CN217300623U - Temporary support device for coal mine roadway excavation - Google Patents

Temporary support device for coal mine roadway excavation Download PDF

Info

Publication number
CN217300623U
CN217300623U CN202221074027.1U CN202221074027U CN217300623U CN 217300623 U CN217300623 U CN 217300623U CN 202221074027 U CN202221074027 U CN 202221074027U CN 217300623 U CN217300623 U CN 217300623U
Authority
CN
China
Prior art keywords
plate
support device
temporary support
base plate
extension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221074027.1U
Other languages
Chinese (zh)
Inventor
王进路
田双
朱彬鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202221074027.1U priority Critical patent/CN217300623U/en
Application granted granted Critical
Publication of CN217300623U publication Critical patent/CN217300623U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Signs Or Road Markings (AREA)

Abstract

The utility model discloses a colliery tunnel tunnelling temporary support device relates to supporting technical field. The utility model discloses a: the two sides of the top of the base plate are hinged with hollow columns, and extension columns are movably inserted into the hollow columns; a locking member detachably connected between the two hollow posts for preventing the extension posts from moving; the mounting panel sets firmly base plate top both sides, and be close to mutually with the cavity post, be connected with the cylinder through the pivot rotation between the bottom plate of mounting panel. The utility model discloses during transportation in the mine, can stretch the inside of well hollow column with the extension post, then rotate well hollow column and make it keep flat on the base plate, place the guard plate on the base plate at last, because whole volume is less, occupation space is less, passes through narrow and small passageway in the mine more easily, has fully embodied this temporary support device's of coal mine tunnel tunnelling practicality, is worth generally applying and promoting.

Description

一种煤矿巷道掘进临时支护装置A kind of temporary support device for coal mine roadway excavation

技术领域technical field

本实用新型涉及支护装置技术领域,具体涉及一种煤矿巷道掘进临时支护装置。The utility model relates to the technical field of support devices, in particular to a temporary support device for coal mine tunnel excavation.

背景技术Background technique

煤矿是人类在富含煤炭的矿区开采煤炭资源的区域,但在煤矿巷道掘进生产作业中,为了避免煤矿巷道顶部沙土掉落,因此在巷道掘进工作中需要采用支护装置对巷道顶部临时进行支撑,然后进行人工加固,以提高作业效率及安全度。Coal mines are areas where humans mine coal resources in coal-rich mining areas. However, in order to prevent the sand and soil from falling off the top of the coal mine roadway, a support device is required to temporarily support the top of the roadway during the roadway excavation work. , and then carry out manual reinforcement to improve work efficiency and safety.

现有技术中的煤矿巷道掘进临时支护装置,在使用时,一般在矿井外部,工作人员先通过螺栓将各部件固定安装完好之后,然后整体运到作业地点,但是矿井内,地势比较复杂,特别在一些狭窄路段,由于支护装置体积较大很难通行,给工作人员带来了巨大的麻烦,因此我们提供一种煤矿巷道掘进临时支护装置来解决上述问题。The temporary support device for coal mine roadway excavation in the prior art is generally used outside the mine, and the staff first fixes and installs all the components through bolts, and then transports the whole to the operation site. However, the terrain in the mine is relatively complicated. Especially in some narrow road sections, due to the large size of the support device, it is difficult to pass, which brings huge trouble to the staff. Therefore, we provide a temporary support device for coal mine roadway excavation to solve the above problems.

实用新型内容Utility model content

本实用新型的目的在于:为解决现有技术中支护装置整体运输不方便通行的问题,本实用新型提供了一种煤矿巷道掘进临时支护装置。The purpose of the utility model is: in order to solve the problem that the overall transportation of the supporting device in the prior art is inconvenient to pass, the utility model provides a temporary supporting device for the excavation of a coal mine roadway.

本实用新型为了实现上述目的具体采用以下技术方案:The utility model specifically adopts the following technical solutions in order to achieve the above-mentioned purpose:

一种煤矿巷道掘进临时支护装置,包括:A temporary support device for coal mine roadway excavation, comprising:

基板,所述基板的顶部两侧铰接有中空柱,所述中空柱的内部活动穿插有延长柱;a base plate, a hollow column is hinged on both sides of the top of the base plate, and an extension column is movably interspersed in the interior of the hollow column;

锁定件,可拆卸连接在两个所述中空柱之间,用于阻止所述延长柱移动;a locking piece, detachably connected between the two hollow columns, for preventing the movement of the extension column;

安装板,固设在所述基板顶部两侧,且与中空柱相靠近,所述安装板的底板之间通过转轴转动连接有滚筒;The mounting plate is fixed on both sides of the top of the base plate and is close to the hollow column, and a roller is rotatably connected between the bottom plates of the mounting plate through a rotating shaft;

防护板,可拆卸连接在所述延长柱上方,所述延长柱顶部设有用连接防护板的连接件。The protective plate is detachably connected above the extension column, and the top of the extension column is provided with a connecting piece for connecting the protective plate.

进一步地,所述锁定件包括安装框,所述安装框的侧壁螺纹连接有丝杆,所述延长柱的内侧面延期长度向等间距开设有连接槽,所述丝杆远离安装框的一端贯穿中空柱的侧壁与连接槽螺纹连接。Further, the locking member includes an installation frame, the side wall of the installation frame is threadedly connected with a screw rod, the extension length of the inner side of the extension column is provided with connecting grooves at equal intervals, and the screw rod is away from one end of the installation frame. The side wall of the penetrating hollow column is threadedly connected with the connecting groove.

进一步地,所述连接件包括设置在延长柱顶部的安装盒以及固设在防护板底部边侧的连接板,所述安装盒的一侧螺纹连接有螺杆,所述螺杆位于安装盒内部的一侧通过轴承转动连接有U型板,所述U型板与安装盒的内壁滑动连接,所述安装盒顶部中间开设有矩形通孔,所述连接板底端贯穿矩形通孔伸向安装盒内部,所述连接板对应U型板的位置开设有与U型板相配合的卡接口。Further, the connecting piece includes an installation box arranged on the top of the extension column and a connecting plate fixed on the bottom side of the protective plate, one side of the installation box is threadedly connected with a screw rod, and the screw rod is located in a part inside the installation box. A U-shaped plate is rotatably connected to the side through a bearing, the U-shaped plate is slidably connected to the inner wall of the installation box, a rectangular through hole is opened in the middle of the top of the installation box, and the bottom end of the connecting plate extends through the rectangular through hole to the inside of the installation box and the connecting plate is provided with a card interface matched with the U-shaped plate at the position corresponding to the U-shaped plate.

进一步地,所述基板两端为折线型,且其顶部螺纹连接有插桩,所述插桩的上端设置有套环。Further, both ends of the base plate are of a broken line type, and the top of the base plate is threadedly connected with a plug, and the upper end of the plug is provided with a collar.

进一步地,所述安装板顶部对应中空柱的位置固设有抵触板,所述抵触板为梯形。Further, a collision plate is fixed at a position corresponding to the hollow column on the top of the mounting plate, and the collision plate is trapezoidal.

进一步地,所述防护板为弧形,所述防护板的内侧面等间距设有T型加强杆。Further, the protective plate is arc-shaped, and the inner side surface of the protective plate is provided with T-shaped reinforcing rods at equal intervals.

本实用新型的有益效果如下:The beneficial effects of the present utility model are as follows:

1、本实用新型在矿井内运输时,可以将延长柱伸到中空柱的内部,然后转动中空柱使其平放在基板上,最后将防护板放置在基板上,由于整体体积较小,占用空间较小,更容易通过矿井内狭小的通道,充分体现了该煤矿巷道掘进临时支护装置的实用性,值得普遍应用与推广。1. When the utility model is transported in the mine, the extension column can be extended to the interior of the hollow column, then the hollow column can be rotated to make it flat on the base plate, and finally the protective plate is placed on the base plate. The space is small, and it is easier to pass through the narrow passage in the mine, which fully reflects the practicability of the temporary support device for coal mine roadway excavation, and is worthy of widespread application and promotion.

附图说明Description of drawings

图1是本实用新型立体结构示意图;1 is a schematic diagram of the three-dimensional structure of the present utility model;

图2是本实用新型防护板结构示意图;Fig. 2 is the structural representation of the protective plate of the present utility model;

图3是本实用新型连接件结构示意图。FIG. 3 is a schematic diagram of the structure of the connector of the present invention.

附图标记:1、基板;2、中空柱;3、延长柱;301、连接槽;4、锁定件;401、安装框;402、丝杆;5、安装板;6、滚筒;7、防护板;701、T型加强杆;8、连接件;801、安装盒;8011、矩形通孔;802、连接板;8021、卡接口;803、螺杆;804、U型板;9、插桩;901、套环;10、抵触板。Reference numerals: 1, base plate; 2, hollow column; 3, extension column; 301, connecting groove; 4, locking piece; 401, mounting frame; 402, screw rod; 5, mounting plate; 6, roller; 7, protection plate; 701, T-shaped reinforcing rod; 8, connecting piece; 801, installation box; 8011, rectangular through hole; 802, connecting plate; 8021, card interface; 803, screw rod; 804, U-shaped plate; 9, plugging; 901, a collar; 10, a collision plate.

具体实施方式Detailed ways

为使本实用新型实施例的目的、技术方案和优点更加清楚,下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述。In order to make the purposes, technical solutions and advantages of the embodiments of the present utility model more clear, the technical solutions in the embodiments of the present utility model will be described clearly and completely below with reference to the accompanying drawings in the embodiments of the present utility model.

如图1-3所示,一种煤矿巷道掘进临时支护装置,包括:As shown in Figure 1-3, a temporary support device for coal mine roadway excavation includes:

基板1,基板1的顶部两侧铰接有中空柱2,中空柱2的内部活动穿插有延长柱3;A base plate 1, a hollow column 2 is hinged on both sides of the top of the base plate 1, and an extension column 3 is movably interspersed in the interior of the hollow column 2;

锁定件4,可拆卸连接在两个中空柱2之间,用于阻止延长柱3移动;A locking piece 4, detachably connected between the two hollow columns 2, is used to prevent the movement of the extension column 3;

安装板5,固设在基板1顶部两侧,且与中空柱2相靠近,安装板5的底板之间通过转轴转动连接有滚筒6;The mounting plate 5 is fixed on both sides of the top of the base plate 1, and is close to the hollow column 2, and a roller 6 is rotatably connected between the bottom plates of the mounting plate 5 through a rotating shaft;

防护板7,可拆卸连接在延长柱3上方,延长柱3顶部设有用连接防护板7的连接件8。The protective plate 7 is detachably connected above the extension column 3 , and the top of the extension column 3 is provided with a connecting piece 8 for connecting the protective plate 7 .

更具体的,不同的煤矿巷道高度不同,延长柱3在中空柱2的内部位置可以移动,因此工作人员可以改变支护装置的支撑高度,滚筒6相比滚轮,其与地面接触面积更大,使得支护装置移动过程更加稳定。More specifically, different coal mine roadways have different heights. The extension column 3 can move inside the hollow column 2, so the staff can change the support height of the support device. Compared with the roller, the roller 6 has a larger contact area with the ground. It makes the moving process of the support device more stable.

该煤矿巷道掘进临时支护装置在运输时,可以将延长柱伸到中空柱的内部,然后转动中空柱使其平放在基板上,最后将防护板放置在基板上,由于整体体积较小,占用空间较小,更容易通过矿井内狭小的通道,当支护装置运到作业地点之后,工作人员可以将中空柱2调整到竖直状态,然后根据矿井巷道的高度对延长柱3进行位置调整,同时可以使用锁定件4对中空柱2以及延长柱3进行锁定,最后通过连接件8将防护板7安装到延长柱3上,就可以完成支护装置整体的安装,操作非常简单,充分体现了该煤矿巷道掘进临时支护装置的实用性。When the temporary support device for coal mine roadway excavation is transported, the extension column can be extended to the inside of the hollow column, and then the hollow column is rotated to make it flat on the base plate, and finally the protective plate is placed on the base plate. Due to the small overall volume, It takes up less space and is easier to pass through the narrow passage in the mine. After the support device is transported to the operation site, the staff can adjust the hollow column 2 to a vertical state, and then adjust the position of the extension column 3 according to the height of the mine roadway. At the same time, the hollow column 2 and the extension column 3 can be locked by the locking piece 4, and finally the protective plate 7 is installed on the extension column 3 through the connecting piece 8, and the whole installation of the supporting device can be completed. The operation is very simple and fully reflects The practicability of the temporary support device for the tunnel excavation of the coal mine is discussed.

如图1所示,在一些实施例中,锁定件4包括安装框401,安装框401的侧壁螺纹连接有丝杆402,延长柱3的内侧面延期长度向等间距开设有连接槽301,丝杆402远离安装框401的一端贯穿中空柱2的侧壁与连接槽301螺纹连接,更具体的,该煤矿巷道掘进临时支护装置在使用时,工作人员先根据矿井巷道的高度对延长柱3的位置进行调整后,然后转动丝杆402,使其远离安装框401的一端贯穿中空柱2的侧壁与连接槽301螺纹连接,就可以完成对延长柱3的固定。As shown in FIG. 1 , in some embodiments, the locking member 4 includes an installation frame 401 , the side wall of the installation frame 401 is threadedly connected with a screw rod 402 , and the extension length of the inner side of the extension column 3 is provided with connecting grooves 301 at equal intervals. The end of the screw rod 402 away from the installation frame 401 penetrates the side wall of the hollow column 2 and is threadedly connected to the connecting groove 301. More specifically, when the temporary support device for tunneling in the coal mine is in use, the staff first adjusts the extension column according to the height of the mine roadway. After adjusting the position of 3 , then turn the screw 402 so that the end away from the mounting frame 401 penetrates the side wall of the hollow column 2 and is threadedly connected to the connecting groove 301 to complete the fixing of the extension column 3 .

如图3所示,在一些实施例中,连接件8包括设置在延长柱3顶部的安装盒801以及固设在防护板7底部边侧的连接板802,安装盒801的一侧螺纹连接有螺杆803,螺杆803位于安装盒801内部的一侧通过轴承转动连接有U型板804,U型板804与安装盒801的内壁滑动连接,安装盒801顶部中间开设有矩形通孔8011,连接板802底端贯穿矩形通孔8011伸向安装盒801内部,连接板802对应U型板804的位置开设有与U型板804相配合的卡接口8021,更具体的,在安装防护板7时,工作人员先将连接板802由矩形通孔8011插入到安装盒801内部,然后转动螺杆803,使得U型板804与卡接口8021相卡合,就可以完成防护板7的安装固定,该安装过程主要通过物理结构嵌合的方式进行连接安装,相比传统的螺栓固定,连接更为牢固,拆卸更加方便,实用性更高。As shown in FIG. 3 , in some embodiments, the connecting member 8 includes an installation box 801 disposed on the top of the extension column 3 and a connecting plate 802 fixed on the bottom side of the protective plate 7 . One side of the installation box 801 is screwed with The screw 803, the side of the screw 803 located inside the installation box 801 is connected with a U-shaped plate 804 through the bearing rotation, the U-shaped plate 804 is slidably connected with the inner wall of the installation box 801, and a rectangular through hole 8011 is opened in the middle of the top of the installation box 801, and the connecting plate The bottom end of the 802 penetrates the rectangular through hole 8011 and extends to the inside of the installation box 801. The connecting plate 802 is provided with a card interface 8021 matched with the U-shaped plate 804 at the position corresponding to the U-shaped plate 804. More specifically, when the protective plate 7 is installed, The staff first inserts the connecting plate 802 into the installation box 801 through the rectangular through hole 8011, and then rotates the screw 803, so that the U-shaped plate 804 is engaged with the card interface 8021, and the installation and fixation of the protective plate 7 can be completed. This installation process The connection and installation are mainly carried out by means of physical structure fitting. Compared with the traditional bolt fixing, the connection is firmer, the disassembly is more convenient, and the practicability is higher.

如图1所示,在一些实施例中,基板1两端为折线型,且其顶部螺纹连接有插桩9,插桩9的上端设置有套环901,更具体的,将基板1两端设置为折线型,这样基板1在行进过程中,可以更容易通过凸起的石块,当支护装置移动到作业地点之后可以转动插桩9,使其底端插入泥土中,这样可以对支护装置进行固定,在运输支护装置时,可以将牵引绳系在套环901上,然后通过牵引机构拉动牵引绳,使得支护装置整体向前移动。As shown in FIG. 1 , in some embodiments, both ends of the substrate 1 are folded, and the top of the substrate 1 is threadedly connected with a plug 9 , and the upper end of the plug 9 is provided with a collar 901 . It is set as a folded line type, so that the base plate 1 can pass the raised stones more easily during the traveling process. When the support device moves to the work site, the plug 9 can be rotated to insert the bottom end into the soil, so that the support The support device is fixed. When the support device is transported, the traction rope can be tied on the collar 901, and then the traction rope is pulled by the traction mechanism, so that the support device moves forward as a whole.

如图1所示,在一些实施例中,安装板5顶部对应中空柱2的位置固设有抵触板10,抵触板10为梯形,更具体的,当中空柱2处于竖直状态时,中空柱2远离锁定件4的一侧与抵触板10相抵触,可以显著提高装置整体的稳定性。As shown in FIG. 1 , in some embodiments, a collision plate 10 is fixed at the position of the top of the mounting plate 5 corresponding to the hollow column 2 , and the collision plate 10 is trapezoidal. More specifically, when the hollow column 2 is in a vertical state, the hollow column 2 is The side of the column 2 away from the locking member 4 is in conflict with the abutting plate 10, which can significantly improve the overall stability of the device.

如图1所示,在一些实施例中,防护板7为弧形,防护板7的内侧面等间距设有T型加强杆701,更具体的,将防护板7设置为弧形可以使其更加贴合矿井巷道的顶壁,起到更好的支撑防护效果,设置T型加强杆701,可以提高支护板7的整体强度,延长支护板7的使用寿命。As shown in FIG. 1 , in some embodiments, the protective plate 7 is arc-shaped, and the inner side surface of the protective plate 7 is provided with T-shaped reinforcing rods 701 at equal intervals. It fits more closely with the top wall of the mine roadway, and has a better support and protection effect. Setting the T-shaped reinforcing rod 701 can improve the overall strength of the support plate 7 and prolong the service life of the support plate 7 .

对所公开的实施例的上述说明,使本领域专业技术人员能够实现或使用本实用新型。对这些实施例的多种修改对本领域的专业技术人员来说将是显而易见的,本文中所定义的一般原理可以在不脱离本实用新型的精神或范围的情况下,在其它实施例中实现。因此,本实用新型将不会被限制于本文所示的这些实施例,而是要符合与本文所公开的原理和新颖特点相一致的最宽的范围。The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Thus, the present invention is not intended to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (6)

1. The utility model provides a colliery tunnel tunnelling temporary support device which characterized in that includes:
the structure comprises a base plate (1), wherein hollow columns (2) are hinged to two sides of the top of the base plate (1), and extension columns (3) are movably inserted into the hollow columns (2);
a locking member (4) detachably connected between the two hollow columns (2) for preventing the extension column (3) from moving;
the mounting plates (5) are fixedly arranged on two sides of the top of the base plate (1) and are close to the hollow column (2), and a roller (6) is rotatably connected between the bottom plates of the mounting plates (5) through a rotating shaft;
protection plate (7), can dismantle the connection and be in extension post (3) top, extension post (3) top is equipped with connecting piece (8) with connecting protection plate (7).
2. The temporary support device for coal mine roadway excavation according to claim 1, wherein the locking member (4) comprises a mounting frame (401), a screw rod (402) is in threaded connection with the side wall of the mounting frame (401), the inner side surface of the extension column (3) is provided with connecting grooves (301) at equal intervals along the length direction of the inner side surface, and one end, far away from the mounting frame (401), of the screw rod (402) penetrates through the side wall of the hollow column (2) to be in threaded connection with the connecting grooves (301).
3. The coal mine roadway driving temporary support device according to claim 1, the connecting piece (8) comprises an installation box (801) arranged at the top of the extension column (3) and a connecting plate (802) fixedly arranged on the side of the bottom of the protection plate (7), one side of the mounting box (801) is in threaded connection with a screw rod (803), one side of the screw rod (803) positioned in the mounting box (801) is rotatably connected with a U-shaped plate (804) through a bearing, the U-shaped plate (804) is connected with the inner wall of the mounting box (801) in a sliding manner, a rectangular through hole (8011) is formed in the middle of the top of the mounting box (801), the bottom end of the connecting plate (802) penetrates through the rectangular through hole (8011) and extends into the mounting box (801), the connecting plate (802) is provided with a clamping interface (8021) corresponding to the U-shaped plate (804) and matched with the U-shaped plate (804).
4. The temporary support device for coal mine roadway excavation according to claim 1, wherein both ends of the base plate (1) are of a broken line type, a plug pile (9) is connected to the top of the base plate in a threaded mode, and a sleeve ring (901) is arranged at the upper end of the plug pile (9).
5. The temporary support device for coal mine roadway excavation according to claim 1, wherein a contact plate (10) is fixedly arranged at the top of the mounting plate (5) corresponding to the position of the hollow column (2), and the contact plate (10) is trapezoidal.
6. The temporary support device for coal mine roadway excavation according to claim 1, wherein the protection plate (7) is arc-shaped, and T-shaped reinforcing rods (701) are arranged on the inner side surface of the protection plate (7) at equal intervals.
CN202221074027.1U 2022-05-07 2022-05-07 Temporary support device for coal mine roadway excavation Expired - Fee Related CN217300623U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221074027.1U CN217300623U (en) 2022-05-07 2022-05-07 Temporary support device for coal mine roadway excavation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221074027.1U CN217300623U (en) 2022-05-07 2022-05-07 Temporary support device for coal mine roadway excavation

Publications (1)

Publication Number Publication Date
CN217300623U true CN217300623U (en) 2022-08-26

Family

ID=82916539

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221074027.1U Expired - Fee Related CN217300623U (en) 2022-05-07 2022-05-07 Temporary support device for coal mine roadway excavation

Country Status (1)

Country Link
CN (1) CN217300623U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116291627A (en) * 2023-05-17 2023-06-23 山西八方电气股份有限公司 Roadway reinforcement device for coal mine engineering and reinforcement method thereof
CN116607801A (en) * 2023-05-31 2023-08-18 中建五局第三建设有限公司 Modularized protection device for urban rail transit ceiling construction
CN117868923A (en) * 2024-03-07 2024-04-12 山西宏厦第一建设有限责任公司 Advanced support equipment for coal mine underground roadway tunneling and support method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116291627A (en) * 2023-05-17 2023-06-23 山西八方电气股份有限公司 Roadway reinforcement device for coal mine engineering and reinforcement method thereof
CN116607801A (en) * 2023-05-31 2023-08-18 中建五局第三建设有限公司 Modularized protection device for urban rail transit ceiling construction
CN117868923A (en) * 2024-03-07 2024-04-12 山西宏厦第一建设有限责任公司 Advanced support equipment for coal mine underground roadway tunneling and support method thereof
CN117868923B (en) * 2024-03-07 2024-05-14 山西宏厦第一建设有限责任公司 Advanced support equipment for coal mine underground roadway tunneling and support method thereof

Similar Documents

Publication Publication Date Title
CN106593437A (en) Digging, supporting, anchoring and drilling all-in-one fully-mechanized excavating machine
CN101289939A (en) Comprehensive support device for gob-side entry retention
CN101169036B (en) Single-lane rapid excavation technology of crawler-type liftable roof anchor rod and anchor cable construction drilling rig
CN109026025B (en) Pipe jacking supporting and jacking system for construction tunnel connection channel
CN101403302A (en) Pedrail type liftable anchor bar anchor cable construction drill rig and double-lane fast digging technique
CN115012820B (en) A compact and highly adaptable narrow drilling vehicle for coal mines
CN101781972B (en) Crawler-type lifting top and slope bolt and anchor construction drill
CN110318332B (en) Coal mine underground crawler mobile air bridge device and using method
CN112302698A (en) Folding hydraulic tunnel supporting device convenient to carry
CN110318791A (en) It is a kind of shallowly to locate to use mine roof support means under mine
CN217999616U (en) A movable trolley for culvert construction
CN206448809U (en) Pick, branch, anchor, drill integrated fully-mechanized digging machine
CN211819422U (en) Lifting walking template trolley suitable for construction of curve tunnel
CN204357457U (en) Crawler type anchor props up machine
CN220226937U (en) Underground excavation safety support structure
CN105971649A (en) Whole set of supporting equipment for roof cutting entry retaining
CN207109857U (en) A kind of piping lane Operation Van
CN215108962U (en) A support device for preventing the bottom drum of coal mine
CN205876368U (en) Roof cutting stays lane complete set to strut equipment
CN214464292U (en) Tunnel excavation end temporary support device
CN210950215U (en) A water pipe support frame spanning a road
CN115478878A (en) A walking trolley for rapid construction of culverts and its use method
CN223676287U (en) Gob-side entry retaining supporting structure
CN222160797U (en) Rotary track for underground coal mine material transportation vehicle
CN114060070A (en) Supporting device for underground narrow tunnel construction engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220826

CF01 Termination of patent right due to non-payment of annual fee