CN212053723U - Fastener type combined steel pipe stair - Google Patents

Fastener type combined steel pipe stair Download PDF

Info

Publication number
CN212053723U
CN212053723U CN202020058721.9U CN202020058721U CN212053723U CN 212053723 U CN212053723 U CN 212053723U CN 202020058721 U CN202020058721 U CN 202020058721U CN 212053723 U CN212053723 U CN 212053723U
Authority
CN
China
Prior art keywords
steel
rods
support rods
steel pipe
cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020058721.9U
Other languages
Chinese (zh)
Inventor
王超迪
金振
楼群
邵帅帅
李亚龙
胡翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Dongyang Third Construction Engineering Co ltd
Original Assignee
Zhejiang Dongyang Third Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Dongyang Third Construction Engineering Co ltd filed Critical Zhejiang Dongyang Third Construction Engineering Co ltd
Priority to CN202020058721.9U priority Critical patent/CN212053723U/en
Application granted granted Critical
Publication of CN212053723U publication Critical patent/CN212053723U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

本实用新型涉及一种扣件式组合钢管楼梯,属于建筑施工领域。一种扣件式组合钢管楼梯,包括钢筋踏板、支撑杆、十字扣件,其特征在于:用十字扣件将钢筋踏板两端与支撑杆连接在一起,根据使用高度的不同来设置相应数量的钢筋踏板,支撑杆架设在外脚手架两侧钢管上,同样采用十字扣件连接。安装时先将两个支撑杆分别斜放在外脚手架两边立杆内侧,支撑杆上下两端分别搭在外脚手架上下层的横向水平杆上,用十字扣件将支撑杆与横向水平杆连接在一起,紧接着将钢筋踏板两端的短钢管分别搭在两个支撑杆上,调整钢筋踏板整体处于水平位置后用十字扣件连接,并依此顺序由低到高把剩余钢筋踏板全部安装上去即可。

Figure 202020058721

The utility model relates to a fastener type combined steel pipe staircase, which belongs to the field of building construction. A fastener-type combined steel pipe staircase, including steel treads, support rods, and cross fasteners, is characterized in that: cross fasteners are used to connect both ends of the steel reinforcement treadle with the support rods, and a corresponding number of Reinforced pedals and support rods are erected on the steel pipes on both sides of the outer scaffolding, which are also connected by cross fasteners. When installing, first place the two support rods on the inside of the vertical rods on both sides of the outer scaffold respectively, and the upper and lower ends of the support rods are respectively placed on the horizontal horizontal rods on the upper and lower layers of the external scaffolding. Next, place the short steel pipes at both ends of the rebar pedal on the two support rods, adjust the rebar pedal to a horizontal position and connect it with cross fasteners, and install all the remaining rebar pedals from low to high in this order.

Figure 202020058721

Description

一种扣件式组合钢管楼梯A fastener type combined steel pipe staircase

技术领域technical field

本实用新型涉及一种扣件式组合钢管楼梯,属于建筑施工领域。The utility model relates to a fastener type combined steel pipe staircase, which belongs to the field of building construction.

背景技术Background technique

现有外脚手架上下层通行方式通常有型钢斜梯、斜道等,型钢斜梯、斜道的通行方式虽然便利,但工程量大且搭设复杂,不利于重复使用。另外还有临时的钢管楼梯,其搭设灵活、拆装方便,但是抗滑性差,容易造成施工人员滑倒坠落事故。The existing ways of passing the upper and lower floors of the outer scaffolding usually include profiled steel inclined ladders, ramps, etc. Although the passages of profiled steel inclined ladders and ramps are convenient, the engineering volume is large and the erection is complicated, which is not conducive to repeated use. In addition, there are temporary steel pipe stairs, which are flexible to erect and easy to disassemble and assemble, but have poor sliding resistance, which may easily cause construction workers to slip and fall.

发明内容SUMMARY OF THE INVENTION

本实用新型的目的是提供一种扣件式组合钢管楼梯,能够满足不同高度要求的钢管楼梯设置,以便供施工人员能够安全便利的上下通行外脚手架。The purpose of the utility model is to provide a fastener type combined steel pipe staircase, which can meet the requirements of different heights to set the steel pipe staircase, so that the construction personnel can safely and conveniently pass the outer scaffolding up and down.

为实现上述目的,本实用新型采用如下技术方案解决:For achieving the above object, the present utility model adopts the following technical solutions to solve:

一种扣件式组合钢管楼梯,包括钢筋踏板、支撑杆、十字扣件,其特征在于:用十字扣件将钢筋踏板两端与支撑杆连接在一起,根据使用高度的不同来设置相应数量的钢筋踏板,支撑杆架设在外脚手架上,同样采用十字扣件连接。A fastener-type combined steel pipe staircase, comprising steel treads, support rods, and cross fasteners, characterized in that: cross fasteners are used to connect the two ends of the steel reinforcement pedals with the support rods, and a corresponding number of Reinforced pedals and support rods are erected on the outer scaffolding, which are also connected by cross fasteners.

所述钢筋踏板为长方形钢筋骨架,由若干根一级钢焊接而成,两端再各焊接一根250mm长的短钢管作为与支撑杆连接部位,短钢管型号同外脚手架钢管型号一致。The reinforced pedal is a rectangular reinforced skeleton, which is welded by several first-grade steels, and a short steel pipe with a length of 250 mm is welded at each end as the connecting part with the support rod. The model of the short steel pipe is the same as that of the outer scaffolding steel pipe.

所述支撑杆为外脚手架用钢管,长度由使用高度决定。The support rod is a steel pipe for outer scaffolding, and the length is determined by the height of use.

所述十字扣件为外脚手架用十字扣件,用于各构件之间的连接。The cross fasteners are cross fasteners for outer scaffolding, which are used for connection between various components.

优选的,所述支撑杆一端搭在脚手架上层横向水平杆上,另一端搭在下层横向水平杆上,用所述十字扣件固定。Preferably, one end of the support rod is draped on the upper horizontal horizontal rod of the scaffold, and the other end is draped on the lower horizontal horizontal rod, and is fixed by the cross fastener.

优选的,所述钢筋踏板可通过调节所述十字扣件松紧度来调整与所述支撑杆的角度。Preferably, the angle between the steel bar pedal and the support rod can be adjusted by adjusting the tightness of the cross fastener.

优选的,将所述支撑杆水平放置,用所述十字扣件连接在脚手架水平杆上,调节所述钢筋踏板至水平位置,形成临时跳板。Preferably, the support rod is placed horizontally, connected to the horizontal rod of the scaffold with the cross fastener, and the steel bar pedal is adjusted to a horizontal position to form a temporary springboard.

本实用新型具备以下优点:The utility model has the following advantages:

1、整个装置结构简单,抗滑性能好,可在施工现场临时取材制成。1. The whole device has a simple structure and good anti-skid performance, and can be made of materials temporarily at the construction site.

2、采用扣件连接,可拆卸、重复周转使用,且安装与拆卸劳动强度小,操作简便、快捷。2. It is connected by fasteners, which can be disassembled and used repeatedly, and the labor intensity of installation and disassembly is small, and the operation is simple and fast.

3、能够根据实际使用需要调整钢管楼梯的搭设角度和高度,亦可作为临时跳板使用。3. The erection angle and height of the steel pipe staircase can be adjusted according to the actual needs, and it can also be used as a temporary springboard.

附图说明Description of drawings

图1是本实用新型的正视图。Figure 1 is a front view of the present invention.

图2是本实用新型的俯视图。Figure 2 is a top view of the present invention.

图3是本实用新型的侧视图。Figure 3 is a side view of the present invention.

图4是本实用新型的三维图。Figure 4 is a three-dimensional view of the present invention.

图5是本实用新型的实施例一安装示意图。FIG. 5 is a schematic diagram of the installation of Embodiment 1 of the present invention.

图6是本实用新型的实施例二安装示意图。FIG. 6 is a schematic diagram of the installation of the second embodiment of the present invention.

图中1.钢筋踏板,2.支撑杆,3.十字扣件,4.外架手架。In the picture 1. Reinforced pedal, 2. Support rod, 3. Cross fastener, 4. Outer frame.

具体实施方式Detailed ways

下面结合附图与实施例对本实用新型作进一步详细描述。The present utility model will be described in further detail below in conjunction with the accompanying drawings and embodiments.

实施例一:首先根据外脚手架4搭设情况,确认钢管楼梯的位置及其搭设角度和高度,计算出所需支撑杆2的长度以及钢筋踏板1和十字扣件3的数量。其中,钢筋踏板1由施工现场采用一级钢筋和钢管焊接制作而成。Embodiment 1: First, according to the erection of the outer scaffolding 4, confirm the position of the steel pipe staircase and its erection angle and height, and calculate the required length of the support rod 2 and the number of steel treads 1 and cross fasteners 3. Among them, the reinforced pedal 1 is made by welding first-grade steel bars and steel pipes on the construction site.

制作完钢筋踏板1后,将一定数量的钢筋踏板1与支撑杆2、十字扣件3运至外脚手架4通道口处,如图5中所示,安装时先将两个支撑杆2分别斜放在外脚手架4两边立杆内侧,支撑杆2上下两端分别搭在外脚手架4上下层的横向水平杆上,用十字扣件3将支撑杆2与横向水平杆连接在一起,紧接着将钢筋踏板1两端的短钢管分别搭在两个支撑杆2上,调整钢筋踏板1整体处于水平位置后用十字扣件3连接,并依此顺序由低到高把剩余钢筋踏板1全部安装上去即可。After the rebar pedals 1 are made, a certain number of rebar pedals 1, support rods 2, and cross fasteners 3 are transported to the passage opening of the outer scaffold 4. As shown in Figure 5, the two support rods 2 are first inclined respectively during installation. Put it on the inside of the vertical rods on both sides of the outer scaffold 4, and the upper and lower ends of the support rod 2 are respectively placed on the horizontal horizontal rods on the upper and lower layers of the external scaffold 4. Use the cross fasteners 3 to connect the support rod 2 and the horizontal horizontal rod together. 1. The short steel pipes at both ends are placed on the two support rods 2 respectively. After adjusting the steel pedal 1 to be in a horizontal position as a whole, connect it with cross fasteners 3, and install all the remaining steel pedals 1 from low to high in this order.

所有扣件式组合钢管楼梯的安装均如上所述,此处不再赘述。The installation of all fastener-type composite steel pipe stairs is as described above, and will not be repeated here.

安装好的钢管楼梯需检查钢筋踏板1与支撑杆2的连接是否牢固,施工人员踩踏时,钢筋踏板1是否会转动,如出现转动应及时对十字扣件3进行拧紧加固。Installed steel pipe stairs need to check whether the connection between the steel tread 1 and the support rod 2 is firm, and whether the steel tread 1 will rotate when the construction workers step on it.

当外脚手架使用完毕进入拆除阶段时,钢管楼梯同步进行拆卸,用扳手先将连接钢筋踏板1与支撑杆2的十字扣件3卸下来,然后将钢筋踏板1一个一个取下来捆绑到一起运至地面。支撑杆2的拆卸同钢筋踏板1拆卸步骤一致。When the outer scaffolding is used and enters the dismantling stage, the steel pipe stairs will be dismantled synchronously. Use a wrench to first remove the cross fasteners 3 connecting the steel treads 1 and the support rods 2, and then remove the steel treads 1 one by one. ground. The disassembly of the support rod 2 is the same as the disassembly steps of the reinforced pedal 1.

实施例二:当脚手架不需要上下通行时,通道口对同层脚手架通行形成阻碍,此时可将支撑杆2水平放置在通道口两端的横向水平杆下方,同时调节十字扣件的松紧度,将钢筋踏板1与支撑杆2的角度调为零,即让钢筋踏板1在水平方向并排,紧接着用十字扣件3将支撑杆2与横向水平杆连接,也可用若干十字扣件3将支撑杆2与通道口两侧的纵向水平杆连接在一起。安装完成后就形成了一个临时跳板以供施工人员通行。Embodiment 2: When the scaffolding does not need to pass up and down, the passageway will hinder the passage of the scaffolding on the same layer. At this time, the support rod 2 can be placed horizontally under the horizontal horizontal rods at both ends of the passageway, and the tightness of the cross fasteners can be adjusted at the same time. Adjust the angle of the rebar pedal 1 and the support rod 2 to zero, that is, let the rebar pedals 1 be side by side in the horizontal direction, and then use the cross fastener 3 to connect the support rod 2 to the horizontal horizontal rod, or use several cross fasteners 3 to support The rod 2 is connected with the longitudinal horizontal rods on both sides of the channel opening. After the installation is completed, a temporary springboard is formed for the construction personnel to pass.

临时跳板的拆除同实施例一相同,此处不再赘述。The removal of the temporary springboard is the same as that in the first embodiment, and will not be repeated here.

所有需要铺设跳板的脚手架应用场所都可以采用本实施例的临时跳板作为通行方式。All scaffolding application sites that need to lay a springboard can use the temporary springboard of this embodiment as a way of passage.

施工注意问题:在外脚手架施工作业时,必须系好安全绳,安全绳另一端扣在外脚手架钢管上,佩戴好安全帽,系上帽带;每隔一段时间应定期检查钢管楼梯是否牢固,有无松动现象;拆卸后的钢管楼梯零件应集中摆放或放入仓库保存。Construction precautions: During the construction of the outer scaffolding, the safety rope must be fastened, and the other end of the safety rope should be fastened to the steel pipe of the outer scaffolding. Looseness; disassembled steel pipe stair parts should be placed centrally or stored in a warehouse.

Claims (4)

1. The utility model provides a fastener formula combination steel pipe stair, includes steel bar pedal, bracing piece, cross fastener, its characterized in that: the two ends of the steel bar pedal are connected with the supporting rods through the cross fasteners, the steel bar pedals with corresponding quantities are arranged according to different use heights, the supporting rods are erected on steel pipes on two sides of the outer scaffold, and the steel bar pedals are connected through the cross fasteners.
2. The stair made of fastened combination steel tubes according to claim 1, wherein said support rods are fastened by said cross fasteners by being overlapped at one end on the upper horizontal rods and at the other end on the lower horizontal rods of the scaffold.
3. The stair made of fastened combination steel pipes according to claim 1, wherein the angle between the steel bar tread and the supporting rod can be adjusted by adjusting the tightness of the cross fastener.
4. The stair with fastening type combination steel pipe as claimed in claim 1, wherein the support rods are horizontally arranged, the cross fasteners are connected to the horizontal rods of the scaffold, and the steel bar pedals are adjusted to be in a horizontal position to form the temporary springboard.
CN202020058721.9U 2020-01-06 2020-01-06 Fastener type combined steel pipe stair Active CN212053723U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020058721.9U CN212053723U (en) 2020-01-06 2020-01-06 Fastener type combined steel pipe stair

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020058721.9U CN212053723U (en) 2020-01-06 2020-01-06 Fastener type combined steel pipe stair

Publications (1)

Publication Number Publication Date
CN212053723U true CN212053723U (en) 2020-12-01

Family

ID=73536069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020058721.9U Active CN212053723U (en) 2020-01-06 2020-01-06 Fastener type combined steel pipe stair

Country Status (1)

Country Link
CN (1) CN212053723U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113235974A (en) * 2021-05-27 2021-08-10 浙江昊杨新能源科技有限公司 Assembled steel pipe frame pedal stair and installation method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113235974A (en) * 2021-05-27 2021-08-10 浙江昊杨新能源科技有限公司 Assembled steel pipe frame pedal stair and installation method thereof

Similar Documents

Publication Publication Date Title
CN101775896B (en) Rigid suspended scaffold for installing pipeline of steel roof equipment
CN101871259B (en) Construction method of integral sliding scaffold for steel grid construction
CN102561669A (en) Cantilever scaffold and construction method thereof
CN116537534A (en) Construction method of high and large formwork engineering supporting system
CN104234447B (en) Deep foundation ditch tool-type hangs stair
JP6590512B2 (en) Staircase temporary scaffolding
CN212053723U (en) Fastener type combined steel pipe stair
CN111005547B (en) Construction method of outer scaffold of two-way bending and twisting staggered floor elevation
CN204876578U (en) Building construction system
CN106869421A (en) Assembled staircase structure and installation method thereof
CN114775979A (en) Assembly operation frame device for safety production training
CN221740927U (en) A high pier body steel bar binding construction platform
CN221567819U (en) Quick construction device for horizontal structure in super high-rise core tube
CN204876577U (en) Building construction system
CN110863641A (en) Ultrahigh floor type boarding scaffold in hyperbolic cooling tower and erection method thereof
CN207079889U (en) A kind of working assembling type mobile construction platform of ceiling
CN215670884U (en) A prefabricated building stairwell operating platform
CN206376514U (en) Tool climbing scaffold
CN117090408A (en) Attached lifting protection shed and installation and lifting method thereof
CN211850495U (en) Assembled stair railing
CN201053199Y (en) Large template pylon
CN206477512U (en) Assembled staircase structure
CN223190122U (en) Stair climbing device for concrete structure construction layer
CN218292706U (en) Staircase operation platform
CN219196671U (en) Modularized silo construction stair

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right

Effective date of registration: 20250820

Granted publication date: 20201201

PP01 Preservation of patent right
PD01 Discharge of preservation of patent

Date of cancellation: 20251119

Granted publication date: 20201201

PD01 Discharge of preservation of patent
PP01 Preservation of patent right

Effective date of registration: 20251119

Granted publication date: 20201201

PP01 Preservation of patent right