CN211948557U - Prefabricated pipe gallery - Google Patents

Prefabricated pipe gallery Download PDF

Info

Publication number
CN211948557U
CN211948557U CN202020468831.2U CN202020468831U CN211948557U CN 211948557 U CN211948557 U CN 211948557U CN 202020468831 U CN202020468831 U CN 202020468831U CN 211948557 U CN211948557 U CN 211948557U
Authority
CN
China
Prior art keywords
fixedly connected
side wall
spring
fixed block
outer side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020468831.2U
Other languages
Chinese (zh)
Inventor
周玉宝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Construction Technology Development Co ltd
Original Assignee
Jiangsu Construction Technology Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Construction Technology Development Co ltd filed Critical Jiangsu Construction Technology Development Co ltd
Priority to CN202020468831.2U priority Critical patent/CN211948557U/en
Application granted granted Critical
Publication of CN211948557U publication Critical patent/CN211948557U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a prefabricated pipe gallery, including the corridor, one side of corridor is seted up flutedly, one side fixedly connected with framework that the corridor kept away from the recess, the lateral wall fixedly connected with first rubber pad of framework, the inside wall of recess evenly fixedly connected with first fixed block, the lateral wall sliding connection of first fixed block has first casing, the one end fixedly connected with first spring that the recess was kept away from to first fixed block; the utility model discloses a collocation setting of recess and framework can be pegged graft two the same this devices, through the setting of first rubber pad, can play waterproof effect to the junction of this device, and through the collocation setting of first body of rod, first spring and second spring isotructure, can play absorbing effect, prevents that the junction of this device from receiving the harm because of vibrations to improve the security of this device.

Description

Prefabricated pipe gallery
Technical Field
The utility model relates to a piping lane technical field specifically is prefabricated piping lane.
Background
The prefabricated pipe gallery is more and more applied to municipal engineering projects, the existing prefabricated pipe gallery is mainly divided into an integral prefabricated pipe gallery and a block prefabricated pipe gallery, wherein the integral prefabricated pipe gallery is formed by dividing the pipe gallery into short sections on a longitudinal axis for prefabrication and then splicing the short sections on a construction site, and the pipe gallery is only provided with a transverse splicing seam perpendicular to the longitudinal axis; prefabricated piping lane of piecemeal not only falls into the nipple joint on the axis of ordinates, but also prefabricate behind the nipple joint subdividing, each piecemeal is assembled to the job site, the piping lane is not bare to have the horizontal concatenation seam of perpendicular to axis of ordinates, still be on a parallel with the vertical concatenation seam of axis of ordinates, prefabricated piping lane mainly used various underground pipelines concentrate and arrange, operational environment is underground, antiseep and taking precautions against earthquakes are and important measure among the operational safety of piping lane, chinese utility model CN201720062383.4 discloses a connection structure of prefabricated piping lane of assembled, the device utilizes the method of pegging graft to splice prefabricated piping lane, but the device has ignored the waterproof and shockproof problem of grafting department, make prefabricated piping lane have the potential safety hazard, for this reason, propose prefabricated piping lane.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a prefabricated piping lane to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the prefabricated pipe gallery comprises a gallery, wherein one side of the gallery is provided with a groove, one side of the gallery far away from the groove is fixedly connected with a frame body, the outer side wall of the frame body is fixedly connected with a first rubber pad, the inner side wall of the groove is uniformly and fixedly connected with a first fixed block, the outer side wall of the first fixed block is slidably connected with a first shell, one end of the first fixed block far away from the groove is fixedly connected with a first spring, one end of the first spring far away from the first fixed block is fixedly connected with a second fixed block, the second fixed block is sleeved outside the first spring, the outer side wall of the second fixed block is slidably connected with the inner side wall of the first shell, the outer side wall of the first shell is respectively and fixedly connected with a second spring and a second shell, the second shell is sleeved outside the second spring, and one end of the second spring far away from the first shell is fixedly connected with a third fixed block, the outer side wall of the third fixing block is connected to the inner side wall of the second shell in a sliding mode, and one end, far away from the second spring, of the third fixing block is fixedly connected to the inner side wall of the groove.
As further preferable in the present technical solution: the inside wall fixedly connected with second rubber pad of framework.
As further preferable in the present technical solution: four threaded holes are symmetrically formed in the frame body and the outer side wall of the first rubber pad, four fixing bolts are symmetrically and threadedly connected to the outer side wall, adjacent to the groove, of the gallery, the bottom end of each fixing bolt penetrates through the outer side wall of the gallery, and the fixing bolts are matched with the threaded holes.
As further preferable in the present technical solution: the inside of corridor evenly is equipped with first reinforcing bar pole, and is adjacent first reinforcing bar pole is even is interconnected through the second reinforcing bar pole.
As further preferable in the present technical solution: four handles of upper surface symmetry fixedly connected with of corridor, the bottom fixed connection of handle in the lateral wall of first reinforcing bar pole.
As further preferable in the present technical solution: the bottom of corridor symmetry fixedly connected with four body of rods, the lateral wall that the body of rod is located the bottom is connected with the body through the bearing rotation, the body is located the inside wall threaded connection of bearing below has the threaded rod, the threaded rod is kept away from the one end fixedly connected with fixed plate of body.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses a collocation setting of recess and framework can be pegged graft two the same this devices, through the setting of first rubber pad, can play waterproof effect to the junction of this device, and through the collocation setting of first body of rod, first spring and second spring isotructure, can play absorbing effect, prevents that the junction of this device from receiving the harm because of vibrations to improve the security of this device.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is an enlarged schematic structural view of a region a in fig. 1 according to the present invention;
fig. 3 is a left side view of the present invention.
In the figure: 1. a gallery; 2. a groove; 3. a first fixed block; 4. a first housing; 5. a first spring; 6. a second fixed block; 7. a second spring; 8. a second housing; 9. a third fixed block; 10. a first reinforcing bar rod; 11. a second reinforcing bar rod; 12. a handle; 13. a frame body; 14. a first rubber pad; 15. a second rubber pad; 16. a threaded hole; 17. a rod body; 18. a bearing; 19. a pipe body; 20. a threaded rod; 21. a fixing plate; 22. and (5) fixing the bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-3, the present invention provides a technical solution: a prefabricated pipe gallery comprises a gallery 1, a groove 2 is formed in one side of the gallery 1, a frame body 13 is fixedly connected to one side, away from the groove 2, of the gallery 1, a first rubber pad 14 is fixedly connected to the outer side wall of the frame body 13, a first fixing block 3 is uniformly and fixedly connected to the inner side wall of the groove 2, a first shell 4 is slidably connected to the outer side wall of the first fixing block 3, a first spring 5 is fixedly connected to one end, away from the groove 2, of the first spring 5, a second fixing block 6 is fixedly connected to one end, away from the first fixing block 3, of the first spring 5, the second fixing block 6 is sleeved outside the first spring 5, the outer side wall of the second fixing block 6 is slidably connected to the inner side wall of the first shell 4, a second spring 7 and a second shell 8 are fixedly connected to the outer side wall of the first shell 4 respectively, the second shell 8 is sleeved outside the second spring 7, and a third fixing block 9, the outer side wall of the third fixing block 9 is slidably connected to the inner side wall of the second housing 8, and one end of the third fixing block 9, which is far away from the second spring 7, is fixedly connected to the inner side wall of the groove 2.
In this embodiment, specifically: the inner side wall of the frame body 13 is fixedly connected with a second rubber pad 15; through the setting of second rubber pad 15, can be so that between 13 and the recess 2 inseparabler, simultaneously, the waterproof effect in second layer can be played in the setting of second rubber pad 15, increases the waterproof nature of the junction of this device.
In this embodiment, specifically: four threaded holes 16 are symmetrically formed in the outer side walls of the frame body 13 and the first rubber pad 14, four fixing bolts 22 are symmetrically in threaded connection with the outer side wall of the gallery 1 adjacent to the groove 2, the bottom ends of the fixing bolts 22 penetrate through the outer side wall of the gallery 1, and the fixing bolts 22 are matched with the threaded holes 16; the connection of the device is made more stable by passing the fixing bolts 22 through the outer side wall of the gallery 1 and connecting them with the threaded holes 16.
In this embodiment, specifically: first reinforcing steel bars 10 are uniformly arranged in the gallery 1, and the adjacent first reinforcing steel bars 10 are uniformly connected with each other through second reinforcing steel bars 11; the arrangement of the first and second reinforcing bars 10, 11 can form a "net rack" so that the gallery 1 is more stable.
In this embodiment, specifically: the upper surface of the gallery 1 is symmetrically and fixedly connected with four handles 12, and the bottoms of the handles 12 are fixedly connected to the outer side wall of the first reinforcing steel bar rod 10; through the setting of handle 12, be convenient for lift by crane and remove of this device, catch on four handles 12 through the crane to can this device lift by crane the removal, because handle 12 links to each other with first reinforcing bar pole 10, so make between handle 12 and the corridor 1 more firm, thereby security when having strengthened this device hoist and mount.
In this embodiment, specifically: the bottom of the gallery 1 is symmetrically and fixedly connected with four rod bodies 17, the outer side wall of the rod body 17 at the bottom is rotatably connected with a pipe body 19 through a bearing 18, the inner side wall of the pipe body 19 below the bearing 18 is in threaded connection with a threaded rod 20, and one end, far away from the pipe body 19, of the threaded rod 20 is fixedly connected with a fixing plate 21; because there is the unevenness in ground, can adjust the length that threaded rod 20 stretches out body 19 through rotatory body 19 to the height of the corner of this device can be adjusted, thereby can adjust the planarization of this device, because the setting of bearing 18 makes body 19 can be rotatory in the outside of the body of rod 17.
Working principle or structure principle, when in use, four handles 12 are hooked by a crane, so that the device can be lifted and moved, the handles 12 are connected with the first steel bar rod 10, so that the handles 12 and the gallery 1 are more stable, the safety of the device during lifting is enhanced, the frame body 13 is inserted into the adjacent groove 2 of the device, the first rubber pad 14 and the second rubber pad 15 are arranged, so that the connection part of the device is more compact, meanwhile, a double-layer waterproof effect can be achieved, the length of the threaded rod 20 extending out of the tube body 19 can be adjusted by rotating the tube body 19 due to the unevenness of the ground, so that the height of the corner of the device can be adjusted, the evenness of the device can be adjusted, the fixing bolt 22 penetrates through the outer side wall of the gallery 1 and is connected with the threaded hole 16, so that the connection part of the device is more stable, then can separate crane and this device, carry out splicing work on next step, when this device receives the collision or when receiving vibrations when using when connecting junction, second fixed block 6 or third fixed block 9 can receive external force vibrations and remove, thereby make second fixed block 6 extrude first spring 5, third fixed block 9 extrudees second spring 7, when second fixed block 6 extrudes first spring 5, second fixed block 6 can receive first spring 5's thrust reversal, thereby reduce the influence that vibrations brought, when third fixed block 9 extrudees second spring 7, third fixed block 9 can receive second spring 7's thrust reversal, thereby reduce the influence that vibrations brought, thereby prolong the life of this device.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. Prefabricated piping lane, including corridor (1), its characterized in that: one side of the gallery (1) is provided with a groove (2), one side of the gallery (1) far away from the groove (2) is fixedly connected with a frame body (13), the outer side wall of the frame body (13) is fixedly connected with a first rubber pad (14), the inner side wall of the groove (2) is uniformly and fixedly connected with a first fixed block (3), the outer side wall of the first fixed block (3) is slidably connected with a first shell (4), one end of the first fixed block (3) far away from the groove (2) is fixedly connected with a first spring (5), one end of the first spring (5) far away from the first fixed block (3) is fixedly connected with a second fixed block (6), the second fixed block (6) is sleeved outside the first spring (5), the outer side wall of the second fixed block (6) is slidably connected with the inner side wall of the first shell (4), the outer side wall of the first shell (4) is fixedly connected with a second spring (7) and a second shell (8) respectively, the second shell (8) is sleeved on the outside of the second spring (7), the second spring (7) is far away from one end of the first shell (4) and fixedly connected with a third fixing block (9), the outer side wall of the third fixing block (9) is slidably connected with the inner side wall of the second shell (8), and the third fixing block (9) is far away from one end of the second spring (7) and fixedly connected with the inner side wall of the groove (2).
2. The prefabricated pipe gallery of claim 1, wherein: and a second rubber pad (15) is fixedly connected to the inner side wall of the frame body (13).
3. The prefabricated pipe gallery of claim 1, wherein: four threaded holes (16) are symmetrically formed in the outer side wall of the frame body (13) and the first rubber pad (14), four fixing bolts (22) are symmetrically and threadedly connected to the outer side wall, adjacent to the groove (2), of the gallery (1), the bottom end of each fixing bolt (22) penetrates through the outer side wall of the gallery (1), and the fixing bolts (22) are mutually matched with the threaded holes (16).
4. The prefabricated pipe gallery of claim 1, wherein: the interior of corridor (1) evenly is equipped with first reinforcing bar pole (10), and adjacent first reinforcing bar pole (10) are even interconnect through second reinforcing bar pole (11).
5. The prefabricated pipe gallery of claim 4, wherein: the upper surface symmetry fixedly connected with four handles (12) of corridor (1), the bottom fixed connection of handle (12) in the lateral wall of first reinforcing bar pole (10).
6. The prefabricated pipe gallery of claim 1, wherein: the bottom of corridor (1) is symmetrical four body of rods (17) of fixedly connected with, the lateral wall that the body of rod (17) is located the bottom is rotated through bearing (18) and is connected with body (19), body (19) are located the inside wall threaded connection of bearing (18) below has threaded rod (20), threaded rod (20) are kept away from the one end fixedly connected with fixed plate (21) of body (19).
CN202020468831.2U 2020-04-02 2020-04-02 Prefabricated pipe gallery Active CN211948557U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020468831.2U CN211948557U (en) 2020-04-02 2020-04-02 Prefabricated pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020468831.2U CN211948557U (en) 2020-04-02 2020-04-02 Prefabricated pipe gallery

Publications (1)

Publication Number Publication Date
CN211948557U true CN211948557U (en) 2020-11-17

Family

ID=73170213

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020468831.2U Active CN211948557U (en) 2020-04-02 2020-04-02 Prefabricated pipe gallery

Country Status (1)

Country Link
CN (1) CN211948557U (en)

Similar Documents

Publication Publication Date Title
CN104564104B (en) A kind of table system for tunnel-liner
CN103867215A (en) Expressway tunnel groove integral lining trolley
CN109457800A (en) A kind of assembly concrete column column connected node
CN111042579A (en) Quick back jacking device and method for load-bearing structure
CN211948557U (en) Prefabricated pipe gallery
CN209339309U (en) A kind of assembly concrete column column connected node
CN203702181U (en) Expressway tunnel groove integral lining trolley
CN212743447U (en) Reinforced structure that building structure is firm anti collapsing
CN110295781A (en) A kind of anti-buckling support device and preparation method thereof of multistage surrender
CN211945883U (en) Assembled building structure subassembly convenient to transportation
CN104961058A (en) Double-Z-type supporting steel girder, crane supporting component with same and use method
CN212984715U (en) Temporary supporting device for large-span grid structure one-by-one accumulated sliding construction
CN210049632U (en) Shear force wall reinforced structure
CN111719882B (en) Wall reinforcing structure and method for reinforcing integrity of ancient building
CN204876620U (en) Peripheral hardware concrete frame reinforced structure
CN204530990U (en) A kind of housing construction fire preventing steel structure framework with curvature-prevention support component
CN211523532U (en) Steel structure with reinforcing mechanism for factory building
CN113323152A (en) Drum-shaped combined steel box node, arch frame node structure and construction method thereof
CN111441364A (en) Recoverable PC worker method combination steel-pipe pile adds steel pipe shaped steel support system
CN207553359U (en) Assembled ribbing steel plate shear force wall
CN206680869U (en) Short line casting box beam pier top block rackwork
CN218149685U (en) Green energy-conserving construction frame reinforcing apparatus of using
CN204491840U (en) A kind of being convenient to is installed and the space frame formula self-contained flat be connected
CN210827427U (en) Assembled waterproof underground continuous wall
CN204645605U (en) A kind of circular steel reinforced concrete chimney wall reverse mould construction platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant