CN211572085U - A wallboard connection major structure for assembly type structure - Google Patents
A wallboard connection major structure for assembly type structure Download PDFInfo
- Publication number
- CN211572085U CN211572085U CN201922387004.0U CN201922387004U CN211572085U CN 211572085 U CN211572085 U CN 211572085U CN 201922387004 U CN201922387004 U CN 201922387004U CN 211572085 U CN211572085 U CN 211572085U
- Authority
- CN
- China
- Prior art keywords
- wall body
- body plate
- bolt
- base
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 13
- 239000010959 steel Substances 0.000 claims description 13
- 239000004568 cement Substances 0.000 claims description 11
- 238000005034 decoration Methods 0.000 claims description 6
- 239000000203 mixture Substances 0.000 claims description 4
- 238000009434 installation Methods 0.000 abstract description 8
- 238000010276 construction Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000000149 penetrating effect Effects 0.000 description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model belongs to the technical field of assembly type building, especially, be a wallboard connection major structure for assembly type building, including the base, the inside of base has seted up the constant head tank, the inside joint of constant head tank has the reference column, the upper surface of reference column fixedly connected with first wall board, the inside of first wall board has seted up the through-hole, the inside of through-hole is worn to be equipped with embedded bar, the one end fixed connection of embedded bar is in the inside of base, the one end fixed connection of first wall board has L type piece; the utility model discloses, through setting up U type piece, L type piece, first bolt and second bolt, in the application of reality, through the cooperation between the aforesaid, the high fastening nature of first wall body board with second wall body board junction has been guaranteed to need not to carry out the secondary at the job site and pour the junction of first wall body board and second wall body board, and then reduce the installation long required, improve work efficiency.
Description
Technical Field
The utility model belongs to the technical field of the assembly type structure, concretely relates to a wallboard connection major structure for assembly type structure.
Background
With the development of modern industrial technology, the building of houses can be made in batches and in sets like the production of machines, and only prefabricated house components are transported to the construction site for assembly, and the assembly type building is interesting in the beginning of the 20 th century and is realized in the end of the sixties, and the countries of English, French, Soviet Union and the like make the first attempt. The prefabricated building is characterized in that the prefabricated building is composed of prefabricated parts, and is divided into five types, namely a block building, a plate building, a box building, a framework plate building, a rising-plate rising-layer building and the like according to the form and construction method of a prefabricated part.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a wallboard connection major structure for assembly type structure has the characteristics that improve work efficiency.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a wallboard connection major structure for assembly type structure, includes the base, the constant head tank has been seted up to the inside of base, the inside joint of constant head tank has the reference column, the first wallboard of last fixed surface of reference column is connected with, the through-hole has been seted up to the inside of first wallboard, embedded steel bar is worn to be equipped with in the inside of through-hole, embedded steel bar's one end fixed connection is in the inside of base, the one end fixedly connected with L type piece of first wallboard, the inside joint of L type piece has U type piece, the one end fixedly connected with second wallboard of U type piece, first bolt is worn to be equipped with in the inside of first wallboard, the one end threaded connection of first bolt is in the inside of U type piece, the second bolt is worn to be equipped with in the inside of second wallboard, one end threaded connection of second bolt is in the inside of L type piece.
Preferably, the first wall body plate comprises an outer decorative layer, a cement layer is arranged on one side of the outer decorative layer, and an inner decorative layer is arranged on one side of the cement layer.
Preferably, the number of the through holes is two, and the through holes are all arranged in the cement layer.
Preferably, the internal composition of the second wall panel is the same as the internal composition of the first wall panel.
Preferably, the number of the positioning columns is two, and the positioning columns are fixedly connected to the lower surfaces of the inner decoration layer and the outer decoration layer respectively.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses, through setting up U type piece, L type piece, first bolt and second bolt, in actual application, cooperation between the aforesaid, the high fastening nature of first wall body board and second wall body board junction has been guaranteed, thereby need not to carry out the secondary at the job site and pour the junction of first wall body board and second wall body board, and then it is long when reducing the installation, and the work efficiency is improved, through setting up embedded steel bar, a pedestal, constant head tank and reference column, in actual application, cooperation between the aforesaid, make first wall body board and second wall body board can be accurate in the installation be connected with the base, thereby guarantee the high accurate nature of installation, simultaneously under embedded steel bar's effect, the steadiness after first wall body board and second wall body board are connected has been improved, the life of this device has been ensured.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic structural view of a front view section of the present invention;
fig. 2 is a schematic structural view from the top of the present invention;
FIG. 3 is a schematic structural view of the position A of the present invention;
in the figure: 1. a base; 2. an outer decorative layer; 3. a through hole; 4. embedding reinforcing steel bars in advance; 5. a cement layer; 6. an inner decorative layer; 7. a first wall panel; 8. a first bolt; 9. a U-shaped block; 10. an L-shaped block; 11. a second wall panel; 12. a second bolt; 13. a positioning column; 14. and (6) positioning a groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-3, the present invention provides the following technical solutions: a main wall board connecting structure for an assembly type building comprises a base 1, wherein a positioning groove 14 is formed in the base 1, a positioning column 13 is clamped in the positioning groove 14, a first wall board 7 is fixedly connected to the upper surface of the positioning column 13, a through hole 3 is formed in the first wall board 7, embedded steel bars 4 penetrate through the through hole 3, the first wall board 7 and a second wall board 11 can be accurately connected with the base 1 in the installation process through the arrangement of the embedded steel bars 4, the base 1, the positioning groove 14 and the positioning column 13 in practical application through the cooperation of the embedded steel bars 4, the accuracy of the installation height is guaranteed, meanwhile, the stability of the first wall board 7 and the second wall board 11 after connection is improved under the action of the embedded steel bars 4, the service life of the device is guaranteed, one end of each embedded steel bar 4 is fixedly connected in the base 1, one end of the first wall body plate 7 is fixedly connected with an L-shaped block 10, a U-shaped block 9 is clamped inside the L-shaped block 10, one end of the U-shaped block 9 is fixedly connected with a second wall body plate 11, a first bolt 8 penetrates through the first wall body plate 7, one end of the first bolt 8 is in threaded connection with the U-shaped block 9, a second bolt 12 penetrates through the second wall body plate 11, one end of the second bolt 12 is in threaded connection with the L-shaped block 10, the U-shaped block 9, the L-shaped block 10, the first bolt 8 and the second bolt 12 are arranged, in practical application, through the cooperation of the U-shaped block 9, the L-shaped block 10 and the second wall body plate 11, the high fastening performance of the joint of the first wall body plate 7 and the second wall body plate 11 is guaranteed, the joint of the first wall body plate 7 and the second wall body plate 11 does not need to be poured for the second time at a construction site, and the installation time is reduced, the working efficiency is improved.
Specifically, the first wall body plate 7 includes an outer decorative layer 2, a cement layer 5 is provided on one side of the outer decorative layer 2, an inner decorative layer 6 is provided on one side of the cement layer 5, and the arrangement of the inner decorative layer 6 and the outer decorative layer 2 improves the overall aesthetic property of the device in practical application.
Specifically, the number of the through holes 3 is two and the through holes 3 are all arranged in the cement layer 5.
Specifically, the internal composition of the second wall plate 11 is the same as that of the first wall plate 7.
Specifically, the number of the positioning columns 13 is two and the positioning columns are respectively fixedly connected to the lower surfaces of the inner decoration layer 6 and the outer decoration layer 2.
The utility model discloses a theory of operation and use flow: when the utility model is used, firstly, the first wall body plate 7 is lifted by the crane, the first wall body plate 7 is sleeved with the embedded steel bars 4 through the through holes 3, then the first wall body plate 7 continuously moves downwards until the positioning columns 13 on the lower surface of the first wall body plate 7 are clamped in the positioning grooves 14 on the upper surface of the base 1, the connection between the first wall body plate 7 and the base 1 can be completed, then the second wall body plate 11 is lifted by the crane, the U-shaped blocks 9 on one side of the second wall body plate 11 are clamped with the L-shaped blocks 10 on one side of the first wall body plate 7, then the second wall body plate 11 is controlled to continuously move downwards, the connection between the second wall body plate 11 and the base 1 is completed through the positioning grooves 14, the positioning columns 13 and the embedded steel bars 4, then the first bolt 8 is used for penetrating through the U-shaped blocks 9 on the first wall body plate 7 and the second wall body plate 11, the second bolt 12 is used for penetrating through the second wall body plate 11 and connecting with the L-shaped blocks, the first wall body plate 7 and the second wall body plate 11 can be connected, and finally cement is injected into the through hole 3 to wait for cooling so as to finish the installation of the installation structure.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (5)
1. A wall panel connection body structure for prefabricated buildings, comprising a base (1), characterized in that: the base is characterized in that a positioning groove (14) is formed in the base (1), a positioning column (13) is clamped in the positioning groove (14), a first wall body plate (7) is fixedly connected to the upper surface of the positioning column (13), a through hole (3) is formed in the first wall body plate (7), embedded steel bars (4) penetrate through the through hole (3), one end of each embedded steel bar (4) is fixedly connected to the inside of the base (1), one end of each first wall body plate (7) is fixedly connected with an L-shaped block (10), a U-shaped block (9) is clamped in the L-shaped block (10), one end of each U-shaped block (9) is fixedly connected with a second wall body plate (11), a first bolt (8) penetrates through the inside of each first wall body plate (7), and one end of each first bolt (8) is in the U-shaped block (9) in a threaded manner, and a second bolt (12) penetrates through the interior of the second wall body plate (11), and one end of the second bolt (12) is in threaded connection with the interior of the L-shaped block (10).
2. A panel connecting body structure for prefabricated buildings according to claim 1, wherein: the first wall body plate (7) comprises an outer decorative layer (2), a cement layer (5) is arranged on one side of the outer decorative layer (2), and an inner decorative layer (6) is arranged on one side of the cement layer (5).
3. A panel connecting body structure for prefabricated buildings according to claim 1, wherein: the number of the through holes (3) is two, and the through holes (3) are all arranged in the cement layer (5).
4. A panel connecting body structure for prefabricated buildings according to claim 1, wherein: the internal composition structure of the second wall body plate (11) is the same as that of the first wall body plate (7).
5. A panel connecting body structure for prefabricated buildings according to claim 1, wherein: the number of the positioning columns (13) is two, and the positioning columns are fixedly connected to the lower surfaces of the inner decoration layer (6) and the outer decoration layer (2) respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922387004.0U CN211572085U (en) | 2019-12-26 | 2019-12-26 | A wallboard connection major structure for assembly type structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922387004.0U CN211572085U (en) | 2019-12-26 | 2019-12-26 | A wallboard connection major structure for assembly type structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211572085U true CN211572085U (en) | 2020-09-25 |
Family
ID=72551139
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922387004.0U Expired - Fee Related CN211572085U (en) | 2019-12-26 | 2019-12-26 | A wallboard connection major structure for assembly type structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211572085U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113175127A (en) * | 2021-04-28 | 2021-07-27 | 广东中寰建设工程有限公司 | Green assembly type building wall member, processing device and method |
-
2019
- 2019-12-26 CN CN201922387004.0U patent/CN211572085U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113175127A (en) * | 2021-04-28 | 2021-07-27 | 广东中寰建设工程有限公司 | Green assembly type building wall member, processing device and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101761232A (en) | Construction technology of large-scale fair-faced concrete cylindrical structural part with paper tube template | |
CN211572085U (en) | A wallboard connection major structure for assembly type structure | |
CN211007754U (en) | Reinforced concrete column node antidetonation reinforcing apparatus | |
CN110344535A (en) | A kind of prefabricated assembled combined wall board and construction method realized concealed beam and exempt from formwork | |
CN106381999A (en) | Fair-faced concrete wall intaglio character die plate construction method | |
CN209779560U (en) | Steel formwork for irrigation and water conservancy concrete channel | |
CN205853051U (en) | A kind of band is magnetic the precast concrete production mould of dividing plate | |
CN107119800A (en) | A kind of many high-rise assembled modularization Self-resetting steel construction square tube post frame systems | |
CN111809729A (en) | Dry-type connected node of assembled concrete beam column | |
CN206917010U (en) | A kind of framework spinning bolt-type integrates inner partition plate | |
CN211229781U (en) | Novel prefabricated hollow enclosure | |
CN205189366U (en) | Leveling device of wedge basic unit | |
CN210194906U (en) | Concrete formwork for fabricated building | |
CN212642117U (en) | Tool type supporting device for laminated bottom plate supporting system | |
CN211250567U (en) | Pouring die for balcony | |
CN207402949U (en) | A kind of prefabricated panel for concrete prefabricated element production line positions hole tool | |
CN207812479U (en) | A kind of prefabricated case change basis | |
CN112459347A (en) | Cold-formed thin-wall steel light concrete composite integrated wallboard structure | |
CN206538901U (en) | A kind of assembling type partition wall | |
CN205894401U (en) | Curtain slot type buries a top and buries positioner | |
CN217679801U (en) | Grouting assembly type concrete shear wall component | |
CN219118753U (en) | Building bay line position is with integrative aluminium template of area drip internal corner | |
CN213539382U (en) | Cross plug connector for shear wall pouring construction | |
CN218091978U (en) | Sealed supporting template for building template | |
CN204940688U (en) | Body of wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200925 |