China
Prior art keywords
concrete column
column
precast concrete
screw rod
connecting pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822201764.3U
Other languages
Chinese (zh)
Inventor
刘继磊
韩伟
张磊
叶艳霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changan University
Original Assignee
Changan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changan University filed Critical Changan University
Priority to CN201822201764.3U priority Critical patent/CN209339309U/en
Application granted granted Critical
Publication of CN209339309U publication Critical patent/CN209339309U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

本实用新型公开了一种装配式混凝土柱柱连接节点结构简单,节点施工简便,造价较低,连接部件易于更换,简化了节点区钢筋的搭接工作,整个安装过程都是干式连接,大大减少了节点区的后浇作业,不需要特殊工具,加快了施工速度;传力明确可靠,当遭遇较低烈度地震作用时,结构保持完好;当遭遇较大烈度地震作用时,四周侧壁的低屈服钢板首先吸收能量达到屈服,固定螺母抵抗竖向的剪力和水平拉力,在这一过程中达到耗能的效果;接着混凝土柱四个边角的连接部件也逐渐达到屈服,连接部件的两侧的调节螺母抵抗竖向拉力;由外到内依次耗能,保证了装配式混凝土柱柱连接节点结构在不同烈度地震作用时的受力性能以及强震后结构的可迅速修复性能。

The utility model discloses an assembled concrete column-column connecting node with simple structure, convenient node construction, low cost, easy replacement of connecting parts, and simplifies the overlapping work of steel bars in the node area. The whole installation process is dry connection, greatly The post-pouring operation in the node area is reduced, no special tools are required, and the construction speed is accelerated; the force transmission is clear and reliable, and the structure remains intact when encountering a low-intensity earthquake; when encountering a high-intensity earthquake, the surrounding side walls The low-yield steel plate first absorbs energy to yield, and the fixing nut resists the vertical shear force and horizontal tension, and achieves the effect of energy dissipation in this process; then the connecting parts at the four corners of the concrete column also gradually reach yield, and the connecting parts The adjusting nuts on both sides resist the vertical tension; energy is dissipated sequentially from the outside to the inside, which ensures the mechanical performance of the fabricated concrete column-to-column joint structure under earthquakes of different intensities and the rapid repairability of the structure after strong earthquakes.

Description

一种装配式混凝土柱柱连接节点A prefabricated concrete column-to-column connection node

技术领域technical field

本实用新型涉及建筑工程技术领域,具体涉及一种装配式混凝土柱柱连接节点。The utility model relates to the technical field of construction engineering, in particular to an assembled concrete column connection node.

背景技术Background technique

近年来,为了促进建筑行业的转型升级,建筑界正在大力发展装配式建筑,装配式混凝土框架结构作为一种最普遍的结构体系,广泛应用于商场,车库,办公楼等公共建筑中。预制框架梁柱节点的受力性能对结构的整体性能起着重要作用,关于预制构件的连接技术正在引起更多技术人员的关注。In recent years, in order to promote the transformation and upgrading of the construction industry, the construction industry is vigorously developing prefabricated buildings. As one of the most common structural systems, prefabricated concrete frame structures are widely used in public buildings such as shopping malls, garages, and office buildings. The mechanical performance of prefabricated frame beam-column joints plays an important role in the overall performance of the structure, and the connection technology of prefabricated components is attracting more attention from technicians.

目前预制混凝土框架柱-柱连接节点技术主要有端板螺栓连接、钢筋连接套筒灌浆连接和现场支模后浇等。端板螺栓连接通过在上下预制柱端部预埋钢板,外部再套钢板,中间填充混凝土,通过螺栓固定外部钢板,实现预制柱的连接,其缺点是:用钢量较大,施工复杂。钢筋连接套筒灌浆连接是通过连接钢筋连接套筒将上下预制柱的纵筋进行连接的技术,其缺点是:造价高,灌浆质量不易检测。现场支模后浇是通过在节点的核心区支设模板,然后进行混凝土后浇施工,从而完成预制柱连接的方法,其缺点是:现场湿作业太多,尤其是现浇的区域设在梁柱节点区时钢筋布置复杂,不便于施工。因此研发一种传力可靠,造价较低,施工简便的装配式混凝土框架柱-柱连接技术对装配式建筑的推广和应用有重要意义。At present, the precast concrete frame column-column connection joint technologies mainly include end-plate bolt connection, steel bar connection sleeve grouting connection, and post-casting after field formwork. The end plate bolt connection realizes the connection of prefabricated columns by pre-embedding steel plates at the ends of the upper and lower precast columns, covering the outside with steel plates, filling the middle with concrete, and fixing the external steel plates with bolts. The disadvantages are: large amount of steel and complicated construction. Rebar connection sleeve grouting connection is a technology to connect the longitudinal reinforcement of the upper and lower prefabricated columns by connecting the reinforcement connection sleeve. Its disadvantages are: high cost and difficult detection of grouting quality. On-site formwork post-casting is a method of completing the connection of prefabricated columns by setting up formwork in the core area of the node, and then carrying out concrete post-casting construction. In the column joint area, the reinforcement arrangement is complicated, which is not convenient for construction. Therefore, the development of a column-to-column connection technology for prefabricated concrete frames with reliable force transmission, low cost and easy construction is of great significance to the promotion and application of prefabricated buildings.

实用新型内容Utility model content

为解决以上问题,本实用新型提供一种装配式混凝土柱柱连接节点结构简单,节点施工简便,造价较低,连接部件易于更换,简化了节点区钢筋的搭接工作,整个安装过程都是干式连接,大大减少了节点区的后浇作业,不需要特殊工具,加快了施工速度;传力明确可靠,当遭遇较低烈度地震作用时,结构保持完好;当遭遇较大烈度地震作用时,四周侧壁的低屈服钢板首先吸收能量达到屈服,固定螺母抵抗竖向的剪力和水平拉力,在这一过程中达到耗能的效果;接着混凝土柱四个边角的连接部件也逐渐达到屈服,连接部件的两侧的调节螺母抵抗竖向拉力;由外到内依次耗能,保证了装配式混凝土柱柱连接节点结构在不同烈度地震作用时的受力性能以及强震后结构的可迅速修复性能。In order to solve the above problems, the utility model provides a prefabricated concrete column-to-column joint with simple structure, simple joint construction, low cost, easy replacement of connecting parts, simplified joint work of steel bars in the joint area, and the whole installation process is dry. Type connection, which greatly reduces the post-pouring operation in the node area, does not require special tools, and speeds up the construction speed; the force transmission is clear and reliable, and the structure remains intact when encountering a low-intensity earthquake; when encountering a relatively high-intensity earthquake, The low-yield steel plates on the surrounding side walls first absorb energy to yield, and the fixing nuts resist vertical shear force and horizontal tension, achieving the effect of energy dissipation in this process; then the connecting parts at the four corners of the concrete column also gradually yield , the adjusting nuts on both sides of the connecting parts resist the vertical tension; the energy is dissipated sequentially from the outside to the inside, which ensures the mechanical performance of the assembled concrete column-column joint structure under earthquakes of different intensities and the rapidity of the structure after strong earthquakes. Fix performance.

为了达到上述目的,本实用新型采用以下技术方案予以解决。In order to achieve the above object, the utility model adopts the following technical solutions to solve it.

一种装配式混凝土柱柱连接节点,包括:上段预制混凝土柱、下段预制混凝土柱和盖板;所述上段预制混凝土柱和下段预制混凝土柱内分别设置有纵向连接筋和横向连接筋,所述纵向连接筋和横向连接筋固定连接;所述上段预制混凝土柱的底部四角分别去除相同的长方体形成上十字连接端,所述上十字连接端与所述上段预制混凝土柱平齐的侧壁上分别横向设置上螺杆;所述下段预制混凝土柱的顶部四角分别去除相同的长方体形成与所述上十字连接端对应的下十字连接端,所述下十字连接端的侧壁上分别横向设置有与上螺杆对应的下螺杆;所述盖板上分别设置有与上螺杆和下螺杆相对应的固定孔,所述上螺杆和下螺杆分别穿过所述固定孔并通过固定螺母固定。An assembled concrete column-to-column connection node, comprising: an upper precast concrete column, a lower precast concrete column and a cover plate; the upper precast concrete column and the lower precast concrete column are respectively provided with longitudinal connecting bars and transverse connecting bars, the The longitudinal connecting bars and the transverse connecting bars are fixedly connected; the same cuboids are removed from the four corners of the bottom of the upper precast concrete column respectively to form an upper cross connecting end, and the upper cross connecting end is flush with the side walls of the upper precast concrete column respectively. The upper screw rod is arranged horizontally; the same cuboid is removed from the top four corners of the lower precast concrete column to form the lower cross connection end corresponding to the upper cross connection end, and the upper screw rod is arranged horizontally on the side wall of the lower cross connection end. Corresponding lower screw rods; fixed holes corresponding to upper screw rods and lower screw rods are respectively arranged on the cover plate, and the upper screw rods and lower screw rods respectively pass through the fixing holes and are fixed by fixing nuts.

根据本实用新型的装配式混凝土柱柱连接节点,上段预制混凝土柱和下段预制混凝土柱内的纵向连接筋和横向连接筋采用绑扎连接,上段预制混凝土柱的底部四个边角分别去除相同的长方体(也可以是正方体)形成凸出的上十字连接端,上十字连接端与上段预制混凝土柱平齐的侧壁上分别横向设置上螺杆。下段预制混凝土柱的顶端采用相同的方法成型对应的下十字连接端,下十字连接端上对应设置下螺杆,上螺杆和对应的下螺杆分别穿过盖板上相对应的固定孔并通过固定螺母固定,盖板采用低屈服点钢板,从而将上段预制混凝土柱和下段预制混凝土柱固定连接。本实用新型的装配式混凝土柱柱连接节点受力合理,连接牢固,整体稳定性和抗震性能良好;当遇到地震时,上、下十字连接端与预制混凝土柱平齐的侧壁首先吸收能量达到屈服,盖板上的固定螺母抵抗竖向的剪力和水平拉力,节点施工简便,传力明确可靠,造价较低,实用性强,便于推广使用,具有显著的经济效益和社会效益。According to the prefabricated concrete column connection node of the present invention, the longitudinal connecting bars and transverse connecting bars in the precast concrete column of the upper section and the precast concrete column of the lower section are connected by binding, and the four corners of the bottom of the precast concrete column of the upper section are respectively removed from the same cuboid (It can also be a cube) to form a protruding upper cross connection end, and upper screw rods are arranged horizontally on the side walls of the upper cross connection end and the upper section of the prefabricated concrete column that are flush. The top of the lower prefabricated concrete column adopts the same method to form the corresponding lower cross connection end, and the lower cross connection end is correspondingly provided with the lower screw, and the upper screw and the corresponding lower screw respectively pass through the corresponding fixing holes on the cover plate and pass through the fixing nuts Fixed, the cover plate is made of steel plate with low yield point, so that the upper precast concrete column and the lower precast concrete column are fixedly connected. The joints of the prefabricated concrete column-column connection of the utility model are reasonably stressed, the connection is firm, and the overall stability and anti-seismic performance are good; when an earthquake occurs, the upper and lower cross connection ends and the side walls of the prefabricated concrete column are first to absorb energy To achieve yield, the fixed nut on the cover plate resists vertical shear force and horizontal pull force, the joint construction is simple, the force transmission is clear and reliable, the cost is low, the practicability is strong, it is easy to popularize and use, and has significant economic and social benefits.

作为优选的,所述上十字连接端去除四周相同的长方体形成上矩形连接端,所述下十字连接端去除四周相同的长方体形成与上矩形连接端对应的下矩形连接端。Preferably, the same cuboid around the upper cross connection end is removed to form an upper rectangular connection end, and the same cuboid around the lower cross connection end is removed to form a lower rectangular connection end corresponding to the upper rectangular connection end.

根据本实用新型的装配式混凝土柱柱连接节点,分别去除上十字连接端和下十字连接端四周相同的凸出的长方体形成相对应的上矩形连接端和下矩形连接端;并将上螺杆设置在上矩形连接端的四个侧壁上,下矩形连接端的四个侧壁上设置相对应的下螺杆,盖板穿过上螺杆和下螺杆并通过固定螺母固定。According to the assembled concrete column connection node of the present utility model, the same protruding cuboids around the upper cross connection end and the lower cross connection end are respectively removed to form corresponding upper rectangular connection ends and lower rectangular connection ends; and the upper screw is set Corresponding lower screw rods are arranged on the four side walls of the upper rectangular connecting end and the four side walls of the lower rectangular connecting end, and the cover plate passes through the upper screw rod and the lower screw rod and is fixed by a fixing nut.

作为优选的,所述上段预制混凝土柱内四个边角或四周处的纵向连接筋伸出所述上段预制混凝土柱的底端,所述纵向连接筋的伸出端设置有上预埋部;所述下段预制混凝土柱内的纵向连接筋的伸出端设置有与所述上预埋部相对应的下预埋部;所述上预埋部和下预埋部通过连接部件固定连接。As a preference, the longitudinal connecting bars at the four corners or around the upper precast concrete column protrude from the bottom end of the upper precast concrete column, and the protruding end of the longitudinal connecting bar is provided with an upper embedded part; The protruding end of the longitudinal connecting rib in the lower precast concrete column is provided with a lower pre-embedded part corresponding to the upper pre-embedded part; the upper pre-embedded part and the lower pre-embedded part are fixedly connected by a connecting part.

根据本实用新型的装配式混凝土柱柱连接节点,上部纵向连接筋分别从上段预制混凝土柱内四个边角或四周底端伸出并设置上预埋部,下部的纵向连接筋分别从下段预制混凝土柱内四个边角或四周顶端伸出并设置与上预埋部对应的下预埋部,上预埋部和下预埋部通过连接部件固定连接,进而将上段预制混凝土柱和下段预制混凝土柱固定连接;连接部件可以抵抗竖向拉力,通过预埋部和连接部件加强节点的连接稳定性。当装配式混凝土柱柱连接节点结构承受荷载时,四个边角处的预埋部和连接部件先承受荷载;当荷载较大时,四周的预埋部和连接部件进一步承受荷载,提高装配式混凝土柱柱连接节点结构的稳定性。According to the prefabricated concrete column-column connection node of the present invention, the upper longitudinal connecting ribs protrude from the four corners or the bottom of the surrounding prefabricated concrete column of the upper section respectively, and the upper pre-buried parts are arranged, and the lower longitudinal connecting ribs are respectively prefabricated from the lower section. The four corners or the surrounding tops of the concrete column protrude and set the lower embedded part corresponding to the upper embedded part. The upper embedded part and the lower embedded part are fixedly connected by connecting parts, and then the upper precast concrete column and the lower precast The concrete column is fixedly connected; the connecting parts can resist vertical tension, and the connection stability of the nodes is strengthened through the embedded parts and connecting parts. When the prefabricated concrete column-to-column connection node structure bears the load, the embedded parts and connecting parts at the four corners bear the load first; when the load is large, the surrounding embedded parts and connecting parts bear the load further, improving the assembly Stability of concrete column-to-column joint structures.

作为优选的,所述连接部件包含两个调节螺母和工形连接杆;每个调节螺母的一端设置有螺纹孔,调节螺母的另一端设置有卡口,所述工形连接杆的两端分别穿过卡口并活动设置在两个调节螺母内;所述纵向连接筋的伸出端设置有外螺纹,所述上预埋部和下预埋部分别为纵向连接筋的外螺纹端,所述外螺纹与所述螺纹孔的内螺纹相匹配。Preferably, the connecting part includes two adjusting nuts and an I-shaped connecting rod; one end of each adjusting nut is provided with a threaded hole, the other end of the adjusting nut is provided with a bayonet, and the two ends of the I-shaped connecting rod are respectively Pass through the bayonet and be movably arranged in the two adjusting nuts; the protruding end of the longitudinal connecting rib is provided with external threads, and the upper embedded part and the lower embedded part are respectively the external thread ends of the longitudinal connecting ribs. The external thread matches the internal thread of the threaded hole.

根据本实用新型的装配式混凝土柱柱连接节点,工形连接杆的两端分别穿过卡口并活动设置在两个调节螺母内,两个调节螺母可分别单独围绕工形连接杆水平转动和上下移动,纵向连接筋的外螺纹端通过相互匹配的外螺纹和内螺纹拧入调节螺母的螺纹孔内,进而将上部和下部的纵向连接筋连接拉紧。连接部件便于更换,简化了节点区钢筋的搭接工作,整个安装过程都是干式连接,大大减少了节点区的后浇作业,不需要特殊工具,施工速度快。According to the assembled concrete column connection node of the utility model, the two ends of the I-shaped connecting rod pass through the bayonet respectively and are movably arranged in the two adjusting nuts, and the two adjusting nuts can respectively rotate horizontally and independently around the I-shaped connecting rod. Moving up and down, the external thread end of the longitudinal connecting rib is screwed into the threaded hole of the adjusting nut through the matching external thread and internal thread, and then the upper and lower longitudinal connecting ribs are connected and tightened. The connecting parts are easy to replace, which simplifies the overlapping work of the steel bars in the joint area. The whole installation process is a dry connection, which greatly reduces the post-casting work in the joint area. No special tools are required, and the construction speed is fast.

作为优选的,所述工形连接杆的两端的端面分别设置有凹槽,所述凹槽与所述纵向连接筋的螺头相匹配。Preferably, grooves are respectively provided on the end faces of the two ends of the I-shaped connecting rod, and the grooves are matched with the screw heads of the longitudinal connecting ribs.

根据本实用新型的装配式混凝土柱柱连接节点,当纵向连接筋拧入调节螺母的螺纹孔较深时,纵向连接筋的螺头抵在凹槽内,对纵向连接筋进行限位,保证节点连接的稳定性。According to the assembled concrete column-to-column connection node of the present utility model, when the threaded hole of the adjusting nut is screwed into the longitudinal connection bar is deep, the screw head of the longitudinal connection bar is in the groove, and the longitudinal connection bar is limited to ensure that the joint The stability of the connection.

作为优选的,所述连接部件包含两个调节螺母和工形连接杆;每个调节螺母的一端设置有螺杆,调节螺母的另一端设置有卡口,所述工形连接杆的两端分别穿过卡口并活动设置在两个调节螺母内;所述纵向连接筋的伸出端上设置有钢筋连接套筒,所述上预埋部和下预埋部分别为钢筋连接套筒,所述钢筋连接套筒与所述螺杆相匹配。As preferably, the connecting part includes two adjusting nuts and an I-shaped connecting rod; one end of each adjusting nut is provided with a screw rod, and the other end of the adjusting nut is provided with a bayonet, and the two ends of the I-shaped connecting rod respectively pass through Pass through the bayonet and be movably arranged in the two adjusting nuts; the protruding end of the longitudinal connecting rib is provided with a reinforcing bar connecting sleeve, and the upper pre-embedded part and the lower pre-embedded part are respectively a reinforcing bar connecting sleeve. The reinforcing bar connecting sleeve is matched with the screw rod.

根据本实用新型的装配式混凝土柱柱连接节点,上部和下部的纵向连接筋分别安装有钢筋连接套筒,调节螺母上的螺杆通过相互匹配的外螺纹和内螺母拧入钢筋连接套筒内,实现连接部件与两端的纵向连接筋的可拆卸连接。According to the assembled concrete column-to-column connection node of the present invention, the upper and lower longitudinal connecting bars are respectively equipped with steel bar connecting sleeves, and the screw on the adjusting nut is screwed into the steel bar connecting sleeves through mutually matching external threads and internal nuts. Realize the detachable connection between the connecting part and the longitudinal connecting ribs at both ends.

作为优选的,所述上十字连接端的底端设置有限位块,所述下十字连接端的顶端设置有与所述限位块相匹配的限位槽。Preferably, a limit block is provided at the bottom of the upper cross connection end, and a limit groove matching the limit block is provided at the top end of the lower cross connection end.

根据本实用新型的装配式混凝土柱柱连接节点,上十字连接端的限位块可插入下十字连接端的限位槽内,增加节点连接的契合度,保证装配式混凝土柱柱连接节点连接的侧向稳定性,且便于盖板、连接部件等的对准安装。According to the connection node of the assembled concrete column of the utility model, the limit block at the upper cross connection end can be inserted into the limit groove at the lower cross connection end, so as to increase the fit degree of the joint connection and ensure the lateral direction of the joint connection of the assembly concrete column column Stability, and easy alignment and installation of covers, connecting parts, etc.

作为优选的,所述限位块为梯形限位块,所述限位槽为梯形限位槽。Preferably, the limiting block is a trapezoidal limiting block, and the limiting groove is a trapezoidal limiting groove.

根据本实用新型的装配式混凝土柱柱连接节点,梯形限位块可插入限位槽为梯形限位槽内,使装配式混凝土柱柱连接节点结构的稳定性更佳。According to the assembled concrete column-column connecting node of the present invention, the trapezoidal limiting block can be inserted into the limiting groove as the trapezoidal limiting groove, so that the stability of the assembled concrete column-column connecting node structure is better.

作为优选的,还包括第一耗能元件和第二耗能元件;所述第一耗能元件包覆设置于所述上段预制混凝土柱的底部所有外表面,所述第一耗能元件上设置有与所述纵向连接筋相对应的插孔,所述上螺杆的一端与所述上段预制混凝土柱连接,所述上螺杆的另一端依次穿过第一耗能元件和盖板并通过固定螺母固定;所述第二耗能元件包覆设置于所述下段预制混凝土柱的顶部所有外表面,所述第二耗能元件上设置有与所述纵向连接筋相对应的插孔,所述下螺杆的一端与所述下段预制混凝土柱连接,所述下螺杆的另一端依次穿过第二耗能元件和盖板并通过固定螺母固定。Preferably, it also includes a first energy dissipation element and a second energy dissipation element; the first energy dissipation element is covered and arranged on all the outer surfaces of the bottom of the upper precast concrete column, and the first energy dissipation element is arranged on There is a socket corresponding to the longitudinal connecting rib, one end of the upper screw is connected to the upper precast concrete column, and the other end of the upper screw passes through the first energy dissipation element and the cover plate in sequence and passes through the fixing nut fixed; the second energy-dissipating element is covered and arranged on all outer surfaces of the top of the lower precast concrete column, and the second energy-dissipating element is provided with an insertion hole corresponding to the longitudinal connecting rib, and the lower One end of the screw is connected to the lower section of the prefabricated concrete column, and the other end of the lower screw passes through the second energy dissipation element and the cover plate sequentially and is fixed by a fixing nut.

根据本实用新型的装配式混凝土柱柱连接节点,第一耗能元件包覆设置于所述上段预制混凝土柱的底部所有外表面,即第一耗能元件包覆于上十字连接端的底部和侧壁外表面以及纵向连接筋伸出的上段预制混凝土柱的底面,第一耗能元件的四个边角处设置有纵向连接筋插入的插孔,增加上部和下部纵向连接筋连接的精准度,确保连接部件对上部和下部纵向连接筋进行连接拉紧,第一耗能元件底部形成梯形限位块,第二耗能元件上端对应形成梯形限位槽,增加节点连接的契合度。第一耗能元件与上段预制混凝土柱平齐的侧壁内外预装有上螺杆,上螺杆预埋部上段预制混凝土柱内,增加第一异型钢板与上段预制混凝土柱的连接性。第二耗能元件的设置与第一耗能元件相同,区别在于第二耗能元件的顶端形成与梯形限位块相对应的梯形限位槽。第一耗能元件和第二耗能元件分别为钢板,利用钢板的耗能作用缓冲地震的作用力。同时,梯形限位块和梯形限位槽上包覆的钢板可以增加局部刚度,抵抗地震部分水平力。According to the assembled concrete column-to-column connection node of the present invention, the first energy-dissipating element is coated on all the outer surfaces of the bottom of the upper precast concrete column, that is, the first energy-dissipating element is coated on the bottom and sides of the upper cross connection end. The outer surface of the wall and the bottom surface of the upper precast concrete column protruding from the longitudinal connecting bars, the four corners of the first energy dissipation element are provided with sockets for inserting the longitudinal connecting bars to increase the connection accuracy of the upper and lower longitudinal connecting bars, Ensure that the connecting parts connect and tighten the upper and lower longitudinal connecting ribs. The bottom of the first energy dissipation element forms a trapezoidal limit block, and the upper end of the second energy dissipation element corresponds to a trapezoidal limit groove to increase the fit of the node connection. The first energy-dissipating element is pre-installed on the inside and outside of the side wall that is flush with the upper precast concrete column. The upper screw is embedded in the upper precast concrete column to increase the connection between the first special-shaped steel plate and the upper precast concrete column. The setting of the second energy dissipating element is the same as that of the first energy dissipating element, except that the top of the second energy dissipating element forms a trapezoidal limiting groove corresponding to the trapezoidal limiting block. The first energy-dissipating element and the second energy-dissipating element are respectively steel plates, and the force of an earthquake is buffered by utilizing the energy-dissipating effect of the steel plates. At the same time, the steel plate coated on the trapezoidal limit block and the trapezoidal limit groove can increase the local stiffness and resist the horizontal force of the earthquake.

作为优选的,所述梯形凸块和梯形凹槽之间设置有橡胶垫。Preferably, a rubber pad is arranged between the trapezoidal protrusion and the trapezoidal groove.

根据本实用新型的装配式混凝土柱柱连接节点,梯形凸块和梯形凹槽之间设置的橡胶垫,利用橡胶的耗能作用达到吸收能量减震效果,装配式混凝土柱柱连接节点结构的稳定性更佳、抗震性更好;且橡胶垫为氯化橡胶材料,具有防火的功能。According to the assembled concrete column-column connection node of the utility model, the rubber pad provided between the trapezoidal bump and the trapezoidal groove utilizes the energy dissipation effect of the rubber to achieve the effect of absorbing energy and shock absorption, and the structure of the assembled concrete column-column connection node is stable. Better performance and better shock resistance; and the rubber pad is made of chlorinated rubber material, which has the function of fire prevention.

作为优选的,所述固定孔为腰形孔。Preferably, the fixing hole is a waist-shaped hole.

根据本实用新型的装配式混凝土柱柱连接节点,盖板上固定孔为腰形孔,地震时候允许上螺杆和下螺杆在腰形孔内有微小位移,使装配式混凝土柱柱连接节点结构达到减震耗能的作用,避免因地震时产生较大能量而发生破坏。According to the assembled concrete column-column connecting node of the present invention, the fixing hole on the cover plate is a waist-shaped hole, and the upper screw and the lower screw are allowed to have a small displacement in the waist-shaped hole during an earthquake, so that the assembled concrete column-column connecting node structure reaches The function of shock absorption and energy consumption can avoid damage caused by large energy generated during earthquakes.

附图说明Description of drawings

下面结合附图和具体实施例对本实用新型做进一步详细说明。Below in conjunction with accompanying drawing and specific embodiment the utility model is described in further detail.

图1是本实用新型的装配式混凝土柱柱连接节点未装盖板的结构示意图;Fig. 1 is the structural representation of the assembled concrete column-column connecting node of the present utility model without cover plate;

图2是本实用新型的装配式混凝土柱柱连接节点安装盖板的结构示意图;Fig. 2 is a structural schematic diagram of the installation cover plate of the assembled concrete column-column connection node of the utility model;

图3是图2中过连接部件中心轴的A-A剖视图;Fig. 3 is the A-A cross-sectional view of the central axis of the connecting part in Fig. 2;

图4是图2的B-B剖视图;Fig. 4 is the B-B sectional view of Fig. 2;

图5是图1中上段预制混凝土柱的结构示意图;Fig. 5 is a schematic structural view of the upper precast concrete column in Fig. 1;

图6是图1中下段预制混凝土柱的结构示意图;Fig. 6 is a schematic structural view of the lower section of the prefabricated concrete column in Fig. 1;

图7图1中连接部件的结构示意图;Fig. 7 is a schematic structural view of the connecting parts in Fig. 1;

图8图1中连接部件与两侧的纵向连接筋之间连接的结构示意图;Fig. 8 is a schematic structural diagram of the connection between the connecting part and the longitudinal connecting ribs on both sides in Fig. 1;

图9是图1中第一耗能元件的结构示意图;Fig. 9 is a schematic structural view of the first energy dissipation element in Fig. 1;

图10是图1中第二耗能元件的结构示意图;Fig. 10 is a schematic structural view of the second energy dissipation element in Fig. 1;

图11是图2中盖板的结构示意图。FIG. 11 is a schematic structural view of the cover plate in FIG. 2 .

在以上图中:1上段预制混凝土柱;2下段预制混凝土柱;3盖板;301固定孔;302固定螺母;4纵向连接筋;401上预埋部;402下预埋部;5横向连接筋;6上十字连接端;601上螺杆;602梯形限位块;7下十字连接端;701下螺杆;702梯形限位槽;8连接部件;810调节螺母;811螺纹孔;812卡口;820工形连接杆;821凹槽;9第一耗能元件;901插孔;10第二耗能元件。In the above figure: 1 upper precast concrete column; 2 lower precast concrete column; 3 cover plate; 301 fixing hole; 302 fixing nut; 4 longitudinal connecting rib; 401 upper embedded part; 402 lower embedded part; 5 horizontal connecting rib ;6 upper cross connection end; 601 upper screw; 602 trapezoidal limit block; 7 lower cross connection end; 701 lower screw; 702 trapezoidal limit groove; 8 connecting parts; 810 adjustment nut; I-shaped connecting rod; 821 groove; 9 first energy dissipation element; 901 jack; 10 second energy dissipation element.

具体实施方式Detailed ways

参考图1-8和图11,根据本实用新型的内容的实施例所提出的一种装配式混凝土柱柱连接节点,包括:上段预制混凝土柱1、下段预制混凝土柱2和盖板3;所述上段预制混凝土柱1和下段预制混凝土柱2内分别设置有纵向连接筋4和横向连接筋5,所述纵向连接筋4和横向连接筋5固定连接;所述上段预制混凝土柱1的底部四角分别去除相同的长方体形成上十字连接端6,所述上十字连接端6与所述上段预制混凝土柱1平齐的侧壁上分别横向设置上螺杆601;所述下段预制混凝土柱2的顶部四角分别去除相同的长方体形成与所述上十字连接端6对应的下十字连接端7,所述下十字连接端7的侧壁上分别横向设置有与上螺杆601对应的下螺杆701;所述盖板3上分别设置有与上螺杆601和下螺杆701相对应的固定孔301,所述上螺杆601和下螺杆701分别穿过所述固定孔301并通过固定螺母302固定。Referring to Fig. 1-8 and Fig. 11, a prefabricated concrete column-column connection node proposed according to an embodiment of the content of the present invention includes: an upper precast concrete column 1, a lower precast concrete column 2 and a cover plate 3; The upper precast concrete column 1 and the lower precast concrete column 2 are respectively provided with longitudinal connecting bars 4 and transverse connecting bars 5, and the longitudinal connecting bars 4 and the transverse connecting bars 5 are fixedly connected; the bottom four corners of the upper precast concrete column 1 Respectively remove the same cuboid to form the upper cross connection end 6, and the upper cross connection end 6 and the side wall of the upper section precast concrete column 1 are horizontally provided with upper screw rods 601 respectively; the top four corners of the lower section precast concrete column 2 Respectively remove the same cuboid to form the lower cross connection end 7 corresponding to the upper cross connection end 6, and the lower screw rod 701 corresponding to the upper screw rod 601 is horizontally arranged on the side wall of the lower cross connection end 7; the cover Fixing holes 301 corresponding to the upper screw 601 and the lower screw 701 are respectively provided on the board 3 , and the upper screw 601 and the lower screw 701 respectively pass through the fixing holes 301 and are fixed by fixing nuts 302 .

在以上实施例中,上段预制混凝土柱1和和下段预制混凝土柱2内的纵向连接筋4和横向连接筋5采用绑扎连接,上段预制混凝土柱1的底部四个边角分别去除相同的长方体(也可以是正方体)形成凸出的上十字连接端6,上十字连接端6与上段预制混凝土柱1平齐的侧壁上分别横向设置上螺杆601。下段预制混凝土柱2的顶端采用相同的方法成型对应的下十字连接端7,下十字连接端7上对应设置下螺杆701,上螺杆601和对应的下螺杆701分别穿过盖板3上相对应的固定孔301并通过固定螺母302固定,盖板3采用低屈服点钢板,从而将上段预制混凝土柱1和下段预制混凝土柱2固定连接。本实用新型的装配式混凝土柱柱连接节点受力合理,连接牢固,整体稳定性和抗震性能良好;当遇到地震时,上、下十字连接端7与预制混凝土柱平齐的侧壁首先吸收能量达到屈服,盖板3上的固定螺母302抵抗竖向的剪力和水平拉力,节点施工简便,传力明确可靠,造价较低,实用性强,便于推广使用,具有显著的经济效益和社会效益。In the above embodiment, the longitudinal connecting bars 4 and the transverse connecting bars 5 in the upper section precast concrete column 1 and the lower section precast concrete column 2 are connected by binding, and the same cuboid ( It can also be a cube) to form a protruding upper cross connection end 6, and upper screw rods 601 are arranged laterally on the side walls of the upper cross connection end 6 and the upper precast concrete column 1 that are flush. The top of the lower precast concrete column 2 adopts the same method to form the corresponding lower cross connection end 7, and the lower cross connection end 7 is correspondingly provided with a lower screw 701, and the upper screw 601 and the corresponding lower screw 701 respectively pass through the cover plate 3 and correspond to each other. The fixing hole 301 is fixed by the fixing nut 302, and the cover plate 3 is made of a steel plate with a low yield point, so that the upper precast concrete column 1 and the lower precast concrete column 2 are fixedly connected. The joints of the prefabricated concrete columns of the utility model are reasonably stressed, the connection is firm, and the overall stability and anti-seismic performance are good; when an earthquake occurs, the upper and lower cross connection ends 7 and the side walls of the prefabricated concrete columns are first absorbed The energy reaches yield, and the fixed nut 302 on the cover plate 3 resists vertical shear force and horizontal tension force. The joint construction is simple, the force transmission is clear and reliable, the cost is low, the practicability is strong, it is easy to popularize and use, and has significant economic benefits and social benefits. benefit.

作为优选的,所述上十字连接端6去除四周相同的长方体形成上矩形连接端,所述下十字连接端7去除四周相同的长方体形成与上矩形连接端对应的下矩形连接端。Preferably, the upper cross connection end 6 removes the same cuboid around it to form an upper rectangular connection end, and the lower cross connection end 7 removes the same cuboid around it to form a lower rectangular connection end corresponding to the upper rectangular connection end.

根据本实用新型的装配式混凝土柱柱连接节点,分别去除上十字连接端6和下十字连接端7四周相同的凸出的长方体形成相对应的上矩形连接端和下矩形连接端;并将上螺杆601设置在上矩形连接端的四个侧壁上,下矩形连接端的四个侧壁上设置相对应的下螺杆701,盖板穿过上螺杆601和下螺杆701并通过固定螺母302固定。According to the assembled concrete column connection node of the present utility model, the same protruding cuboids around the upper cross connection end 6 and the lower cross connection end 7 are respectively removed to form corresponding upper rectangular connection ends and lower rectangular connection ends; The screw rod 601 is arranged on the four side walls of the upper rectangular connecting end, and the corresponding lower screw rod 701 is arranged on the four side walls of the lower rectangular connecting end.

参考图3,根据本实用新型的一个实施例,所述上段预制混凝土柱1内四个边角或四周处的纵向连接筋4伸出所述上段预制混凝土柱1的底端,所述纵向连接筋4的伸出端设置有上预埋部401;所述下段预制混凝土柱2内的纵向连接筋4的伸出端设置有与所述上预埋部401相对应的下预埋部402;所述上预埋部401和下预埋部402通过连接部件8固定连接。With reference to Fig. 3, according to an embodiment of the present utility model, the longitudinal connecting bars 4 at the four corners or around the upper precast concrete column 1 protrude from the bottom end of the upper precast concrete column 1, and the longitudinal connecting ribs The protruding end of the rib 4 is provided with an upper pre-embedded part 401; the protruding end of the longitudinal connecting bar 4 in the lower precast concrete column 2 is provided with a lower pre-embedded part 402 corresponding to the upper pre-embedded part 401; The upper embedded part 401 and the lower embedded part 402 are fixedly connected by a connecting member 8 .

在以上实施例中,上部纵向连接筋4分别从上段预制混凝土柱1内四个边角或四周底端伸出并设置上预埋部401,下部的纵向连接筋4分别从下段预制混凝土柱2内四个边角或四周顶端伸出并设置与上预埋部401对应的下预埋部402,上预埋部401和下预埋部402通过连接部件8固定连接,进而将上段预制混凝土柱1和下段预制混凝土柱2固定连接;连接部件8可以抵抗竖向拉力,通过预埋部和连接部件8加强节点的连接稳定性。当装配式混凝土柱柱连接节点结构承受荷载时,四个边角处的预埋部和连接部件8先承受荷载;当荷载较大时,四周的预埋部和连接部件8进一步承受荷载,提高装配式混凝土柱柱连接节点结构的稳定性。In the above embodiments, the upper longitudinal connecting ribs 4 protrude from the four corners or the bottom of the four sides of the upper precast concrete column 1 respectively, and the upper embedded parts 401 are provided, and the lower longitudinal connecting ribs 4 extend from the lower precast concrete column 2 respectively. The four inner corners or the surrounding tops protrude and set the lower pre-embedded part 402 corresponding to the upper pre-embedded part 401. The upper pre-embedded part 401 and the lower pre-embedded part 402 are fixedly connected by the connecting part 8, and then the upper precast concrete column 1 and the lower precast concrete column 2 are fixedly connected; the connecting part 8 can resist vertical tension, and the connection stability of the node is strengthened through the embedded part and the connecting part 8. When the prefabricated concrete column-to-column joint structure bears the load, the embedded parts and connecting parts 8 at the four corners bear the load first; when the load is larger, the surrounding embedded parts and connecting parts 8 further bear the load, improving Stability of prefabricated concrete column-to-column joint structure.

参考图1-3和图7-8,根据本实用新型的一个实施例,所述连接部件8包含两个调节螺母810和工形连接杆820;每个调节螺母810的一端设置有螺纹孔811,调节螺母810的另一端设置有卡口812,所述工形连接杆820的两端分别穿过卡口812并活动设置在两个调节螺母810内;所述纵向连接筋4的伸出端设置有外螺纹,所述上预埋部401和下预埋部402分别为纵向连接筋4的外螺纹端,所述外螺纹与所述螺纹孔811的内螺纹相匹配。Referring to Figures 1-3 and Figures 7-8, according to an embodiment of the present utility model, the connecting part 8 includes two adjusting nuts 810 and an I-shaped connecting rod 820; one end of each adjusting nut 810 is provided with a threaded hole 811 , the other end of the adjusting nut 810 is provided with a bayonet 812, and the two ends of the I-shaped connecting rod 820 respectively pass through the bayonet 812 and are movably arranged in the two adjusting nuts 810; the protruding end of the longitudinal connecting rib 4 An external thread is provided, and the upper embedded part 401 and the lower embedded part 402 are the external thread ends of the longitudinal connecting rib 4 respectively, and the external thread matches the internal thread of the threaded hole 811 .

在以上实施例中,工形连接杆820的两端分别穿过卡口812并活动设置在两个调节螺母810内,两个调节螺母810可分别单独围绕工形连接杆820水平转动和上下移动,纵向连接筋4的外螺纹端通过相互匹配的外螺纹和内螺纹拧入调节螺母810的螺纹孔811内,进而将上部和下部的纵向连接筋4连接拉紧。连接部件8便于更换,简化了节点区钢筋的搭接工作,整个安装过程都是干式连接,大大减少了节点区的后浇作业,不需要特殊工具,施工速度快。In the above embodiment, the two ends of the I-shaped connecting rod 820 respectively pass through the bayonet 812 and are movably arranged in the two adjusting nuts 810, and the two adjusting nuts 810 can rotate horizontally and move up and down around the I-shaped connecting rod 820 respectively. , the external thread end of the longitudinal connecting rib 4 is screwed into the threaded hole 811 of the adjusting nut 810 through the matching external thread and internal thread, and then the upper and lower longitudinal connecting ribs 4 are connected and tightened. The connecting part 8 is easy to replace and simplifies the overlapping work of the steel bars in the node area. The whole installation process is a dry connection, which greatly reduces the post-casting operation in the node area. No special tools are required, and the construction speed is fast.

参考图8,根据本实用新型的一个实施例,所述工形连接杆820的两端的端面分别设置有凹槽821,所述凹槽821与所述纵向连接筋4的螺头相匹配。Referring to FIG. 8 , according to an embodiment of the present invention, grooves 821 are respectively provided on the end surfaces of the two ends of the I-shaped connecting rod 820 , and the grooves 821 are matched with the screw heads of the longitudinal connecting ribs 4 .

在以上实施例中,当纵向连接筋4拧入调节螺母810的螺纹孔811较深时,纵向连接筋4的螺头抵在凹槽821内,对纵向连接筋4进行限位,保证节点连接的稳定性。In the above embodiment, when the longitudinal connecting rib 4 is screwed into the threaded hole 811 of the adjusting nut 810 deeply, the screw head of the longitudinal connecting rib 4 is against the groove 821, and the longitudinal connecting rib 4 is limited to ensure the node connection stability.

根据本实用新型的一个实施例,所述连接部件8包含两个调节螺母810和工形连接杆820;每个调节螺母810的一端设置有螺杆,调节螺母810的另一端设置有卡口812,所述工形连接杆820的两端分别穿过卡口812并活动设置在两个调节螺母810内;所述纵向连接筋4的伸出端上设置有钢筋连接套筒,所述上预埋部401和下预埋部402分别为钢筋连接套筒,所述钢筋连接套筒与所述螺杆相匹配。According to an embodiment of the present utility model, the connecting part 8 includes two adjusting nuts 810 and an I-shaped connecting rod 820; one end of each adjusting nut 810 is provided with a screw rod, and the other end of the adjusting nut 810 is provided with a bayonet 812, The two ends of the I-shaped connecting rod 820 respectively pass through the bayonet 812 and are movably arranged in the two adjusting nuts 810; The part 401 and the lower pre-embedded part 402 are steel bar connection sleeves respectively, and the steel bar connection sleeves are matched with the screw rods.

在以上实施例中,上部和下部的纵向连接筋4分别安装有钢筋连接套筒,调节螺母810上的螺杆通过相互匹配的外螺纹和内螺母拧入钢筋连接套筒内,实现连接部件8与两端的纵向连接筋4的可拆卸连接。In the above embodiments, the upper and lower longitudinal connecting ribs 4 are respectively equipped with reinforcing bar connecting sleeves, and the screw rod on the adjusting nut 810 is screwed into the reinforcing bar connecting sleeves through the external threads and internal nuts that match each other, so as to realize the connecting parts 8 and The detachable connection of the longitudinal connecting ribs 4 at both ends.

参考图5-6,根据本实用新型的一个实施例,所述上十字连接端6的底端设置有限位块,所述下十字连接端7的顶端设置有与所述限位块相匹配的限位槽。Referring to Figures 5-6, according to an embodiment of the present utility model, the bottom end of the upper cross connection end 6 is provided with a limit block, and the top end of the lower cross connection end 7 is provided with a stopper matching the limit block. limit slot.

在以上实施例中,上十字连接端6的限位块可插入下十字连接端7的限位槽内,增加节点连接的契合度,保证装配式混凝土柱柱连接节点连接的侧向稳定性,且便于盖板3、连接部件8等的对准安装。In the above embodiments, the limit block of the upper cross connection end 6 can be inserted into the limit groove of the lower cross connection end 7 to increase the fit of the joint connection and ensure the lateral stability of the joint connection of the fabricated concrete column column. And it is convenient to align and install the cover plate 3 and the connecting part 8 .

参考图5-6,根据本实用新型的一个实施例,所述限位块为梯形限位块602,所述限位槽为梯形限位槽702。Referring to FIGS. 5-6 , according to an embodiment of the present invention, the limiting block is a trapezoidal limiting block 602 , and the limiting groove is a trapezoidal limiting groove 702 .

在以上实施例中,梯形限位块602可插入限位槽为梯形限位槽702内,使装配式混凝土柱柱连接节点结构的稳定性更佳。In the above embodiments, the trapezoidal limiting block 602 can be inserted into the limiting groove as the trapezoidal limiting groove 702, so that the stability of the joint structure of the assembled concrete columns is better.

参考图9-10,根据本实用新型的一个实施例,还包括第一耗能元件9和第二耗能元件10;所述第一耗能元件9包覆设置于所述上段预制混凝土柱1的底部所有外表面,所述第一耗能元件9上设置有与所述纵向连接筋4相对应的插孔901,所述上螺杆601的一端与所述上段预制混凝土柱1连接,所述上螺杆601的另一端依次穿过第一耗能元件9和盖板3并通过固定螺母302固定;所述第二耗能元件10包覆设置于所述下段预制混凝土柱2的顶部所有外表面,所述第二耗能元件10上设置有与所述纵向连接筋4相对应的插孔901,所述下螺杆701的一端与所述下段预制混凝土柱2连接,所述下螺杆701的另一端依次穿过第二耗能元件10和盖板3并通过固定螺母302固定。Referring to Figures 9-10, according to an embodiment of the present invention, it also includes a first energy dissipation element 9 and a second energy dissipation element 10; the first energy dissipation element 9 is wrapped and arranged on the upper precast concrete column 1 All outer surfaces of the bottom of the first energy-dissipating element 9 are provided with sockets 901 corresponding to the longitudinal connecting ribs 4, one end of the upper screw 601 is connected with the upper precast concrete column 1, and the The other end of the upper screw 601 passes through the first energy dissipation element 9 and the cover plate 3 in turn and is fixed by the fixing nut 302; the second energy dissipation element 10 covers all the outer surfaces of the top of the lower precast concrete column 2 , the second energy dissipation element 10 is provided with a socket 901 corresponding to the longitudinal connecting rib 4, one end of the lower screw 701 is connected to the lower precast concrete column 2, the other end of the lower screw 701 One end passes through the second energy dissipation element 10 and the cover plate 3 in sequence and is fixed by a fixing nut 302 .

在以上实施例中,第一耗能元件9包覆设置于所述上段预制混凝土柱1的底部所有外表面,即第一耗能元件9包覆于上十字连接端6的底部和侧壁外表面以及纵向连接筋4伸出的上段预制混凝土柱1的底面,第一耗能元件9的四个边角处设置有纵向连接筋4插入的插孔901,增加上部和下部纵向连接筋4连接的精准度,确保连接部件8对上部和下部纵向连接筋4进行连接拉紧,第一耗能元件9底部形成梯形限位块602,第二耗能元件10上端对应形成梯形限位槽702,增加节点连接的契合度。第一耗能元件9与上段预制混凝土柱1平齐的侧壁内外预装有上螺杆601,上螺杆601预埋部上段预制混凝土柱1内,增加第一异型钢板与上段预制混凝土柱1的连接性。第二耗能元件10的设置与第一耗能元件9相同,区别在于第二耗能元件10的顶端形成与梯形限位块602相对应的梯形限位槽702。第一耗能元件9和第二耗能元件10分别为钢板,利用钢板的耗能作用缓冲地震的作用力。同时,梯形限位块602和梯形限位槽702上包覆的钢板可以增加局部刚度,抵抗地震部分水平力。In the above embodiment, the first energy dissipating element 9 is covered and arranged on all the outer surfaces of the bottom of the upper precast concrete column 1 , that is, the first energy dissipating element 9 is wrapped on the bottom and the side wall of the upper cross connection end 6 The surface and the bottom surface of the upper precast concrete column 1 protruding from the longitudinal connecting ribs 4, the four corners of the first energy dissipation element 9 are provided with sockets 901 for inserting the longitudinal connecting ribs 4, increasing the connection between the upper and lower longitudinal connecting ribs 4 The accuracy ensures that the connecting part 8 connects and tightens the upper and lower longitudinal connecting ribs 4, the bottom of the first energy dissipation element 9 forms a trapezoidal limit block 602, and the upper end of the second energy dissipation element 10 forms a trapezoidal limit groove 702 correspondingly, Increase the fit of node connections. The upper screw 601 is pre-installed inside and outside the side wall of the first energy-dissipating element 9 flush with the upper precast concrete column 1, and the upper screw 601 is embedded in the upper precast concrete column 1, and the first special-shaped steel plate and the upper precast concrete column 1 are added connectivity. The arrangement of the second energy dissipation element 10 is the same as that of the first energy dissipation element 9 , the difference is that the top of the second energy dissipation element 10 forms a trapezoidal limiting groove 702 corresponding to the trapezoidal limiting block 602 . The first energy-dissipating element 9 and the second energy-dissipating element 10 are respectively steel plates, and the force of the earthquake is buffered by the energy-dissipating effect of the steel plates. At the same time, the steel plate coated on the trapezoidal limiting block 602 and the trapezoidal limiting groove 702 can increase local rigidity and resist partial horizontal force of the earthquake.

根据本实用新型的一个实施例,所述梯形限位块602和梯形限位槽702之间设置有橡胶垫。According to an embodiment of the present invention, a rubber pad is provided between the trapezoidal limiting block 602 and the trapezoidal limiting groove 702 .

在以上实施例中,梯形限位块602和梯形限位槽702之间填充橡胶垫,利用橡胶的耗能作用达到吸收能量减震效果,装配式混凝土柱柱连接节点结构的稳定性更佳、抗震性更好;且橡胶垫为氯化橡胶材料,具有防火的功能。In the above embodiments, rubber pads are filled between the trapezoidal limiting block 602 and the trapezoidal limiting groove 702, and the energy dissipation effect of the rubber is used to absorb energy and shock absorption, and the stability of the assembled concrete column-to-column connection node structure is better. The shock resistance is better; and the rubber pad is made of chlorinated rubber material, which has the function of fire prevention.

根据本实用新型的一个实施例,所述固定孔301为腰形孔。According to an embodiment of the present utility model, the fixing hole 301 is a waist-shaped hole.

在以上实施例中,盖板3上固定孔301为腰形孔,地震时候允许上螺杆601和下螺杆701在腰形孔内有微小位移,使装配式混凝土柱柱连接节点结构达到减震耗能的作用,避免因地震时产生较大能量而发生破坏。In the above embodiment, the fixing hole 301 on the cover plate 3 is a waist-shaped hole, and the upper screw 601 and the lower screw 701 are allowed to have a small displacement in the waist-shaped hole during an earthquake, so that the assembled concrete column-column connection node structure can achieve shock absorption. The function of energy can avoid damage due to the large energy generated during the earthquake.

本实用新型的装配式混凝土柱柱连接节点的施工方法为:先将第一耗能元件9和第二耗能元件10分别包覆于上段预制混凝土柱1的底部所外表面和下段预制混凝土柱2的顶部所有外表面,上部和下部的纵向连接筋4分别穿过第一耗能元件9和第二耗能元件10上对应的插孔901,对第一耗能元件9和第二耗能元件10进行固定,第一耗能元件9的侧壁内外分别预装上螺杆601,上段预制混凝土柱1先浇筑部分混凝土,然后将上螺杆601预埋在上段预制混凝土柱1再继续浇筑混凝土,实现第一耗能元件9与上段预制混凝土柱1的固定连接,第二耗能元件10采用与第一耗能元件9同样的方式进行安装。然后将包覆耗能元件的上段预制混凝土柱1通过相互匹配的梯形限位块602和梯形限位槽702插入下段预制混凝土柱2内。按压连接部件8两端的调节螺母810,使连接部件8插入上、下纵向连接筋4之间,分别转动两侧的调节螺母810,使纵向连接筋4的螺纹端拧入调节螺母810内,进而将上、下纵向连接筋4连接在一起。接着将低屈服点钢板盖在上十字连接端6和下十字连接的侧壁上,上螺杆601和下螺杆701分别穿过盖板3上的固定孔301并通过螺母固定。最后在梯形限位块602和梯形限位槽702之间填充橡胶材料,可以是氯化橡胶材料。The construction method of the prefabricated concrete column-column connection node of the utility model is as follows: first, the first energy-dissipating element 9 and the second energy-dissipating element 10 are respectively coated on the outer surface of the bottom of the upper precast concrete column 1 and the lower precast concrete column 2, the upper and lower longitudinal connecting ribs 4 pass through the corresponding sockets 901 on the first energy dissipating element 9 and the second energy dissipating element 10 respectively, and the first energy dissipating element 9 and the second energy dissipating element 10 The element 10 is fixed, and the inside and outside of the side wall of the first energy-dissipating element 9 are respectively pre-installed with screw rods 601. The upper precast concrete column 1 is first poured with part of the concrete, and then the upper screw rod 601 is pre-embedded in the upper precast concrete column 1, and then the pouring of concrete is continued. The fixed connection between the first energy dissipation element 9 and the upper precast concrete column 1 is realized, and the second energy dissipation element 10 is installed in the same manner as the first energy dissipation element 9 . Then insert the upper precast concrete column 1 covering the energy dissipation elements into the lower precast concrete column 2 through the matching trapezoidal stop block 602 and trapezoidal stop slot 702 . Press the adjusting nuts 810 at the two ends of the connecting part 8, so that the connecting part 8 is inserted between the upper and lower longitudinal connecting ribs 4, respectively rotate the adjusting nuts 810 on both sides, so that the threaded ends of the longitudinal connecting ribs 4 are screwed into the adjusting nuts 810, and then Connect the upper and lower longitudinal connecting ribs 4 together. Next, the low yield point steel plate is covered on the side walls of the upper cross connection end 6 and the lower cross connection, and the upper screw rod 601 and the lower screw rod 701 respectively pass through the fixing holes 301 on the cover plate 3 and are fixed by nuts. Finally, a rubber material is filled between the trapezoidal limiting block 602 and the trapezoidal limiting groove 702, which may be a chlorinated rubber material.

本实用新型的装配式混凝土柱柱连接节点结构简单,节点施工简便,传力明确可靠,造价较低,连接部件8易于更换,简化了节点区钢筋的搭接工作,整个安装过程都是干式连接,大大减少了节点区的后浇作业,不需要特殊工具,加快了施工速度;传力明确可靠,当遭遇较低烈度地震作用时,结构保持完好;当遭遇较大烈度地震作用时,四周侧壁的低屈服钢板首先吸收能量达到屈服,固定螺母302抵抗竖向的剪力和水平拉力,在这一过程中达到耗能的效果;接着混凝土柱四个边角的连接部件8也逐渐达到屈服,连接部件8的两侧的调节螺母810抵抗竖向拉力;最后破坏的是混凝土柱梯形限位块602和梯形限位槽702,梯形限位块602和梯形限位槽702可部分抵抗地震水平力。本实用新型的装配式混凝土柱柱连接节点由外到内依次耗能,保证了装配式混凝土柱柱连接节点结构在不同烈度地震作用时的受力性能以及强震后结构的可迅速修复性能,施工成本低,有利于装配式混凝土框架结构的推广使用,具有显著的经济效益和社会效益。The assembled concrete column-to-column connection node structure of the utility model is simple, the node construction is simple, the force transmission is clear and reliable, the cost is low, the connecting parts 8 are easy to replace, and the overlapping work of the steel bars in the node area is simplified. The whole installation process is dry. The connection greatly reduces the post-pouring operation in the joint area, does not require special tools, and speeds up the construction speed; the force transmission is clear and reliable, and the structure remains intact when encountering a low-intensity earthquake; when encountering a relatively high-intensity earthquake, the surrounding The low-yield steel plate on the side wall first absorbs energy to yield, and the fixing nut 302 resists the vertical shear force and horizontal tension force, and achieves the effect of energy dissipation in this process; then the connecting parts 8 at the four corners of the concrete column also gradually reach Yield, the adjusting nuts 810 on both sides of the connecting part 8 resist the vertical tension; the final damage is the trapezoidal limiting block 602 and the trapezoidal limiting groove 702 of the concrete column, the trapezoidal limiting block 602 and the trapezoidal limiting groove 702 can partially resist earthquakes horizontal force. The assembled concrete column-to-column connection nodes of the utility model consume energy sequentially from the outside to the inside, which ensures the mechanical performance of the assembled concrete column-to-column connection node structure under the action of earthquakes of different intensities and the rapid repairability of the structure after strong earthquakes. The construction cost is low, which is conducive to the popularization and use of the prefabricated concrete frame structure, and has significant economic and social benefits.

显然,本领域的技术人员可以对本实用新型进行各种改动和变型而不脱离本实用新型的精神和范围。这样,倘若本实用新型的这些改动和变型属于本实用新型权利要求及其等同技术的范围之内,则本实用新型也意图包含这些改动和变型在内。Obviously, those skilled in the art can make various changes and modifications to the utility model without departing from the spirit and scope of the utility model. In this way, if these changes and modifications of the utility model fall within the scope of the claims of the utility model and their equivalent technologies, the utility model is also intended to include these changes and modifications.

Claims (10)

1. a kind of assembly concrete column column connected node characterized by comprising upper section precast concrete column (1), lower section are pre- Concrete column (2) processed and cover board (3);It is respectively set in the upper section precast concrete column (1) and lower section precast concrete column (2) There are longitudinally connected muscle (4) and lateral connection muscle (5), the longitudinally connected muscle (4) is fixedly connected with lateral connection muscle (5);
The bottom four corners of the upper section precast concrete column (1) remove identical cuboid respectively and form cross connecting pin (6), Upper screw rod is laterally set respectively on the upper cross connecting pin (6) side wall concordant with upper section precast concrete column (1) (601);
The top quadrangle of the lower section precast concrete column (2) removes identical cuboid formation respectively and connect with the upper cross (6) corresponding lower cross connecting pin (7) is held, is horizontally arranged with respectively and upper screw rod on the side wall of the lower cross connecting pin (7) (601) corresponding lower screw rod (701);
Fixation hole (301) corresponding with upper screw rod (601) and lower screw rod (701) is respectively arranged on the cover board (3), it is described Upper screw rod (601) and lower screw rod (701) are each passed through the fixation hole (301) and are fixed by fixture nut (302).
2. assembly concrete column column connected node according to claim 1, which is characterized in that the upper cross connecting pin (6) the identical cuboid of removal surrounding forms rectangle connecting pin, and lower cross connecting pin (7) the removal surrounding is identical rectangular Body forms lower rectangle connecting pin corresponding with upper rectangle connecting pin.
3. assembly concrete column column connected node according to claim 1 or 2, which is characterized in that the upper section is prefabricated Longitudinally connected muscle (4) in concrete column (1) at four corners or surrounding stretches out the bottom of the upper section precast concrete column (1) End, the extension end of the longitudinally connected muscle (4) is provided with preburying part (401);It is vertical in the lower section precast concrete column (2) The extension end of dowel (4) is provided with lower preburying part (402) corresponding with upper preburying part (401);It is described pre-buried Portion (401) is fixedly connected with lower preburying part (402) by connecting component (8).
4. assembly concrete column column connected node according to claim 3, which is characterized in that the connecting component (8) Include two adjusting nuts (810) and work shape connecting rod (820);One end of each adjusting nut (810) is provided with threaded hole (811), the other end of adjusting nut (810) is provided with bayonet (812), and the both ends of the work shape connecting rod (820) are each passed through Bayonet (812) is simultaneously movably arranged in two adjusting nuts (810);The extension end of the longitudinally connected muscle (4) is provided with outer spiral shell Line, the upper preburying part (401) and lower preburying part (402) are respectively the male end of longitudinally connected muscle (4), the external screw thread with The internal screw thread of the threaded hole (811) matches.
5. assembly concrete column column connected node according to claim 4, which is characterized in that the work shape connecting rod (820) end face at both ends is respectively set fluted (821), the screw head phase of the groove (821) and the longitudinally connected muscle (4) Matching.
6. assembly concrete column column connected node according to claim 3, which is characterized in that the connecting component (8) Include two adjusting nuts (810) and work shape connecting rod (820);One end of each adjusting nut (810) is provided with screw rod, adjusts The other end of nut (810) is provided with bayonet (812), and the both ends of the work shape connecting rod (820) are each passed through bayonet (812) simultaneously It is movably arranged in two adjusting nuts (810);It is provided with reinforcing steel bar connecting sleeve tube on the extension end of the longitudinally connected muscle (4), The upper preburying part (401) and lower preburying part (402) are respectively reinforcing steel bar connecting sleeve tube, the reinforcing steel bar connecting sleeve tube and the screw rod Match.
7. assembly concrete column column connected node according to claim 1, which is characterized in that the upper cross connecting pin (6) bottom end is provided with limited block, and the top of the lower cross connecting pin (7) is provided with the limit to match with the limited block Slot.
8. assembly concrete column column connected node according to claim 7, which is characterized in that the limited block is trapezoidal Limited block (602), the limiting slot are trapezoidal limiting slot (702).
9. assembly concrete column column connected node according to claim 8, which is characterized in that further include the first energy consumption member Part (9) and the second dissipative cell (10);First dissipative cell (9) cladding is set to the upper section precast concrete column (1) Bottom all outer surfaces, be provided with jack corresponding with longitudinally connected muscle (4) on first dissipative cell (9) (901), one end of the upper screw rod (601) is connect with the upper section precast concrete column (1), the upper screw rod (601) it is another One end sequentially passes through the first dissipative cell (9) and cover board (3) and is fixed by fixture nut (302);
Second dissipative cell (10) cladding is set to the top all outer surfaces of the lower section precast concrete column (2), institute It states and is provided with jack (901) corresponding with longitudinally connected muscle (4), the lower screw rod on the second dissipative cell (10) (701) one end is connect with the lower section precast concrete column (2), and the other end of the lower screw rod (701) sequentially passes through second Dissipative cell (10) and cover board (3) are simultaneously fixed by fixture nut (302).
10. assembly concrete column column connected node according to claim 8, which is characterized in that the trapezoidal limited block (602) rubber pad is provided between trapezoidal limiting slot (702).
CN201822201764.3U 2018-12-26 2018-12-26 A prefabricated concrete column-to-column connection node Expired - Fee Related CN209339309U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822201764.3U CN209339309U (en) 2018-12-26 2018-12-26 A prefabricated concrete column-to-column connection node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822201764.3U CN209339309U (en) 2018-12-26 2018-12-26 A prefabricated concrete column-to-column connection node

Publications (1)

Publication Number Publication Date
CN209339309U true CN209339309U (en) 2019-09-03

Family

ID=67759080

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822201764.3U Expired - Fee Related CN209339309U (en) 2018-12-26 2018-12-26 A prefabricated concrete column-to-column connection node

Country Status (1)

Country Link
CN (1) CN209339309U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109457800A (en) * 2018-12-26 2019-03-12 长安大学 A kind of assembly concrete column column connected node
CN111997192A (en) * 2020-08-06 2020-11-27 东南大学 Precast concrete post concatenation node
CN117386196A (en) * 2023-11-22 2024-01-12 中铁建设集团华北工程有限公司 An assembled column base connection mechanism and canopy system in alpine and cold areas
CN119288065A (en) * 2024-12-12 2025-01-10 中国二十二冶集团有限公司 A high-strength thermal insulation integrated assembled structure

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109457800A (en) * 2018-12-26 2019-03-12 长安大学 A kind of assembly concrete column column connected node
CN109457800B (en) * 2018-12-26 2024-01-02 长安大学 A kind of prefabricated concrete column connection node
CN111997192A (en) * 2020-08-06 2020-11-27 东南大学 Precast concrete post concatenation node
CN117386196A (en) * 2023-11-22 2024-01-12 中铁建设集团华北工程有限公司 An assembled column base connection mechanism and canopy system in alpine and cold areas
CN119288065A (en) * 2024-12-12 2025-01-10 中国二十二冶集团有限公司 A high-strength thermal insulation integrated assembled structure
CN119288065B (en) * 2024-12-12 2025-03-04 中国二十二冶集团有限公司 High-strength heat-preservation integrated assembly structure

Similar Documents

Publication Publication Date Title
CN109457800B (en) A kind of prefabricated concrete column connection node
CN104847052B (en) A kind of damaged replaceable composite column structure
CN103195170B (en) Prefabricated reinforced concrete frame structure system
CN203213282U (en) Fabricated reinforced concrete frame structure system
CN211080544U (en) Combined type precast concrete beam column shockproof connecting device
CN110528950A (en) A prefabricated concealed corbel-shaped beam-column joint connection device
CN108755951B (en) Precast prestressed concrete frame energy-dissipating and shock-absorbing beam-column joints
US20170089089A1 (en) Techniques for protection of structures from wind and earthquake type stresses
CN207348083U (en) A kind of damping vibrating type supporting device with steel structure
CN111749352A (en) An energy dissipation connection device for prefabricated shear walls
CN110565799A (en) A prefabricated concrete beam-column connection method for earthquake resistance
CN211665987U (en) Energy dissipation shock attenuation node reaches shock attenuation post including this node
CN112681808A (en) Quick construction honeycomb building suitable for earthquake relief work
CN111851769A (en) A prefabricated buttress for an energy dissipator and a connection node between the buttress and the energy dissipator
CN110700434A (en) Energy dissipation and shock absorption node, shock absorption column and installation method
CN110145021A (en) A prefabricated self-resetting beam-column connection node with built-in extrusion energy dissipation device
CN220451069U (en) Spliced building structure
CN115142544B (en) A mortise and tenon joint type assembled concrete frame structure
CN206752675U (en) A kind of concrete frame node
CN204676776U (en) Damaged replaceable composite column structure
KR101424347B1 (en) Shear anchor for joing new and old concrete and method for joining new and old concrete
CN110206162B (en) Assembled steel structure building connecting piece and construction method thereof
CN115059180B (en) Assembled earthquake-resistant building system
CN214885797U (en) Reinforcing device for brick-concrete structure of constructional engineering
CN216195515U (en) Light steel construction antidetonation node for assembly type structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190903

CF01 Termination of patent right due to non-payment of annual fee