CN212053723U - Fastener type combined steel pipe stair - Google Patents

Fastener type combined steel pipe stair Download PDF

Info

Publication number
CN212053723U
CN212053723U CN202020058721.9U CN202020058721U CN212053723U CN 212053723 U CN212053723 U CN 212053723U CN 202020058721 U CN202020058721 U CN 202020058721U CN 212053723 U CN212053723 U CN 212053723U
Authority
CN
China
Prior art keywords
steel bar
rods
cross
steel
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020058721.9U
Other languages
Chinese (zh)
Inventor
王超迪
金振
楼群
邵帅帅
李亚龙
胡翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Dongyang Third Construction Engineering Co ltd
Original Assignee
Zhejiang Dongyang Third Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Dongyang Third Construction Engineering Co ltd filed Critical Zhejiang Dongyang Third Construction Engineering Co ltd
Priority to CN202020058721.9U priority Critical patent/CN212053723U/en
Application granted granted Critical
Publication of CN212053723U publication Critical patent/CN212053723U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model relates to a fastener formula combination steel pipe stair belongs to the construction field. The utility model provides a fastener formula combination steel pipe stair, includes steel bar pedal, bracing piece, cross fastener, its characterized in that: the two ends of the steel bar pedal are connected with the supporting rods through the cross fasteners, the steel bar pedals with corresponding quantities are arranged according to different use heights, the supporting rods are erected on steel pipes on two sides of the outer scaffold, and the steel bar pedals are connected through the cross fasteners. During installation, the two support rods are respectively obliquely placed at the inner sides of the vertical rods at the two sides of the outer scaffold, the upper end and the lower end of each support rod are respectively lapped on the transverse horizontal rods at the upper layer and the lower layer of the outer scaffold, the support rods are connected with the transverse horizontal rods through the cross fasteners, then the short steel pipes at the two ends of the steel bar pedal are respectively lapped on the two support rods, the whole steel bar pedal is adjusted to be in the horizontal position and then connected through the cross fasteners, and the rest steel bar pedals are completely installed from low to high in sequence.

Description

Fastener type combined steel pipe stair
Technical Field
The utility model relates to a fastener formula combination steel pipe stair belongs to the construction field.
Background
The upper and lower layer passing mode of the existing external scaffold generally comprises a section steel inclined ladder, a chute and the like, and the passing mode of the section steel inclined ladder and the chute is convenient, but the engineering quantity is large, the erection is complex, and the repeated use is not facilitated. In addition, the steel pipe stair is temporary, flexible in erection and convenient to disassemble and assemble, but poor in skid resistance, and easily causes the slip and fall accidents of constructors.
Disclosure of Invention
The utility model aims at providing a fastener formula combination steel pipe stair can satisfy the steel pipe stair setting of not co-altitude requirement to supply the current outer scaffold frame from top to bottom that the workman can be safe convenient of executing.
In order to achieve the above purpose, the utility model adopts the following technical scheme to solve:
the utility model provides a fastener formula combination steel pipe stair, includes steel bar pedal, bracing piece, cross fastener, its characterized in that: the two ends of the steel bar pedal are connected with the supporting rods through the cross fasteners, the steel bar pedals with corresponding quantity are arranged according to different use heights, the supporting rods are erected on the outer scaffold, and the cross fasteners are also adopted for connection.
The steel bar pedal is a rectangular steel bar framework and is formed by welding a plurality of pieces of first-level steel, two ends of the steel bar pedal are respectively welded with a 250mm long short steel pipe serving as a connecting part with the supporting rod, and the short steel pipe is consistent with the steel pipe of the external scaffold in model.
The bracing piece is steel pipe for the outer scaffold frame, and length is by using the height-dependent.
The cross fastener is used for connecting the components.
Preferably, one end of the support rod is lapped on the upper-layer horizontal rod of the scaffold, and the other end of the support rod is lapped on the lower-layer horizontal rod and fixed by the cross fastener.
Preferably, the angle between the reinforced pedal and the supporting rod can be adjusted by adjusting the tightness of the cross fastener.
Preferably, the support rods are horizontally placed, the cross fasteners are connected to the horizontal rods of the scaffold, and the steel bar pedals are adjusted to be in the horizontal position to form the temporary springboard.
The utility model discloses possess following advantage:
1. the whole device has simple structure and good anti-skid performance and can be made of temporary materials on the construction site.
2. The connecting device is connected by the fasteners, can be disassembled and repeatedly recycled, and has small labor intensity in installation and disassembly and simple and convenient and rapid operation.
3. Can adjust the angle of setting up and the height of steel pipe stair according to the in-service use needs, also can regard as interim springboard to use.
Drawings
Fig. 1 is a front view of the present invention.
Fig. 2 is a plan view of the present invention.
Fig. 3 is a side view of the present invention.
Fig. 4 is a three-dimensional view of the present invention.
Fig. 5 is an installation diagram of an embodiment of the present invention.
Fig. 6 is a schematic view of the installation of the second embodiment of the present invention.
In the figure, 1, a steel bar pedal, 2, a support rod, 3, a cross fastener and 4, an external frame hand rack are arranged.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and examples.
The first embodiment is as follows: firstly, according to the erection condition of the external scaffold 4, the position of the steel pipe stair and the erection angle and height of the steel pipe stair are confirmed, and the length of the required support rod 2 and the number of the steel bar pedals 1 and the cross fasteners 3 are calculated. Wherein, the steel bar pedal 1 is manufactured by welding a first-level steel bar and a steel pipe on a construction site.
After having made steel bar pedal 1, with a certain amount of steel bar pedal 1 and bracing piece 2, cross fastener 3 transports to 4 access ways of outer scaffold frame department, as shown in fig. 5, earlier put two bracing pieces 2 respectively to one side in the pole setting of 4 both sides of outer scaffold frame inboard during the installation, both ends take respectively on the horizontal pole of lower floor on outer scaffold frame 4 about bracing piece 2, link together bracing piece 2 and horizontal pole with cross fastener 3, take respectively on two bracing pieces 2 with the short steel pipe at 1 both ends of steel bar pedal immediately, adjust whole being in the horizontal position of steel bar pedal and connect with cross fastener 3, and according to this order by low to high all install remaining steel bar pedal 1 go can.
The installation of all fastener type combined steel pipe staircases is as described above, and the description is omitted here.
The steel pipe stair of installation need inspect whether firm with being connected of bracing piece 2 of steel bar footboard 1, and when constructor trampled, whether steel bar footboard 1 can rotate, should in time screw up the reinforcement to cross fastener 3 if appear rotating.
When the outer scaffold frame finishes using and enters the dismantling stage, the steel pipe stairs are dismantled synchronously, the cross fasteners 3 for connecting the steel bar pedals 1 and the supporting rods 2 are dismantled by a wrench, and then the steel bar pedals 1 are taken down one by one to be bound together and transported to the ground. The dismounting of the supporting rod 2 is consistent with the dismounting step of the reinforced pedal 1.
Example two: when the scaffold frame need not pass from top to bottom, the passway is to the current formation hindrance of same floor scaffold frame, can place the horizontal horizon bar below at the passway both ends with 2 levels of bracing piece this moment, adjust the elasticity of cross fastener simultaneously, with the angle modulation of steel bar footboard 1 and bracing piece 2 zero, let steel bar footboard 1 side by side in the horizontal direction promptly, be connected bracing piece 2 and horizontal horizon bar with cross fastener 3 immediately, also available a plurality of cross fasteners 3 link together bracing piece 2 and the vertical horizon bar of passway both sides. After the installation is completed, a temporary springboard is formed for the passage of the applicator.
The removal of the temporary springboard is the same as the first embodiment, and the description is omitted here.
All scaffold application places where the springboards need to be laid can adopt the temporary springboards of the embodiment as a passing mode.
The construction attention problem is as follows: when the outer scaffold is in construction operation, a safety rope is tied, the other end of the safety rope is buckled on the outer scaffold steel pipe, a safety helmet is worn, and a helmet belt is tied; regularly checking whether the steel pipe stair is firm or not at intervals and whether the steel pipe stair is loose or not; the disassembled parts of the steel pipe stairs are required to be intensively placed or put into a warehouse for storage.

Claims (4)

1. The utility model provides a fastener formula combination steel pipe stair, includes steel bar pedal, bracing piece, cross fastener, its characterized in that: the two ends of the steel bar pedal are connected with the supporting rods through the cross fasteners, the steel bar pedals with corresponding quantities are arranged according to different use heights, the supporting rods are erected on steel pipes on two sides of the outer scaffold, and the steel bar pedals are connected through the cross fasteners.
2. The stair made of fastened combination steel tubes according to claim 1, wherein said support rods are fastened by said cross fasteners by being overlapped at one end on the upper horizontal rods and at the other end on the lower horizontal rods of the scaffold.
3. The stair made of fastened combination steel pipes according to claim 1, wherein the angle between the steel bar tread and the supporting rod can be adjusted by adjusting the tightness of the cross fastener.
4. The stair with fastening type combination steel pipe as claimed in claim 1, wherein the support rods are horizontally arranged, the cross fasteners are connected to the horizontal rods of the scaffold, and the steel bar pedals are adjusted to be in a horizontal position to form the temporary springboard.
CN202020058721.9U 2020-01-06 2020-01-06 Fastener type combined steel pipe stair Active CN212053723U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020058721.9U CN212053723U (en) 2020-01-06 2020-01-06 Fastener type combined steel pipe stair

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020058721.9U CN212053723U (en) 2020-01-06 2020-01-06 Fastener type combined steel pipe stair

Publications (1)

Publication Number Publication Date
CN212053723U true CN212053723U (en) 2020-12-01

Family

ID=73536069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020058721.9U Active CN212053723U (en) 2020-01-06 2020-01-06 Fastener type combined steel pipe stair

Country Status (1)

Country Link
CN (1) CN212053723U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113235974A (en) * 2021-05-27 2021-08-10 浙江昊杨新能源科技有限公司 Assembled steel pipe frame pedal stair and installation method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113235974A (en) * 2021-05-27 2021-08-10 浙江昊杨新能源科技有限公司 Assembled steel pipe frame pedal stair and installation method thereof

Similar Documents

Publication Publication Date Title
CN206768611U (en) Bridge pier hanging basket mounting operation platform
CN101775896B (en) Rigid suspended scaffold for installing pipeline of steel roof equipment
CN108996421B (en) Finished furniture hoisting machine and finished furniture hoisting method
CN105908960A (en) Construction rack for construction of high and large space
CN212053723U (en) Fastener type combined steel pipe stair
CN214495317U (en) Lifting device for transporting personnel in elevator shaft during construction of main structure
CN113719092A (en) Large-scale demonstration screen fixing structure adopting light high-strength steel and mounting and dismounting method
CN110863641A (en) Ultrahigh floor type boarding scaffold in hyperbolic cooling tower and erection method thereof
CN206279783U (en) Assembled construction safety channel
CN212867550U (en) Assembled subway subsurface excavation construction is overhead pedestrian passageway device for vertical well
CN214828568U (en) Tower crane pedestrian passageway capable of being integrally lifted along with climbing frame
CN205296892U (en) A merogenesis stair and up -downgoing passageway for deep foundation pit construction is current from top to bottom
CN114319809A (en) Construction method of ultrahigh operation platform disc buckle type operation scaffold system
CN111677259B (en) High-rise Bailey truss cantilever construction method
CN211815605U (en) Construction device for pile column type pier tie beam and capping beam
CN208934293U (en) Vertical shaft stair
CN208502205U (en) The high mobile operation platform of big layer
CN206581578U (en) Double-layer basket constructing device for overhanging scaffold
CN111764623A (en) Lower hanging construction platform module of high-altitude large-cantilever steel roof truss and construction method
CN219710905U (en) Tunnel movable scaffold construction platform
CN213679551U (en) Tower crane pedestrian passageway
CN209244126U (en) Precast stair structure
CN213174700U (en) Building block type splicing operation frame
CN114673385B (en) Large eccentric demonstration screen fixing structure adopting light high-strength steel and construction process
CN210194440U (en) T-shaped beam bridge load test support platform device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant