CN211689924U - High mound bracket supports bracket anchor structure - Google Patents
High mound bracket supports bracket anchor structure Download PDFInfo
- Publication number
- CN211689924U CN211689924U CN201922127868.9U CN201922127868U CN211689924U CN 211689924 U CN211689924 U CN 211689924U CN 201922127868 U CN201922127868 U CN 201922127868U CN 211689924 U CN211689924 U CN 211689924U
- Authority
- CN
- China
- Prior art keywords
- bracket
- anchor
- tenons
- mound
- board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model relates to a high mound bracket supports bracket anchor structure, pre-buried anchor bolt in the high mound pier body, be equipped with 3 horizontal tenons on the bracket anchor board, bracket mounted position is equipped with the recess that the tenon on 3 and the anchor board corresponds on the mound body, 3 tenons on the anchor board gomphosis respectively to 3 recesses on the mound body in, the anchor board passes through anchor bolt and pier body anchor. The utility model has the advantages that 3 tenon structures on the bracket anchoring plate are occluded with the reserved opening of the pier body, so that the vertical load acting on the anchoring plate is borne by the concrete of the pier body, and the stress capacity is stronger; the bracket mounting and dismounting process has no welding and cutting operation, the structure of the bracket is not damaged, and the bracket can be used in a circulating way.
Description
Technical Field
The utility model belongs to the technical field of the bridge construction, a bearing structure of bridge superstructure construction bracket is related to, concretely relates to anchor structure of high mound bracket support bracket.
Background
In the process of bridge construction, overhanging concrete pouring construction is usually carried out, such as a No. 0 block, a cable tower cross beam, a high pier capping beam and the like of a rigid frame bridge. When the pier is higher, the ground support cannot be erected, and the bracket method is mainly adopted for the concrete construction of the overhanging part. The bracket needs to be supported by means of a bracket anchored to the pier body. The anchor of the bracket and the pier body is usually in two modes, one mode is to embed a bolt in the pier body, the bracket is anchored with the pier body through the embedded bolt, the vertical shearing force is resisted through the friction force between the pier body and the bracket and the high-strength bolt, but the bracket and the pier body are not tightly attached due to the uneven concrete surface of the pier body, the friction force generated in the compression process is small, the shearing resistance of the bolt is weak, and the safety and reliability of the support are low; the other mode is that the steel plates are embedded in pier body concrete, and the brackets are welded with the embedded steel plates, but a large amount of field overhead welding operation is needed, the construction safety risk is large, the welding quality is difficult to control, and the brackets need to be cut when being detached, so that the nondestructive turnover cannot be realized, the material waste can be caused, and the construction cost is high.
Disclosure of Invention
The utility model aims at improving the structure of traditional bracket and pier shaft anchor mode, improving bracket and pier shaft anchor strength and security to cancel on-the-spot welding process, convenient construction, reduce cost.
The technical scheme of the utility model as follows:
the utility model provides a high mound bracket supports bracket anchor structure, pre-buried anchor bolt in the high mound pier body, the bracket includes the anchor board, and anchor board one side welding has bracket roof and side riser, and the anchor board passes through anchor bolt anchor on the mound body, its characterized in that: the other side of the anchoring plate is provided with 3 transverse tenons, and the tenons are provided with screw holes corresponding to the anchoring bolts; the bracket mounted position is equipped with the recess that 3 tenons on with the anchor board correspond on the pier shaft, and pre-buried anchor bolt front end is outstanding to the pier shaft outside in the recess in the pier shaft, 3 tenons on the anchor board gomphosis respectively to 3 recesses on the pier shaft, and the screw and spiro union nut on the tenon are passed to anchor bolt front end and are anchored with the anchor board.
The utility model has the advantages that 3 tenon structures on the bracket anchoring plate are meshed with the reserved notches of the pier body, so that the vertical load acting on the anchoring plate is born by the pier body concrete, the characteristic of high compressive strength of the concrete is fully exerted, the contact area between the anchoring plate and the concrete is increased, the mutual friction force between the anchoring plate and the concrete is enhanced, and the stress capacity is stronger; the bracket is welded in advance, and is installed through the embedded bolt on site, so that the construction speed is high, welding and cutting operations are not required in the installation and disassembly processes, the structure of the bracket is not damaged, the bracket can be used in a turnover manner, and the economic benefit is obvious.
Drawings
Fig. 1 is a schematic elevation structure of the present invention;
FIG. 2 is a side view schematic of the bracket;
FIG. 3 is a schematic front view of a corbel;
fig. 4 is a side elevational view of the pier body;
fig. 5 is a front view structure schematic diagram of the pier body.
Detailed Description
As shown in fig. 1, the utility model discloses pre-buried anchor bolt 2 that has in high mound pier shaft 1, the bracket includes anchor board 3, and 3 one side welding of anchor board have bracket roof 4 and side riser 5, and anchor board 3 is through anchor bolt 2 anchor on pier shaft.
The corbel is structured as shown in fig. 2 and 3, 3 transverse tenons 31 are arranged on the other surface of the anchoring plate 3, and screw holes 32 corresponding to anchoring bolts are arranged on the tenons 31.
As shown in fig. 4 and 5, 3 grooves 6 corresponding to the tenons on the anchoring plates are arranged at the bracket mounting positions on the pier body 1, and the front ends of the anchoring bolts 2 pre-embedded in the pier body protrude out of the pier body from the grooves.
As shown in figure 1, 3 tenons 31 on the bracket anchor plate 3 are respectively embedded into 3 grooves on the pier body, and the front end of the anchor bolt 2 passes through a screw hole on the tenon and is screwed with a nut 7 to be anchored with the anchor plate 3.
When the utility model is implemented, the bracket is welded on the ground in advance, the thickness of the tenon on the anchoring plate is not less than 3cm, and the distance is 15 cm; when pouring pier body concrete, reserving a groove at the designed installation position of the bracket, and embedding an anchor bolt; when the bracket is installed, the anchoring plate is directly embedded into the groove on the pier body and is anchored with the pier body through the anchoring bolt. The installation rate is fast, convenient to detach, and after the construction, the bracket of dismantling can have enough to meet the need the use.
Claims (1)
1. The utility model provides a high mound bracket supports bracket anchor structure, pre-buried anchor bolt in the high mound pier body, the bracket includes the anchor board, and anchor board one side welding has bracket roof and side riser, and the anchor board passes through anchor bolt anchor on the mound body, its characterized in that: the other side of the anchoring plate is provided with 3 transverse tenons, and the tenons are provided with screw holes corresponding to the anchoring bolts; the bracket mounted position is equipped with the recess that 3 tenons on with the anchor board correspond on the pier shaft, and pre-buried anchor bolt front end is outstanding to the pier shaft outside in the recess in the pier shaft, 3 tenons on the anchor board gomphosis respectively to 3 recesses on the pier shaft, and the screw and spiro union nut on the tenon are passed to anchor bolt front end and are anchored with the anchor board.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922127868.9U CN211689924U (en) | 2019-11-30 | 2019-11-30 | High mound bracket supports bracket anchor structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922127868.9U CN211689924U (en) | 2019-11-30 | 2019-11-30 | High mound bracket supports bracket anchor structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211689924U true CN211689924U (en) | 2020-10-16 |
Family
ID=72789133
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922127868.9U Active CN211689924U (en) | 2019-11-30 | 2019-11-30 | High mound bracket supports bracket anchor structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211689924U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113737960A (en) * | 2021-08-06 | 2021-12-03 | 水利部交通运输部国家能源局南京水利科学研究院 | Bracket with combined fixing plate wall corner |
-
2019
- 2019-11-30 CN CN201922127868.9U patent/CN211689924U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113737960A (en) * | 2021-08-06 | 2021-12-03 | 水利部交通运输部国家能源局南京水利科学研究院 | Bracket with combined fixing plate wall corner |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103306214A (en) | Novel reinforcement device for reinforced concrete beam and floor slab and construction method thereof | |
CN211689924U (en) | High mound bracket supports bracket anchor structure | |
CN113235438A (en) | Pouring construction tool and construction method for steel-concrete composite beam bridge deck | |
CN104233961B (en) | A kind of supporting shelf bracket of No. 0 block of cantilever bridge | |
CN203639753U (en) | Railway roadbed ballast blocking plate | |
CN210031489U (en) | Stool type bracket capping beam support | |
CN203257121U (en) | Novel reinforcing device of reinforced concrete beam and floor plate | |
CN102953344A (en) | Climbing cone type triangular cantilever bracket | |
CN201952777U (en) | Pile wharf steel hoop support structure | |
CN211498508U (en) | Assembled pocket bottom protection device | |
CN202881854U (en) | Support bracket for bridge construction | |
KR102340195B1 (en) | Rail installation system for rail type gantry crane (RMGC) using complex SOLE PLATE | |
CN206015523U (en) | The built-in steel anchor beam accurate positioning device of free-standing Sarasota | |
CN210947663U (en) | Scaffold mounting structure encorbelments | |
CN103306196A (en) | Spiral bridge support | |
CN204023422U (en) | A kind of assembling Coping Construction operating platform | |
CN103572669B (en) | Ballast bed and tunnel bottom defect regulating and constructing method as well as anchoring device | |
CN2782639Y (en) | Structure for preventing hoist trake loose | |
CN202000266U (en) | Supporting structure of bridge coping template | |
CN107354877B (en) | Integral cup opening mounting structure for sound barrier | |
CN202925471U (en) | Hydraulic formwork system for high pier construction | |
CN202788877U (en) | Horizontal-vertical loading tunnel combined type full space supporting and propping frame | |
CN201883372U (en) | Integral sidewalk pedestrian plate | |
CN205369292U (en) | Control framing formula bridge steel structure tower crane basis | |
CN218989930U (en) | Full support for pushing double-slideway prestressed concrete beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |