CN211524087U - Wall structure with reserved equipment wall chase - Google Patents
Wall structure with reserved equipment wall chase Download PDFInfo
- Publication number
- CN211524087U CN211524087U CN201922401258.3U CN201922401258U CN211524087U CN 211524087 U CN211524087 U CN 211524087U CN 201922401258 U CN201922401258 U CN 201922401258U CN 211524087 U CN211524087 U CN 211524087U
- Authority
- CN
- China
- Prior art keywords
- wall
- equipment
- chase
- steel pipe
- screw rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model discloses a wall structure with reserve equipment wall chase, including the wall body, set up aluminum film plate and the wire casing device at the wall body lateral surface, the wire casing device includes nut, bolt and pre-buried steel pipe section of jurisdiction in the wall body, and the bolt includes bolt head and screw rod, and the screw head setting is at steel pipe section of jurisdiction medial surface, and the wall body is stretched out to the screw rod afterbody, offers the hole that is used for passing the screw rod on the aluminum film plate, and is fixed through the nut between screw rod and the aluminum film plate. The position of the equipment pipeline is predetermined, and an equipment pipeline groove is reserved on the concrete wall surface. The aluminum template is spliced and fixed through the equipment mould, so that the spliced template is provided with the pipeline chase in advance, and the structure is simple and the design is reasonable. The investment cost is low, the material source is wide during manufacturing, the construction is simple and convenient, the using effect is good, and the construction quality of the reserved groove of the pipeline in the shear wall can be effectively improved. The pipe groove is smooth and attractive in shape, more convenient to operate, less in labor consumption and less in material consumption.
Description
Technical Field
The utility model relates to an aluminium diaphragm plate construction auxiliary assembly field especially has the wall structure who reserves equipment wall chase.
Background
In general, the equipment pipe slot is usually formed by cutting a wall body after the wall body is poured, and then forming the equipment pipe slot on the wall body.
The secondary construction of slotting is carried out on the wall body after the pouring is finished, and the defects mainly exist: firstly, the pipe groove of the equipment is uneven and has poor appearance; secondly, the construction quality is poor; thirdly, the difficulty of excavation is high; fourth, material waste and high labor costs are incurred.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a wall structure with reserve equipment wall chase, work load is big when solving the wire casing construction, construction cost is high, the efficiency of construction is low, equipment tube groove unevenness is apparent poor, consume extravagant material, the high technical problem of cost of labor.
In order to achieve the above purpose, the utility model adopts the following technical scheme: wall structure with reserve equipment wall chase, including the wall body, set up aluminium lamina membranacea and the wire casing device at the wall body lateral surface, the wire casing device includes nut, bolt and pre-buried steel pipe section of jurisdiction in the wall body, and the bolt includes bolt head and screw rod, and the screw head setting is at steel pipe section of jurisdiction medial surface, and the wall body is stretched out to the screw rod afterbody, offers the hole that is used for passing the screw rod on the aluminium lamina membranacea, and is fixed through the nut between screw rod and the aluminium lamina membranacea.
Further, the section of the steel pipe segment is arc-shaped.
Further, the bolts are arranged at intervals along the axis direction of the steel pipe segment.
Further, the screw head is welded and fixed with the steel pipe piece.
Further, the length of the screw is larger than the thickness of the aluminum film plate.
Further, the thickness of steel pipe section of jurisdiction is 3 mm.
Further, the diameter of the screw head is smaller than the inner diameter of the steel pipe segment.
The beneficial effects of the utility model are embodied in:
1, the utility model provides a wall structure with reserve equipment wall chase, equipment pipeline position is reserved on concrete wall to predetermined equipment pipeline position. The aluminum template is spliced and fixed through the equipment mould, so that the spliced template is provided with the pipeline chase in advance, and the structure is simple and the design is reasonable. The position of the pipeline of the equipment is clear, the installation and the repair are convenient, and the decoration effect is beautiful.
2, the utility model provides a wall structure with reserve equipment wall chase, the input cost is lower, and the material source is extensive during the preparation, and the construction is simple and convenient, excellent in use effect, can effectively improve the construction quality in shear force wall inner tube way reservation groove. The pipe groove is smooth and attractive in shape, more convenient to operate, less in labor consumption and less in material consumption.
Additional features and advantages of the invention will be set forth in the description which follows, and in part will be obvious from the description, or may be learned by the practice of the invention. The primary objects and other advantages of the invention may be realized and attained by the structure particularly pointed out in the written description.
Drawings
The present invention will be described in further detail with reference to the accompanying drawings.
Fig. 1 is an equipment line reservation elevation.
Fig. 2 is a plan view of the present invention.
Figure 3 is a schematic diagram of the construction of the trunking arrangement.
FIG. 4 is a schematic view of FIG. 1-1.
Fig. 5 is a schematic view of a steel pipe segment structure.
Reference numerals: 1-wall body, 2-aluminum film plate, 3-steel pipe piece, 4-nut and 5-bolt.
Detailed Description
The technical solutions of the present invention are described in detail below by way of examples, which are only exemplary and can be used only for explaining and explaining the technical solutions of the present invention, but not for explaining the limitations of the technical solutions of the present invention.
Examples
As shown in figure 1, the utility model provides a wall structure with reserve equipment wall chase can effectively avoid the artifical chisel of picking in later stage. Specifically, including wall body 1, setting at 1 lateral surface of wall body aluminium lamina 2 and wire casing device, the wire casing device includes nut 4, bolt 5 and pre-buried steel pipe section of jurisdiction 3 in wall body 1, and bolt 5 includes bolt head and screw rod, and the screw head setting is at 3 medial surfaces of steel pipe section of jurisdiction, and the screw rod afterbody stretches out wall body 1, offers the hole that is used for passing the screw rod on the aluminium lamina 2, and is fixed through nut 4 between screw rod and the aluminium lamina 2.
As shown in fig. 2, the cross section of the steel pipe segment 3 is circular arc.
As shown in fig. 3, the bolts 5 are provided at intervals in the axial direction of the pipe segment 3. The number of the bolts 5 is adapted to the length of the steel pipe segment 3. The screw head is welded and fixed with the steel pipe segment 3. The length of the screw is greater than the thickness of the aluminum diaphragm plate 2. The thickness of the steel pipe segment 3 is 3 mm. The diameter of the screw head is smaller than the inner diameter of the steel pipe segment 3.
As shown in fig. 4 and 5, a device pipeline preformed groove is formed in the shear wall, and the preformed device preformed groove mold is composed of an arc-shaped steel pipe segment 3, a bolt 5 and a nut 4. The bolt 5 is fixedly connected with the arc-shaped steel pipe segment 3 in a welding mode, and the welded bolt penetrates through the surface of the aluminum template and is connected with the aluminum template through the nut 4.
The reserved equipment wire slot mold is required to ensure the elevation and the size of the wire slot when being manufactured, can be installed on a template when being assembled with a site template, and can also be directly fixed on the template when being manufactured with an aluminum mold.
The utility model provides a wire casing device reserves the wall chase and avoids the artifical chisel of picking in later stage. The construction method has the advantages of simple operation, low input cost, simple construction and good use effect, can effectively improve the construction quality of the reserved groove of the pipeline in the shear wall, and can be used in a circulating manner.
The utility model discloses can predetermine equipment pipeline position, reserve equipment pipeline recess on the concrete wall. The aluminum template is spliced and fixed through the equipment mould, so that the spliced template is provided with the pipeline chase in advance, and the structure is simple and the design is reasonable. The position of the pipeline of the equipment is clear, the installation and the repair are convenient, and the decoration effect is beautiful.
The above description is only for the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any changes or substitutions that can be considered by those skilled in the art within the technical scope of the present invention should be covered by the protection scope of the present invention.
Claims (7)
1. Wall structure with reserve equipment wall chase, its characterized in that: including wall body (1), set up aluminium lamina membranacea (2) and the wire casing device at wall body (1) lateral surface, the wire casing device includes nut (4), bolt (5) and pre-buried steel pipe section of jurisdiction (3) in wall body (1), and bolt (5) include bolt head and screw rod, and the screw head sets up at steel pipe section of jurisdiction (3) medial surface, and the screw rod afterbody stretches out wall body (1), offers the hole that is used for passing the screw rod on aluminium lamina membranacea (2), and is fixed through nut (4) between screw rod and aluminium lamina membranacea (2).
2. The wall structure with the preserved equipment pipe chase as claimed in claim 1, wherein the cross-section of the steel pipe segment (3) is in the shape of a circular arc.
3. The wall structure with the reserved equipment pipe chase of claim 1, wherein the bolts (5) are arranged at intervals along the axial direction of the steel pipe segment (3).
4. The wall structure with the reserved equipment pipe chase of claim 1, wherein the screw heads are welded and fixed with the steel pipe segments (3).
5. The wall structure with the preserved equipment chase, as recited in claim 1, wherein the length of the screw is greater than the thickness of the aluminum membrane plate (2).
6. The wall structure with the pre-fabricated equipment wall chase as recited in claim 1, wherein the thickness of the steel pipe segment (3) is 3 mm.
7. The wall structure with the reserved equipment chase as recited in claim 1, wherein the screw head has a diameter smaller than the inner diameter of the steel pipe segment (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922401258.3U CN211524087U (en) | 2019-12-27 | 2019-12-27 | Wall structure with reserved equipment wall chase |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922401258.3U CN211524087U (en) | 2019-12-27 | 2019-12-27 | Wall structure with reserved equipment wall chase |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211524087U true CN211524087U (en) | 2020-09-18 |
Family
ID=72447551
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922401258.3U Active CN211524087U (en) | 2019-12-27 | 2019-12-27 | Wall structure with reserved equipment wall chase |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211524087U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114086986A (en) * | 2021-11-30 | 2022-02-25 | 中铁第四勘察设计院集团有限公司 | Method and device applied to shield method tunnel segment of reserved pipeline installation hole |
-
2019
- 2019-12-27 CN CN201922401258.3U patent/CN211524087U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114086986A (en) * | 2021-11-30 | 2022-02-25 | 中铁第四勘察设计院集团有限公司 | Method and device applied to shield method tunnel segment of reserved pipeline installation hole |
CN114086986B (en) * | 2021-11-30 | 2023-12-22 | 中铁第四勘察设计院集团有限公司 | Method and device applied to shield-method tunnel segment with reserved pipeline installation pore canal |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103061504B (en) | Concrete slab Pipe installing hole to be provided construction mould and construction method | |
CN211524087U (en) | Wall structure with reserved equipment wall chase | |
CN111335264A (en) | Double-steel-plate rubber concrete protection structure with built-in corrugated steel pipe | |
CN107514097B (en) | Prestressed corrugated pipe assembly and installation and construction method thereof | |
CN202416869U (en) | Novel building engineering basement exterior wall split bolt | |
CN211524098U (en) | Special hole plugging device for aluminum alloy template | |
CN106812252A (en) | The anti-skidding prestressing force pull end anchorage of one kind sealing | |
CN201714093U (en) | Turn-around tie bolt used in construction of concrete wall form | |
CN212224627U (en) | Pipeline preformed hole plugging die | |
CN211499784U (en) | Pouring module device after secondary hole opening of floor slab | |
CN212053813U (en) | Prefabricated wall body split bolt hole built-in fitting | |
CN211572085U (en) | A wallboard connection major structure for assembly type structure | |
CN210563370U (en) | Novel assembled tongue-and-groove section bar for building aluminium mould | |
CN204940616U (en) | The integrated prefabricated concrete folding wallboard of a kind of modular door and window | |
CN210858003U (en) | Aluminum alloy template beam with buckle device | |
CN210194906U (en) | Concrete formwork for fabricated building | |
CN210530430U (en) | Prefabricated substation | |
CN101614076A (en) | A kind of civil engineering with syllogic to draw rod device and mounting method thereof | |
CN113530224A (en) | Device for reserving water pipe pressure groove on primary structure | |
CN211333786U (en) | Split type cold drawing side forms of PC component | |
CN112609982A (en) | Method for manufacturing wall with heat-insulation plate by adopting energy-saving bolt | |
CN212317496U (en) | Device for reserving water pipe pressure groove on primary structure | |
CN220868831U (en) | Device for avoiding collision between aluminum die screw and steel bar | |
CN211473394U (en) | Quick positioning device for embedded sleeve in aluminum formwork construction | |
CN215364616U (en) | Novel tower crane attaches wall built-in fitting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |