CN107119800A - A kind of many high-rise assembled modularization Self-resetting steel construction square tube post frame systems - Google Patents

A kind of many high-rise assembled modularization Self-resetting steel construction square tube post frame systems Download PDF

Info

Publication number
CN107119800A
CN107119800A CN201710226490.0A CN201710226490A CN107119800A CN 107119800 A CN107119800 A CN 107119800A CN 201710226490 A CN201710226490 A CN 201710226490A CN 107119800 A CN107119800 A CN 107119800A
Authority
CN
China
Prior art keywords
square tube
tube post
point module
module
post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710226490.0A
Other languages
Chinese (zh)
Other versions
CN107119800B (en
Inventor
刘学春
崔小雄
徐路
商子轩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing University of Technology
Original Assignee
Beijing University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Technology filed Critical Beijing University of Technology
Priority to CN201710226490.0A priority Critical patent/CN107119800B/en
Publication of CN107119800A publication Critical patent/CN107119800A/en
Application granted granted Critical
Publication of CN107119800B publication Critical patent/CN107119800B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2415Brackets, gussets, joining plates
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2418Details of bolting
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2454Connections between open and closed section profiles

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

A kind of many high-rise assembled modularization Self-resetting steel construction square tube post frame systems, belong to technical field of structural engineering, including acromere point module, angularpitch point module and internal segment point module.The present invention proposes to be assembled as overall at a kind of novel fabricated module, the node and inflection point of interception framework, and framework inflection point moment of flexure very little, post can use weaker connected mode with post, and connected mode is flexibly, reduction steel consumption and reduction connection difficulty.The design of prestress wire, can reduce residual deformation of the frame joint after earthquake, and realize the effect of Self-resetting.The setting of supporting plate, cover plate and external fin, while can making beam precise positioning, puies forward the stability of node.External fin is arranged on inside flange of beam, while improving local bearing capacity, may also reach up effect attractive in appearance.And in the production and construction of steel structure system, by modularization, batch production, standardization and assembling are combined, and are realized factorial praluction, are reduced construction costs.

Description

A kind of many high-rise assembled modularization Self-resetting steel construction square tube post frame systems
Technical field
The present invention relates to a kind of many high-rise assembled modularization Self-resetting steel construction square tube post frame systems, belong to structure work Journey technical field.
Background technology
In the life cycle management of building, economize on resources to greatest extent and (save land, save, economizing on water, saving material), environmental protection With reduce pollution, for people provides it is healthy, applicable, efficiently using space, the building with natural harmony symbiosis.This theory is Transform mode of economic growth and promote the grand strategy of sustainable development to make the transition, it is really corresponding for China house (house) steel construction System innovation and industrialization provide major opportunity.
At present, the system research both at home and abroad to high-rise steel structure house is in the starting stage, and industrialization assembled is high-rise Steel structure system innovation is imperative.Traditional housing building of steel-structure employs substantial amounts of welding when constructing, speed of application is slow, To the seriously polluted of environment, it is most important that the quality of weld seam should not be controlled, the security performance of building is had a strong impact on.
The content of the invention
The present invention proposes a kind of a kind of many high-rise assembled modularization Self-resetting steel for belonging to technical field of structural engineering Structure square tube post frame system.Its object is to propose a kind of novel fabricated module, intercept at the node and inflection point of framework Assembled as overall, framework inflection point moment of flexure very little, post can use weaker connected mode, and connected mode spirit with post It is living, reduce steel consumption and reduction connection difficulty.The design of prestress wire, can reduce remnants of the frame joint after earthquake Deformation, and realize the effect of Self-resetting.The setting of supporting plate, cover plate and external fin, while can making beam precise positioning, carries the steady of node It is qualitative.External fin is arranged on inside flange of beam, while improving local bearing capacity, may also reach up effect attractive in appearance.And in steel In the production and construction of structural system, by modularization, batch production, standardization and assembling are combined, and realize factorial praluction, Live quick assembling, on the premise of construction quality is ensured, improves speed of application, reduces the construction period, reduce engineering Cost.
A kind of many high-rise assembled modularization Self-resetting steel construction square tube post frame systems, the system includes acromere point module (A), angularpitch point module (B) and internal segment point module (C);The system includes acromere point module (A), angularpitch point module (B) and internal segment Point module (C);The angularpitch point module (B) and internal segment point module (C) are similar to acromere point module (A) composition and structure, angularpitch Point module (B) is L-shaped structure, and internal segment point module (C) is decussate texture, and acromere point module (A) is T-shaped structure.Exterior node mould Block (A) is arranged in the middle of the periphery of steel construction square tube post frame system, and angularpitch point module (B) is arranged on steel construction side's tubular column frame The corner of system, internal segment point module (C) is arranged on the centre position of steel construction square tube post frame system;.
The acromere point module (A) includes square tube post (1), beam (2), prestress wire I (3), prestress wire II (4), supporting plate (5), cover plate (6), external fin (7), ribbed stiffener (8), end plate I (9) and end plate II (10).Square tube post (1) length is layer Height, the adjacent three face soldering pallet (5) in the middle part of square tube post (1), and ensure supporting plate (5) level, the distance one above supporting plate (5) The local horizontal welded cover plate (6) of deck-molding, and ensure supporting plate (5) upper surface to the distance between cover plate (6) lower surface be one Deck-molding.Weld external fin (7) vertically in each supporting plate (5) both sides, and ensure external fin (7) outer surface with square tube post (1) sideways same One plane.End plate II (10) is welded on the side of square tube post (1), and ensure end plate II (10) supporting plate (5) and cover plate (6) it Between.Beam (2) uses H profile steel, in the beam-ends welded end plate I (9) close to post, the vertical welding ribbed stiffener (8) in the middle part of beam.Prestressing force Steel strand wires I (3) passes through square tube post (1) to the ribbed stiffener (8) in another curb girder from the ribbed stiffener (8) in a curb girder;Prestress steel Twisted wire I (3) is pinned on the outside of ribbed stiffener (8) with tapered end.Prestress wire II (4) is from the side end panel II (10) of square tube post (1) one Square tube post (1) passes through to the ribbed stiffener (8) in another curb girder in place;Prestress wire II (4) is respectively at ribbed stiffener (8) place and end Plate II (10) place is pinned with tapered end.
In many high-rise assembled modularization Self-resetting steel construction square tube post frame systems between each module beam connection It is connected by screw bolts, including connecting plate I (11) and connecting plate II (12).Connecting plate I (11) is placed on the outside of flange of beam, connecting plate II (12) it is placed on the inside of flange of beam.But the type of attachment between Liang Yuliang is not limited only to this form, other bolts can also be used Type of attachment.
The connection of the studding of each module in many high-rise assembled modularization Self-resetting steel construction square tube post frame systems It can use clamping bolts or welded connection, different connected modes may be selected according to different condition;As needed can also be Casting concrete in post, the connection of reinforcing prop.
In the acromere point module (A), supporting plate (5) and cover plate (6) have identical size, end plate I (9) and end plate II (10) Have that position is relative, size identical bolt hole with post.Between each module in the connection of beam, connecting plate I (11) and connecting plate II (12) there is equal length, with position is relative, size identical bolt hole, the bolt hole is arranged as single row or multiple rows bolt company Connect, bolt quantity, specification as the case may be depending on.
In many high-rise assembled modularization Self-resetting steel construction square tube post frame systems, all components are in factory It is prefabricated to machine, and complete in factory the assembly of each module.First Liang Yuzhu and associated rib plate weld above are completed, then will Beam is placed between supporting plate (5) and cover plate (6), is then worn prestress wire and is carried out tensioning and anchor, you can realizes each module Making.Framework can be completed by only needing to progress post and the connection He Liang of post and the bolt connection of beam at the scene;According to actual work Journey need, can in post casting concrete.
The beneficial effects of the invention are as follows above-mentioned how high-rise assembled modularization Self-resetting steel construction square tube post frame system In all modules it is all prefabricated in factory process, scene only need to carry out intermodule connector installation can just complete build. Due to framework inflection point moment of flexure very little, post can use weaker connected mode with post, and connected mode is flexibly, reduces steel consumption Difficulty is connected with reduction.The design of prestress wire, can reduce residual deformation of the frame joint after earthquake, and realize certainly The effect of reset.The setting of supporting plate, cover plate and external fin, while can making beam precise positioning, puies forward the stability of node.External fin is set Inside flange of beam, while improving local bearing capacity, effect attractive in appearance may also reach up.And in the production of steel structure system In construction, by modularization, batch production, standardization and assembling are combined, and realize factorial praluction, live quick assembling, On the premise of construction quality is ensured, speed of application is improved, the construction period is reduced, construction costs is reduced.
Brief description of the drawings
The present invention is further described with reference to the accompanying drawings and examples.
Fig. 1 is the assembled modularization Self-resetting block schematic illustration of the present invention
Fig. 2 is the exterior node module diagram of the present invention
Fig. 3 is the beam construction schematic diagram of the present invention
Fig. 4 is the post organigram of the present invention
Fig. 5 is the prestress wire I schematic diagrames of the present invention
Fig. 6 is the prestress wire II schematic diagrames of the present invention
Fig. 7 is each module beam connection diagram of the present invention
In figure:1-square tube post, 2-beam, 3-prestress wire I, 4-prestress wire II, 5-supporting plate, 6-lid Plate, 7-external fin, 8-ribbed stiffener, 9-end plate I, 10-end plate II, 11-connecting plate I, 12-connecting plate II.
Embodiment
The present invention is described in detail below in conjunction with the accompanying drawings:
As shown in figure 3, the beam (2) in many high-rise assembled modularization Self-resetting steel construction square tube post frame systems is adopted With H profile steel, in the beam-ends welded end plate I (9) close to post, the vertical welding ribbed stiffener (8) in the middle part of beam.
As shown in figure 4, the square tube post in many high-rise assembled modularization Self-resetting steel construction square tube post frame systems (1) length is floor height, the adjacent three face soldering pallet (5) in the middle part of square tube post (1), and ensures supporting plate (5) level, in supporting plate (5) The local horizontal welded cover plate (6) of one deck-molding of top distance, and ensure supporting plate (5) upper surface between cover plate (6) lower surface Distance be deck-molding.External fin (7) is welded vertically in each supporting plate (5) both sides, and ensures external fin (7) outer surface and square tube post (1) sideways in same plane.End plate II (10) is welded on the last one side of square tube post (1), and ensures end plate II (10) in supporting plate (5) Between cover plate (6).
As shown in figure 5, prestress wire I (3) passes through square tube post (1) to opposite side from the ribbed stiffener (8) in a curb girder Ribbed stiffener (8) in beam;Prestress wire I (3) is pinned on the outside of ribbed stiffener (8) with tapered end.
As shown in fig. 6, prestress wire II (4) passed through from the side end panel II (10) of square tube post (1) one square tube post (1) to Ribbed stiffener (8) in another curb girder;Prestress wire II (4) is respectively at ribbed stiffener (8) place and end plate II (10) place tapered end Pin.
As shown in Fig. 2 in the acromere point module (A), supporting plate (5) and cover plate (6) have an identical size, end plate I (9) and End plate II (10) and post have that position is relative, size identical bolt hole.Between each module in the connection of beam, connecting plate I (11) There is equal length with connecting plate II (12), with position is relative, size identical bolt hole, the bolt hole be arranged as it is single or Multiple rows of bolt connection, bolt quantity, specification as the case may be depending on.Many high-rise assembled modularization Self-resetting steel constructions In square tube post frame system, all components are prefabricated in factory to be machined, and completes in factory the assembly of each module.First Liang Yuzhu and associated rib plate weld above are completed, then beam is placed between supporting plate (5) and cover plate (6), prestressing force is then worn Steel strand wires carry out tensioning and anchored, you can realize the making of each module.Only need to carry out at the scene post and the connection of post and beam with The bolt connection of beam can complete framework.

Claims (5)

1. a kind of many high-rise assembled modularization Self-resetting steel construction square tube post frame systems, it is characterised in that:The system includes Acromere point module (A), angularpitch point module (B) and internal segment point module (C);The system includes acromere point module (A), angularpitch point module And internal segment point module (C) (B);The angularpitch point module (B) and internal segment point module (C) are constituted and structure with acromere point module (A) Similar, angularpitch point module (B) is L-shaped structure, and internal segment point module (C) is decussate texture, and acromere point module (A) is T-shaped structure; Acromere point module (A) is arranged in the middle of the periphery of steel construction square tube post frame system, and angularpitch point module (B) is arranged on steel construction side The corner of tubular column frame system, internal segment point module (C) is arranged on the centre position of steel construction square tube post frame system;
The acromere point module (A) include square tube post (1), beam (2), prestress wire I (3), prestress wire II (4), Supporting plate (5), cover plate (6), external fin (7), ribbed stiffener (8), end plate I (9) and end plate II (10);Square tube post (1) length is floor height, Adjacent three face soldering pallet (5) in the middle part of square tube post (1), and ensure supporting plate (5) level, one deck-molding of distance above supporting plate (5) Local horizontal welded cover plate (6), and ensure supporting plate (5) upper surface to the distance between cover plate (6) lower surface be a deck-molding; Weld external fin (7) vertically in each supporting plate (5) both sides, and ensure external fin (7) outer surface with square tube post (1) sideways same flat Face;End plate II (10) is welded on the side of square tube post (1), and ensures end plate II (10) between supporting plate (5) and cover plate (6);Beam (2) H profile steel is used, in the beam-ends welded end plate I (9) close to post, the vertical welding ribbed stiffener (8) in the middle part of beam;Prestress steel twist Line I (3) passes through square tube post (1) to the ribbed stiffener (8) in another curb girder from the ribbed stiffener (8) in a curb girder;Prestress wire I (3) pinned on the outside of ribbed stiffener (8) with tapered end;Prestress wire II (4) is passed through from the side end panel II (10) of square tube post (1) one Square tube post (1) is to the ribbed stiffener (8) in another curb girder;Prestress wire II (4) is respectively in ribbed stiffener (8) place and end plate II (10) place is pinned with tapered end.
2. a kind of many high-rise assembled modularization Self-resetting steel construction square tube post frame systems according to claim 1, its It is characterised by:In many high-rise assembled modularization Self-resetting steel construction square tube post frame systems between each module beam connection It is connected by screw bolts, including connecting plate I (11) and connecting plate II (12);Connecting plate I (11) is placed on the outside of flange of beam, connecting plate II (12) it is placed on the inside of flange of beam.
3. a kind of many high-rise assembled modularization Self-resetting steel construction square tube post frame systems according to claim 1, its It is characterised by:The connection of the studding of each module in many high-rise assembled modularization Self-resetting steel construction square tube post frame systems Use clamping bolts or welded connection, different connected modes may be selected according to different condition;Poured as needed in post mixed Solidifying soil, the connection of reinforcing prop.
4. a kind of many high-rise assembled modularization Self-resetting steel construction square tube post frame systems according to claim 1, its It is characterised by:In the acromere point module (A), supporting plate (5) and cover plate (6) have identical size, end plate I (9) and end plate II (10) have that position is relative, size identical bolt hole with post;Between each module in the connection of beam, connecting plate I (11) and connection Plate II (12) has equal length, with position is relative, size identical bolt hole, and the bolt hole is arranged as single row or multiple rows spiral shell Tether and connect, bolt quantity, specification as the case may be depending on.
5. a kind of many high-rise assembled modularization Self-resetting steel construction square tube post frame systems according to claim 1, its It is characterised by:In many high level assembled modularization Self-resetting steel construction square tube post frame systems, all components are pre- in factory System is machined, and completes in factory the assembly of each module;First Liang Yuzhu and associated rib plate weld above are completed, then by beam It is placed between supporting plate (5) and cover plate (6), then wears prestress wire and carry out tensioning and anchor, you can realize each module Make;Framework can be completed by only needing to progress post and the connection He Liang of post and the bolt connection of beam at the scene;According to Practical Project Need, can in post casting concrete.
CN201710226490.0A 2017-04-09 2017-04-09 A kind of more high-rise assembled modularization Self-resetting steel construction square tube column frame systems Active CN107119800B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710226490.0A CN107119800B (en) 2017-04-09 2017-04-09 A kind of more high-rise assembled modularization Self-resetting steel construction square tube column frame systems

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710226490.0A CN107119800B (en) 2017-04-09 2017-04-09 A kind of more high-rise assembled modularization Self-resetting steel construction square tube column frame systems

Publications (2)

Publication Number Publication Date
CN107119800A true CN107119800A (en) 2017-09-01
CN107119800B CN107119800B (en) 2019-04-05

Family

ID=59724671

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710226490.0A Active CN107119800B (en) 2017-04-09 2017-04-09 A kind of more high-rise assembled modularization Self-resetting steel construction square tube column frame systems

Country Status (1)

Country Link
CN (1) CN107119800B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035440A (en) * 2017-10-27 2018-05-15 西安建筑科技大学 A kind of assembled Self-resetting Column Joint with Wedge device
CN108149786A (en) * 2018-01-18 2018-06-12 南京林业大学 A kind of assembled bamboo hollow frame structure with prestressing force enhancing box beam
CN112302230A (en) * 2020-10-23 2021-02-02 中国石油工程建设有限公司青海分公司 Floor plate structure of steel structure house

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1046663A (en) * 1996-08-05 1998-02-17 Kurosawa Kensetsu Kk Joint structure between post and beam
CN103266660A (en) * 2013-05-23 2013-08-28 北京工业大学 Industrialized assembly type column through beam solid-web steel structure framework prestressed eccentric supporting system
CN103669570A (en) * 2013-12-19 2014-03-26 北京工业大学 Special-shaped steel column-prestress central supporting frame easy to restore after earthquake
CN105040817A (en) * 2015-07-30 2015-11-11 北京建筑大学 Prestressed assembled middle column steel frame recoverable in function
CN105839793A (en) * 2016-05-20 2016-08-10 西安建筑科技大学 Rigid connection joint of multi-cavity concrete-filled steel tube composite column and steel beam as well as assembly method
CN106522382A (en) * 2016-11-10 2017-03-22 西安建筑科技大学 Fabricated concrete-filled steel tube column-H type steel beam self-resetting energy consumption connection joint

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1046663A (en) * 1996-08-05 1998-02-17 Kurosawa Kensetsu Kk Joint structure between post and beam
CN103266660A (en) * 2013-05-23 2013-08-28 北京工业大学 Industrialized assembly type column through beam solid-web steel structure framework prestressed eccentric supporting system
CN103669570A (en) * 2013-12-19 2014-03-26 北京工业大学 Special-shaped steel column-prestress central supporting frame easy to restore after earthquake
CN105040817A (en) * 2015-07-30 2015-11-11 北京建筑大学 Prestressed assembled middle column steel frame recoverable in function
CN105839793A (en) * 2016-05-20 2016-08-10 西安建筑科技大学 Rigid connection joint of multi-cavity concrete-filled steel tube composite column and steel beam as well as assembly method
CN106522382A (en) * 2016-11-10 2017-03-22 西安建筑科技大学 Fabricated concrete-filled steel tube column-H type steel beam self-resetting energy consumption connection joint

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035440A (en) * 2017-10-27 2018-05-15 西安建筑科技大学 A kind of assembled Self-resetting Column Joint with Wedge device
CN108149786A (en) * 2018-01-18 2018-06-12 南京林业大学 A kind of assembled bamboo hollow frame structure with prestressing force enhancing box beam
CN112302230A (en) * 2020-10-23 2021-02-02 中国石油工程建设有限公司青海分公司 Floor plate structure of steel structure house

Also Published As

Publication number Publication date
CN107119800B (en) 2019-04-05

Similar Documents

Publication Publication Date Title
CN107143034A (en) A kind of assembly concrete frame structure beam column rigid connection node
CN104912190B (en) Dry type joggle frame structure
CN107299679A (en) A kind of many high-rise assembled modularization Self-resetting steel construction special-shaped column frame systems
CN204876059U (en) Prefabricated assembled shaped steel concrete frame structure system
CN205242773U (en) Adopt prefabricated assembled steel - concrete combination beam of cant chisei connection
CN107165274B (en) A kind of more high-rise assembled modularization Self-resetting steel construction H profile steel column frame systems
CN111677107B (en) Assembled connected node
CN107119800A (en) A kind of many high-rise assembled modularization Self-resetting steel construction square tube post frame systems
CN106149937A (en) Assembly concrete beam and plate dry type method of attachment thereof
CN103669574A (en) Building frame system and assembly method thereof
CN205875394U (en) Antidetonation concrete beam column that dry process is connected
CN103741970A (en) Assembled machining shed for building construction and manufacture and installation method thereof
CN208501880U (en) Prefabricated concrete structure column and column rigid connection node
CN105220777B (en) Reinforced timber structure energy dissipation node
CN209468856U (en) A kind of assembly concrete column beam connecting node
CN208280371U (en) A kind of prefabricated assembled exterior wall horizontal connection structure
CN205206047U (en) Strenghthened type timber structure power consumption node
CN205024850U (en) Hidden power consumption connecting piece of font timber structure returns
CN207032474U (en) A kind of assembly concrete frame structure beam column rigid connection node
CN113737966A (en) Assembled RCS lotus root beam column connecting node and application thereof
CN206428805U (en) A kind of concrete prefabricated balcony of assembled steel
CN209975803U (en) Ecological composite wall structure
CN113482152A (en) Assembled steel node
CN103541434B (en) The complete cross Combined concrete node of assembled
CN206034685U (en) Integrated system is gone along with sb. to guard him to structure of wide post husked kaoliang of dry -type link pack formula concrete

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant