CN211541638U - Pouring mold for concrete wallboard production - Google Patents

Pouring mold for concrete wallboard production Download PDF

Info

Publication number
CN211541638U
CN211541638U CN202020031910.7U CN202020031910U CN211541638U CN 211541638 U CN211541638 U CN 211541638U CN 202020031910 U CN202020031910 U CN 202020031910U CN 211541638 U CN211541638 U CN 211541638U
Authority
CN
China
Prior art keywords
fixedly connected
welded
mold
concrete wallboard
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020031910.7U
Other languages
Chinese (zh)
Inventor
王兵
陈丰
邵红才
许飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangzhou Polytechnic College Yangzhou Radio and TV University
Original Assignee
Yangzhou Polytechnic College Yangzhou Radio and TV University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangzhou Polytechnic College Yangzhou Radio and TV University filed Critical Yangzhou Polytechnic College Yangzhou Radio and TV University
Priority to CN202020031910.7U priority Critical patent/CN211541638U/en
Application granted granted Critical
Publication of CN211541638U publication Critical patent/CN211541638U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a concreting formwork for concrete wallboard production relates to concrete wallboard production technical field, can't guarantee when having concrete wallboard production that the concrete is filled closely knit to current concrete wallboard production, and can't accomplish pipelined production when pouring, the problem of taking out is carried out in inconvenient later stage simultaneously, the following scheme is proposed at present, including two bracing pieces, two the top welding of bracing piece has the fixed block, two one side welding that the fixed block is close to each other has the storage case, four of the bottom fixedly connected with of storage case hang the pull mechanism, hang the mould on the bottom fixedly connected with of pull mechanism, the bottom fixedly connected with driving motor of storage case, the fixed cover of driving motor's output shaft is equipped with the cam, the both sides fixedly connected with push rod motor of last mould. The utility model discloses not only conveniently pour closely knit, guarantee to pour the quality, but also conveniently carry out pipelined and pour, improve production efficiency, still make things convenient for the later stage to take off labour saving and time saving simultaneously.

Description

Pouring mold for concrete wallboard production
Technical Field
The utility model relates to a concrete wall panel production technical field especially relates to a concrete wall panel production is with pouring mould.
Background
The mould is various moulds and tools for obtaining required products by injection molding, blow molding, extrusion, die casting or forging forming, smelting, stamping and other methods in industrial production. In short, a mold is a tool used to make a shaped article, the tool being made up of various parts, different molds being made up of different parts. The processing of the appearance of an article is realized mainly through the change of the physical state of a formed material. The element has the name of "industrial mother".
In the building construction, the mould also needs to be used, for example when prefabricating concrete wall panel, just need use the mould to pour production, current concrete wall panel pouring mould is when using, can't guarantee that the concrete is filled closely knit, can't accomplish pipelined production when pouring moreover, and inconvenient later stage takes out simultaneously to influence wallboard production efficiency, for this we provide a concrete wall panel production and use pouring mould.
SUMMERY OF THE UTILITY MODEL
The utility model provides a pair of concrete wall panel production is with pouring mould has solved unable assurance concrete when current concrete wall panel production and has filled closely knit, can't accomplish pipelined production when pouring moreover, and inconvenient later stage carries out the problem of taking out simultaneously.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a pouring die for concrete wallboard production comprises two supporting rods, wherein fixed blocks are welded at the tops of the two supporting rods, a storage box is welded at one side, close to each other, of the two fixed blocks, four lifting mechanisms are fixedly connected to the bottom of the storage box, an upper die is fixedly connected to the bottom of each lifting mechanism, a driving motor is fixedly connected to the bottom of the storage box, a cam is fixedly sleeved on an output shaft of the driving motor, push rod motors are fixedly connected to two sides of the upper die, a pull plate is fixedly connected to the tail end of the output shaft of each push rod motor, a lower die is arranged at the top of each pull plate, two first baffles which are longitudinally arranged are movably sleeved on two sides of the top of the lower die, two second baffles which are transversely arranged are movably sleeved on the top of the lower die, and two limiting plates are welded at one sides, far away from, and the limiting plate is movably sleeved at the top of the lower die, and a conveying mechanism is arranged below the lower die.
Preferably, hang and draw mechanism including sleeve pipe, spring and movable rod, sheathed tube top and storage case welding, sheathed tube inside cover is equipped with the spring of being connected with the storage case, the bottom fixedly connected with movable rod of spring, and the bottom of movable rod with go up the mould welding.
Preferably, transport mechanism includes two splint, transfer roller and conveyer belt, two one side rotation that splint are close to each other is connected with a plurality of transfer rollers, the outside cover of transfer roller is equipped with the conveyer belt.
Preferably, the bottom welding of storage case has the discharging pipe that communicates with it, install the solenoid valve on the discharging pipe, the feed port has been seted up on the last mould, the top welding of feed port has the feeder hopper, the top of storage case is equipped with the opening.
Preferably, two first inserting grooves which are longitudinally arranged are formed in the top of the lower die, two second inserting grooves which are transversely arranged are formed in the top of the lower die, the first baffle and the second baffle are respectively inserted into the first inserting grooves and the second inserting grooves, two limiting grooves are formed in one sides, away from the perpendicular bisector of the lower die, of the first inserting grooves and the second inserting grooves, and the limiting plates are movably sleeved in the limiting grooves.
Preferably, four supporting blocks are welded at the bottom of the lower die, and bottom plates are welded at the bottoms of the supporting rods and the clamping plates.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses an installation storage case, hang and draw the mechanism, driving motor, the cam, the upper die, the lower mould, push rod motor, the arm-tie, first baffle, the second baffle, limiting plate and transport mechanism isotructure, wherein deposit the concrete in the storage case, push rod motor drives the arm-tie about when pouring, the arm-tie then pulls the lower mould and folds together with the upper mould, the concrete in the storage case flows in between upper mould and the lower mould, driving motor then drives the cam and rotates, the cam rotates then drives upper mould and lower mould and vibrate, the concrete placement who conveniently pours is closely knit like this, and after pouring, can place the lower mould and send away on transport mechanism, improve the efficiency of pouring, the device is novel in design, and easy operation, not only conveniently pour closely knit, guarantee pouring quality, but also conveniently carry out pipelined pouring, production efficiency is improved, simultaneously still make things convenient for the later stage to take off, time and labor are saved.
Drawings
Fig. 1 is a schematic front view of a pouring mold for producing a concrete wall panel according to the present invention;
fig. 2 is the utility model provides a concrete wall panel production is with lower mould, first baffle, second baffle and limiting plate of pouring mould overlook the structure sketch map.
In the figure: the automatic feeding device comprises a supporting rod 1, a fixing block 2, a material storage box 3, a sleeve 4, a spring 5, a movable rod 6, an upper die 7, a driving motor 8, a cam 9, a push rod motor 10, a pulling plate 11, a lower die 12, a first baffle 13, a second baffle 14, a limiting plate 15, a clamping plate 16 and a conveyor belt 17.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-2, a pouring mold for concrete wallboard production comprises two support rods 1, fixed blocks 2 are welded on the tops of the two support rods 1, a storage box 3 is welded on one side of the two fixed blocks 2, which is close to each other, four lifting mechanisms are fixedly connected to the bottom of the storage box 3, an upper mold 7 is fixedly connected to the bottom of each lifting mechanism, a driving motor 8 is fixedly connected to the bottom of the storage box 3, a cam 9 is fixedly sleeved on an output shaft of the driving motor 8, push rod motors 10 are fixedly connected to both sides of the upper mold 7, a pulling plate 11 is fixedly connected to the tail ends of the output shafts of the push rod motors 10, a lower mold 12 is arranged on the top of the pulling plate 11, two first baffles 13 which are longitudinally arranged are movably sleeved on both sides of the top of the lower mold 12, two second baffles 14 which are transversely arranged are movably sleeved on the top of the lower mold 12, and two, and the limiting plate 15 is movably sleeved at the top of the lower die 12, and a conveying mechanism is arranged below the lower die 12.
In this embodiment, hang and draw mechanism to include sleeve pipe 4, spring 5 and movable rod 6, and sleeve pipe 4's top and storage case 3 welding, and sleeve pipe 4's inside cover is equipped with the spring 5 of being connected with storage case 3, and spring 5's bottom fixedly connected with movable rod 6, and movable rod 6's bottom and last mould 7 welding.
In this embodiment, transport mechanism includes two splint 16, conveying roller and conveyer belt 17, and two splint 16 one side rotation that is close to each other is connected with a plurality of conveying rollers, and the outside cover of conveying roller is equipped with conveyer belt 17.
In this embodiment, the welding of the bottom of storage case 3 has the discharging pipe that communicates with it, installs the solenoid valve on the discharging pipe, has seted up the feed port on going up mould 7, and the welding of the top of feed port has the feeder hopper, and the top of storage case 3 is equipped with the opening.
In this embodiment, two first inserting grooves which are longitudinally arranged are formed in the top of the lower die 12, two second inserting grooves which are transversely arranged are formed in the top of the lower die 12, the first baffle 13 and the second baffle 14 are respectively inserted into the first inserting grooves and the second inserting grooves, two limiting grooves are formed in one sides, away from the perpendicular bisector of the lower die 12, of the first inserting grooves and the second inserting grooves, and the limiting plates 15 are movably sleeved in the limiting grooves.
In this embodiment, four support blocks are welded to the bottom of the lower mold 12, and a bottom plate is welded to the bottoms of the support rod 1 and the clamp plate 16.
The working principle is that firstly, concrete is stored in the storage box 3, the push rod motor 10 drives the pull plate 11 to move upwards during pouring, the pull plate 11 pulls the lower die 12 and the upper die 7 to be closed together, the concrete in the storage box 3 flows into a space between the upper die 7 and the lower die 12, the driving motor 8 drives the cam 9 to rotate, and the cam 9 rotates to drive the upper die 7 and the lower die 12 to vibrate, so that the poured concrete is compact, after pouring is finished, the push rod motor 10 drives the pull plate 11 to move downwards, the lower die 12 can be placed on the conveying mechanism to be conveyed away, the pouring efficiency is improved, when materials are taken, only the first baffle 13, the second baffle 14 and the limiting plate 15 need to be pulled out of the lower die 12, the whole device is convenient to compact pouring, the pouring quality is ensured, assembly line type pouring is also convenient to be carried out, the production efficiency is improved, and meanwhile, later-stage taking is also convenient, time and labor are saved.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The casting mold for producing the concrete wallboard comprises two support rods (1) and is characterized in that fixed blocks (2) are welded at the tops of the two support rods (1), storage boxes (3) are welded at one sides, close to each other, of the fixed blocks (2), four lifting mechanisms are fixedly connected to the bottoms of the storage boxes (3), upper molds (7) are fixedly connected to the bottoms of the lifting mechanisms, driving motors (8) are fixedly connected to the bottoms of the storage boxes (3), cams (9) are fixedly sleeved on output shafts of the driving motors (8), push rod motors (10) are fixedly connected to the two sides of the upper molds (7), pull plates (11) are fixedly connected to the tail ends of the output shafts of the push rod motors (10), lower molds (12) are arranged at the tops of the pull plates (11), and two first baffle plates (13) which are longitudinally arranged are movably sleeved on the two sides of the tops of the lower molds (12), the top movable sleeve of lower mould (12) is equipped with two second baffles (14) of horizontal setting, one side that lower mould (12) plumb line was kept away from in first baffle (13) and second baffle (14) has all welded two limiting plates (15), and limiting plate (15) movable sleeve establishes the top of lower mould (12), the below of lower mould (12) is equipped with transport mechanism.
2. The casting mold for producing the concrete wallboard according to claim 1, wherein the hoisting mechanism comprises a sleeve (4), a spring (5) and a movable rod (6), the top of the sleeve (4) is welded with the storage box (3), the spring (5) connected with the storage box (3) is sleeved inside the sleeve (4), the movable rod (6) is fixedly connected to the bottom end of the spring (5), and the bottom end of the movable rod (6) is welded with the upper mold (7).
3. The casting mold for producing the concrete wallboard according to claim 1, wherein the conveying mechanism comprises two clamping plates (16), a conveying roller and a conveying belt (17), one side of the two clamping plates (16) close to each other is rotatably connected with a plurality of conveying rollers, and the conveying belt (17) is sleeved outside the conveying rollers.
4. The pouring mold for producing the concrete wall panel according to claim 1, wherein a discharging pipe communicated with the storage box (3) is welded at the bottom of the storage box (3), an electromagnetic valve is installed on the discharging pipe, a feeding hole is formed in the upper mold (7), a feeding hopper is welded at the top of the feeding hole, and an opening is formed in the top of the storage box (3).
5. The pouring mold for producing the concrete wallboard according to claim 1, wherein the top of the lower mold (12) is provided with two first insertion grooves which are longitudinally arranged, the top of the lower mold (12) is provided with two second insertion grooves which are transversely arranged, the first baffle (13) and the second baffle (14) are respectively inserted into the first insertion grooves and the second insertion grooves, two limiting grooves are arranged on one sides of the first insertion grooves and the second insertion grooves, which are far away from the perpendicular bisector of the lower mold (12), and the limiting plates (15) are movably sleeved in the limiting grooves.
6. The casting mold for producing the concrete wall panel according to claim 3, wherein four supporting blocks are welded to the bottom of the lower mold (12), and a bottom plate is welded to the bottom of the supporting rod (1) and the clamping plate (16).
CN202020031910.7U 2020-01-08 2020-01-08 Pouring mold for concrete wallboard production Expired - Fee Related CN211541638U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020031910.7U CN211541638U (en) 2020-01-08 2020-01-08 Pouring mold for concrete wallboard production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020031910.7U CN211541638U (en) 2020-01-08 2020-01-08 Pouring mold for concrete wallboard production

Publications (1)

Publication Number Publication Date
CN211541638U true CN211541638U (en) 2020-09-22

Family

ID=72490600

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020031910.7U Expired - Fee Related CN211541638U (en) 2020-01-08 2020-01-08 Pouring mold for concrete wallboard production

Country Status (1)

Country Link
CN (1) CN211541638U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112665360A (en) * 2020-12-08 2021-04-16 苏州良浦住宅工业有限公司 Industrial production line for assembled building wallboard components
CN113021565A (en) * 2021-03-10 2021-06-25 光明铁道控股有限公司 Vibration compacting and forming device for concrete
CN113070986A (en) * 2021-04-01 2021-07-06 浙江创宇铝模科技有限公司 Aluminum alloy template for building concrete pouring forming

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112665360A (en) * 2020-12-08 2021-04-16 苏州良浦住宅工业有限公司 Industrial production line for assembled building wallboard components
CN113021565A (en) * 2021-03-10 2021-06-25 光明铁道控股有限公司 Vibration compacting and forming device for concrete
CN113021565B (en) * 2021-03-10 2023-02-14 光明铁道控股有限公司 Vibration compacting and forming device for concrete
CN113070986A (en) * 2021-04-01 2021-07-06 浙江创宇铝模科技有限公司 Aluminum alloy template for building concrete pouring forming

Similar Documents

Publication Publication Date Title
CN211541638U (en) Pouring mold for concrete wallboard production
CN110883912B (en) Resistant firebrick vibrations brickmaking machine with automatic feeding selects separately structure
CN110039646B (en) Automatic ceramic grouting forming system
CN201049501Y (en) Light aggregate concrete formwork wall component forming device
CN113580356B (en) Cement concrete prefabricated part processing equipment and processing method
CN211729664U (en) Automatic concrete block production line
CN205415963U (en) Horizontal precast concrete box culvert mould of pouring
CN211306787U (en) Concrete prefabricated part processing equipment
CN108556129B (en) Automatic casting vehicle for cement precast block
CN101224599B (en) Plaster decoration line production line
EP2135722B1 (en) Method for demoulding ceramic products and apparatus for implementing the method.
CN210758404U (en) Precast concrete spare production facility
CN214236203U (en) Small-size magnesium ingot continuous casting device
CN108856684A (en) A kind of inner cavity mold cleaning system
CN214349491U (en) Vertical injection die casting machine
CN209775070U (en) concrete precast block processing equipment
CN210651219U (en) Novel wallboard mould
CN112847969A (en) A mould for preparing baffle reinforcing plate down
CN207310187U (en) A kind of big die station mould for the construction of plate class prefabricated components assembly line
CN218168635U (en) Sand box sand-adding assembly line of lost foam casting part
CN110561609A (en) Continuous automatic production method of gypsum core mould for cast-in-place concrete
CN201169006Y (en) Roller conveyer
CN219054783U (en) A material loading machine for die box production
CN213596323U (en) Metal product is loading attachment for thermal treatment convenient to get and put
CN204658656U (en) Foam concrete heat insulation brick one-shaper

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200922

Termination date: 20220108

CF01 Termination of patent right due to non-payment of annual fee