CN211524270U - Wall wire drawing device - Google Patents
Wall wire drawing device Download PDFInfo
- Publication number
- CN211524270U CN211524270U CN201921863245.1U CN201921863245U CN211524270U CN 211524270 U CN211524270 U CN 211524270U CN 201921863245 U CN201921863245 U CN 201921863245U CN 211524270 U CN211524270 U CN 211524270U
- Authority
- CN
- China
- Prior art keywords
- wire
- plate
- stay wire
- stay
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
The utility model relates to a wall wire drawing device, which comprises a wire drawing wire, wherein two ends of the wire drawing wire are respectively connected to a house beam and a cement electric pole; one end of each stay wire is connected with the cement electric pole through a stay wire hoop, the other end of each stay wire is connected with the house beam through a connecting member, and the connecting point of each stay wire on the cement electric pole is higher than the connecting point on the house beam; the connecting component comprises a wall pulling plate fixed on the house beam and an UT wire clamp connected with the wall pulling plate; the wall arm-tie is for being the steel sheet of "L" type structure, is provided with the through-hole that supplies the UT fastener to pass the connection on one curb plate of wall arm-tie, is provided with on the other curb plate to supply expansion bolts to lock the back and fixed a plurality of bolt holes with the room roof beam.
Description
Technical Field
The utility model relates to a wall wire drawing device belongs to power equipment technical field.
Background
In the process of distribution network engineering design, the common corner cement pole can simultaneously receive the resultant force action of horizontal component load in the direction of the inner angle bisector of the wire and the tension of the wire, so that the common corner cement pole needs to be provided with a stay wire to prevent the problem that the safe operation of a power line is influenced by the resultant force of the horizontal component load in the direction of the inner angle bisector of the wire and the tension of the wire due to the guide rod and the like. However, at present, the distribution network line is basically located in a street lane with dense houses, the houses are too close to the power line, and the corner cement pole cannot adopt a common stay wire design, so that the construction, operation and maintenance safety of the distribution network engineering is greatly influenced.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a wall guy device will act as go-between through special component and fix on the wall, solve among the prior art ordinary guy wire because of cement pole and building apart from near can't bury the problem that the drawing disk stabilizes the cement pole underground, can guarantee to be located the construction and the fortune dimension safety of joining in marriage the net twine way in the intensive street alley in house.
The technical scheme of the utility model as follows:
a wall guy device comprises guys with two ends respectively connected with a house beam and a cement electric pole; one end of each stay wire is connected with the cement electric pole through a stay wire hoop, the other end of each stay wire is connected with the house beam through a connecting member, and the connecting point of each stay wire on the cement electric pole is higher than the connecting point on the house beam; the connecting component comprises a wall pulling plate fixed on the house beam and a UT wire clamp connected with the wall pulling plate, wherein the wall pulling plate is an L-shaped steel plate, a through hole for the UT wire clamp to penetrate through and be connected is formed in one side plate of the wall pulling plate, and a plurality of bolt holes for the expansion bolts to be locked and then fixed with the house beam are formed in the other side plate.
Furthermore, a reinforcing pipe with a right-angled triangle cross section is arranged at the joint of the two side plates of the wall pulling plate.
Furthermore, the stay wire hoop comprises two half arc hoop plates which are axisymmetric and used for encircling and hooping the cement electric pole; two ends of the half-arc hoop plate extend outwards horizontally to form a connecting plate in an integrated mode respectively, a stiffening plate for supporting the half-arc hoop plate and the connecting plate is arranged on the connecting plate, and the two half-arc hoop plates are locked and fixed through fastening bolts.
Furthermore, the stay wire and a fastening bolt for locking the stay wire hoop are fixed through a wedge-shaped wire clamp and an extension ring; the wedge-shaped wire clamp is fixedly connected with one end of the stay wire, and the extension ring is fixedly connected with the wedge-shaped wire clamp and then hung on the fastening bolt.
Furthermore, the two end parts of the stay wires, which are respectively connected with the house beam and the cement electric pole, are respectively bound by galvanized wires; binding the end part of the stay wire connected with the house beam to form a lower tail wire, and keeping the lower tail wire for 30-35 cm; and the end part bound to the connecting part of the stay wire and the concrete electric pole is an upper tail wire, and the upper tail wire is left for 20-25 cm.
Furthermore, a stay insulator is arranged in the middle of the stay.
The utility model discloses following beneficial effect has: the utility model provides a wall guy device, mainly be applied to in the intensive street alley in house, building and power line position are near, utilize the cooperation between wall arm-tie and the UT fastener to replace the arm-tie in the ordinary line of acting as go-between and the excellent horizontal component load of conductor interior angle bisector direction and the tensile resultant force of wire of bearing with the arm-tie, in the actual installation of engineering, pass through expansion bolts with the wall arm-tie and fix on the room beam, UT fastener and wall arm-tie with adjustable the elasticity accessible of acting as go-between are connected and are adjusted, the unable fixed problem of pole that the arm-tie led to in the unable buried depth of narrow and small space among the prior art has been solved, guarantee to be located the intensive street alley in house and join in marriage the construction and the fortune dimension safety of net twine way.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the connection between the anchor ear and the stay wire;
fig. 3 is a schematic view of the connection between the wall pulling plate and the UT wire clamp of the present invention;
fig. 4 is a schematic structural view of the wall pulling plate of the present invention;
fig. 5 is the structure schematic diagram of the utility model discloses well pole staple bolt.
The reference numbers in the figures denote:
1. a house beam; 2. a concrete pole; 3. a pull wire; 31. a stay insulator; 4. a stay wire hoop; 41. a half-arc hoop plate; 42. a connecting plate; 43. a stiffening plate; 44. fastening a bolt; 45. a wedge-shaped wire clamp; 46. an extension ring; 5. a connecting member; 51. wall pulling plates; 52. a UT cable clamp; 53. a through hole; 54. an expansion bolt; 55. bolt holes; 56. a reinforcement tube; 61. a lower handle tail wire; 62. and (6) arranging tail lines.
Detailed Description
The present invention will be described in detail below with reference to the accompanying drawings and specific embodiments.
Referring to fig. 1 to 5, a wall guy apparatus includes a guy 3 having both ends connected to a beam 1 and a concrete pole 2, respectively; one end of the stay wire 3 is connected with the cement electric pole 2 through a stay wire hoop 4, the other end of the stay wire is connected with the house beam 1 through a connecting member 5, the connecting point of the stay wire 3 on the cement electric pole 2 is higher than that on the house beam 1, and the stay wire 3 is fixed on the house beam 1 to stabilize the cement electric pole 2; the connecting component 5 comprises a wall pulling plate 51 fixed on the house beam 1 and a UT wire clamp 52 connected with the wall pulling plate 51; the wall pulling plate 51 is a steel plate with an L-shaped structure, a through hole 53 for enabling the UT wire clamp 52 to penetrate and be connected is formed in one side plate of the wall pulling plate 51, a plurality of bolt holes 55 for enabling expansion bolts 54 to be locked and then fixed with the house beam 1 are formed in the other side plate, in the actual installation process of engineering, the wall pulling plate 51 is fixed on the house beam 1 through the expansion bolts 54, and the pull wire 3 can be tensioned through the UT wire clamp 52 to adjust the price, so that the fixing effect of the pull wire 3 can be achieved.
Furthermore, a reinforcing pipe 56 with a right-angled triangle cross section is arranged at the joint of the two side plates of the wall pulling plate 51, so that the bearing capacity of the two side plates of the wall pulling plate 51 can be enhanced.
Further, the stay anchor ear 4 comprises two half arc hoop plates 41 which are axisymmetric and used for encircling and hooping the cement electric pole 2; the two ends of the half-arc hoop plate 41 extend outwards horizontally to form a connecting plate 42 in an integrated mode, a stiffening plate 43 supporting the half-arc hoop plate 41 and the connecting plate 42 is arranged on the connecting plate 42, the stiffening plate 43 can improve the strength of the stay wire anchor ear 4 and prevent the stay wire anchor ear 4 from deforming under the action of strong external force, and the two half-arc hoop plates 41 are locked and fixed through fastening bolts 44.
Further, the stay wire 3 is fixed with a fastening bolt 44 of the locking stay wire hoop 4 through a wedge-shaped wire clamp 45 and an extension ring 46; the wedge-shaped wire clamp 45 is fixedly connected with one end of the stay wire 3, and the extension ring 46 is fixedly connected with the wedge-shaped wire clamp 45 and then hung on the fastening bolt 44.
Furthermore, the two ends of the stay wires 3, which are respectively connected with the house beam 1 and the cement electric pole 2, are respectively bound by galvanized wires; the end part bound on the connecting part of the stay wire 3 and the house beam 1 is a lower tail wire 61, and the lower tail wire 61 is reserved for 35-40 cm; the end part which is bound on the connecting part of the stay wire 3 and the concrete pole 2 is an upper tail wire 62, and the upper tail wire 62 is left for 45-60 cm.
Furthermore, a stay insulator 31 is arranged in the middle of the stay wire 3, and the stay insulator 31 can prevent the stay wire 3 from being touched by a lead and prevent the stay wire 3 from passing through a live lead to cause an electric shock accident when the stay wire 3 is live.
The utility model discloses a theory of operation:
firstly, after one end of a stay wire 3 is bound by a galvanized wire, the stay wire is fixed by a wedge-shaped wire clamp 45, then the wedge-shaped wire clamp 45 is fixed with an extension ring 46, finally the extension ring 46 is fixed on a fastening bolt 44 for locking a stay wire hoop 4, the stay wire hoop 4 is fixed on a cement electric pole 2, and then the stay wire 3 is connected with the cement electric pole 2;
secondly, a stay insulator 31 is additionally arranged at the position of the stay wire 3 with the vertical distance of more than 2m on the ground;
then, the other end of the pull wire 3 is bound by a galvanized wire and then is connected with the UT wire clamp 52; the wall pulling plate 51 is fixed with the house beam 1 by using an expansion bolt 54;
finally, pass the through-hole 53 on the curb plate of wall arm-tie 51 with the U type screw rod of UT fastener 52, it is fixed with UT fastener 52 and wall arm-tie 51, and then connect room roof beam 1, acting as go-between 3 and cement pole 2, the accessible adjustment simultaneously with acting as go-between 4 on wedge fastener 45 and the UT fastener 52 adjust the tensioning degree of acting as go-between 3, firm cement pole 2.
The above only is the embodiment of the present invention, not limiting the patent scope of the present invention, all the equivalent structures or equivalent processes that are used in the specification and the attached drawings or directly or indirectly applied to other related technical fields are included in the patent protection scope of the present invention.
Claims (6)
1. A wall wire drawing device is characterized in that: comprises a stay wire (3) with two ends respectively connected with a house beam (1) and a cement electric pole (2); one end of the stay wire (3) is connected with the cement electric pole (2) through a stay wire hoop (4), the other end of the stay wire is connected with the house beam (1) through a connecting member (5), and the connecting point of the stay wire (3) on the cement electric pole (2) is higher than the connecting point on the house beam (1); the connecting component (5) comprises a wall pulling plate (51) fixed on the house beam (1) and a UT wire clamp (52) connected with the wall pulling plate (51); the wall pulling plate (51) is a steel plate with an L-shaped structure, a through hole (53) for the UT wire clamp (52) to pass through for connection is formed in one side plate of the wall pulling plate (51), and a plurality of bolt holes (55) for the expansion bolts (54) to be locked and then fixed with the house beam (1) are formed in the other side plate.
2. A wall pulling apparatus as defined in claim 1, wherein: and a reinforcing pipe (56) with a right-angled triangle cross section is arranged at the joint of the two side plates of the wall pulling plate (51).
3. A wall pulling apparatus as defined in claim 2, wherein: the stay wire hoop (4) comprises two half arc hoop plates (41) which are axisymmetric and used for encircling and hooping the cement electric pole (2); two ends of the half-arc hoop plate (41) extend outwards horizontally to form a connecting plate (42) in an integrated mode, a stiffening plate (43) for supporting the half-arc hoop plate (41) and the connecting plate (42) is arranged on the connecting plate (42), and the two half-arc hoop plates (41) are locked and fixed through fastening bolts (44).
4. A wall pulling apparatus as defined in claim 3, wherein: the stay wire (3) and a fastening bolt (44) of the stay wire locking hoop (4) are fixed through a wedge-shaped wire clamp (45) and an extension ring (46); the wedge-shaped wire clamp (45) is fixedly connected with one end of the pull wire (3), and the extension ring (46) is fixedly connected with the wedge-shaped wire clamp (45) and then hung on the fastening bolt (44).
5. A wall pulling apparatus as defined in claim 4, wherein: the two end parts of the stay wire (3) which are respectively connected with the house beam (1) and the cement electric pole (2) are respectively bound by a galvanized wire; the tail line (61) is bound at the end part of the stay wire (3) connected with the house beam (1), and the tail line (61) is left for 30-35 cm; the end part of the tie-line (3) connected with the concrete pole (2) is an upper tail line (62), and the upper tail line (62) is left for 20-25 cm.
6. A wall pulling apparatus as defined in claim 5, wherein: and a stay insulator (31) is arranged in the middle of the stay wire (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921863245.1U CN211524270U (en) | 2019-11-01 | 2019-11-01 | Wall wire drawing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921863245.1U CN211524270U (en) | 2019-11-01 | 2019-11-01 | Wall wire drawing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211524270U true CN211524270U (en) | 2020-09-18 |
Family
ID=72462410
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921863245.1U Active CN211524270U (en) | 2019-11-01 | 2019-11-01 | Wall wire drawing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211524270U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114284943A (en) * | 2021-11-29 | 2022-04-05 | 广西电网有限责任公司防城港供电局 | Distribution lines shaft tower can be dismantled and act as go-between |
-
2019
- 2019-11-01 CN CN201921863245.1U patent/CN211524270U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114284943A (en) * | 2021-11-29 | 2022-04-05 | 广西电网有限责任公司防城港供电局 | Distribution lines shaft tower can be dismantled and act as go-between |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107460954A (en) | A kind of post-tensioned prestressing assembling concrete frame energy dissipation component system and construction method | |
CN205894364U (en) | Prefabricated formula wall body and prefabricated formula housing construction | |
CN104481178B (en) | Composite material substation structure | |
CN105275222A (en) | Immature soil coil-filling type traditional folk house wall reinforcing structure and reinforcing method | |
CN211524270U (en) | Wall wire drawing device | |
CN202215040U (en) | Telescopic adjustable temporary wire drawing device for transmission line pole/tower | |
CN214995799U (en) | Tool type wall hanging cantilever frame | |
EP2388878B1 (en) | Transmission line tower | |
CN204386242U (en) | For the combined type truss column of 500kV transformer station | |
CN213774763U (en) | Reinforced structure of air film building | |
CN105926851A (en) | Large-span truss | |
CN216109354U (en) | Conversion layer steel column mounting structure | |
CN205134981U (en) | Core pattern tradition local -style dwelling houses wall body reinforced structure is filled out to immature soil | |
CN212223581U (en) | Bridge girder structure based on photovoltaic power generation | |
CN210151772U (en) | Precast concrete assembled foundation for power transmission line | |
CN105375432B (en) | A kind of tunnel construction high-tension cable laying support | |
CN204402097U (en) | For the integrated form framework of the outlet of 500kV transformer station, inlet wire, transition | |
CN210013444U (en) | Closed cantilever scaffold system | |
CN210340110U (en) | Two T board hoisting structure of large-span assembled | |
CN204570684U (en) | A kind of anchor head of Recyclable anchor rope is fixed and guiding device | |
CN202450838U (en) | Assembling type iron tower base station | |
CN108331261B (en) | Steel pipe high-strength concrete shear wall connecting beam longitudinal bar anchoring structure | |
CN104563554A (en) | Combined lattice beam for integrated framework of 500kV transformer substation | |
CN206942282U (en) | A kind of reinforcement type electric force pole tower | |
CN206439062U (en) | A kind of supporting construction of roadway junction triangle coal body |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |