CN211548450U - Parapet wall coping and lightning protection belt integrated construction structure - Google Patents

Parapet wall coping and lightning protection belt integrated construction structure Download PDF

Info

Publication number
CN211548450U
CN211548450U CN201922221432.6U CN201922221432U CN211548450U CN 211548450 U CN211548450 U CN 211548450U CN 201922221432 U CN201922221432 U CN 201922221432U CN 211548450 U CN211548450 U CN 211548450U
Authority
CN
China
Prior art keywords
parapet
plate
capping
construction structure
integrated construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922221432.6U
Other languages
Chinese (zh)
Inventor
张欣
张春锋
张峰
黄文强
刘玉彬
王丽鹏
杨伊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Construction Engineering Group Bohai Construction Co ltd
Original Assignee
Beijing Construction Engineering Group Bohai Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Construction Engineering Group Bohai Construction Co ltd filed Critical Beijing Construction Engineering Group Bohai Construction Co ltd
Priority to CN201922221432.6U priority Critical patent/CN211548450U/en
Application granted granted Critical
Publication of CN211548450U publication Critical patent/CN211548450U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a parapet coping and lightning protection belt integrated construction structure, which comprises a parapet, wherein the outside of the parapet is provided with a heat preservation plate, the top end of the parapet is provided with a steel bracket, the steel bracket comprises a lower flat plate and an upper inclined plate, the lower flat plate is fixedly connected with the top end of the parapet, and the upper inclined plate is inclined downwards along the direction from the outside of the parapet to the inside of the parapet; the upper surface of going up the swash plate has set firmly and has pushed up aluminum plate, push up aluminum plate include with last swash plate laminating mutually and with last swash plate fixed connection push up swash plate and set up extension board under first extension board and the second on pushing up the swash plate, the lower extreme of first extension board is buckled and is had first kink, first kink butt in the heated board, the lower extreme of extension board is buckled and is had the second kink under the second, second kink butt in the inboard of parapet. It both can avoid leading to pushing up aluminum plate and leaking the water because the trompil leads to, can avoid again leading to pushing up aluminum plate extravagant because the trompil position is inaccurate.

Description

Parapet wall coping and lightning protection belt integrated construction structure
Technical Field
The utility model relates to a construction technical field, in particular to parapet bears down on one and takes integration construction structures with lightning protection.
Background
Lightning arrester strips are a type of lightning arrester, generally laid horizontally or inclined (depending on the inclination of the roof), connected at least two places (end to end) to a down conductor, generally set up brightly, but also hidden under the concrete or tiles of the roof.
Referring to fig. 1, there is shown a side view showing a state of installation of a lightning strip in the prior art. The lightning-arrest area of roofing generally sets up along the parapet, and lightning-arrest area and support stand in the parapet top. Referring to fig. 2, a plan view showing a state of installation of a lightning strip in the related art is shown. Referring to fig. 1 to 2, a plurality of support rods 1a are inserted at intervals at the top of a parapet 2a and protrude out of the parapet 2a, when a decoration layer 3a is laid on the parapet 2a, if the decoration layer 3a is an aluminum plate, a through hole needs to be formed in the aluminum plate, the support rods 1a fixed on the parapet 2a are correspondingly inserted into the through holes of the aluminum plate, and then the lightning protection belt 4a is arranged along the support rods 1a and is fixedly connected with the support rods 1 a. This just leads to being equipped with the through-hole on the aluminum plate, and the fixed position of bracing piece becomes waterproof weak point, has the seepage hidden danger, and if the trompil position is not accurate in location, and the position that causes to insert bracing piece 1a of establishing and the through-hole on the aluminum plate does not coincide, the extravagant condition of monoblock panel very easily.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims to provide a parapet bears down on one and takes integration construction structures with lightning-arrest, it both can avoid leading to bearing down on one aluminum plate to leak the infiltration because the trompil, can avoid again leading to bearing down on one aluminum plate extravagant because the trompil position is inaccurate.
The parapet wall coping and lightning protection belt integrated construction structure comprises a parapet wall, wherein a heat insulation plate is arranged on the outer side of the parapet wall, a steel support is arranged at the top end of the parapet wall, the steel support comprises a lower flat plate and an upper inclined plate, the lower flat plate is fixedly connected to the top end of the parapet wall, and the upper inclined plate is obliquely downwards arranged along the direction from the outer side of the parapet wall to the inner side of the parapet wall; the upper surface of going up the swash plate has set firmly and has pushed up aluminum plate, push up aluminum plate include with last swash plate laminating mutually and with last swash plate fixed connection push up swash plate and set up extension board under first extension board and the second on pushing up the swash plate, the lower extreme of first extension board extends to the heated board outside, the lower extreme of first extension board has first kink towards heated board direction bending type, first kink butt in the heated board, the lower extreme of extension board extends to the outside of parapet under the second, the lower extreme of extension board has the second kink towards parapet direction bending type under the second, second kink butt in the inboard of parapet.
By adopting the technical scheme, the method has the advantages that,
the utility model discloses further set up to: the lower flat plate is in a strip shape, the number of the lower flat plates is multiple, and the lower flat plates are arranged at intervals along the length direction of the parapet wall.
Through adopting above-mentioned technical scheme, lower flat board is not full and is spread in parapet top, not only practices thrift panel, is convenient for install moreover.
The utility model discloses further set up to: the lower flat plate is arranged along the width direction of the parapet wall.
Through adopting above-mentioned technical scheme, be the angle setting for the direction of setting up of lower flat board and parapet's width direction, lower flat board sets up saving panel along parapet's width direction.
The utility model discloses further set up to: the steel bracket further comprises a cushion block arranged between the lower flat plate and the upper inclined plate, and the lower flat plate and the upper inclined plate are arranged at intervals.
Through adopting above-mentioned technical scheme, the cushion not only is used for realizing the connection between dull and stereotyped and the upper inclined plate down, is used for conveniently adjusting the inclination of upper inclined plate moreover.
The utility model discloses further set up to: the lower flat plate and the parapet are fixedly connected together through galvanized expansion bolts.
Through adopting above-mentioned technical scheme, not only simple to operate connects moreover firmly.
The utility model discloses further set up to: the upper sloping plate is provided with a yielding through hole for installing the galvanized expansion bolt.
Through adopting above-mentioned technical scheme, the via hole of stepping down supplies galvanized expansion bolts to pass through the swash plate, makes things convenient for galvanized expansion bolts to be dull and stereotyped fixed connection in the top of parapet under with.
The utility model discloses further set up to: the top pressing inclined plate and the upper inclined plate are fixedly connected together through a galvanized self-tapping screw.
Through adopting above-mentioned technical scheme, self-tapping screw is used for the fixed connection between capping swash plate and the last swash plate, and simple to operate, connection are firm not only, moreover because capping swash plate and last swash plate have the effect of water conservancy diversion to rainwater etc. neither can stay in self-tapping screw department, can not leak the infiltration through self-tapping screw again.
The utility model discloses further set up to: and a first weather-resistant glue layer for sealing a connecting gap between the first bending part and the heat-insulating plate is arranged between the first bending part and the heat-insulating plate.
Through adopting above-mentioned technical scheme, first resistant glue film of waiting is used for sealing connecting gap between first kink and the heated board.
The utility model discloses further set up to: and a second weather-resistant glue layer for sealing the connecting gap between the second bending part and the parapet is arranged between the second bending part and the parapet.
Through adopting above-mentioned technical scheme, the weather resistant glue film of second is used for sealing the joint line between second kink and the parapet.
The utility model discloses further set up to: and a plastering layer is arranged between the top ends of the parapet wall and the heat insulation plate and the lower flat plate.
Through adopting above-mentioned technical scheme for the top of protection parapet and heated board.
To sum up, the utility model discloses following beneficial effect has: it both can avoid leading to pushing up aluminum plate and leaking the water because the trompil leads to, can avoid again leading to pushing up aluminum plate extravagant because the trompil position is inaccurate.
Drawings
Fig. 1 is a sectional view showing an installation state of a lightning arrester strap in the related art;
fig. 2 is a bottom view of a state of installation of a lightning arrester strap in the prior art;
fig. 3 is a cross-sectional view of the present invention.
In the figure, 1, parapet; 11. a thermal insulation board; 12. plastering layer; 2. a galvanized expansion bolt; 3. a steel bracket; 31. a lower flat plate; 32. an upper sloping plate; 321. yielding through holes; 33. cushion blocks; 4. pressing the aluminum plate; 41. pressing a top sloping plate; 42. a first lower extension plate; 421. a first bent portion; 43. a second lower extension plate; 431. a second bent portion; 5. galvanized self-tapping screws; 51. a waterproof pad; 6. a first weather-resistant glue layer; 7. and the second weather-resistant glue layer.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 3, for the utility model discloses a parapet 1 bears down on one and takes integration construction structures with lightning protection, including parapet 1, parapet 1's the outside is provided with heated board 11, and heated board 11 can set up to the polyphenyl board. The top of parapet 1 and heated board 11 is provided with plastering layer 12, and the upper surface on plastering layer 12 is provided with steel support 3.
The steel bracket 3 includes a plurality of lower flat plates 31, an upper inclined plate 32, and a spacer 33. Dull and stereotyped 31 sets up and the length of dull and stereotyped 31 equals polyphenyl heat preservation and parapet 1's gross thickness down along the thickness direction of parapet 1, and a plurality of dull and stereotyped 31 are arranged along parapet 1's circumference direction equidistant down, the utility model discloses do not do the injecing to dull and stereotyped 31's quantity down, the quantity of dull and stereotyped 31 is decided by parapet 1's length, and parapet 1 installs a lower dull and stereotyped 31 every 0.5 meters. Each lower flat plate 31 is fixedly connected to the top end of the parapet wall 1 through two galvanized expansion bolts 2, and the two galvanized expansion bolts 2 are arranged at intervals along the thickness direction of the parapet wall 1.
The upper inclined plate 32 is inclined downwards from the outside of the parapet wall 1 to the inside of the parapet wall 1, the upper inclined plate 32 is arranged in an annular closed manner, and the upper inclined plate 32 and the parapet wall 1 are arranged oppositely from top to bottom.
Cushion 33 sets up between dull and stereotyped 31 and the upper inclined plate 32 down for the interval that realizes dull and stereotyped 31 and upper inclined plate 32 sets up, and the lower extreme of cushion 33 welds in dull and stereotyped 31's upper surface down, and the upper end of cushion 33 welds in the lower surface of upper inclined plate 32, and every cushion 33 quantity between dull and stereotyped 31 and the upper inclined plate 32 sets up to two down, and two cushion 33 are arranged along dull and stereotyped 31 length direction down.
The upper sloping plate 32 is provided with abdicating through holes 321 for installing the galvanized expansion bolts 2, the abdicating through holes 321 correspond to the galvanized expansion bolts 2 one to one, and the abdicating through holes 321 are positioned right above the galvanized expansion bolts 2.
The upper surface of the upper inclined plate 32 is fixedly provided with a capping aluminum plate 4, the capping aluminum plate 4 is integrally formed, and the thickness of the capping aluminum plate 4 is 1.2 mm.
The capping aluminum plate 4 includes a capping inclined plate 41, and first and second lower extension plates 42 and 43 provided at both ends of the capping inclined plate 41.
The jacking inclined plate 41 is attached to the upper inclined plate 32, and the jacking inclined plate 41 and the upper inclined plate 32 are fixedly connected together through the galvanized self-tapping screw 5. The galvanized self-tapping screw 5 may be waterproofed by a waterproof pad 51.
The lower extreme of first extension board 42 extends to the heated board 11 outside, and the lower extreme of first extension board 42 has first kink 421 towards heated board 11 bending type, and first kink 421 butt in heated board 11 is provided with the first weather resistant glue film 6 that is used for sealed both connection gaps between first kink 421 and the heated board 11.
The lower end of the second lower extension plate 43 extends to the outside of the parapet 1, the lower end of the second lower extension plate 43 is bent towards the parapet 1 to form a second bent portion 431, the second bent portion 431 abuts against the inside of the parapet 1, and a second weather-resistant adhesive layer 7 for sealing a connecting gap between the second bent portion 431 and the parapet 1 is arranged between the second bent portion 431 and the parapet 1.
The implementation principle of the embodiment is as follows: by using the capping aluminum plate 4 as a lightning receptor, an annular lightning protection belt is formed after lightning strikes penetrate through the capping aluminum plate 4, the capping aluminum plate 4 guides current to the steel support 3, and the lower flat plate 31 of the steel support 3 is connected with a down conductor. Therefore, the condition of trompil is carried out to capping aluminum plate 4 to the installation of lightning-arrest area has been avoided in this practicality to avoided leading to capping aluminum plate 4 to leak water infiltration because the trompil, can avoid again leading to capping aluminum plate 4 extravagant because the trompil position is inaccurate.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (10)

1. The parapet wall coping and lightning protection belt integrated construction structure is characterized by comprising a parapet wall (1), wherein a heat insulation plate (11) is arranged on the outer side of the parapet wall (1), a steel support (3) is arranged at the top end of the parapet wall (1), the steel support (3) comprises a lower flat plate (31) and an upper inclined plate (32), the lower flat plate (31) is fixedly connected to the top end of the parapet wall (1), and the upper inclined plate (32) is obliquely downwards arranged from the outer side of the parapet wall (1) to the inner side of the parapet wall (1); the upper surface of the upper inclined plate (32) is fixedly provided with a capping aluminum plate (4), the capping aluminum plate (4) comprises a capping inclined plate (41) which is attached to the upper inclined plate (32) and is fixedly connected with the upper inclined plate (32), and a first lower extension plate (42) and a second lower extension plate (43) which are arranged on the capping inclined plate (41), the lower end of the first lower extension plate (42) extends to the outer side of the heat preservation plate (11), the lower end of the first lower extension plate (42) is bent towards the direction of the heat preservation plate (11) to form a first bending part (421), the first bending part (421) is abutted to the heat insulation board (11), the lower end of the second lower extension board (43) extends to the outer side of the parapet wall (1), the lower end of the second lower extension board (43) is bent towards the parapet wall (1) to form a second bending part (431), and the second bending part (431) is abutted to the inner side of the parapet wall (1).
2. The parapet capping and lightning strip integrated construction structure according to claim 1, wherein the lower flat plates (31) are arranged in a strip shape, the number of the lower flat plates (31) is multiple, and the multiple lower flat plates (31) are arranged at intervals along the length direction of the parapet (1).
3. The parapet capping and lightning strip integrated construction structure according to claim 2, wherein the lower plate (31) is disposed along a width direction of the parapet (1).
4. The parapet capping and lightning strip integrated construction structure according to claim 1, wherein the steel bracket (3) further comprises a spacer block (33) disposed between the lower flat plate (31) and the upper sloping plate (32), and the lower flat plate (31) and the upper sloping plate (32) are disposed at an interval.
5. The parapet capping and lightning strip integrated construction structure as claimed in claim 1, wherein the lower plate (31) and the parapet (1) are fixedly connected together by a galvanized expansion bolt (2).
6. The parapet capping and lightning strip integrated construction structure according to claim 5, wherein the upper sloping plate (32) is provided with an abdicating through hole (321) for installing the galvanized expansion bolt (2).
7. The parapet coping and lightning strip integrated construction structure according to claim 1, wherein said coping inclined plate (41) and upper inclined plate (32) are fixedly connected together by a galvanized self-tapping screw (5).
8. The parapet capping and lightning strip integrated construction structure according to claim 1, wherein a first weather-resistant adhesive layer (6) for sealing a connection gap between the first bending portion (421) and the heat preservation plate (11) is arranged between the first bending portion and the heat preservation plate.
9. The parapet capping and lightning strip integrated construction structure according to claim 1, wherein a second weather-resistant adhesive layer (7) for sealing a connecting gap between the second bending part (431) and the parapet (1) is arranged between the second bending part and the parapet.
10. The parapet capping and lightning strip integrated construction structure according to claim 1, wherein a plastering layer (12) is arranged between the top ends of the parapet (1) and the insulation board (11) and the lower flat plate (31).
CN201922221432.6U 2019-12-11 2019-12-11 Parapet wall coping and lightning protection belt integrated construction structure Active CN211548450U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922221432.6U CN211548450U (en) 2019-12-11 2019-12-11 Parapet wall coping and lightning protection belt integrated construction structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922221432.6U CN211548450U (en) 2019-12-11 2019-12-11 Parapet wall coping and lightning protection belt integrated construction structure

Publications (1)

Publication Number Publication Date
CN211548450U true CN211548450U (en) 2020-09-22

Family

ID=72505887

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922221432.6U Active CN211548450U (en) 2019-12-11 2019-12-11 Parapet wall coping and lightning protection belt integrated construction structure

Country Status (1)

Country Link
CN (1) CN211548450U (en)

Similar Documents

Publication Publication Date Title
CN101781917A (en) Complex heat-preservation roof and construction method thereof
CN112796467A (en) Photovoltaic integrated ventilation and heat insulation roof
CN204252425U (en) A kind of heat insulation type photovoltaic tile roof structure
CN211548450U (en) Parapet wall coping and lightning protection belt integrated construction structure
CN113605609A (en) Assembled roof cornice fixing node and mounting method
CN207700562U (en) Photovoltaic roof drainage system
CN214423787U (en) Photovoltaic integrated ventilation and heat insulation roof
CN215166641U (en) Vertical waterproof construction of assembled compound incubation externally-hung wallboard
CN212026888U (en) Waterproof eaves gutter of pitched roof
CN210562685U (en) Assembled wallboard connection structure
CN211473102U (en) Photovoltaic integration expansion joint structure
JP2907326B2 (en) Side-roof exterior structure
JP3528034B2 (en) Joint structure of solar cell holding tile
CN207863326U (en) A kind of draining support construction for photovoltaic roofing system
JP2011144575A (en) Structure of photovoltaic panel-installed roof, and method for constructing the same
CN111827492A (en) Assembly type wallboard connecting structure and assembly method thereof
CN215484127U (en) Gutter flashing connection structure in cement color tile slope roof
CN218205265U (en) Roof covering board upper end edge waterproof structure
CN210530173U (en) Metal roof inner gutter node
CN207568076U (en) Al-Mg-Mn metal roofing structure
CN211926166U (en) Be used for integral type heat collector to install connection structure on balcony board
CN216475975U (en) Assembly type building roof waterproof engineering structure convenient to overhaul
CN212957309U (en) Heat collector installation connecting node structure at eaves edge of heat-insulation roof
CN217500613U (en) External wall heat preservation system
CN217480633U (en) Architectural design roofing structure waterproof construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant