CN211817541U - Mechanical spraying gypsum plaster rapid leveling plastering structure - Google Patents

Mechanical spraying gypsum plaster rapid leveling plastering structure Download PDF

Info

Publication number
CN211817541U
CN211817541U CN201921323203.9U CN201921323203U CN211817541U CN 211817541 U CN211817541 U CN 211817541U CN 201921323203 U CN201921323203 U CN 201921323203U CN 211817541 U CN211817541 U CN 211817541U
Authority
CN
China
Prior art keywords
gypsum
positioning
interface bonding
bonding layer
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921323203.9U
Other languages
Chinese (zh)
Inventor
王永强
孙洪亮
郑超
豆亚莉
李伟
李晏峰
赵文华
陈普泽
刘峰
王建凯
任光强
王涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
China Construction First Bureau Group Decoration Engineering Co Ltd
Original Assignee
China Construction First Group Corp Ltd
China Construction First Bureau Group Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, China Construction First Bureau Group Decoration Engineering Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201921323203.9U priority Critical patent/CN211817541U/en
Application granted granted Critical
Publication of CN211817541U publication Critical patent/CN211817541U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

A plastering structure for quick leveling of mechanically sprayed gypsum comprises a wall surface base layer, an interface bonding layer, a reinforcing steel bar and a decorative layer which are sequentially arranged from inside to outside; positioning cards are arranged on the interface bonding layer and at positions corresponding to the reinforcing steel bars; the steel bar is fixed on the interface bonding layer through a positioning clamp; gypsum positioning blocks are arranged on the outer side surface of the interface bonding layer at intervals; the outer side surface of the gypsum positioning block exceeds the outer side surface of the steel bar; the interface bonding layer is provided with a group of vertical gypsum positioning strips; covering the reinforcing steel bars with gypsum positioning bars, and pressing the reinforcing steel bars on the interface bonding layer; a gypsum filling layer is mechanically sprayed on the interface bonding layer and positioned between the gypsum positioning blocks, and the outer side surfaces of the gypsum filling layer are flush with the outer side surfaces of the gypsum positioning blocks; the decorative layer is arranged outside the gypsum filling layer. The utility model provides a traditional structure construction of plastering have construction process alternately, need work strength big, construction cost is high, construction quality is difficult to guarantee and the technical problem that the efficiency of construction is low.

Description

Mechanical spraying gypsum plaster rapid leveling plastering structure
Technical Field
The utility model relates to a basic unit of indoor wall makes level and plasters construction technical field, especially a mechanical spraying gypsum structure of plastering of making level fast.
Background
With the high-speed development of the building market, health, comfort, energy conservation and environmental protection are the mainstream trends of modern indoor decoration, and the traditional cement mortar cannot meet the change of market requirements; the novel plastering and leveling system integrates the functions of indoor climate regulation, pressure resistance, heat insulation, noise absorption, flame retardance and the like, and is suitable for transportation. The gypsum is a white powder prepared by taking building gypsum powder as a base material and adding various additives, fillers and the like, and is a novel decorative material; the material is particularly suitable for structural surfaces such as concrete shear wall boards, concrete aerated blocks, light sand aerated blocks, concrete blocks, clay bricks and the like. The traditional common plastering gypsum and cement plastering structure has the defects of crossed construction procedures, large labor force, high construction cost, difficult guarantee of construction quality and low construction efficiency during construction.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a mechanical spraying gypsum structure of plastering of making level fast, there is the construction process alternately, needs a large amount of labours, construction cost height, construction quality to be difficult to guarantee and the technical problem that the efficiency of construction is low in the construction of solving traditional ordinary plaster of whitewashing, cement plastering.
In order to achieve the above purpose, the utility model adopts the following technical scheme.
A plastering structure for quick leveling of mechanical spraying gypsum comprises a wall surface base layer, an interface bonding layer, a reinforcing steel bar and a decorative layer which are sequentially arranged from inside to outside; the interface bonding layer is coated on the outer side surface of the wall surface base layer, and positioning cards are arranged on the interface bonding layer and at positions corresponding to the reinforcing steel bars; the reinforcing steel bars are fixed on the interface bonding layer through the positioning cards; gypsum positioning blocks are arranged on the outer side surface of the interface bonding layer at intervals; the outer side surface of the gypsum positioning block exceeds the outer side surface of the reinforcing steel bar; the interface bonding layer is provided with a vertical gypsum positioning strip; a group of gypsum positioning strips are arranged on each reinforcing steel bar at intervals; wherein each gypsum positioning strip covers the steel bar, and the steel bar is pressed on the interface bonding layer; a gypsum filling layer is mechanically sprayed in the space between the gypsum positioning blocks on the interface bonding layer, and the outer side surface of the gypsum filling layer is flush with the outer side surface of the gypsum positioning blocks; the decorative layer is arranged on the outer side of the gypsum filling layer.
Preferably, when the height of wall is less than 3.5m, the reinforcing bar is the grub bar to the grub bar is arranged a set of, and a set of grub bar sets up along horizontal parallel interval.
Preferably, when the height of wall is greater than 3.5m, the reinforcing bar is horizontal muscle to horizontal muscle has arranged a set ofly, and a set of horizontal muscle sets up along horizontal parallel interval, and adjacent horizontal muscle interval 1500 ~ 2000 mm.
Preferably, the width of the gypsum positioning strip is 30-50 mm, and the distance between every two adjacent gypsum positioning strips is 1200-1500 mm.
Preferably, the cross section of the positioning card is U-shaped and comprises a transverse edge and vertical edges connected to two sides of the transverse edge; wherein, the end parts of the two vertical edges are respectively bent outwards and horizontally to form flanges; the flanges at two sides of the positioning card are tightly attached to the interface bonding layer; the flanging on one side is hinged with the interface bonding layer, and the flanging on the other side is detachably connected with the interface bonding layer.
Preferably, the distance between the gypsum positioning block and the side edge of the corresponding side of the wall surface base layer is not less than 200 mm; the distance between adjacent gypsum positioning blocks is 1200 mm-1500 mm.
Preferably, the thickness of the gypsum positioning block is 5 mm-35 mm; the thickness of the gypsum filling layer is 5 mm-35 mm corresponding to the thickness of the gypsum positioning block.
Compared with the prior art, the utility model has the following characteristics and beneficial effect.
1. The utility model discloses a gypsum filling layer one-time molding, not shrink fracture, the efficiency of construction is high, practice thrift construction cycle, cost, the gypsum locating piece of the earlier stage construction of combination technology, it is many to solve to whitewash the gypsum and scribble the covering, not only has brought into full play the gypsum effectual, the sustainable advantage of environmental protection, has brought into play the excellent water-retaining property of gypsum again, low thermal expansion shrinkage and low wet expansion shrinkage, effectively prevent in the course of hardening that little expansion can not appear losing moisture, the shrink fracture phenomenon, need not the expansion joint (except that the basic unit itself has the position of expansion joint) within 15 meters of general length; in addition, the gypsum filling layer can be formed at one time to obtain a smooth surface without additional putty, so that the construction period quality is effectively improved; meanwhile, the coating is directly used for plastering and leveling various structural surfaces, solves the problems of limitation of use of a base layer and hidden danger of hollowing and cracking, and achieves the aims of integrating multiple functions of indoor climate adjustment, pressure resistance, heat insulation, noise absorption, flame retardance and the like.
2. The utility model aims to provide a plastering structure for quick leveling of mechanical spraying gypsum, wherein a single spraying machine can finish the spraying and leveling of 300-320 square meters of gypsum every day, and people can finish 60-80 square meters every day; compared with the conventional artificial gypsum leveling, the material is saved by 20 percent, and the labor is saved by 50 percent; the emulsion paint or the wall wallpaper can save 100% of putty materials and manpower; the construction of this kind of structure has saved a large amount of labours and material cost to shorten construction cycle greatly, realized the comprehensive control to construction progress, process management, finished product protection more easily, change in assurance construction quality, the effectual administrative cost that reduces has improved work efficiency, reduces finished product protection expense.
3. The sprayed gypsum filling layer has the advantages of fast hardening, early strength, strong bonding force, good volume stability, no cracking after hardening, no corrosion, no powder falling and no peeling, thus fundamentally overcoming the phenomena of hollowing and cracking of cement mortar and reducing the rework risk, and the gypsum filling layer has the advantages of moisture absorption, sound absorption, fire prevention, smoothness, whiteness, beauty, large thermal capacity and large moisture absorption, can adjust the indoor temperature and humidity, keep the balance of the gypsum filling layer and bring comfort to people; in addition, the volume weight of the gypsum mortar is far lower than that of cement mortar, the load of thousands of tons of a building structure can be reduced, the workability of the gypsum is good, the gypsum is not separated by bleeding, the mechanical matching and the manual operation are convenient, the energy-saving effect is good, the poplar dust caused by yellow sand materials used on the conventional construction site is avoided, and the stacking of raw materials on the construction site occupies a small area.
4. The utility model has good bonding performance of the gypsum filling layer, after the wall surface base layer is cleaned, the material can be directly used for plastering various wall surfaces, and the interface agent treatment on concrete slabs, columns, beams and light brickwork is not needed; to machine spraying type gypsum mortar wall, like the later stage needs the repair of production such as pipe laying again, equipment repacking, can not produce wall crust and empty thigh phenomenon to wall after the spray forming has certain material and moulds the bubble space in the work progress, possesses the active function that has other materials not possess, has promptly to breathe in, the sound absorption effect. The air is moist and absorbs the redundant moisture in the room; over-drying, releasing moisture. And the indoor humidity is automatically adjusted. Especially has better absorption effect on the humid air in the room on continuous rainy days.
5. The sprayed gypsum filling layer has good heat insulation performance, can keep the surface temperature of a wall body at 18-20 ℃, provides comfortable body feeling, and has good fireproof performance, gypsum is a non-combustible material, the heat conductivity coefficient of the gypsum is lower than that of cement mortar (0.28 is compared with 0.87), crystal water in gypsum components can evaporate and absorb heat energy firstly when a fire disaster happens, and experiments prove that the sprayed gypsum with the thickness of 10mm is similar to the fireproof limit of concrete with the thickness of 10 mm.
6. The utility model discloses set up the gypsum locating bar in the outside of reinforcing bar, utilize the gypsum locating bar to press the reinforcing bar to establish on the interface bonding layer, the interval sets up the locator card simultaneously on the reinforcing bar, carries out further fixed to the reinforcing bar.
Drawings
The present invention will be described in further detail with reference to the accompanying drawings.
Fig. 1 is a schematic view of the sectional structure of the plastering structure of the present invention.
Fig. 2 is the utility model discloses well locator card installs the schematic structure in the reinforcing bar outside.
Fig. 3 is a layout diagram of the gypsum positioning block of the present invention.
Fig. 4 is a schematic structural diagram of the middle positioning card of the present invention.
Reference numerals: 1-wall surface base layer, 2-interface bonding layer, 3-gypsum positioning block, 4-reinforcing steel bar, 5-decorative layer, 6-positioning card, 6.1-transverse edge, 6.2-vertical edge, 6.3-flanging, 7-gypsum filling layer and 8-gypsum positioning strip.
Detailed Description
As shown in fig. 1-4, the mechanical spray gypsum plastering structure for quick leveling comprises a wall surface base layer 1, an interface bonding layer 2, a reinforcing steel bar 4 and a decorative layer 5 which are sequentially arranged from inside to outside; the interface bonding layer 2 is coated on the outer side surface of the wall surface base layer 1, and a positioning card 6 is arranged on the interface bonding layer 2 and at a position corresponding to the reinforcing steel bar 4; the reinforcing steel bar 4 is fixed on the interface bonding layer 2 through a positioning clamp 6; gypsum positioning blocks 3 are arranged on the outer side surface of the interface bonding layer 2 at intervals; the outer side surface of the gypsum positioning block 3 exceeds the outer side surface of the reinforcing steel bar 4; the interface bonding layer 2 is provided with a vertical gypsum positioning strip 8; a group of gypsum positioning strips 8 are arranged on each reinforcing steel bar 4 at intervals; wherein each gypsum positioning strip 8 covers the steel bar 4, and the steel bar 4 is pressed on the interface bonding layer 2; a gypsum filling layer 7 is mechanically sprayed in the space between the gypsum positioning blocks 3 on the interface bonding layer 2, and the outer side surface of the gypsum filling layer 7 is flush with the outer side surface of the gypsum positioning blocks 3; the decorative layer 5 is arranged on the outer side of the gypsum filling layer 7.
In this embodiment, when the height of wall was less than 3.5m, reinforcing bar 4 was the stud to the stud has arranged a set ofly, and a set of stud sets up along horizontal parallel interval.
In this embodiment, when the height of wall is greater than 3.5m, reinforcing bar 4 is horizontal muscle to horizontal muscle has arranged a set ofly, and horizontal muscle is followed horizontal parallel interval and is set up, and adjacent horizontal muscle interval 1500 ~ 2000 mm.
In this embodiment, the width of gypsum location strip 8 is 30 ~50 mm, and the interval of adjacent gypsum location strip 8 is 1200 ~ 1500 mm.
In the embodiment, the cross section of the positioning card 6 is U-shaped, and comprises a transverse edge 6.1 and vertical edges 6.2 connected to two sides of the transverse edge 6.1; wherein, the end parts of the two vertical edges 6.2 are respectively bent outwards and horizontally to form flanges 6.3; the flanges 6.3 at the two sides of the positioning card 6 are tightly attached to the interface bonding layer 2; wherein the turned edge 6.3 at one side is hinged with the interface bonding layer 2, and the turned edge 6.3 at the other side is detachably connected with the interface bonding layer 2.
In the embodiment, the distance between the gypsum positioning block 3 and the side edge of the corresponding side of the wall surface base layer 1 is not less than 200 mm; the distance between the adjacent gypsum positioning blocks 3 is 1200 mm-1500 mm.
In the embodiment, the thickness of the gypsum positioning block 3 is 5 mm-35 mm; the thickness of the gypsum filling layer 7 is 5 mm-35 mm corresponding to the thickness of the gypsum positioning block 3.
In the embodiment, after the outer surface of the gypsum filling layer 7 is leveled and polished, the decorative layer 5 can be directly constructed without leveling by using putty; the decorative layer 5 is made of emulsion paint or wall wallpaper.
In this embodiment, the thickness of the gypsum filling layer 7 is within the range of 5-35 mm.
In the embodiment, the gypsum positioning block 3, the gypsum filling layer 7 and the gypsum positioning strip 8 are all made of 100% flue gas desulfurization gypsum, so that mining and carbon dioxide discharge are reduced; the material is natural component, and the data value is greatly less than the detection standard value of the whitewash cement mortar for detecting the indoor environment air, thus being a pollution-free product.
In this embodiment, one ton of the sprayed gypsum in the gypsum filling layer 7 can be made into 1000 to 2000L gypsum slurry, which can cover 100 to 120m2(ii) a When the gypsum filling layer 7 is sprayed, 4 people and one machine can finish the spraying operation within 8 hours in each group of a worker for 300-200 m2Leveling and plastering work.
In the embodiment, during the construction of the plastering structure, after the inspection treatment of the wall surface base layer 1 is completed, infrared ray paying-off and squaring are firstly carried out in a room, leveling points are aligned on the wall surface every 1.5-2 m by using gypsum positioning blocks 3 according to a squaring line, and after the gypsum positioning blocks 3 of the leveling points are initially set, gypsum positioning strips 8 are covered on the outer side surface of a reinforcing steel bar 4 to form leveling ribs; after the machine is in place, large-area spraying is directly carried out, a scraper is used for leveling, and after the gypsum filling layer 7 is solidified and before final setting, secondary leveling is carried out, polishing with a small amount of water is carried out, and surface polishing treatment is carried out.
The construction process flow is as follows: processing a wall surface base layer 1 → squaring an infrared system in a room → dotting a gypsum positioning block 3 → constructing a gypsum positioning strip 8 → reinforcing bars, repairing bars, installing corner protectors → debugging equipment and mixing slurry → spraying a gypsum filling layer 7 → leveling and repairing → polishing and smoothing; the specific operation steps are as follows.
Step one, in the process of treating the wall surface base layer 1, the measures described in the following table can be referred to:
Figure 936291DEST_PATH_IMAGE001
secondly, the infrared system in the room finds the square and just selects a longer wall as the reference of the central axis of the room according to the house type characteristics, and an infrared instrument is used for positioning the central axis; the other rooms are lined by infrared instrument lines on the basis of the central axis, and the central control axis of each room is quickly positioned; two infrared instruments are used for placing diagonal positions and pulling transverse and vertical lines to control the square of a room (the square needs to be controlled within 5 mm), and after the paying-off of each room is finished, the longitudinal and transverse directions must be controlled within +/-5 mm.
Step three, gypsum dotting: according to the main axis infrared ray in the room, hanging the vertical part, sleeving the square part and finding the gauge according to the flat vertical condition of the surface of the wall surface base layer 1; covering a square by using mobile infrared rays, and punching a square gypsum positioning block 3 on the interface bonding layer 2; before plastering and leveling, the thickness of a gypsum positioning block 3 is determined on the interface bonding layer 2, and the gypsum positioning block 3 is made for ensuring the level and the verticality and is used for controlling the construction quality; when the gypsum positioning blocks 3 are dotted, transverse lines need to be pulled to ensure that all the gypsum positioning blocks 3 on each structural surface are positioned on one plane (the vertical and the flat positions are controlled to be 1 mm), and the distance between the gypsum positioning blocks 3 and the wall edge is within 200mm, and one gypsum positioning block is positioned at 1500mm square; since the later gypsum positioning strip 8 is strip-shaped, the verticality of the strip-shaped surface can be better controlled.
When the gypsum positioning strips 8, namely the reinforcement punching, are constructed, firstly, construction is carried out strictly according to the size and position requirements of paying-off and dotting, and the number of the gypsum positioning strips 8 cannot be reduced; and then checking whether the parts such as the structural seams, the wire conduit slots and the like are adhered with gridding cloth or not and the construction quality, and timely processing the parts which are missed and can not meet the quality requirement.
Step four, 5, rib repairing and corner protection installation: the end part of the gypsum positioning strip 8 is provided with an inclined opening to facilitate bar connection, the mortar bar which is not punched to the surface is subjected to bar compounding, and after the bar connection is finished, actual measurement personnel perform vertical, flat and smooth inspection, find problems and repair in time to ensure the quality of the gypsum positioning strip 8; after the rib punching and the rib connecting are finished, the checking is carried out, the problem is found and repaired in time, and the quality of the gypsum positioning strip 8 is ensured.
After the gypsum positioning strip 8 is constructed, the corner protection parts of the door and the window are checked, and the corners are straightened by adopting a plumb line to ensure that the corners are smooth and vertical (controlled to be +/-2 mm); finally, gypsum is used for installing the external corner protection angle according to the method of punching ribs; the sizes of the door opening and the window are strictly controlled (the size of the door opening and the size of the window are controlled to be +/-2 mm).
According to the condition of the structural surface, the adhesive mesh cloth can be added; the strict requirements are as follows: firstly, leveling the full batch of gypsum mortar → spreading and laying the grid cloth to be smooth → leveling the full batch of gypsum mortar; or the whole surface is added with a brushing interface agent.
Step five, equipment debugging and slurry blending: firstly, ensuring enough water pressure, if the water pressure is not enough, adopting a method of externally connecting a booster pump to solve the problem, if the water pressure is too high, increasing a ball valve switch to control the water quantity; the overlong water pipe is avoided as much as possible, so that the insufficient or unstable water pressure is avoided, and the guniting effect is not influenced; all the connecting pieces are ensured to be firmly connected, so that the falling off is prevented, the construction is influenced, and a container which can be filled with clear water, a booster pump and a suction filter are still prepared on site for standby; before starting up, locking the machine fixed wheel, connecting the water pipe, opening the input pipeline, evacuating the air in the pipe, removing dirt, and then closing the input pipeline; manually adjusting a needle valve to adjust the water inflow, adjusting the water level to about 650 according to the first use suggestion, checking the water level, and injecting water into the mixing bin, wherein the water level is just at the position 1/3 of the mixing bin; adding spraying gypsum into a hopper, simultaneously rotating a grid wheel switch to an 'automatic' state, opening a green starting button, observing the consistency of overflowed mortar, and finely adjusting to a proper consistency by using an adjusting needle valve; pressing a red button to confirm the end of the operation, connecting the air pipe with the air valve and the ejector, and then starting the air compressor; then the mortar pipe is wetted by water, and is connected with a mortar outlet and an ejector of the machine, a green starting button is turned on to enable the machine to enter a standby state, an air valve on the ejector is turned on to enable the machine to operate, and meanwhile, a nozzle is adjusted to be in an optimal state, so that spraying can be carried out; the amount of the slurry to be stirred each time is determined, not too much slurry (the slurry must be used up before initial setting, water cannot be added in the using process, and the coagulated ash cannot be added with water for stirring and using any more), and the consistency of the plastering slurry is thinner than that of the normal plastering slurry in high-temperature weather in summer.
Step six, gypsum spraying: arranging a spraying machine in place after the reinforcement on the wall surface is finished and hardened; the operators are suitable for four persons in total, one person is responsible for charging and monitoring equipment, one person is responsible for spraying gypsum, and the other two persons are responsible for scraping the gypsum; when spraying, the distance between the nozzle and the object surface is preferably 300-400 mm; too close to easily sag; the gypsum is uneven too far, so that pits are easy to appear, and the gypsum scattered on the way from the nozzle to the object surface is wasted; the specific size of the distance is properly adjusted according to the type, viscosity and air pressure of the gypsum, the spraying distance of the slow-drying gypsum can be a little longer, and the spraying distance of the quick-drying gypsum can be a little shorter; the spray gun moves up and down and left and right in sequence and operates uniformly at the speed of 10-12 m/min, and the spray nozzle is required to be sprayed on the object plane straightly, so that the inclined spraying is reduced as much as possible. When the spray gun is sprayed to the two ends of the object surface, the hand pulling the trigger of the spray gun needs to be loosened quickly, so that the gypsum fog is reduced, and the two ends of the object surface are usually sprayed for more than two times, which is the place most prone to causing sagging; when spraying, the next pass is required to press 1/3 or 1/4 of the previous pass, so that the phenomenon of missing spraying cannot occur; adjusting the thickness of the slurry within a small range of 10-50 mm according to the viscosity of the slurry, wherein the thickness of the slurry sprayed at one time is 5-20 mm; and according to the plaster leveling layer number, the gridding cloth can be pasted.
Step seven, strickling and repairing: after the spraying is finished, one person then uses an H-shaped scraper to vertically and horizontally scrape once, and the surfaces of the upper and lower punching ribs are tightly adhered to scrape redundant slurry from left to right, and meanwhile, the insufficient part is filled; the working procedure can be repeated for a plurality of times before the slurry is initially set until the wall surface is flat; then comprehensively checking whether the bottom ash is smooth and flat, and checking the vertical condition of the wall surface and the flat condition of the wall surface by using a wire supporting plate; the spraying thickness is more than 20mm, layered construction is needed, and when the bottom ash is dried, the surface layer gypsum spraying operation can be started; after the wall surface is leveled, the internal and external corner parts are sprayed and scraped to be vertical, the peripheries of the holes, the electric box, the groove and the box are left to be smoothed and leveled, and the wall surface needs to be sprayed and scraped to be a plaster rib surface and be leveled and smooth; in the spraying and scraping process, quality problems such as hollowing, bubbles, cracks and the like are required to be repaired and processed in time, follow-up repair is achieved after spraying and scraping of each room is completed, and work completion and site cleaning are achieved on a construction site.
Step eight, polishing and light collecting: after the scraped gypsum is initially set, a 3mT type scraper is used for secondary leveling; then a spray can is used for spraying water to the surface of the initial setting gypsum for moistening, the water spraying amount is not too much, and a sponge trowel is used for polishing and extracting the slurry while spraying water.
In the embodiment, the mixed mortar is used up within 60 minutes, and the hardened mortar and the ground mortar cannot be added with water for secondary use; the operation tool and the container are cleaned when used up, otherwise the use effect of the sprayed plaster is influenced.
In the embodiment, in rainy days, the gypsum powder is easy to damp and agglomerate, so that the gypsum powder is prevented from being transported in rainy days; in a high-temperature period, the surface setting time of the gypsum mortar is about 30 minutes, the material after being scraped is immediately collected and reused, otherwise, the material is easy to harden; the water content of the slurry is easily absorbed by the wall substrate and the water content is volatilized quickly, so that the plastering gypsum lacks the water content required by hydration, and cracks and hollows appear.
In the embodiment, the consistency of the gypsum mortar is required to be carried out when the mortar pipe is not connected with a machine and the air compressor is not started, the mortar pipe is soaked by water before use, and the surplus water is emptied and then is connected to a mortar outlet of the machine, so that the mortar pipe is prevented from being blocked; if the pause time is too long or the spraying is finished, the mixing bin and the mortar pipe of the machine need to be cleaned immediately, so that the blockage caused by the solidification of the gypsum mortar is avoided; if the device is stopped for a short time, the air valve on the ejector needs to be opened for 20-30 seconds after about 10 minutes, and the gypsum mortar is prevented from being solidified.
In the embodiment, after construction is finished, finished product protection among professionals is required, mutual collision is avoided, indoor ventilation is kept, and equipment is cleaned according to a correct mechanical use method.
In the embodiment, before guniting, a layer of rubber plate is paved on the wall along the ground, so that the ground ash in the plastering process can be recycled for continuous use. However, the slurry which is coagulated or is to be coagulated can not be reused, so that the ground ash must be recycled at any time during plastering so as to avoid waste.
The above embodiments are not exhaustive of the specific embodiments, and other embodiments are possible, and the above embodiments are intended to illustrate, but not limit the scope of the present invention, and all applications coming from the simple changes of the present invention fall within the scope of the present invention.

Claims (7)

1. A plastering structure for quick leveling of mechanical spraying gypsum comprises a wall surface base layer (1), an interface bonding layer (2), reinforcing steel bars (4) and a decorative layer (5) which are sequentially arranged from inside to outside; the method is characterized in that: the interface bonding layer (2) is coated on the outer side surface of the wall surface base layer (1), and a positioning clamp (6) is arranged on the interface bonding layer (2) and at a position corresponding to the reinforcing steel bar (4); the reinforcing steel bar (4) is fixed on the interface bonding layer (2) through a positioning clamp (6); gypsum positioning blocks (3) are arranged on the outer side surface of the interface bonding layer (2) at intervals; the outer side surface of the gypsum positioning block (3) exceeds the outer side surface of the reinforcing steel bar (4); the interface bonding layer (2) is provided with a vertical gypsum positioning strip (8); the gypsum positioning strips (8) are arranged on each reinforcing steel bar (4) at intervals in a group; wherein each gypsum positioning strip (8) covers the steel bar (4), and the steel bar (4) is pressed on the interface bonding layer (2); a gypsum filling layer (7) is mechanically sprayed in the space between the gypsum positioning blocks (3) on the interface bonding layer (2), and the outer side surface of the gypsum filling layer (7) is flush with the outer side surface of the gypsum positioning blocks (3); the decorative layer (5) is arranged on the outer side of the gypsum filling layer (7).
2. The mechanical spray gypsum plastering structure for quick leveling according to claim 1, wherein: when the height of wall was less than 3.5m, reinforcing bar (4) were the stud to the stud has arranged a set ofly, and a set of stud sets up along horizontal parallel interval.
3. The mechanical spray gypsum plastering structure for quick leveling according to claim 1, wherein: when the height of wall is greater than 3.5m, reinforcing bar (4) are horizontal muscle to horizontal muscle has arranged a set ofly, and horizontal muscle is followed horizontal parallel interval and is set up, and adjacent horizontal muscle interval 1500 ~ 2000 mm.
4. The mechanical spray gypsum plastering structure for quick leveling according to claim 1, wherein: the width of gypsum positioning strip (8) is 30-50 mm, and the interval of adjacent gypsum positioning strips (8) is 1200-1500 mm.
5. The mechanical spray gypsum plastering structure for quick leveling according to claim 1, wherein: the cross section of the positioning clamp (6) is U-shaped and comprises a transverse edge (6.1) and vertical edges (6.2) connected to two sides of the transverse edge (6.1); wherein, the end parts of the two vertical edges (6.2) are respectively bent outwards and horizontally to form flanges (6.3); the flanges (6.3) at the two sides of the positioning card (6) are tightly attached to the interface bonding layer (2); wherein the turned-over edge (6.3) at one side is hinged with the interface bonding layer (2), and the turned-over edge (6.3) at the other side is detachably connected with the interface bonding layer (2).
6. The mechanical spray gypsum plastering structure for quick leveling according to claim 1, wherein: the distance between the gypsum positioning block (3) and the side edge of the corresponding side of the wall surface base layer (1) is not less than 200 mm; the distance between the adjacent gypsum positioning blocks (3) is 1200 mm-1500 mm.
7. The mechanical spray gypsum plastering structure for quick leveling according to claim 1, wherein: the thickness of the gypsum positioning block (3) is 5 mm-35 mm; the thickness of the gypsum filling layer (7) is 5 mm-35 mm corresponding to the thickness of the gypsum positioning block (3).
CN201921323203.9U 2019-08-15 2019-08-15 Mechanical spraying gypsum plaster rapid leveling plastering structure Active CN211817541U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921323203.9U CN211817541U (en) 2019-08-15 2019-08-15 Mechanical spraying gypsum plaster rapid leveling plastering structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921323203.9U CN211817541U (en) 2019-08-15 2019-08-15 Mechanical spraying gypsum plaster rapid leveling plastering structure

Publications (1)

Publication Number Publication Date
CN211817541U true CN211817541U (en) 2020-10-30

Family

ID=72995098

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921323203.9U Active CN211817541U (en) 2019-08-15 2019-08-15 Mechanical spraying gypsum plaster rapid leveling plastering structure

Country Status (1)

Country Link
CN (1) CN211817541U (en)

Similar Documents

Publication Publication Date Title
CN109838065B (en) Floor tile ground paving construction method
CN104018598B (en) A kind of external wall structure and construction installation method
CN103572845B (en) A kind of insulation clay reflective heat-insulation paint exterior wall heat-preserving system and construction technology thereof
CN105399389A (en) Building inner wall whitewashing gypsum and process flow thereof
CN106499091A (en) A kind of assembling type partition wall construction method based on ALC plates
CN109797920B (en) Indoor decoration construction method
CN103046709A (en) Building construction method of inner wall surface
CN105649285A (en) Construction method for heat insulation layer combined type exhaust hole of accessible roof
CN112267628A (en) Construction method of plastering-free system for interior wall decoration of constructional engineering
CN106801517A (en) A kind of schoolhouse surface consolidation of Prefabricated porous plate brick mixed structure strengthens method
CN104358341A (en) Building brickwork and masonry construction method of building brickwork
CN104746772A (en) Ash concrete hollow partition board anti-cracking construction method
CN106013509A (en) Dry-method construction method for high-performance autolaved aerated concrete block wall
CN1962530A (en) Thermal insulation material and its preparing process and usage
CN106284998A (en) Plastering on inner walls completely spreads fiberglass gridding cloth construction method
CN110219443A (en) Machinery whitewashing plastering construction method
CN113006397A (en) Construction method for square leveling of kitchen and bathroom space
CN109555238A (en) The processing method that a kind of aluminum alloy mould plate concrete body exempts from plastering
CN108130992A (en) Rubble plate, styrofoam and porous brick compound thermal-insulating decorative external wall construction engineering method
CN105888084A (en) Whole outer wall internal thermal insulation system construction method by using enhanced composite thermal insulation material
CN104695706A (en) Construction method for AAC block free-loading wall
CN110306819A (en) A kind of ancient building common brick exterior wall method for repairing and mending
CN109138423A (en) External wall thermal insulation/decoration integration board construction technology
CN211817541U (en) Mechanical spraying gypsum plaster rapid leveling plastering structure
CN103291024A (en) Novel cement-based plastering mortar construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant