CN211899577U - Hanging basket device for building construction - Google Patents

Hanging basket device for building construction Download PDF

Info

Publication number
CN211899577U
CN211899577U CN202020538828.3U CN202020538828U CN211899577U CN 211899577 U CN211899577 U CN 211899577U CN 202020538828 U CN202020538828 U CN 202020538828U CN 211899577 U CN211899577 U CN 211899577U
Authority
CN
China
Prior art keywords
component
hanging
slide rail
sliding
fixing component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020538828.3U
Other languages
Chinese (zh)
Inventor
王勇涛
夏海
林豪
余旺
李光峰
赖君毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202020538828.3U priority Critical patent/CN211899577U/en
Application granted granted Critical
Publication of CN211899577U publication Critical patent/CN211899577U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a hanging flower basket device for construction, including suspending in midair fixed subassembly, flexible slide rail set spare, wire rope, hanging flower basket subassembly, power component, suspend in midair fixed subassembly and can fix on the guardrail, and suspend in midair fixed subassembly and can follow the guardrail removal, flexible slide rail set spare one end is articulated through the pivot and suspend in midair fixed subassembly, and flexible slide rail set spare can be followed the axis of pivot is rotated, the flexible slide rail set spare other end and hanging flower basket subassembly fixed connection, power component installs in the top of suspending in midair fixed subassembly, wire rope one end is connected with flexible slide rail set spare, and the other end is installed on power component, power component can drive wire rope and remove and let flexible slide rail set spare flexible. Utilize flexible slide rail set spare to overcome and only adopted wire rope can receive external environment influence among the prior art. The stability of hanging flower basket subassembly is stronger, and is safer, has improved efficiency of construction and construction safety.

Description

Hanging basket device for building construction
Technical Field
The utility model relates to a hanging flower basket technical field, concretely relates to hanging flower basket device for construction and application method thereof.
Background
The hanging flower basket is a traditional scaffold that can replace, can alleviate intensity of labour, improves work efficiency to novel aerial working equipment that can used repeatedly. At present, the use of the construction hanging basket gradually becomes a trend, and the construction hanging basket is widely accepted in high-altitude operations such as outer wall construction, curtain wall installation, heat preservation construction, outer wall maintenance and cleaning of high-rise multi-storey buildings and the like. Meanwhile, the method can be used for the operation of large-scale tank bodies, bridges, dams and other projects.
The hanging basket in the prior art mostly consists of a hanging platform, a steel wire rope, a lifter and a hanging basket, wherein the hanging platform is fixed on the top surface of a building, the hanging basket moves up and down along the steel wire rope extending out of the hanging platform, but the steel wire rope is woven by soft steel wires, so that the hanging basket is poor in stability in the using process, is easily influenced by the external environment to swing, and influences the construction quality. Meanwhile, the hanging basket is only used vertically, when the outer surface of a building is designed to be inclined, a conventional hanging basket is only provided with a top fixed point without support in the middle, stable climbing and descending of the hanging basket cannot be achieved, construction operation of an inclined construction vertical face cannot be performed, the hanging basket is connected with the building only through a steel wire rope, safety measures are omitted, and safety accidents easily occur when the steel wire rope breaks.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that the hanging flower basket among the prior art comprises platform, wire rope, lifting machine and hanging flower basket in midair more, suspends the platform in midair and fixes the top surface at the building, and the hanging flower basket reciprocates along the wire rope that extends out on suspending the platform in midair, nevertheless because wire rope weaves by soft steel wire and forms, poor stability in the use, receives external environment to influence easily and takes place the swing, influences construction quality.
The utility model discloses a following technical scheme realizes:
the utility model provides a hanging flower basket device for construction, is including suspending in midair fixed subassembly, flexible slide rail set spare, wire rope, hanging flower basket subassembly, power component, suspend in midair fixed subassembly and can fix on the guardrail, and suspend in midair fixed subassembly and can follow the guardrail removal, flexible slide rail set spare one end is articulated with suspending in midair fixed subassembly through the pivot, and flexible slide rail set spare can be followed the axis of pivot is rotated, the flexible slide rail set spare other end and hanging flower basket subassembly fixed connection, power component installs in the top of suspending in midair fixed subassembly, wire rope one end is connected with flexible slide rail set spare, and the other end is installed on power component, power component can drive wire rope and remove and let flexible slide rail set spare flexible.
The hanging basket in the prior art mostly consists of a hanging platform, a steel wire rope, a lifter and a hanging basket, wherein the hanging platform is fixed on the top surface of a building, the hanging basket moves up and down along the steel wire rope extending out of the hanging platform, but the steel wire rope is woven by soft steel wires, so that the hanging basket is poor in stability in the using process, is easily influenced by the external environment to swing, and influences the construction quality. This application is through setting up flexible slide rail set spare between suspending in midair fixed subassembly and hanging flower basket subassembly, and it is flexible through power device and the flexible slide rail set spare of wire rope control, has overcome and only has adopted wire rope can receive external environment to influence among the prior art for the swing of hanging flower basket subassembly influences efficiency of construction and construction safety. Meanwhile, the end part of the telescopic slide rail component is hinged with the suspension fixing component and can rotate, so that the hanging basket in the prior art cannot be used on a building with an inclined plane, and the influence of unevenness of the plane of the building on the lifting of the hanging basket component can be overcome. And meanwhile, the hanging fixing component can move along the guardrail, so that the hanging basket is convenient to move and more convenient to use.
The guardrail is a safety device formed by pouring concrete at the edge of the top layer of the building, and can form a safety barrier for the top of the building, such as safety guardrails on two sides of a viaduct, and the safety barrier on the top of a high-rise building can be a guardrail.
Furthermore, the suspension fixing component comprises a first suspension fixing component, a second suspension fixing component and an adjusting device, the section of the first suspension fixing component is T-shaped, the section of the second suspension fixing component is L-shaped and rotates 180 degrees clockwise, the second suspension fixing component is spliced with the first suspension fixing component, the adjusting device is installed between the first suspension fixing component and the second suspension fixing component, the adjusting device can adjust the distance between the first suspension fixing component and the second suspension fixing component, the telescopic slide rail component is hinged to the end of the horizontal section of the first suspension fixing component, and the power component is fixedly installed at the top of the first suspension fixing component. The positions of the first suspension assembly and the second suspension fixing assembly are adjusted by arranging the adjusting device, and the suspension fixing assembly can be clamped and fixed on guardrails with different thicknesses when in use, so that the use is more convenient.
Furthermore, a slot is formed in one end, away from the telescopic sliding rail assembly, of the horizontal section of the first suspension fixing assembly, a horizontal section of the second suspension fixing assembly is inserted into the slot, the second suspension fixing assembly can move along the slot, a through hole is formed in the horizontal section of the second suspension fixing assembly, the adjusting device is a screw rod assembly, one end of the screw rod assembly is fixed in the slot, and the other end of the screw rod assembly penetrates through the through hole to connect the first suspension fixing assembly and the second suspension fixing assembly. The screw assembly and the slot are matched to adjust the distance between the first suspension fixing assembly and the second suspension fixing assembly, so that the use is convenient, and the cost is low.
The first suspension fixing component and the second suspension fixing component are provided with a plurality of first universal guide wheels on two opposite surfaces respectively, and the bottom surface of one side of the horizontal section of the first suspension fixing component close to the second suspension fixing component is provided with a plurality of second universal guide wheels. Through setting up first universal wheel and second universal wheel and being convenient for when changing the hanging flower basket position, adjust the pressure that reduces first universal wheel to the guardrail through adjusting device, through promoting first fixed subassembly or the second of suspending in midair the fixed subassembly, first fixed subassembly and the second of suspending in midair suspend the fixed subassembly and can remove under the effect of first universal wheel and second universal wheel, and first universal wheel and second universal wheel can reduce the frictional force when removing, promote more easily.
Furthermore, flexible slide rail set spare has two sets ofly, two sets of flexible slide rail set spare all includes first slide rail, second slide rail, third slide rail, be provided with first spout on the first slide rail, be provided with the second spout on the third slide rail, be provided with first slider and second slider on the second slide rail, first spout and the cooperation of first slider with first slide rail can the removal install on the second slide rail, the cooperation of second spout and second slider with third slide rail can the removal install on the second slide rail, the top of the first slide rail of two sets of flexible slide rail set spares is articulated with hanging in midair fixed subassembly respectively, third slide rail bottom and hanging flower basket subassembly fixed connection, wire rope tip and third slide rail fixed connection. Through setting flexible slide rail to a plurality of slide rails, the slide rail has certain rigidity, can prevent to be moved by environmental impact when using, and simple structure simultaneously, flexible in-process is controlled by wire rope more conveniently.
Further, the top of first slider is provided with first stopper, the bottom of second slider is provided with the second stopper, the bottom of first spout is provided with the third stopper, second spout top is provided with the fourth stopper. Through setting up the stopper, can carry on spacingly to the slide rail, avoid wire rope fracture, drop between the slide rail, lead to the incident to take place, and stopper between two slide rails just can inject the biggest extension length of two slide rails, and is safe in utilization, and the security is high.
Further, including the electromagnetic lock, be provided with the electromagnetic lock on first slider and the second slider, be provided with the locked groove in the first spout of first slide rail, be provided with the locked groove in the second spout of third slide rail, the electromagnetic lock can stretch into the locked groove and can be with first slide rail, third slide rail and second slide rail relatively fixed. Through setting up the electromagnetic lock, the electromagnetic lock is connected with power device, and the electromagnetic lock outage when power device descends, other time outage, slide rail whereabouts in-process when wire rope fracture, the electromagnetic lock can insert in the locked groove, can guarantee, constructor's safety for the hanging flower basket can not descend a lot, uses safelyr.
The electromagnetic lock is similar to an electromagnet, and when a coil is electrified, an iron core and an armature are magnetized to form two pieces of iron with opposite polarities. An electromagnetic attraction force is generated between them. When the attraction force is greater than the reaction force of the spring, the armature begins to move toward the core. When the current in the coil is less than a certain value or the power supply is interrupted, the electromagnetic attraction force is less than the counterforce of the spring, and the armature returns to the original release position under the action of the counterforce. An electromagnetic lock is an electrical appliance that uses the electromagnetic attraction force generated by a current-carrying iron core coil to operate a mechanical device to achieve a desired action. It is an electromagnetic element that converts electrical energy into mechanical energy.
Furthermore, one side of the hanging basket component close to the hanging fixing component is provided with a plurality of third universal guide wheels. Through set up the third universal wheel in the hanging flower basket is close to one side of suspending in midair fixed subassembly, guarantee that the hanging flower basket relies on universal wheel and wall body to produce and rolls at the decline in-process, avoid the damage of hanging flower basket to the wall body.
Further, still include fourth slide rail, slider, the both ends of fourth slide rail are fixed in the lateral wall of two sets of third slide rails respectively, what the slider can remove installs in the fourth slide rail, be provided with rings on the slider, it is two sets of be provided with the ladder frame between the first slide rail. Through setting up rings, during the construction, the user of service can hang the safety device of self on rings like the safety belt, and during the construction, the slider of rings can be followed the fourth slide rail and removed, facilitates the use, has improved the security of using simultaneously, and ladder frame convenience of use personnel gets into the hanging flower basket from the building top.
Compared with the prior art, the utility model, following advantage and beneficial effect have:
the utility model discloses a set up flexible slide rail set spare between suspending in midair fixed subassembly and hanging flower basket subassembly, flexible through power device and the flexible slide rail set spare of wire rope control, overcome among the prior art only adopt wire rope can receive external environment influence for the swing of hanging flower basket subassembly influences efficiency of construction and construction safety. Meanwhile, the end part of the telescopic slide rail component is hinged with the suspension fixing component, so that the problem that a hanging basket in the prior art cannot be used on a building with an inclined plane is solved, and the influence on the lifting of the hanging basket component due to the unevenness of the plane of the building can be overcome. Adjust the interval that first subassembly and the second hung fixed subassembly through setting up adjusting device, be convenient for can let when using hang in midair the fixed subassembly centre gripping and fix on the guardrail of different thickness, it is more convenient to use. Through setting up first universal wheel and second universal wheel be convenient for when changing the hanging flower basket position, frictional force when can reducing the removal promotes more easily. Through setting up stopper and electromagnetic lock, can carry on spacingly to the slide rail, avoid wire rope fracture, drop between the slide rail, lead to the incident to take place, use safelyr. The utility model also discloses a hanging flower basket device application method for construction, let the use of hanging flower basket safer and swift
Drawings
The accompanying drawings, which are included to provide a further understanding of the embodiments of the invention and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the invention and together with the description serve to explain the principles of the invention. In the drawings:
fig. 1 is a schematic view of the overall structure of the embodiment of the present invention.
Fig. 2 is a schematic structural view of a suspension fixing assembly according to an embodiment of the present invention.
Fig. 3 is a schematic structural view of the retractable slide rail assembly according to an embodiment of the present invention.
Fig. 4 is a schematic sectional view of the telescopic slide rail assembly according to an embodiment of the present invention.
Fig. 5 is a schematic structural diagram of a basket assembly according to an embodiment of the present invention.
Reference numbers and corresponding part names in the drawings:
1-a suspension fixing component, 2-a telescopic slide rail component, 3-a steel wire rope, 4-a hanging basket component, 5-a power component, 6-a rotating shaft, 7-a first suspension fixing component, 8-a second suspension fixing component, 9-an adjusting device, 10-a slot, 11-a through hole, 12-a first universal guide wheel, 13-a second universal guide wheel, 14-a first slide rail, 15-a second slide rail, 16-a third slide rail, 17-a first sliding groove, 18-a first sliding block, 19-a second sliding block, 20-an electromagnetic lock, 21-a locking groove, 22-a first limiting block, 23-a second limiting block, 24-a third limiting block, 25-a second sliding groove, 26-a fourth sliding rail, 27-a sliding block and 28-a hanging ring, 29-a ladder frame, 30-a third universal guide wheel, 31-a fourth limiting block.
Detailed Description
To make the objects, technical solutions and advantages of the present invention more apparent, the present invention is further described in detail below with reference to the following examples and drawings, and the exemplary embodiments and descriptions thereof of the present invention are only used for explaining the present invention, and are not intended as limitations of the present invention.
Example 1
As shown in fig. 1-5, a hanging flower basket device for building construction, including suspending in midair fixed subassembly 1, flexible slide rail set spare 2, wire rope 3, hanging flower basket subassembly 4, power component 5, suspend in midair fixed subassembly 1 and can fix on the guardrail, and suspend in midair fixed subassembly 1 and can follow the guardrail removal, flexible slide rail set spare 2 one end is through pivot 6 with suspend in midair fixed subassembly 1 articulated, and flexible slide rail set spare 2 can follow the axis of pivot 6 rotates, the flexible slide rail set spare 2 other end and hanging flower basket subassembly 4 fixed connection, power component 5 installs in suspending in midair the top of fixed subassembly 1, 3 one end of wire rope are connected with flexible slide rail set spare 2, and the other end is installed on power component 5, power component 5 can drive wire rope 3 and remove and let flexible slide rail set spare 2 flexible.
Through set up flexible slide rail set spare 2 between suspending in midair fixed subassembly 1 and hanging flower basket subassembly 4, flexible slide rail set spare 2 is flexible through power device 5 and 3 control of wire rope, has overcome and only has adopted wire rope 3 to receive external environment to influence among the prior art for hanging flower basket subassembly 4 swings, influences efficiency of construction and construction safety. Meanwhile, the end part of the telescopic slide rail component 2 is hinged with the suspension fixing component 1 and can rotate, so that the problem that the hanging basket component 4 in the prior art cannot be used on a building with an inclined plane is solved, and the influence of the unevenness of the plane of the building on the lifting of the hanging basket component 4 can be overcome. Meanwhile, the hanging and fixing component 1 can move along the guardrail, so that the hanging basket component 4 can be conveniently moved and used.
Example 2
As shown in fig. 1 to 5, the present embodiment is substantially the same as embodiment 1, except that the suspension fixing assembly 1 includes a first suspension fixing assembly 7, a second suspension fixing assembly 8, and an adjusting device 9, the cross section of the first suspension fixing assembly 7 is T-shaped, the cross section of the second suspension fixing assembly 8 is L-shaped and rotates clockwise 180 °, the second suspension fixing assembly 8 is inserted into the first suspension fixing assembly 7, the adjusting device 9 is installed between the first suspension fixing assembly 7 and the second suspension fixing assembly 8, the adjusting device 9 can adjust the distance between the first suspension fixing assembly 7 and the second suspension fixing assembly 8, the telescopic sliding rail assembly 2 is hinged to the end of the horizontal section of the first suspension fixing assembly 7, and the power assembly 5 is fixedly installed on the top of the first suspension fixing assembly 7.
Specifically, a slot 10 is formed in one end, away from the telescopic sliding rail assembly 2, of the horizontal section of the first suspension fixing assembly 7, the horizontal section of the second suspension fixing assembly 8 is inserted into the slot 10, the second suspension fixing assembly 8 can move along the slot 10, a through hole 11 is formed in the horizontal section of the second suspension fixing assembly 8, the adjusting device 9 is a screw assembly, one end of the screw assembly is fixed in the slot 10, and the other end of the screw assembly penetrates through the through hole 11 to connect the first suspension fixing assembly 7 and the second suspension fixing assembly 8.
The distance between the first suspension component 7 and the second suspension fixing component 8 is adjusted by arranging the adjusting device 9, so that the suspension fixing component 1 can be clamped and fixed on guardrails with different thicknesses in use more conveniently.
Example 3
As shown in fig. 1 to 5, the present embodiment is substantially the same as embodiment 2, except that the first and second suspension fixing assemblies 7 and 7 are provided with a plurality of first universal guide wheels 12 on two opposite surfaces, respectively, and a plurality of second universal guide wheels 13 are provided on a bottom surface of a horizontal section of the first suspension fixing assembly 7 on a side close to the second suspension fixing assembly 8.
The arrangement of the first universal wheel 12 and the second universal wheel 13 is convenient for adjustment through the adjusting device 9 when the position of the hanging basket component 4 is changed, the pressure of the first universal wheel 12 on the guardrail is reduced, the first hanging and fixing component 7 or the second hanging and fixing component 8 is pushed, the first hanging and fixing component 7 and the second hanging and fixing component 8 can move under the action of the first universal wheel 12 and the second universal wheel 13, the friction force between the hanging and fixing component 1 and the guardrail during movement can be reduced through the first universal wheel 12 and the second universal wheel 13, and pushing is easier.
Example 4
As shown in fig. 1 to 5, the present embodiment is substantially the same as embodiment 1, except that there are two sets of the telescopic sliding rail assemblies 2, and each of the two sets of the telescopic sliding rail assemblies 2 includes a first sliding rail 14, a second sliding rail 15, and a third sliding rail 16, a first sliding groove 17 is arranged on the first sliding rail 14, a second sliding groove 25 is arranged on the third sliding rail 16, the second slide rail 15 is provided with a first slide block 18 and a second slide block 19, the first slide groove 17 is matched with the first slide block 18 to movably mount the first slide rail 14 on the second slide rail 15, the second sliding chute 25 is matched with the second sliding block 19 to movably mount the third sliding rail 16 on the second sliding rail 15, the top of the first sliding rail 14 of the two groups of telescopic sliding rail components is respectively hinged with the suspension fixing component 1, the bottom of the third slide rail 16 is fixedly connected with the hanging basket component 4, and the end part of the steel wire rope 3 is fixedly connected with the third slide rail 16. First stopper 22 is arranged at the top of first slider 18, second stopper 23 is arranged at the bottom of second slider 19, third stopper 24 is arranged at the bottom of first runner 17, and fourth stopper 31 is arranged at the top of second runner 25. The first slide block 18 and the second slide block 19 are provided with electromagnetic locks 20, a first sliding groove 17 of the first slide rail 14 is provided with a locking groove 21, a second sliding groove 25 of the third slide rail 16 is provided with a locking groove 21, and the electromagnetic locks 20 can extend into the locking groove 21 to relatively fix the first slide rail 14, the third slide rail 16 and the second slide rail 15. And a plurality of third universal guide wheels 30 are arranged on one side of the hanging basket component 4 close to the suspension fixing component 1. The lifting device further comprises a fourth slide rail 26 and a slide block 27, two ends of the fourth slide rail 26 are respectively fixed on the side walls of the two sets of third slide rails 16, the slide block 27 can be movably mounted on the fourth slide rail 26, a lifting ring 28 is arranged on the slide block 27, and a ladder frame 29 is arranged between the two sets of first slide rails 14.
During the use, will suspend fixed subassembly 1 in midair and pass through adjusting device 9 centre gripping on the guardrail wall, it is concrete, it suspends fixed device's interval in midair to adjust first fixed device and the second in midair through the bolt subassembly, let first universal wheel 12 and the second universal wheel 13 kinetic energy support on the guardrail, constructor gets into hanging flower basket subassembly 4 through ladder 29, constructor installs the safety belt in with rings 28, constructor makes hanging flower basket subassembly 4 go up and down through controlling flexible slide rail set 2 of control 5 control, remove fixed subassembly 1 in midair through first universal guide pulley 12 and the removal of second universal guide pulley 13 behind the clamping-force of adjusting device 9 adjustment when constructor need remove hanging flower basket subassembly 4, remove the position that needs to continue the construction, it can continue work to screw adjusting device 9.
The above-mentioned embodiments, further detailed description of the objects, technical solutions and advantages of the present invention, it should be understood that the above description is only the embodiments of the present invention, and is not intended to limit the scope of the present invention, and any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the scope of the present invention.

Claims (9)

1. The hanging basket device for building construction is characterized by comprising a hanging fixing component (1), a telescopic slide rail component (2), a steel wire rope (3), a hanging basket component (4) and a power component (5), wherein the hanging fixing component (1) can be fixed on a guardrail, the hanging fixing component (1) can move along the guardrail, one end of the telescopic slide rail component (2) is hinged with the hanging fixing component (1) through a rotating shaft (6), the telescopic slide rail component (2) can rotate along the axis of the rotating shaft (6), the other end of the telescopic slide rail component (2) is fixedly connected with the hanging basket component (4), the power component (5) is installed at the top of the hanging fixing component (1), one end of the steel wire rope (3) is connected with the telescopic slide rail component (2), and the other end of the steel wire rope is installed on the power component (5), the power component (5) can drive the steel wire rope (3) to move so as to enable the telescopic slide rail component (2) to stretch.
2. The hanging basket device for building construction according to claim 1, wherein the suspension fixing component (1) comprises a first suspension fixing component (7), a second suspension fixing component (8) and an adjusting device (9), the cross section of the first suspension fixing component (7) is T-shaped, the cross section of the second suspension fixing component (8) is L-shaped which rotates clockwise 180 degrees, the second suspension fixing component (8) is inserted into the first suspension fixing component (7), the adjusting device (9) is installed between the first suspension fixing component (7) and the second suspension fixing component (8), the adjusting device (9) can adjust the distance between the first suspension fixing component (7) and the second suspension fixing component (8), the telescopic slide rail component (2) is hinged at the end of the horizontal section of the first suspension fixing component (7), the power assembly (5) is fixedly arranged at the top of the first suspension fixing assembly (7).
3. The hanging basket device for building construction according to claim 2, wherein a slot (10) is formed in one end, away from the telescopic sliding rail assembly (2), of the horizontal section of the first hanging fixing assembly (7), the horizontal section of the second hanging fixing assembly (8) is inserted into the slot (10), the second hanging fixing assembly (8) can move along the slot (10), a through hole (11) is formed in the horizontal section of the second hanging fixing assembly (8), the adjusting device (9) is a screw rod assembly, one end of the screw rod assembly is fixed in the slot (10), and the other end of the screw rod assembly penetrates through the through hole (11) to connect the first hanging fixing assembly (7) and the second hanging fixing assembly (8).
4. The hanging basket device for building construction according to claim 3, further comprising a first universal guide wheel (12) and a second universal guide wheel (13), wherein the first universal guide wheels (12) are respectively arranged on two opposite surfaces of the first hanging fixing component (7) and the second hanging fixing component (8), and the second universal guide wheels (13) are arranged on the bottom surface of one side, close to the second hanging fixing component (8), of the horizontal section of the first hanging fixing component (7).
5. The hanging basket device for building construction according to claim 1, wherein the two sets of the telescopic sliding rail assemblies (2) comprise a first sliding rail (14), a second sliding rail (15) and a third sliding rail (16), the first sliding rail (14) is provided with a first sliding groove (17), the third sliding rail (16) is provided with a second sliding groove (25), the second sliding rail (15) is provided with a first sliding block (18) and a second sliding block (19), the first sliding groove (17) and the first sliding block (18) are matched to movably mount the first sliding rail (14) on the second sliding rail (15), the second sliding groove (25) and the second sliding block (19) are matched to movably mount the third sliding rail (16) on the second sliding rail (15), the tops of the first sliding rails (14) of the two sets of the telescopic sliding rail assemblies are respectively hinged to the suspension fixing assembly (1), the bottom of the third sliding rail (16) is fixedly connected with the hanging basket component (4), and the end part of the steel wire rope (3) is fixedly connected with the third sliding rail (16).
6. The hanging basket device for building construction according to claim 5, characterized in that a first stopper (22) is arranged on the top of the first sliding block (18), a second stopper (23) is arranged on the bottom of the second sliding block (19), a third stopper (24) is arranged on the bottom of the first sliding groove (17), and a fourth stopper (31) is arranged on the top of the second sliding groove (25).
7. The hanging basket device for building construction according to claim 5, characterized in that an electromagnetic lock (20) is included, the electromagnetic lock (20) is disposed on the first slider (18) and the second slider (19), a lock groove (21) is disposed in the first sliding groove (17) of the first sliding rail (14), a lock groove (21) is disposed in the second sliding groove (25) of the third sliding rail (16), and the electromagnetic lock (20) can extend into the lock groove (21) to relatively fix the first sliding rail (14), the third sliding rail (16) and the second sliding rail (15).
8. A basket device for building construction according to claim 1, characterized in that the side of the basket assembly (4) close to the suspension fixing assembly (1) is provided with a plurality of third universal guide wheels (30).
9. The hanging basket device for building construction according to claim 5, characterized by further comprising a fourth slide rail (26) and a slide block (27), wherein two ends of the fourth slide rail (26) are respectively fixed on the side walls of the two sets of third slide rails (16), the slide block (27) is movably mounted on the fourth slide rail (26), the slide block (27) is provided with a hanging ring (28), and a ladder frame (29) is arranged between the two sets of first slide rails (14).
CN202020538828.3U 2020-04-13 2020-04-13 Hanging basket device for building construction Expired - Fee Related CN211899577U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020538828.3U CN211899577U (en) 2020-04-13 2020-04-13 Hanging basket device for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020538828.3U CN211899577U (en) 2020-04-13 2020-04-13 Hanging basket device for building construction

Publications (1)

Publication Number Publication Date
CN211899577U true CN211899577U (en) 2020-11-10

Family

ID=73277575

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020538828.3U Expired - Fee Related CN211899577U (en) 2020-04-13 2020-04-13 Hanging basket device for building construction

Country Status (1)

Country Link
CN (1) CN211899577U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111335614A (en) * 2020-04-13 2020-06-26 中国建筑第二工程局有限公司 Hanging basket device for building construction and using method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111335614A (en) * 2020-04-13 2020-06-26 中国建筑第二工程局有限公司 Hanging basket device for building construction and using method thereof
CN111335614B (en) * 2020-04-13 2024-02-27 中国建筑第二工程局有限公司 Hanging basket device for building construction and using method thereof

Similar Documents

Publication Publication Date Title
CN111335614A (en) Hanging basket device for building construction and using method thereof
CN111371039B (en) Cable erecting device for building electromechanical installation
CN109173113A (en) Falling proof device and its hanging method based on unmanned plane suspension
CN211899577U (en) Hanging basket device for building construction
CN111517205A (en) Steel plate hoisting equipment for building
CN206667719U (en) A kind of building hanging basket
CN105565146B (en) Suspension hook holding structure, crane and suspension hook fixing means
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN207468151U (en) A kind of construction protection hanging basket
CN112360137A (en) Hanging flower basket based on construction of building outer wall is used
CN215331383U (en) Hanging basket structure for high-rise building construction
CN215760354U (en) Construction hanging basket with protection function
CN214942249U (en) Novel indoor wall construction device
CN211850734U (en) Hanging basket for construction site
CN214615369U (en) Safety protection hanging basket for constructional engineering
CN204633283U (en) A kind of built on stilts general cable hook suspension device
CN210828242U (en) Lifting device for building water and electricity construction
CN210340016U (en) Building construction elevator cable limit structure
CN208883430U (en) Window cleaning equipment operator is facilitated to hang the door type structure device passed through in ship in work
CN208361837U (en) A kind of Lifting basket of no suspension mechanism
CN218264859U (en) Hanging basket structure for building exterior wall decoration
CN214062298U (en) Hanging basket for constructional engineering
CN217680418U (en) Construction hanging basket
CN215101623U (en) A hoist device for curtain installation
CN202767496U (en) Eccentric hub type scaffold anti-drop and anti-tilt device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201110

Termination date: 20210413