pulley blocks of welding rail production line at 5 meters to push the polished rails to be welded; set 6-8 pulley blocks of welding rail production line on the rail pushing line between the grinding machine and the welding point of the welding machine to push the rails to the welding position for welding.
在焊接点位置,根据焊机的设置要求吊放焊机;滑轮组从焊机下方通过,以推送钢轨进行焊接。 At the position of the welding point, the welding machine is hoisted according to the setting requirements of the welding machine; the pulley block passes under the welding machine to push the rail for welding.
从距离焊机焊接点起另一侧,根据情况每5-8米设置一个焊轨生产线滑轮组,共设置280米,用于焊接完成后往长轨存储方向推送长钢轨,并推送至长轨存储区存储钢轨。 From the other side from the welding point of the welding machine, according to the situation, set up a welding rail production line pulley block every 5-8 meters, a total of 280 meters, used to push the long rail to the long rail storage direction after welding, and push it to the long rail storage area for storing rails.
各滑轮组之间,必须保持在同一水平面上,以确保焊接的对轨精度。焊接对轨点附近,根据需要增加2-4个焊轨生产线滑轮组,以加强钢轨稳定性,提高对轨精度。 Each pulley block must be kept on the same level to ensure the accuracy of welding rail alignment. Near the welding alignment point, add 2-4 pulley blocks for the welding rail production line according to the needs to strengthen the stability of the rail and improve the accuracy of the alignment.
各滑轮组用钢丝绳固定。 Each block of pulleys is fixed with a wire rope.
各类型门吊的设置及使用 Setting and use of various types of door cranes
焊接前钢轨储存区内设有移动式门吊,焊接前钢轨储存区用于储存25m钢轨,移动式门吊为可移动电动吊门,用以将钢轨从短轨存储区吊放至钢轨打磨床,打磨完成后吊放到滑轮组上,再向焊机位置推送焊接,焊接后钢轨储存区用于储存焊接后250m长钢轨的储存区,每米设置一个承重1T的固定小门吊组成门吊群用于将长轨吊离滑轮组至地面进行存储,各门吊用钢丝绳固定。 There is a mobile door crane in the rail storage area before welding. The rail storage area before welding is used to store 25m rails. The mobile door crane is a movable electric hanging door, which is used to lift the rail from the short rail storage area to the rail grinding machine. After the grinding is completed, it is hoisted on the pulley block, and then pushed to the position of the welding machine for welding. The rail storage area after welding is used to store the 250m long rail after welding. A fixed small door crane with a load capacity of 1T is set up per meter to form a door crane group. It is used to hoist the long rail from the pulley block to the ground for storage, and each door crane is fixed with a wire rope.
使用大型吊车,将焊机吊装上桥,直接吊放在焊机设计安装位置,焊机放置在特制的工作平台上组成闪光焊作业区; Use a large crane to hoist the welding machine onto the bridge, directly hoist it on the design installation position of the welding machine, and place the welding machine on a special working platform to form a flash welding work area;
生产线工作流程 Production line workflow
25m标准轨由平板拖车从存储基地运输并吊装至25m钢轨存储区即焊接前钢轨储存区; The 25m standard rail is transported from the storage base by a flatbed trailer and hoisted to the 25m rail storage area, which is the rail storage area before welding;
钢轨吊装上桥后,由移动式门吊将钢轨吊装至打磨床进行焊前打磨;打磨完成后吊装至焊轨生产线滑轮组,推送至焊接点进行焊接;钢轨焊接完成后采用手动绞缆机辅力推送至250m长钢轨存储区存储即焊接后钢轨储存区。 After the rail is hoisted onto the bridge, the rail is hoisted to the grinding machine by the mobile door crane for pre-welding grinding; after the grinding is completed, it is hoisted to the pulley block of the welding rail production line, and pushed to the welding point for welding; after the rail is welded, the manual cable winch is used to assist Push to the 250m long rail storage area for storage, that is, the rail storage area after welding.
在完成钢轨焊头超声波探伤合格后,使用小型固定式门吊将钢轨吊放至本实施例提供的钢轨运输小车上,固定后,使用牵引车运输到桥上施工的位置,免除了换铺长钢轨工艺的道耗费人力、时间的工序,充分利用桥梁作业面建设临时焊轨点完成长钢轨焊接,道床施工完成即长轨安装完成,仅剩后续应力放散与锁定,节约了大量施工时间和施工成本;结构简单,方便将钢轨与小车用法兰螺栓固定为一体,在走行过程中或曲线地段,避免了钢轨移动掉落;在小车走行方向前端,特意设置一个加强的三角形的三角铁,当小车前部撞向两侧门型筋时,小车通过三角铁能够轻松将门型筋导向小车两侧,并顺利将小车方向扶正并快速通过,使用方便,每条长轨下放置多个小车,在牵引车的牵引下能够实现对长轨的运送,并且长轨不会发生形变。 After the ultrasonic flaw detection of the rail welding head is qualified, use a small fixed door crane to hoist the rail onto the rail transport trolley provided in this embodiment. After fixing, use a tractor to transport it to the construction position on the bridge, eliminating the need to change the length of the shop. The process of rail technology is labor-intensive and time-consuming. Make full use of the temporary welding rail points on the bridge working surface to complete the long rail welding. After the construction of the ballast bed is completed, the installation of the long rail is completed. Only the subsequent stress release and locking are left, which saves a lot of construction time and construction. Cost; the structure is simple, it is convenient to fix the rail and the trolley as a whole with flange bolts, and avoid the rail moving and falling during the running process or in the curved section; a reinforced triangular triangle iron is specially set at the front end of the trolley to act as the front of the trolley When the upper part hits the door ribs on both sides, the trolley can easily guide the door ribs to both sides of the trolley through the triangle iron, and smoothly straighten the direction of the trolley and pass it quickly. It is easy to use, and multiple trolleys are placed under each long rail. The transportation of the long rail can be realized under the bottom, and the long rail will not be deformed.
实施例3 Example 3
在实施例1的基础上,所述的小车托架1长670mm,宽445mm;所述的三角铁6与固定架5连接处的边的长为465mm,该边的高位460mm;结构紧凑,刚性较强,在碰撞的时候不宜发生变形,同时稳定性高; On the basis of embodiment 1, described trolley bracket 1 is long 670mm, wide 445mm; The length of the side of described triangle iron 6 and fixed frame 5 joints is 465mm, and the high position of this side is 460mm; Compact in structure, rigidity is relatively Strong, not suitable for deformation when colliding, and high stability;
所述的固定架5是由方钢焊接而成的长方形钢架。方便将小车托架1与三角铁6焊接在一起,同时稳定性能高。 Described fixed frame 5 is the rectangular steel frame that is welded by square steel. It is convenient to weld the trolley bracket 1 and the triangle iron 6 together, and has high stability.
以上例举仅仅是对本实用新型的举例说明,并不构成对本实用新型的保护范围的限制,凡是与本实用新型相同或相似的设计均属于本实用新型的保护范围之内。 The above examples are only illustrations of the utility model, and do not constitute a limitation to the protection scope of the utility model. All designs identical or similar to the utility model all belong to the protection scope of the utility model.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620196449.4U CN205474639U (en) | 2016-03-15 | 2016-03-15 | A rail travelling bogie that is used for bridge floor railway to lay rail welding rail production line |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620196449.4U CN205474639U (en) | 2016-03-15 | 2016-03-15 | A rail travelling bogie that is used for bridge floor railway to lay rail welding rail production line |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205474639U true CN205474639U (en) | 2016-08-17 |
Family
ID=56657246
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620196449.4U Expired - Fee Related CN205474639U (en) | 2016-03-15 | 2016-03-15 | A rail travelling bogie that is used for bridge floor railway to lay rail welding rail production line |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205474639U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109811604A (en) * | 2019-03-20 | 2019-05-28 | 中铁一局集团有限公司 | A kind of gapless line dials moving device across station track |
| CN110468640A (en) * | 2019-09-09 | 2019-11-19 | 株洲时代电子技术有限公司 | A kind of rail walking apparatus and the railway switch paving including the device are changed planes |
-
2016
- 2016-03-15 CN CN201620196449.4U patent/CN205474639U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109811604A (en) * | 2019-03-20 | 2019-05-28 | 中铁一局集团有限公司 | A kind of gapless line dials moving device across station track |
| CN109811604B (en) * | 2019-03-20 | 2024-04-09 | 中铁一局集团有限公司 | Long rail straddles track shifting device |
| CN110468640A (en) * | 2019-09-09 | 2019-11-19 | 株洲时代电子技术有限公司 | A kind of rail walking apparatus and the railway switch paving including the device are changed planes |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102198695B (en) | Longitudinal moving method for outside die of box girder outer film | |
| CN105421249A (en) | Novel dragging- hoisting combined type hanging basket structure and construction method | |
| CN112411380B (en) | Construction method for connecting prefabricated boxes Liang Duoji to hoist and span river | |
| CN205152788U (en) | But telescopic bridge testing platform of antihunting | |
| CN102230381B (en) | Hollow needle beam lining trolley | |
| CN109653105A (en) | Box girder bridge cantilever construction main truss cradle system and its application method | |
| CN106836000A (en) | Curve via holes Summarized Account of Bridge Erection Construction method based on DJ series Bridge Erectors | |
| WO2021093092A1 (en) | Train maintenance vehicle suitable for air rail transit system | |
| CN103469705B (en) | Section of track track-laying machine and method of laying a railway track thereof | |
| CN116281640A (en) | A Retrofitting Method for Extending the Main Girder on the Riverside of a Riverside Container Crane | |
| CN205364148U (en) | PC track beam mold | |
| CN102837705B (en) | Traveling bogie in steel box | |
| CN205576656U (en) | Rail that bridge floor railway was laid welds rail production line | |
| WO2022193200A1 (en) | Rapid construction method for secondary lining of small-section tunnel | |
| CN102587678B (en) | Device for slipping node of steel structure | |
| CN216764085U (en) | Be arranged in high-rise steel construction transformation component along outer fringe hoist and mount conveyer | |
| CN107938507A (en) | The mobile construction platform of steel truss arched bridge coating project | |
| CN211171456U (en) | A laying trolley for laying U-shaped beam tracks | |
| CN207919265U (en) | Suitable for covering rail plate-type ballastless track plate paver on steel truss girder bridge | |
| CN111270577A (en) | A kind of assembly machine suitable for narrow space of subway underground line and cross-line rail row of elevated line and its construction method | |
| CN212893519U (en) | A front girder lengthening structure applied to quay cranes | |
| CN206438395U (en) | One kind can cross the double girders of pier formula railway and check dolly | |
| CN207581213U (en) | A kind of ceiling mounted tracks composite beam | |
| CN105317031A (en) | Method for hoisting main beam of bridge crane of primary machine room of ship elevator | |
| CN110562848A (en) | A high-low position conversion device for box girder transportation |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20210608 Address after: Floor 16, building IBCC, Huixin, No.1 zhangbayi Road, high tech Zone, Xi'an City, Shaanxi Province, 710065 Patentee after: CCCC Railway Construction Co.,Ltd. Address before: 710065 No.33, west section of Keji 6th Road, high tech Zone, Xi'an City, Shaanxi Province Patentee before: CCCC-SHEC RAILWAY ENGINEERING Co.,Ltd. |
|
| TR01 | Transfer of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160817 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |