CN211816387U - Wooden embedded bolt sleeve for large equipment foundation - Google Patents

Wooden embedded bolt sleeve for large equipment foundation Download PDF

Info

Publication number
CN211816387U
CN211816387U CN202020330309.8U CN202020330309U CN211816387U CN 211816387 U CN211816387 U CN 211816387U CN 202020330309 U CN202020330309 U CN 202020330309U CN 211816387 U CN211816387 U CN 211816387U
Authority
CN
China
Prior art keywords
bolt sleeve
bolt
wood
main body
wooden
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020330309.8U
Other languages
Chinese (zh)
Inventor
朱金侠
李栓平
程温
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Chemical Engineering Second Construction Corp
Original Assignee
China Chemical Engineering Second Construction Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Chemical Engineering Second Construction Corp filed Critical China Chemical Engineering Second Construction Corp
Priority to CN202020330309.8U priority Critical patent/CN211816387U/en
Application granted granted Critical
Publication of CN211816387U publication Critical patent/CN211816387U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a wooden embedded bolt sleeve of a large-scale equipment foundation convenient to remove, which comprises a wooden template, a square wooden keel, a cross-shaped framework and an externally-wrapped benzene board; four wood templates are spliced into a bolt sleeve main body with a hollow cuboid structure in a lap joint mode, square wood keels are fixed at four corners of the bolt sleeve main body respectively along the vertical direction, a cross-shaped framework formed by splicing two wood-rubber mold closing plates in a cross mode is inserted into the middle of the bolt sleeve main body, and four end portions of the cross-shaped framework are supported on the inner side face of the bolt sleeve main body respectively; the upper and lower open end of bolt cover main part is provided with top apron and end cap board respectively, and the cladding of outsourcing benzene board is in the bolt cover main part outside. Through increasing the rigidity of wooden bolt cover, the benzene board is enclosed to the outside, has realized being convenient for demolish and has guaranteed the purpose of rim of a cup quality. By adopting the embedded bolt sleeve, the template turnover rate is high, the appearance quality of the orifice of the equipment is good, the material is easy to obtain, the cost is reduced, the construction process is simple and convenient, the application range is wide, and the like, and the embedded bolt sleeve is particularly suitable for the installation of the large-scale fermentation equipment foundation.

Description

Wooden embedded bolt sleeve for large equipment foundation
Technical Field
The utility model relates to a buried bolt cover in advance particularly, is the buried bolt cover in advance of wood system of a specially adapted fermentation equipment basis.
Background
Relate to during large-scale equipment foundation construction and reserve bolt hole, use certain engineering of our company's construction as the background, this project includes 105 fermentation workshops and 104 fermentation workshops, it is the most important two districts of founding the fermentation cylinder, wherein 105 fermentation workshops are whole factory's mark nature monomer, the time limit for a project requires shortest, the year is put into operation, there are 36 and 28 large-scale fermentation equipment bases in 105 and every workshop of 104 two monomers respectively, in single large-scale fermentation equipment base, there are 24 and reserve bolt hole, the specification: 250mm 1300mm, 300mm 1500mm, the individual equipment base diameter is 6700mm, 7100 mm.
During the foundation construction of large-scale equipment, one of them key point is that guarantee to reserve bolt hole module and take one's place smoothly, do not take place skew and dislocation, reserve bolt hole module traditional construction order and make well the pre-buried bolt cover of standard that accords with the design requirement earlier, fix to the design position again, nevertheless can cause and demolish the difficulty, the outward appearance is difficult to guarantee, the unable reutilization of template.
Disclosure of Invention
The to-be-solved technical problem of the utility model is to provide a main equipment basis wood system embedded bolt cover convenient to demolish.
For solving the above technical problem, the utility model discloses a technical scheme is: a wooden embedded bolt sleeve for a large-scale equipment foundation comprises a wooden template, a square wooden keel, a cross-shaped framework and an externally-wrapped benzene board; four wood templates are spliced into a bolt sleeve main body with a hollow cuboid structure in a lap joint mode, square wood keels are fixed at four corners of the bolt sleeve main body respectively along the vertical direction, a cross-shaped framework formed by splicing two wood-rubber mold closing plates in a cross mode is inserted into the middle of the bolt sleeve main body, and four end portions of the cross-shaped framework are supported on the inner side face of the bolt sleeve main body respectively; the upper and lower open end of bolt cover main part is provided with top apron and end cap board respectively, and the cladding of outsourcing benzene board is in the bolt cover main part outside.
Furthermore, the wooden templates are spliced in a clockwise overlapping mode.
Further, the outer side of the benzene plate is wrapped with a plastic adhesive tape.
Furthermore, the upper parts of the two opposite wood templates are correspondingly provided with die dismounting holes.
Furthermore, the top cover plate and the bottom cover plate are respectively embedded in the upper opening end and the lower opening end of the bolt sleeve main body.
The utility model discloses an increase the rigidity of wood system bolt cover to and at its outside cladding benzene board, realized being convenient for demolish and guaranteed the purpose of rim of a cup quality. By adopting the embedded bolt sleeve, the template turnover rate is high, the appearance quality of the orifice of the equipment is good, the material is easy to obtain, the cost is reduced, the construction process is simple and convenient, the application range is wide, and the like, and the embedded bolt sleeve is particularly suitable for the installation of the large-scale fermentation equipment foundation.
Drawings
Fig. 1 is a schematic longitudinal sectional view of a pre-buried bolt sleeve according to the present invention.
Fig. 2 is a schematic cross-sectional view of the embedded bolt sleeve according to the present invention.
Fig. 3 is a schematic diagram of the lap joint assembly of the wooden template of the embedded bolt sleeve.
Fig. 4 is a schematic view of lap joint assembly of a wooden formwork as a comparative example.
Fig. 5 is a side view of a pre-buried bolt sleeve according to the present invention.
Fig. 6 is a top view of the embedded bolt sleeve according to the present invention.
In the drawing, 1-a wood template, 2-a square wood keel, 3-a cross skeleton, 4-an outer polystyrene board, 5-a die removing hole, 6-a top cover plate, 7-a bottom cover plate and 8-an adhesive tape operating hole.
Detailed Description
As shown in fig. 1 and 2, the utility model relates to a large-scale equipment basis wood system embedded bolt cover that typical embodiment provided, including plank sheathing 1, square timber keel 2, cross skeleton 3 and outsourcing benzene board 4.
As shown in fig. 3, four wood formworks 1 are spliced into a bolt sleeve main body with a hollow cuboid structure. Preferably, as shown in fig. 3, the wood formworks 1 are assembled in a clockwise overlapping manner, where the clockwise overlapping manner means that an inner side surface of a first end of any one of the wood formworks 1 is connected to an end surface of an adjacent one of the wood formworks 1, and an end surface of a second end of the wood formwork 1 is connected to an inner side surface of one end of another adjacent one of the wood formworks 1. Compared with the common same-direction lap joint assembly mode (figure 4), the clockwise lap joint has the advantages of firm disassembly and capability of reducing the probability of damage of the bolt sleeve during disassembly.
As shown in fig. 5, the upper parts of the two opposite wood formworks 1 are correspondingly provided with a demolding hole 5.
The four corners of bolt cover main part are along vertical direction fixed square timber joist 2 respectively, and the cross skeleton 3 that forms is pieced together by two wood-rubber compound template crosses is inserted in bolt cover main part middle part, and four tip of cross skeleton support respectively in the medial surface of bolt cover main part, fix at bolt cover central point. The bolt sleeve body is internally reinforced by square wood keels 2, and a wood plate cross-shaped framework 3 is embedded in the middle of the bolt sleeve body, so that the whole bolt sleeve is not deformed under the extrusion of concrete, and cannot lose shape under external force during dismantling.
The upper and lower open end of bolt housing main part is provided with lamina tecti 6 and end cover 7 respectively, and lamina tecti 6 and end cover 7 are equallyd divide and are respectively embedded in the upper and lower open end of bolt housing main part, make wholly more firm, and guarantee when demolising that the end cover can not suffer to destroy and keep somewhere downtheholely. The top cover plate 6 and the bottom cover plate 7 are respectively provided with an operation hole 8 (figure 6) of a bonding belt in the middle, the operation hole 8 of the bonding belt is used for integrally fixing the bolt sleeve on a coating frame of the bonding belt, the coating of the bonding belt is convenient through rotating the bolt sleeve, and the concrete method is as follows: and (3) a central shaft of the cladding frame penetrates through the bonding belt operating holes reserved in the centers of the top cover plate and the bottom cover plate of the bolt sleeve, the bolt sleeve is fixed on the bonding belt cladding frame, and then the bolt sleeve is synchronously rotated along with the winding of the bonding belt, so that the bonding belt cladding construction and quality control are achieved.
The outer polystyrene board 4 is coated outside the bolt sleeve main body. The polystyrene board is added on the outer side of the wood template 1, so that the mold can be integrally pulled out. The plastic adhesive tape is wrapped on the outer side of the benzene plate, so that the benzene plate can be conveniently and integrally pulled out without pollution.
Examples
Manufacturing a bolt sleeve:
and (3) carrying out batch processing production on the equipment foundation bolt sleeves according to the number and turnover times of the equipment foundations poured each time, and selecting the wood-rubber die plate with smooth surface, good quality and excellent quality.
The wood template 1 is cut to be calculated according to the size, so that the mold is convenient to remove, the specification of the mold core is slightly larger than the design size of the reserved hole, and the lower part of the mold core is small and the upper part is large, 1: 10 tremble the degree and be favorable to the mould to extract, and bolt housing outsourcing 1cm benzene board, the size of outsourcing benzene board need be deducted when the mould cuts to guarantee to reserve the design size of entrance to a cave after the form removal, about the bolt housing upper shed elevation will be higher than bolt hole top elevation 25cm, the box body is demolishd in the perforation of being convenient for.
And the middle cross-shaped framework 3 is customized, a wood-rubber die assembly plate is adopted to be cut into a wedge-shaped square plate which is slightly smaller than the embedded top cover plate by 1cm, a groove is reserved in the middle of the wedge-shaped square plate, and the two die plates are spliced in a cross manner. The polystyrene board is a white foam board with the thickness of 1cm, and has the characteristics of good toughness, light weight, economy, durability and convenience in cutting, the size of the wood-rubber composite template which is pressed down during cutting is taken as a model, the size of an upper opening is controlled to be about 5cm of the elevation of the top of a bolt hole, slurry can be prevented from being poured in, and the polystyrene board is convenient to dismantle.
The centers of the top cover plate 6 and the bottom cover plate 7 are respectively penetrated with phi 8 round holes, inserted into the cladding frame, well controlled and fully adhered with the adhesive tape.
The bolt sleeve mounting method comprises the following steps:
the bolt sleeve is installed and positioned on the equipment foundation, the cup opening is provided with a hole reinforcing rib, double rows of reinforcing ribs are used for binding and reinforcing connection, and a welding process is forbidden to be adopted so as to prevent welding slag from burning and leaking the polystyrene board and influencing later-stage mould removal.
Pouring the concrete twice, and rechecking the central line, the elevation and the verticality of the bolt sleeve before pouring the equipment foundation so as to ensure that the central line of the bolt sleeve is positioned correctly; and after the concrete is accurate, pouring the upper foundation concrete, and rechecking the elevation and the verticality of the embedded bolt sleeve before the initial setting of the concrete so as to ensure the embedding quality of the embedded bolt sleeve.
The bolt sleeve dismounting method comprises the following steps:
in order to ensure that the embedded bolt sleeve is smoothly pulled out, the embedded bolt sleeve is detached after the initial setting of the concrete and before the final setting of the concrete.
Drilling a mold removing hole 5 with the diameter phi 12 at the exposed part of the bolt sleeve, transversely penetrating a phi 12 steel bar, and exposing 10cm at two sides for sleeving a lifting lug.
Preparing two to three kinds of square timbers with different lengths as fulcrums, inserting short steel bars welded on the front section of the scaffold tube into the lifting lugs to serve as crow bars, and sequentially using the square timbers with different lengths as the fulcrums to pull out the bolt sleeves by adopting a lever principle. If the lateral pressure of concrete is too large, the lever principle dismantling method cannot be implemented, a standby scheme can be adopted, a steel pipe hanger is made, a manual chain block is hung on the bolt sleeve in a vertical mode, and the bolt sleeve is dismantled.
Demolish bolt sleeve back, the downthehole surplus benzene board of bolt takes the crow bar to become flexible all around the benzene board, owing to take the sticky tape to fully glue, the benzene board after becoming flexible can wholly be extracted, and the benzene board sediment that the sporadic dropped can float the downthehole benzene board sediment of watering of bolt, and the manual work is clear away can, if there is the benzene board sediment that can't clear away in the bottom, usable rosin water instils into and takes place chemical reaction with the benzene board, clears away the benzene board sediment.
And the dismantled benzene plates are collectively stacked to an unrecyclable waste stacking point, are recovered and processed by a local sanitation garbage truck before fixed-point orientation, and the dismantled bolt sleeves are collectively stacked, are hung to a processing area, are re-coated with the benzene plates and are used for installing the next batch of equipment foundations.

Claims (5)

1. The utility model provides a pre-buried bolt cover of main equipment basis wood system which characterized in that: comprises a wood template, a square wood keel, a cross-shaped framework and an externally-wrapped benzene board; four wood templates are spliced into a bolt sleeve main body with a hollow cuboid structure in a lap joint mode, square wood keels are fixed at four corners of the bolt sleeve main body respectively along the vertical direction, a cross-shaped framework formed by splicing two wood-rubber mold closing plates in a cross mode is inserted into the middle of the bolt sleeve main body, and four end portions of the cross-shaped framework are supported on the inner side face of the bolt sleeve main body respectively; the upper and lower open end of bolt cover main part is provided with top apron and end cap board respectively, and the cladding of outsourcing benzene board is in the bolt cover main part outside.
2. The large equipment foundation wooden embedded bolt sleeve as claimed in claim 1, wherein: the wooden templates are spliced in a clockwise overlapping manner.
3. The large equipment foundation wooden embedded bolt sleeve as claimed in claim 1 or 2, wherein: the outer side of the benzene plate is wrapped with a plastic adhesive tape.
4. The large equipment foundation wooden embedded bolt sleeve as claimed in claim 3, wherein: the upper parts of the two opposite wood templates are correspondingly provided with die dismounting holes.
5. The large equipment foundation wooden embedded bolt sleeve as claimed in claim 4, wherein: the top cover plate and the bottom cover plate are respectively embedded in the upper opening end and the lower opening end of the bolt sleeve main body.
CN202020330309.8U 2020-03-17 2020-03-17 Wooden embedded bolt sleeve for large equipment foundation Active CN211816387U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020330309.8U CN211816387U (en) 2020-03-17 2020-03-17 Wooden embedded bolt sleeve for large equipment foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020330309.8U CN211816387U (en) 2020-03-17 2020-03-17 Wooden embedded bolt sleeve for large equipment foundation

Publications (1)

Publication Number Publication Date
CN211816387U true CN211816387U (en) 2020-10-30

Family

ID=73011290

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020330309.8U Active CN211816387U (en) 2020-03-17 2020-03-17 Wooden embedded bolt sleeve for large equipment foundation

Country Status (1)

Country Link
CN (1) CN211816387U (en)

Similar Documents

Publication Publication Date Title
CN109208790B (en) Single-side formwork erecting construction method for arc shear wall
CN110439265A (en) Bilateral column or wall method for synchronously constructing at a kind of narrow expansion joint
CN104196231A (en) Concrete floor aluminum alloy template and construction method thereof
CN112497439A (en) Die and method for manufacturing bridge deck auxiliary member
CN210396134U (en) Reinforcing tool for controlling horizontal joint quality of shear wall
CN114704112A (en) Disassembly-free anti-seepage plugging method for cantilever type scaffold steel beam through-wall opening
CN211816387U (en) Wooden embedded bolt sleeve for large equipment foundation
CN101787798A (en) Construction process for reinforced concrete beam bottom bracing and reinforcing template
CN219863375U (en) Constructional column top reinforcing steel bar pre-burying device
CN111206614A (en) Turnover utilization construction method for wooden embedded bolt sleeve of large equipment foundation
CN113738157B (en) Temporary supports on two sides of post-cast strip of building and method for constructing constructional column by using temporary supports
CN113090025B (en) Aluminum mold matching overhanging outer frame construction method of full concrete outer wall structure
CN211775746U (en) Sewage treatment pond cone basis steel form and matrix connection structure thereof
CN112647469B (en) Construction method of self-waterproof water channel structure with complex section
CN213654236U (en) Mortise-tenon type reserved pipe groove die
CN210685368U (en) Convenient reinforcing complete die set for concrete wall formworks on two sides of deformation joint
CN210508479U (en) Reinforced structure of historical architecture unit wall body
CN211447004U (en) Reinforced GRC plate and pipe ditch foundation formwork system combining same
CN210508475U (en) History building unitized wall body with waterproof function
CN110965766A (en) Template for construction of deformation joint of shear wall structure, construction structure and construction method
CN218090944U (en) Equipment foundation preformed hole core mold
CN215830000U (en) Arc-shaped water pool formwork supporting system of bamboo plywood
CN216948392U (en) Can assemble detachable mortise-tenon joint assembled basis
CN217326467U (en) Shear wall opening forming template system for allowing cantilever type scaffold steel beam to penetrate
CN219952648U (en) Sectional bolt for prefabricated laminated slab

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant