CN212105068U - Hanging bridge type folding frame of all-steel climbing frame - Google Patents

Hanging bridge type folding frame of all-steel climbing frame Download PDF

Info

Publication number
CN212105068U
CN212105068U CN202020245793.4U CN202020245793U CN212105068U CN 212105068 U CN212105068 U CN 212105068U CN 202020245793 U CN202020245793 U CN 202020245793U CN 212105068 U CN212105068 U CN 212105068U
Authority
CN
China
Prior art keywords
steel
plate
frame
turnover
walkway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020245793.4U
Other languages
Chinese (zh)
Inventor
吴本波
李明
李利
焦良田
褚浩远
周城军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Civil Construction Engineering Co Ltd Of Crecsh Group
Shanghai Civil Engineering Co Ltd of CREC
Construction Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
Civil Construction Engineering Co Ltd Of Crecsh Group
Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Civil Construction Engineering Co Ltd Of Crecsh Group, Shanghai Civil Engineering Co Ltd of CREC filed Critical Civil Construction Engineering Co Ltd Of Crecsh Group
Priority to CN202020245793.4U priority Critical patent/CN212105068U/en
Application granted granted Critical
Publication of CN212105068U publication Critical patent/CN212105068U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A full-steel climbing frame hanging bridge type folding frame comprises two half hanging bridge frames which are symmetrically arranged, wherein each half hanging bridge frame comprises two vertical rods, a turnover type walkway plate, two steel chains, two manual winches and two steel wire ropes; the four upright posts are arranged in a rectangular shape; the turnover type walkway plate comprises a fixed plate and a turnover plate, wherein one end of the fixed plate is connected with the two upright posts, and the other end of the fixed plate is hinged with one end of the turnover plate; one end of the steel chain is connected with the upright stanchion and is arranged above one end of the fixed plate, and the other end of the steel chain is connected with the other end of the turnover plate; the manual capstan is connected with the vertical rod and is arranged above one end of the steel chain, one end of the steel wire rope is wound on the manual capstan, and the other end of the steel wire rope is connected with the other end of the turnover plate. When being applied to full steel and climbing the frame on, can shorten and climb the frame and rise and descend the engineering time, convenient operation avoids repeatedly dismantling, installing the guidance tape simultaneously and causes to climb the frame support body and warp, has guaranteed to climb the wholeness and the stability of frame support body.

Description

Hanging bridge type folding frame of all-steel climbing frame
Technical Field
The utility model relates to an all-steel climbing frame technical field, concretely relates to all-steel climbing frame suspension bridge formula folding leg.
Background
When the all-steel climbing frame in the market is applied to a high-rise building, the all-steel climbing frame is detached from the top, or a walkway plate at the position of an obstacle is detached when the all-steel climbing frame passes through the fixed obstacle, and the walkway plate is installed again after passing through the fixed obstacle.
SUMMERY OF THE UTILITY MODEL
The utility model provides an above-mentioned problem, provide an all steel frame hanger bridge formula folding leg of climbing.
The purpose of the utility model can be realized by the following technical scheme: a full-steel climbing frame hanging bridge type folding frame comprises two half hanging bridge frames which are symmetrically arranged, wherein each half hanging bridge frame comprises two vertical rods, a turnover type walkway plate, two steel chains, two manual winches and two steel wire ropes; four upright posts of the two half-hoisting bridge frames are arranged in a rectangular shape; the turnover type walkway plate comprises a fixed plate and a turnover plate, wherein one end of the fixed plate is fixedly connected with the two upright posts, and the other end of the fixed plate is hinged with one end of the turnover plate; one ends of the two steel chains are respectively and fixedly connected with the two upright posts and arranged above one end of the fixed plate, and the other ends of the two steel chains are respectively and fixedly connected with the other end of the turnover plate; two manual capstan winch respectively with two pole setting fixed connection and set up in the one end top of two steel chains, two wire rope's one end twines respectively on two manual capstan winch, two wire rope's the other end respectively with the other end fixed connection of returning face plate.
Further, the fixed plate and the anti-rotation plate are both: four rectangular pipe welding enclose into the rectangle frame, and the decorative pattern steel sheet is laid in the surface welding, and the inside welding deep floor of rectangle frame.
Furthermore, two sides of one end of the fixing plate are fixedly connected with the first holes at the lowest ends of the two vertical rods through hexagonal head bolts, large gaskets and nuts respectively.
Furthermore, the other end of the fixed plate is hinged with one end of the turnover plate through a bolt.
Further, when the turnover plate of the turnover type walkway plate is in a horizontal position, the steel chain is 45 degrees to the horizontal direction and has no surplus length.
Further, when the turnover plate of the turnover type walkway plate is in a horizontal position, the steel wire rope is 75 degrees to the horizontal direction.
Further, the maximum value of the turnover plate in the horizontal direction when the turnover plate is pulled up is greater than or equal to 70 degrees.
Furthermore, convertible pavement slab still includes two U shaped steel, two U shaped steel vertical welding respectively is in the top surface both sides of the returning face plate other end, and every U shaped steel and the other end of steel chain and wire rope's the other end fixed connection.
Furthermore, the convertible guidance tape still includes two short square steels, two short square steel welds respectively in the top surface both sides of the returning face plate other end, and when the returning face plate of two convertible guidance tapes was in horizontal position, the short square pipe on the two returning face plate other ends passed through the bolt butt joint.
Compared with the prior art, the beneficial effects of the utility model are that: when being applied to full steel and climbing the frame on, can shorten and climb the frame and rise and descend the engineering time, convenient operation avoids repeatedly dismantling, installing the guidance tape simultaneously and causes to climb the frame support body and warp, has guaranteed to climb the wholeness and the stability of frame support body.
Drawings
Fig. 1 is a front view and a schematic structural view when passing through an obstacle according to the present invention.
Fig. 2 is a top view of the present invention.
Fig. 3 is a schematic structural view of the turnover type walkway plate of the present invention when it is laid down.
Fig. 4 is a schematic structural view of the turnover walkway plate of the present invention when it is pulled up.
The parts in the figures are numbered as follows:
1 upright pole
2 fixing plate
3 turnover plate
4U-shaped steel
5 short square steel
6 steel chain
7 hand capstan
8 steel wire rope
9 obstacle
10 rectangular pipe
11 pattern steel plate
12 reinforcing ribs.
Detailed Description
The following detailed description of the embodiments of the present invention will be given with reference to the accompanying drawings to make it clear to those skilled in the art how to practice the invention. While the invention has been described in connection with its preferred embodiments, these embodiments are intended to be illustrative, and not to limit the scope of the invention.
The utility model provides an all-steel frame-climbing suspension bridge formula folding leg, includes two half suspension bridge framves of symmetrical arrangement, every half suspension bridge frame includes two pole settings 1, convertible guidance tape, two steel chains 6, two manual capstan winch 7, two wire rope 8.
Referring to fig. 1 and 2, four vertical rods 1 of two half-hanging bridges are arranged in a rectangular shape, and each vertical rod 1 is a square steel pipe with the thickness of 100 × 50 × 5 mm.
Referring to fig. 1 to 4, the turnover type walkway plate includes a fixed plate 2, a turnover plate 3, two U-shaped steels 4, and two short square steels 5.
The fixed plate 2 and the anti-rotation plate are respectively formed by welding four rectangular pipes 10 of 60 × 30 × 3mm to form a rectangular frame, the surface of the rectangular frame is welded and paved with patterned steel plates 11, every 500mm inside the rectangular frame is welded with a reinforcing rib plate 12, and the reinforcing rib plate 12 is a Q235 steel plate with the thickness of 8 mm.
Two sides of one end of the fixing plate 2 are respectively and fixedly connected with the two vertical rods 1, specifically, two sides of one end of the fixing plate 2 are respectively and fixedly connected with the first holes at the lowest ends of the two vertical rods 1 through M16X 100 hexagon head bolts, large washers and nuts.
The other end of fixed plate 2 is articulated with the one end of returning face plate 3, specifically, the other end of fixed plate 2 is articulated with the one end of returning face plate 3 through 3 bolts that edgewise distributed.
Two U shaped steel 4 is vertical respectively to be welded in the top surface both sides of the 3 other ends of returning face plate, and every U shaped steel 4 is 8mm thick, opens 2 holes on the U shaped steel 4.
Referring to fig. 1 and 2, one end of each of the two steel chains 6 is fixedly connected with the two vertical rods 1 and is disposed above one end of the fixing plate 2, the other end of each of the two steel chains 6 is fixedly connected with the two U-shaped steels 4 on the other end of the turnover plate 3, and the diameter of each of the two steel chains 6 is 10 mm. When the turnover plate 3 is in the horizontal position, the steel chain 6 is 45 degrees to the horizontal direction and has no surplus length, and the steel chain 6 is stressed to ensure normal operation when construction load is added on the turnover type walkway plate.
Two manual capstan winch 7 respectively with two pole setting 1 fixed connection and set up in the one end top of two steel chains 6, two wire rope 8's one end twines respectively on two manual capstan winch 7, two wire rope 8's the other end respectively with two U shaped steel 4 fixed connection on the returning face plate 3 other end. When the roll-over panel 3 is in the horizontal position, the wire rope 8 is at 75 ° to the horizontal. When the manual winch 7 is rotated, the turning plate 3 can be pulled up by 70 degrees or more relative to the horizontal position through the steel wire 8.
Two short square steel 5 welds respectively in the top surface both sides of the returning face plate 3 other end, and every short square steel 5 goes up the trompil. When the turnover plates 3 of the two turnover type walkway plates are in the horizontal position, the short square pipes at the other ends of the two turnover plates 3 are in butt joint through bolts.
When the all-steel climbing frame passes through the barrier 9, the bolts connecting the short square pipes at the other ends of the two turnover plates 3 are disassembled, the two manual winches 7 of the two half-hoisting bridge frames are operated, the two turnover plates 3 are pulled up by 70 degrees under the driving of the steel wire rope 8, the steel wire rope 8 is stressed, the steel chain 6 is not stressed, and the barrier 9 can pass through the gap between the two turnover plates 3. After passing through, the two manual winches 7 of the two half-hoisting bridge frames are operated again, the two turnover plates 3 of the two turnover type walkway plates are put down under the driving of the steel wire rope 8, the horizontal state is recovered, and the steel chains 6 are stressed at the moment to ensure normal operation when construction load is added on the turnover type walkway plates.
It should be noted that many variations and modifications of the embodiments of the present invention are possible, which are fully described, and are not limited to the specific examples of the above embodiments. The above embodiments are merely illustrative of the present invention and are not intended to limit the present invention. In conclusion, the scope of the present invention should include those changes or substitutions and modifications which are obvious to those of ordinary skill in the art.

Claims (9)

1. The full-steel climbing frame hanging bridge type folding frame is characterized by comprising two half hanging bridge frames which are symmetrically arranged, wherein each half hanging bridge frame comprises two vertical rods, a turnover type walkway plate, two steel chains, two manual winches and two steel wire ropes;
four upright posts of the two half-hoisting bridge frames are arranged in a rectangular shape;
the turnover type walkway plate comprises a fixed plate and a turnover plate, wherein one end of the fixed plate is fixedly connected with the two upright posts, and the other end of the fixed plate is hinged with one end of the turnover plate;
one ends of the two steel chains are respectively and fixedly connected with the two upright posts and arranged above one end of the fixed plate, and the other ends of the two steel chains are respectively and fixedly connected with the other end of the turnover plate;
two manual capstan winch respectively with two pole setting fixed connection and set up in the one end top of two steel chains, two wire rope's one end twines respectively on two manual capstan winch, two wire rope's the other end respectively with the other end fixed connection of returning face plate.
2. The all-steel creeper-hanger drawbridge type folding stand according to claim 1, wherein the fixing plate and the rotation preventing plate are both: four rectangular pipe welding enclose into the rectangle frame, and the decorative pattern steel sheet is laid in the surface welding, and the inside welding deep floor of rectangle frame.
3. The all-steel climbing frame drawbridge type folding frame according to claim 1, wherein two sides of one end of the fixing plate are fixedly connected with the first holes at the lowest ends of the two vertical rods through a hexagon head bolt, a large washer and a nut respectively.
4. The all-steel creeper-hanger drawbridge type folding stand according to claim 1, wherein the other end of the fixed plate is hinged to one end of the turning plate by a bolt.
5. The all-steel creel-hanger drawbridge folding stand according to claim 1, wherein when the turning plate of the turnover type walkway plate is in a horizontal position, the steel chain is at 45 ° to the horizontal direction with no surplus length.
6. The all-steel creeper-hanger drawbridge folding stand of claim 1, wherein the wire rope is 75 ° from horizontal when the flipping panel of the flip walkway is in horizontal position.
7. The all-steel creel-hanger bridge-type folding leg as claimed in claim 1, wherein the maximum value of the turning plate from the horizontal direction when being pulled up is 70 ° or more.
8. The all-steel climbing frame hanging bridge type folding frame according to any one of claims 1 to 7, wherein the turnover type walkway plate further comprises two U-shaped steels vertically welded to two sides of the top surface of the other end of the turnover plate, each U-shaped steel is fixedly connected with the other end of the steel chain and the other end of the steel wire rope.
9. The all-steel climbing frame hanging bridge type folding frame according to claim 8, wherein the turning walkway plates further comprise two short square steels welded to both sides of the top surface of the other end of the turning plate, respectively, and when the turning plates of the two turning walkway plates are in a horizontal position, the short square pipes on the other ends of the two turning plates are butted through bolts.
CN202020245793.4U 2020-03-03 2020-03-03 Hanging bridge type folding frame of all-steel climbing frame Active CN212105068U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020245793.4U CN212105068U (en) 2020-03-03 2020-03-03 Hanging bridge type folding frame of all-steel climbing frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020245793.4U CN212105068U (en) 2020-03-03 2020-03-03 Hanging bridge type folding frame of all-steel climbing frame

Publications (1)

Publication Number Publication Date
CN212105068U true CN212105068U (en) 2020-12-08

Family

ID=73632824

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020245793.4U Active CN212105068U (en) 2020-03-03 2020-03-03 Hanging bridge type folding frame of all-steel climbing frame

Country Status (1)

Country Link
CN (1) CN212105068U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115370121A (en) * 2022-08-22 2022-11-22 中建四局第一建设有限公司 Movable climbing frame structure convenient and fast to construct external wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115370121A (en) * 2022-08-22 2022-11-22 中建四局第一建设有限公司 Movable climbing frame structure convenient and fast to construct external wall

Similar Documents

Publication Publication Date Title
CN106939707B (en) A kind of restricted clearance large-scale steel structure supporting platform from method for improving
WO2014015757A1 (en) Bridge maintenance vehicle with hinge-connected type hanging bracket and capable of avoiding bridge-side obstacles
CN110468724B (en) Auxiliary device for main cable construction of space cable suspension bridge and main cable construction method
CN101787732A (en) Cable-stayed multi-layer framework structure and construction control method thereof
CN101514542B (en) Device for overhauling bridge approach pier, bent cap and box girder of a bridge
CN212105068U (en) Hanging bridge type folding frame of all-steel climbing frame
CN205775852U (en) A kind of active force conversion support for steel structure support moulding bed top
CN202099993U (en) Lift type external scaffold made of square steel pipes
CN209456892U (en) Cable-stayed bridge steel overhangs structure of sidewalk
CN210976552U (en) Foldable operation platform device in elevator shaft
CN110685227A (en) Construction method of formwork support system of obstacle-crossing wide-width swivel bridge closure segment hanging bracket method
CN214828568U (en) Tower crane pedestrian passageway capable of being integrally lifted along with climbing frame
CN205955164U (en) Portable steel truss operation platform
CN212101770U (en) Double-rail device convenient to install and detach quickly and used for hoisting curtain wall unit plate
CN107476559A (en) A kind of spigot-and-socket builder's jack and installation method
CN112575685A (en) Heavy tie bar river-crossing construction device for large-span basket type steel arch bridge
CN207775695U (en) A kind of novel suspension cable bridge structure for hydraulic engineering
CN219710948U (en) Push-pull platform device for wall attachment position of climbing tower crane
CN206220547U (en) A kind of operating platform for steel structure column installation
CN207092508U (en) A kind of spigot-and-socket builder's jack
CN201292512Y (en) Suspended cable sliding table for spraying main steel box beam of overpass
CN219490682U (en) Basket hanging device for prestress construction of light T-pier cantilever cap beam
CN201818034U (en) Movable operation platform
CN206128595U (en) Scaffold that encorbelments frame shaped steel platform
CN218261678U (en) Tower top limited space large cantilever hoisting falsework