CN211897785U - Bias-pressure subway station and viaduct combined construction structure - Google Patents

Bias-pressure subway station and viaduct combined construction structure Download PDF

Info

Publication number
CN211897785U
CN211897785U CN202020254446.8U CN202020254446U CN211897785U CN 211897785 U CN211897785 U CN 211897785U CN 202020254446 U CN202020254446 U CN 202020254446U CN 211897785 U CN211897785 U CN 211897785U
Authority
CN
China
Prior art keywords
station
bearing platform
viaduct
plate
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020254446.8U
Other languages
Chinese (zh)
Inventor
毕经东
贺维国
段悟哲
刘鹏
宋超业
秦爱红
汤浩杰
卢海珍
肖志灿
田有圩
吕显福
杜宝义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Liuyuan Group Co Ltd
China Railway Tianjin Tunnel Engineering Survey and Design Co Ltd
Original Assignee
China Railway Liuyuan Group Co Ltd
China Railway Tianjin Tunnel Engineering Survey and Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Liuyuan Group Co Ltd, China Railway Tianjin Tunnel Engineering Survey and Design Co Ltd filed Critical China Railway Liuyuan Group Co Ltd
Priority to CN202020254446.8U priority Critical patent/CN211897785U/en
Application granted granted Critical
Publication of CN211897785U publication Critical patent/CN211897785U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a subway station and viaduct of bias voltage build structure jointly, include: the station plate wall structure comprises a station top plate, a station middle plate, a station bottom plate and a station side wall which are connected through a steel pipe concrete column; the platform comprises a bottom bearing platform and a top bearing platform, wherein the bottom bearing platform and a station bottom plate are fixedly cast together, and the top bearing platform and a station top plate are fixedly cast together; the bridge pier is arranged at the upper part of the top bearing platform, and the pile foundation is anchored into the bottom bearing platform and is positioned below the station bottom plate, so that a subway station and viaduct combined building structure is formed by up-and-down communication. The utility model realizes the combined construction of the subway station and the ground viaduct when the plane line positions of the subway station and the viaduct are not consistent and the column distance of the station is not completely matched with the span of the viaduct; the structure stress is clear, the construction process is simple, the mutual construction interference of the subway station and the viaduct is small, the anti-seismic performance is better, and the application condition of the combined construction of the urban subway station and the viaduct is expanded.

Description

Bias-pressure subway station and viaduct combined construction structure
Technical Field
The utility model relates to a municipal transportation design and construction field especially relate to a subway station and viaduct co-construction structure of bias voltage.
Background
In order to relieve the situation that urban traffic is increasingly tense, a three-dimensional traffic mode formed by underground rail traffic, ground urban roads and ground viaducts is adopted by more and more cities. When the plane lines of the subway station and the ground viaduct are overlapped, two structural schemes of station-bridge separation and station-bridge co-location combined construction are generally adopted.
The station-bridge separation means that the structures of a subway station and a ground viaduct are mutually independent and completely separated, and specifically, the two schemes are as follows: in the first scheme, platforms of a subway station are separated, a separation island type platform or a separation side type platform is adopted, and a viaduct pile foundation is positioned in the middle of the subway station; scheme two, overpass gate-type pier scheme, subway station sets up and the overpass pile foundation promptly between, overpass adopts gate-type pier to span subway station.
The station-bridge co-location co-building means that a subway station and an viaduct are longitudinally arranged in parallel, viaduct piers are arranged on a station top plate, the pier positions correspond to the subway station structure column directions, and the piers and upper loads are directly transmitted to a station bottom plate through the station structure column and then transmitted to a foundation.
The structure scheme of station-bridge separation and station-bridge co-location co-construction has the following disadvantages:
1) according to the station and bridge separation scheme I, stations and platforms need to be connected through a channel or a station hall layer, so that the station and the platforms are not beneficial to being used by passengers, and higher requirements on passenger flow organization, operation management, equipment arrangement and fire evacuation are provided.
2) And in the second station-bridge separation scheme, the span of the gate pier is large, the stress is unreasonable, the influence on the ground landscape is large, and meanwhile, the investment of the viaduct is increased.
3) The station-bridge separation scheme is difficult in construction organization of subway stations and ground viaducts, and meanwhile, the construction has large mutual influence; construction is staggered, the deformation influence of the post-construction structure on the constructed structure is large, and the safety of the operated structure can be endangered.
4) The stations and bridges are constructed in a coordinated mode, the plane linearity of subway stations and viaducts is required to be consistent, the span of the viaduct and the column distance of the stations are required to be matched, the restriction of the surrounding environment and planning conditions is large, and the application conditions are limited.
The influence of the existing surrounding building environment of the city is received, the plane line position of the subway station is not completely consistent with the viaduct, or the upper portion viaduct and the subway station are both in a curve form and have different curvatures, the difference of linear trend of the two structures leads to the fact that the distribution positions of the piers on the subway station have certain discreteness, the load in the same section of the subway station is seriously uneven, the bias condition is serious, and the structure scheme is not suitable for.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a subway station and viaduct co-construction structure of bias voltage, the structure atress is clear and definite, construction process is simple, and subway station, viaduct are under construction each other and are disturbed characteristics little, that anti-seismic performance is more excellent, have realized subway station and the co-construction of subway station and ground viaduct when inconsistent, station column pitch and the incomplete matching of viaduct span.
In order to achieve the above object, the utility model discloses a concrete technical scheme of the subway station of bias voltage and viaduct co-building structure is:
a biased subway station and viaduct co-building structure, comprising: the station plate wall structure comprises a station top plate, a station middle plate, a station bottom plate and a station side wall which are connected through a steel pipe concrete column; the platform comprises a bottom bearing platform and a top bearing platform, wherein the bottom bearing platform and a station bottom plate are fixedly cast together, and the top bearing platform and a station top plate are fixedly cast together; the bridge pier is arranged at the upper part of the top bearing platform, and the pile foundation is anchored into the bottom bearing platform and is positioned below the station bottom plate, so that a subway station and viaduct combined building structure is formed by up-and-down communication.
Furthermore, the joint of the bottom bearing platform and the station bottom plate is in inclined plane transition, the upper layer steel bars of the bottom bearing platform are the same as the upper layer steel bars of the station bottom plate, and the lower layer steel bars of the bottom bearing platform are anchored into the station bottom plate.
Furthermore, the joint of the top bearing platform and the station top plate is in inclined plane transition, the lower layer steel bars of the top bearing platform are the same as the lower layer steel bars of the station top plate, and the upper layer steel bars of the top bearing platform are anchored into the station top plate.
Further, still include: the enclosure structure is positioned on the outer side of the station board wall structure; the water stop pile is arranged on the outer side of the enclosure structure; and the support is transversely arranged between the building enclosures.
And further, the reinforced concrete structure further comprises a reinforced side wall which is fixedly poured together with the station side wall of the station plate wall structure.
Further, still include the upper bridge structure, set up the top at the bridge.
The utility model discloses a biasing's subway station and viaduct co-construction structure's advantage lies in:
1) the application condition is wide, and the limitation by planning is less;
2) the defects of a structure processing scheme when the positions of the subway station and the ground viaduct are overlapped are overcome, and the combined construction of the subway station and the ground viaduct when the positions of the plane lines of the subway station and the viaduct are not consistent and the column distance of the station is not completely matched with the span of the viaduct is realized;
3) the structure has the characteristics of clear structural stress, simple construction process, small mutual construction interference between the subway station and the viaduct and better earthquake resistance, and simultaneously expands the application conditions of the combined construction of the urban subway station and the viaduct;
4) the utility model provides a pier, top cushion cap, end cushion cap, pile foundation and station structure form wholly, and subway station box structure can improve the anti-seismic performance of viaduct pier as the partly on viaduct basis.
Drawings
Fig. 1 is a plan view of the co-building structure of the present invention;
fig. 2a is a cross-sectional view of the co-building structure of the present invention;
fig. 2b is a schematic view of the foundation pit support of the present invention;
fig. 3 is a longitudinal section of the co-building structure of the present invention.
In the figure: 1. a pile foundation; 2. a bottom deck; 3. a station floor; 4. reinforcing the side wall; 5. a station side wall; 6. a steel pipe concrete column; 7. a middle plate of a station; 8. a top bearing platform; 9. a station roof; 10. a bridge pier; 11. a bridge superstructure; 12. an enclosure structure; 13. water stopping piles; 14. and (4) supporting.
Detailed Description
For better understanding of the purpose, structure and function of the present invention, the following description will be made in detail with reference to the accompanying drawings.
As shown in fig. 1 to 3, it shows that the utility model discloses a bias-pressure subway station and viaduct co-building structure, including a station slab wall structure, the station slab wall structure includes a station top plate 9, a station middle plate 7, a station bottom plate 3, a station side wall 5 connected by a steel pipe concrete column 6; the steel bar anchor pile foundation comprises a bridge pier 10 and a pile foundation 1, wherein the steel bar anchor pile foundation 1 is anchored into a bottom bearing platform 2 and is positioned below a station bottom plate 3, and the steel bar anchor pile head of the pile foundation 1 is anchored into the station bottom plate 3 to integrate the pile foundation and the station bottom plate; still including top cushion cap 8 and end cushion cap 2, end cushion cap 2 doubles as station bottom plate 3 and pours together with station bottom plate 3, and top cushion cap 8 doubles as station roof 9 and pours together with station roof 9, forms subway station and viaduct co-construction structure through intercommunication about pier 10, top cushion cap 8, reinforcing side wall 4, station board wall structure, steel core concrete column 6, end cushion cap 2, pile foundation 1.
Wherein, the handing-over department of end cushion cap 2 and station bottom plate 3 adopts 1: 1 inclined plane transition, the upper reinforcing steel bar of the bottom bearing platform 2 is the same as the upper reinforcing steel bar of the station bottom plate 3, and the lower reinforcing steel bar of the bottom bearing platform 2 is anchored into the station bottom plate 3. In addition, the joint between the top deck 8 and the station roof 9 is 1: 1 inclined plane transition, 8 lower floor's reinforcing bars of top cushion cap are the same with 9 lower floor's reinforcing bars of station roof, and 8 upper steel bar anchors of top cushion cap are gone into in the station roof 9.
Particularly, the utility model discloses a construction method of biased subway station and viaduct co-construction structure includes according to design drawing unwrapping wire location, is pile foundation 1 below the construction bottom plate, is empty stake, packing grit above the bottom plate elevation.
Further, the railway station plate wall structure comprises an enclosure structure 12, a water stop pile 13 and a support 14, wherein the enclosure structure 12 is one or a combination of two or more of a cast-in-place pile, an underground continuous wall and the like and is positioned on the outer side of the station plate wall structure; the water stopping pile 13 is one or a combination of two or more than two of water stopping forms such as a jet grouting pile, a stirring pile, grouting and the like, and is arranged on the outer side of the enclosure structure; the support 14 is one or the combination of two or more than two of concrete support, steel support and the like, and is transversely arranged between the enclosing structures on the two sides.
Specifically, the construction method comprises the steps of constructing the station foundation pit enclosure structure 12 and the water stop piles 13 according to design drawings, excavating to the elevation of the bottom of the station bottom plate 3 in a layering mode, and erecting supports 14 in a layering mode in the foundation pit excavation process.
In addition, after the foundation pit is excavated to the bottom, a bottom bearing platform 2 and a station bottom plate 3 are built, pile head concrete of the part, which is invaded into the bottom bearing platform 2, of the pile foundation 1 is chiseled off, the steel bars of the pile foundation 1 are anchored into the bottom bearing platform 2, the bottom bearing platform 2 and the steel bars of the peripheral station bottom plate 3 are mutually anchored, and the pouring is synchronously carried out. And (3) installing the steel pipe column 6 when the concrete of the bottom bearing platform 2 and the station bottom plate 3 reaches the design strength (the steel pipe column is installed in sections, the interface position is considered for subsequent decoration and is attractive, and the steel pipe column is arranged 50mm below the middle longitudinal beam).
Further, the structure further comprises a reinforcing side wall 4, wherein the reinforcing side wall 4 is also used as a station side wall 5 and is poured together with the station side wall 5 of the station plate wall structure. In addition, the reinforced side wall 4 and the steel pipe concrete column 6 bear the dead weight and the upper load of the top bearing platform 8, and transmit the axial force to the bottom bearing platform 2 and the pile foundation 1. Wherein, cushion cap, strengthen the side wall and the simultaneous casting of station board wall, strengthen side wall 4, steel core concrete column 6 and transmit top cushion cap 8, station roof 9 and upper portion load to end cushion cap 2 and pile foundation 1 jointly. The number of the concrete-filled steel tubular columns 6 in the projection range of the bearing platform is not less than 2.
Specifically, the construction method comprises the steps of building the reinforcing side wall 4 and the other station side walls 5 at the bearing platform to the designed elevation, and building the station middle plate 7.
Further, the bridge structure comprises a pier 10 and an upper bridge structure 11, wherein the pier 10 is connected with the top bearing platform 8 through steel bars. The pier concrete and the station top plate 9 concrete are poured simultaneously or in stages, and the reserved steel bar joint for the construction of the station top plate 3 is connected with the steel bars of the upper pier structure.
The utility model discloses a pier 10, top cushion cap 8, strengthen side wall 4, station board wall structure, steel core concrete column 6, end cushion cap 2, pile foundation 1 intercommunication from top to bottom form subway station and viaduct co-construction structure.
Specifically, the construction method comprises the steps of building a top bearing platform 8 and a station roof 9, anchoring the top bearing platform 8 and the peripheral station roof 9 through reinforcing steel bars, pouring synchronously, and meanwhile embedding piers 10 in the top bearing platform to connect the reinforcing steel bars. A pier 10 and an upper bridge structure 11 are constructed.
The utility model discloses a construction method of biased subway station and viaduct co-building structure, contain following step:
step one, paying off and positioning according to a design drawing, constructing a pile foundation 1 below a station bottom plate 3, and filling coarse sand into empty piles above the elevation of the station bottom plate 3.
And step two, constructing the station foundation pit enclosure structure 12 and the water stop piles 13 according to a design drawing, excavating to the elevation of the bottom of the station bottom plate 3 in a layering mode, and erecting supports 14 in a layering mode in the foundation pit excavation process.
And step three, after the foundation pit is excavated to the bottom of the foundation pit, constructing a bottom bearing platform 2 and a station bottom plate 3, chiseling the pile head concrete of the part of the pile foundation 1, which enters the bottom bearing platform 2, anchoring the steel bars of the pile foundation 1 into the bottom bearing platform 2, mutually anchoring the bottom bearing platform 2 and the steel bars of the peripheral station bottom plate 3, and synchronously pouring.
And step four, mounting the steel pipe concrete columns 6 when the concrete of the bottom bearing platform 2 and the station bottom plate 3 reaches the design strength, wherein the steel pipe concrete columns are mounted in sections, the interface position is considered for subsequent decoration and attractiveness, and the steel pipe concrete columns are arranged below the middle longitudinal beam by 45-55 mm (preferably 50 mm).
And fifthly, building the reinforcing side wall 4 and the side walls 5 of other stations at the bearing platform to the designed elevation, and building the middle plate 7 of the station.
And step six, building a station roof 9 and a top bearing platform 8, mutually anchoring the top bearing platform 8 and the peripheral station roof 9 steel bars, pouring synchronously, and meanwhile, embedding piers 10 in the top bearing platform to connect the steel bars.
In the third step to the sixth step, the station bottom plate 3, the station side wall 5, the concrete filled steel tubular column 6, the station middle plate 7 and the station top plate 9 are sequentially constructed from bottom to top, the bottom bearing platform 2 and the reinforcing side wall 4 are simultaneously constructed, the supports are sequentially removed in the construction process of the station bottom plate wall, and the uppermost support 14 is removed after the construction of the station top plate 9 is finished.
And seventhly, constructing a pier 10, backfilling the upper part of the top plate and constructing an upper bridge structure 11.
The utility model discloses a pier 10, top cushion cap 8, strengthen side wall 4, station board wall structure, steel core concrete column 6, end cushion cap 2, pile foundation 1 intercommunication from top to bottom form subway station and viaduct co-construction structure.
The utility model discloses a bias pressure subway station and viaduct co-building structure, which has wide application conditions and less planning restriction; the defects of a structure processing scheme when the positions of the subway station and the ground viaduct are overlapped are overcome, and the combined construction of the subway station and the ground viaduct when the positions of the plane lines of the subway station and the viaduct are not consistent and the column distance of the station is not completely matched with the span of the viaduct is realized; the structure has the characteristics of clear structural stress, simple construction process, small mutual construction interference between the subway station and the viaduct and better earthquake resistance, and simultaneously expands the application conditions of the combined construction of the urban subway station and the viaduct; the utility model provides a pier, top cushion cap, end cushion cap, pile foundation and station structure form wholly, and subway station box structure can improve the anti-seismic performance of viaduct pier as the partly on viaduct basis.
The present invention has been further described with reference to specific embodiments, but it should be understood that the specific description herein should not be construed as limiting the spirit and scope of the present invention, and that various modifications to the above-described embodiments, which would occur to persons skilled in the art after reading this specification, are within the scope of the present invention.

Claims (6)

1. The utility model provides a biasing's subway station constructs structure with overhead bridge jointly which characterized in that includes:
the station plate wall structure comprises a station top plate (9), a station middle plate (7), a station bottom plate (3) and a station side wall (5) which are connected through a steel tube concrete column (6);
the platform comprises a bottom bearing platform (2) and a top bearing platform (8), wherein the bottom bearing platform (2) and a station bottom plate (3) are fixedly poured together, and the top bearing platform (8) and a station top plate (9) are fixedly poured together; and
pier (10) and pile foundation (1), pier (10) set up the upper portion at top cushion cap (8), and pile foundation (1) anchor is gone into in end cushion cap (2) and is located station bottom plate (3) below, through upper and lower intercommunication in order to form subway station and viaduct and build the structure jointly.
2. The combined building structure according to claim 1, characterized in that the junction of the bottom bearing platform (2) and the station bottom plate (3) is a slope transition, the upper layer steel bars of the bottom bearing platform (2) are the same as the upper layer steel bars of the station bottom plate (3), and the lower layer steel bars of the bottom bearing platform (2) are anchored into the station bottom plate (3).
3. The combined building structure according to claim 1, characterized in that the joint of the top bearing platform (8) and the station roof (9) is a slope transition, the lower layer steel bars of the top bearing platform (8) are the same as the lower layer steel bars of the station roof (9), and the upper layer steel bars of the top bearing platform (8) are anchored into the station roof (9).
4. The joint building structure according to claim 1, further comprising:
the enclosure structure (12) is positioned on the outer side of the station board wall structure;
the water stop pile (13) is arranged on the outer side of the enclosure structure (12); and
and the support (14) is transversely arranged between the building enclosures.
5. The combined building structure according to claim 1, further comprising a reinforcing side wall (4) fixedly cast with a station side wall (5) of the station slab wall structure.
6. The co-building structure according to claim 1, further comprising an upper bridge structure (11) arranged on top of the piers (10).
CN202020254446.8U 2020-03-04 2020-03-04 Bias-pressure subway station and viaduct combined construction structure Active CN211897785U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020254446.8U CN211897785U (en) 2020-03-04 2020-03-04 Bias-pressure subway station and viaduct combined construction structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020254446.8U CN211897785U (en) 2020-03-04 2020-03-04 Bias-pressure subway station and viaduct combined construction structure

Publications (1)

Publication Number Publication Date
CN211897785U true CN211897785U (en) 2020-11-10

Family

ID=73301518

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020254446.8U Active CN211897785U (en) 2020-03-04 2020-03-04 Bias-pressure subway station and viaduct combined construction structure

Country Status (1)

Country Link
CN (1) CN211897785U (en)

Similar Documents

Publication Publication Date Title
CN110820594B (en) Symmetrical cantilever construction process suitable for expansion joint bridge pier
CN107119711B (en) Connecting structure for large-range adjacent existing transfer station and construction method
CN109403170B (en) Steep slope road and construction method thereof
CN114592436B (en) Pier capping beam lower support system and construction method thereof
CN112878193A (en) Suspension bridge channel type anchorage foundation and construction method
CN111218886A (en) Bias subway station and viaduct combined construction structure and construction method
CN102797223A (en) Construction method for cast-in-place of continuous beam at turnout junction for passenger transport line in seawall area by false work method
CN113931212A (en) Road and bridge transition section structure for tramcar and construction method thereof
KR101187282B1 (en) Railway bridge constructing method using 2 post type abutment structure
CN211897785U (en) Bias-pressure subway station and viaduct combined construction structure
CN219653488U (en) Pile plate retaining wall and abutment co-building structure
CN106948267A (en) A kind of memorial archway bar formula bridge cable tower king-post method for synchronously constructing
CN110735394A (en) Cable tower structure and construction method thereof
JP4685341B2 (en) Viaduct construction method
CN112627002B (en) Continuous beam bridge suitable for tunnel to pass through giant karst cave and construction technical method thereof
CN211571239U (en) Temporary covering structure for subway station construction
CN112761185A (en) Industrial underground station building structure and construction method
CN210458918U (en) Space stacked bridge structure
CN112523097A (en) Large-span bridge gantry crane and construction method thereof
CN201567523U (en) Temporary bridge for erecting existing railway overhead in sections with soft foundation or high water level
CN111926710A (en) Overhead fixing device for multi-track railway
CN214657223U (en) Industrial built underground station structure
CN219653491U (en) Steel construction abutment suitable for steel trestle
CN114922200B (en) Existing-newly-built combined retaining structure of wide road embankment and construction method
CN103437252A (en) Track bed structure and construction method for same

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant