CN212052218U - Ore road terrace template - Google Patents

Ore road terrace template Download PDF

Info

Publication number
CN212052218U
CN212052218U CN202020471880.1U CN202020471880U CN212052218U CN 212052218 U CN212052218 U CN 212052218U CN 202020471880 U CN202020471880 U CN 202020471880U CN 212052218 U CN212052218 U CN 212052218U
Authority
CN
China
Prior art keywords
fixed
channel
screw
steel
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020471880.1U
Other languages
Chinese (zh)
Inventor
杨富强
唐新建
郝晓波
郝海伟
高培升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ordos Haohua Clean Coal Co Ltd
Original Assignee
Ordos Haohua Clean Coal Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ordos Haohua Clean Coal Co Ltd filed Critical Ordos Haohua Clean Coal Co Ltd
Priority to CN202020471880.1U priority Critical patent/CN212052218U/en
Application granted granted Critical
Publication of CN212052218U publication Critical patent/CN212052218U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a mine floor template, which comprises a channel steel, a reinforcing strut, a supporting frame, a limiting screw and a limiting nut; a plurality of reinforcing struts are vertically fixed in the channel steel channel, and a supporting frame is horizontally and rotatably arranged on each reinforcing strut; the support frame includes rotating sleeve, connecting rod and fixed sleeve, and the rotating sleeve cover is established on strengthening the pillar, is provided with a through-hole in the channel-section steel top and the position that every fixed sleeve corresponds, is equipped with stop screw in the through-hole interpolation, and stop screw's bottom is inserted and is established in the fixed sleeve, and the spiro union has stop nut on the stop screw in the channel-section steel inslot. When the support frame is carried, the support frame is retracted into the channel steel groove, the limiting screw is inserted into the through hole, the limiting nut is screwed to the uppermost end of the limiting screw and is inserted into the fixing sleeve, and the support frame is fixed and convenient to carry; through setting up the engaging lug, can pass through the screw when using with two adjacent the utility model discloses it is fixed, reduce the gap.

Description

Ore road terrace template
The technical field is as follows:
the utility model relates to a coal exploitation field, concretely relates to ore road terrace template.
Background art:
in the coal mining process, after the roadway is excavated, the bottom surface of the roadway is generally argillaceous sandstone or sandy argillaceous rock which is uneven and can not pass through vehicles, so that the floor of the roadway ground in a specific area needs to be paved. In the process of building a terrace, a terrace template needs to be used to ensure the flat edge of the terrace, but in actual construction, the existing terrace template has large weight, and personnel are very labored when moving, loading and unloading the template, so that the risk of smashing the personnel is easy to occur; and the adjacent terrace template junction is irregular, the phenomenon of bulge easily takes place.
The utility model has the following contents:
an object of the utility model is to provide a mine way terrace template convenient to transport and fixed.
The utility model discloses by following technical scheme implement:
a kind of ore road terrace template, including channel-section steel, strengthen the pillar, support frame, stop screw and stop nut;
a plurality of reinforcing struts are vertically fixed in the channel steel groove, and each reinforcing strut is horizontally and rotatably provided with one supporting frame;
the support frame is including rotating sleeve, connecting rod and fixed sleeve, it establishes to rotate the sleeve cover strengthen on the pillar the channel-section steel top and every the position that fixed sleeve corresponds is provided with a through-hole the through-hole interpolation is equipped with stop screw, stop screw's bottom is inserted and is established in the fixed sleeve the inslot of channel-section steel the last spiro union of stop screw has stop nut.
Preferably, reinforcing plates are fixed in grooves at two ends of the channel steel, and connecting lugs are fixed on the reinforcing plates.
Preferably, the steel bar lifting device further comprises a lifting angle steel, and the lifting angle steel is fixed to the upper end of the channel steel through the limiting screw.
The utility model has the advantages that: when the support frame is carried, the support frame is retracted into the channel steel groove, the limiting screw is inserted into the through hole, the limiting nut is screwed to the uppermost end of the limiting screw and is inserted into the fixing sleeve, and the support frame is fixed and convenient to carry; through setting up the engaging lug, can pass through the screw when using with two adjacent the utility model discloses it is fixed, reduce the gap.
Description of the drawings:
fig. 1 is a schematic structural diagram of the present invention;
FIG. 2 is a cross-sectional view A-A of FIG. 1;
fig. 3 is a schematic view of the use of the present invention;
FIG. 4 is a cross-sectional view B-B of FIG. 3;
fig. 5 is a schematic structural view of the installation heightening angle steel of the utility model.
In the figure: channel-section steel 1, reinforcing column 2, support frame 3, rotating sleeve 3.1, connecting rod 3.2, fixed sleeve 3.3, stop screw 4, stop nut 5, through-hole 6, reinforcing plate 7, engaging lug 8, increase angle steel 9.
The specific implementation mode is as follows:
as shown in fig. 1 to 5, a mine floor formwork comprises a channel steel 1, a reinforcing strut 2, a support frame 3, a limit screw 4 and a limit nut 5;
a plurality of reinforcing struts 2 are vertically fixed in the groove of the channel steel 1, and a support frame 3 is horizontally and rotatably arranged on each reinforcing strut 2;
the supporting frame 3 comprises a rotating sleeve 3.1, a connecting rod 3.2 and a fixing sleeve 3.3, the rotating sleeve 3.1 is sleeved on the reinforcing support column 2, a through hole 6 is arranged at the top of the channel steel 1 corresponding to each fixing sleeve 3.3, a limit screw rod 4 is inserted in the through hole 6, the bottom of the limit screw rod 4 is inserted in the fixing sleeve 3.3, and a limit nut 5 is screwed on the limit screw rod 4 in the channel of the channel steel 1;
when the supporting frame is carried, the supporting frame 3 is retracted into the groove of the channel steel 1, the limiting screw 4 is inserted into the through hole 6, meanwhile, the limiting nut 5 is screwed on the limiting screw 4, the limiting nut 5 is screwed to the uppermost end of the limiting screw 4, the limiting screw 4 moves downwards, is inserted into the fixing sleeve 3.3, and the supporting frame 3 is fixed;
when terrace construction used, unscrew stop nut 5, extract limiting screw 4, rotate support frame 3, utilize to use pole class mounting to insert in fixed sleeve 3.3, will the utility model discloses fix subaerial.
At the inslot at 1 both ends of channel-section steel 7, be fixed with engaging lug 8 on reinforcing plate 7, through setting up engaging lug 8, can be adjacent two through the screw when using the utility model discloses fixed, reduce the gap.
It still increases angle steel 9 including, increases angle steel 9 and passes through stop screw 4 to be fixed in 1 upper ends of channel-section steel, increases angle steel 9 through setting up, can increase according to actual conditions, uses in a flexible way.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (3)

1. The utility model provides a ore road terrace template which characterized in that: the device comprises channel steel, a reinforcing strut, a support frame, a limiting screw rod and a limiting nut;
a plurality of reinforcing struts are vertically fixed in the channel steel groove, and each reinforcing strut is horizontally and rotatably provided with one supporting frame;
the support frame is including rotating sleeve, connecting rod and fixed sleeve, it establishes to rotate the sleeve cover strengthen on the pillar the channel-section steel top and every the position that fixed sleeve corresponds is provided with a through-hole the through-hole interpolation is equipped with stop screw, stop screw's bottom is inserted and is established in the fixed sleeve the inslot of channel-section steel the last spiro union of stop screw has stop nut.
2. The ore floor formwork of claim 1, wherein: reinforcing plates are fixed in grooves at two ends of the channel steel, and connecting lugs are fixed on the reinforcing plates.
3. The ore floor formwork of claim 1 or 2, wherein: the steel bar lifting mechanism is characterized by further comprising a lifting angle steel, wherein the lifting angle steel is fixed at the upper end of the channel steel through the limiting screw.
CN202020471880.1U 2020-04-02 2020-04-02 Ore road terrace template Expired - Fee Related CN212052218U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020471880.1U CN212052218U (en) 2020-04-02 2020-04-02 Ore road terrace template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020471880.1U CN212052218U (en) 2020-04-02 2020-04-02 Ore road terrace template

Publications (1)

Publication Number Publication Date
CN212052218U true CN212052218U (en) 2020-12-01

Family

ID=73542886

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020471880.1U Expired - Fee Related CN212052218U (en) 2020-04-02 2020-04-02 Ore road terrace template

Country Status (1)

Country Link
CN (1) CN212052218U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113106818A (en) * 2021-03-03 2021-07-13 中国五冶集团有限公司 Manufacturing method of adjustable movable support leg tool for concrete pouring steel formwork

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113106818A (en) * 2021-03-03 2021-07-13 中国五冶集团有限公司 Manufacturing method of adjustable movable support leg tool for concrete pouring steel formwork

Similar Documents

Publication Publication Date Title
CN103410545A (en) Hydraulic support capable of realizing top coal caving and filling operation
CN212052218U (en) Ore road terrace template
CN204097853U (en) A kind of liftable steel bridge
CN217300623U (en) Temporary support device for coal mine roadway excavation
CN117418873A (en) Temporary reinforcing and supporting device for coal mine tunnel in coal mining tunneling
CN205114961U (en) Skid steer is workstation for loader
CN205152849U (en) Novel construction guardrail
CN203834370U (en) Arch ring steel formwork trolley for circular arch culvert
CN204151797U (en) A kind of protective screening framework for sand-sliding slope protection
CN217300622U (en) Colliery is headwork equipment of working face in pit
CN205876368U (en) Roof cutting stays lane complete set to strut equipment
CN211058821U (en) Strutting arrangement for coal mining with adjustable
CN211081930U (en) Temporary support device for coal mine tunneling
CN208310827U (en) Gob side entry forces side column Special anchor rod pallet
CN214660286U (en) Mining is with combining supporting device who adopts working face
CN206672590U (en) Construction site fixing wind resistance propaganda board device
CN211573583U (en) Supporting device for rescuing mine roadway
CN207111135U (en) A kind of steel canopy supported laneway hands over Cha Chu post type lift canopy
CN206110015U (en) Limit for height frame of protection bridge
CN205675077U (en) A kind of domatic haulage vehicle
CN218862667U (en) Rescue device is strutted in colliery roof fall in pit
CN221547008U (en) Roadway hydraulic support with bottom lifting mechanism
CN205918437U (en) Backfill hydraulic bracket
CN204511380U (en) A kind of rotary and lifting device and comprise the anchor shaft anchor cable drill carriage of this device
CN214573514U (en) Warning device for operation of wear-resistant high-unloading loader

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201201

CF01 Termination of patent right due to non-payment of annual fee