CN208501880U - Prefabricated concrete structure column and column rigid connection node - Google Patents
Prefabricated concrete structure column and column rigid connection node Download PDFInfo
- Publication number
- CN208501880U CN208501880U CN201821100231.XU CN201821100231U CN208501880U CN 208501880 U CN208501880 U CN 208501880U CN 201821100231 U CN201821100231 U CN 201821100231U CN 208501880 U CN208501880 U CN 208501880U
- Authority
- CN
- China
- Prior art keywords
- plate
- column
- steel plate
- steel slab
- embedded steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model relates to a kind of prefabricated concrete structure columns and column rigid connection node, including upper section concrete column and lower section concrete column, one first pre-embedded steel slab is fixedly installed in the lower end of the upper section concrete column, saves cross end plate on the lower end fixed one of first pre-embedded steel slab;One second pre-embedded steel slab is fixedly installed in the upper end of the lower section concrete column, and the upper end of second pre-embedded steel slab is fixed once to save cross end plate, and the upper cross end plate of section is fixedly connected with the lower cross end plate of section.The technical program is easy to construct, junction stress performance is superior, to solve vertically to connect difficult technical problem in prefabricated concrete structure center pillar.
Description
Technical field
The utility model relates to assembled arthitecutral structure node interconnection technique field, in particular to a kind of assembly concretes
Structural column and column rigid connection node.
Background technique
With the rapid development of our country's economy, living standards of the people are constantly promoted, and the requirement to house increasingly improves.Together
When, the cast-in-place construction mode and China's sustainable development idea of house are incompatible.Currently, China's house in the urgent need to address is built
If middle high energy consumption, high pollution, it is with high investment the problems such as, so house town and country construction portion of State Development and Reform Commission of China has promulgated that " green is built
Build action scheme ", the building such as the prefabricated assembled concrete structure for being suitble to industrialized production, steel construction is promoted wherein specifically mentioning
System accelerates development the prefabricated and mounting technology of construction project, and it is horizontal to improve building industrialization Integration ofTechnology.
Prefabricated assembled concrete structure has the advantage that
(1) green construction.Prefabricated concrete structure construction can more meet saving land, energy conservation, saving material, is water-saving for green construction
It is required with environmental protection etc., reduces the negative effect to environment, including reduced noise, prevent fugitive dust, reduce environmental pollution, cleaning
Transport reduces place interference, saves resources and the energy such as water, electricity, material, it then follows the principle of sustainable development.
(2) short time limit.It is all carried out in plant produced and maintenance, construction site due to a large amount of assembly concrete component
Work is only to lift the prefabricated component of precast plant, assemble, joint reinforcing, not only without installing scaffold and branch
Support, and reduces influence of the seasonal factor to the construction period, main structure form laggard luggage repair, the work such as Hydroelectric Project Construction,
Workload is constructed much smaller than cast-in-place method, or even eliminates masonry and plastering process, therefore substantially reduce the whole duration.
(3) component quality is good.Concrete in precast plant does not need to pump, and the water in concrete is less, concrete strength
Grade is higher than cast in situs.After precast plant has poured component, component is just subjected to steam curing, guarantees concrete quality,
And construction site curing concrete can not only provide steam-cured excellent condition, but also be influenced by weather, maintenance quality without
Method is compared with precast plant.And precast concrete column is that level is poured when precast plant is prefabricated, and whole root long column is integrally formed, energy
Guarantee its globality.
But prefabricated assembled concrete structure also has some disadvantages of its own, such as node type of attachment complexity.Mesh
Preceding main connecting node form needs live assembling reinforcement, casting concrete, and need scaffold, template etc., this gives node
Quality bring hidden danger, to construction technical requirement height, limit the use of precast concrete to a certain extent.
The application vertically connects difficult technical problem in prefabricated concrete structure center pillar mainly for solution.
Utility model content
The purpose of this utility model is to provide a kind of prefabricated concrete structure columns and column rigid connection node, are easy to apply
Work, junction stress performance are superior, to solve vertically to connect difficult technical problem in prefabricated concrete structure center pillar.
To solve the above-mentioned problems, the utility model provides a kind of prefabricated concrete structure column and column rigid connection saves
One first pre-buried steel is fixedly installed in the lower end of point, including upper section concrete column and lower section concrete column, the upper section concrete column
Plate saves cross end plate on the lower end fixed one of first pre-embedded steel slab;The upper end of the lower section concrete column is fixedly installed
One second pre-embedded steel slab, the upper end of second pre-embedded steel slab is fixed once to save cross end plate, the upper cross end plate of section
It is fixedly connected with the lower cross end plate of section.
Preferably, the first built-in fitting dowel and the first vertical muscle in the upper section concrete column with first pre-buried steel
Plate is fixedly connected;
The second built-in fitting dowel and the second vertical muscle in the lower section concrete column are fixed with second pre-embedded steel slab
Connection.
Preferably, several first plug welding holes are set on first pre-embedded steel slab, the first built-in fitting dowel and first
The end of vertical muscle, which respectively corresponds, to be welded in several first plug welding holes;
Several second plug welding holes, the end of the second built-in fitting dowel and the second vertical muscle are set on second pre-embedded steel slab
Portion, which respectively corresponds, to be welded in several second plug welding holes.
Preferably, the first built-in fitting dowel and the first vertical muscle are vertical with the first pre-embedded steel slab plane respectively;
The second built-in fitting dowel and the second vertical muscle are vertical with the second pre-embedded steel slab plane respectively.
Preferably, the first built-in fitting dowel and the first vertical muscle are used with the junction of first pre-embedded steel slab respectively
Melt groove welding or fillet weld seam;
The second built-in fitting dowel and the second vertical muscle are used with the junction of second pre-embedded steel slab respectively melts slope
Mouth welding or fillet weld seam.
Preferably, the cross end plate of upper section include with it is vertical with first pre-embedded steel slab respectively and be fixedly connected
First steel plate, the second steel plate and third steel plate, second steel plate and third steel plate are installed in the two of first steel plate respectively
Side, second steel plate, third steel plate vertically form with the first steel plate cross respectively;
The cross end plate of lower section include the 4th steel plate that is vertical with second pre-embedded steel slab respectively and being fixedly connected,
5th steel plate and the 6th steel plate, the 5th steel plate and the 6th steel plate are installed in the two sides of the 4th steel plate respectively, and described
Five steel plates, the 6th steel plate vertically form with the 4th steel plate cross respectively.
Preferably, the cross end plate of upper section and the lower cross end plate of section are completely overlapped.
Preferably, the junction of first steel plate, the second steel plate and third steel plate with first pre-embedded steel slab is adopted
With melt groove welding or fillet weld seam;
First steel plate, the second steel plate are used with the junction of the third steel plate respectively melts groove welding or fillet welding
Seam welding;
4th steel plate, the 5th steel plate and the 6th steel plate, which are used with the junction of second pre-embedded steel slab, melts slope
Mouth welding or fillet weld seam;
5th steel plate and the 6th steel plate are used with the junction of the 4th steel plate respectively melts groove welding or angle
Weld seam welding.
Preferably, the outside of the cross end plate of upper section and the lower cross end plate of section also pass through several side plates of connection with
Closed body structure is formed between first pre-embedded steel slab, the second pre-embedded steel slab, the cross end plate of upper section and the lower cross end plate of section.
Preferably, including four side plate groups, each side plate group includes both side plate, and the side of both side plate is vertically fixedly connected,
The upper and lower ends of each side plate group are fixedly connected with first pre-embedded steel slab and the second pre-embedded steel slab respectively, each side plate group
Left and right ends are fixedly connected with the upper cross end plate of section and the lower cross end plate of section respectively.
Preferably, the both side plate in each side plate group, which uses, melts groove welding or fillet weld seam;
Each side plate is all made of with the connection of the cross end plate of upper section and the lower cross end plate of section respectively melts groove welding
Or fillet weld seam;
Each side plate is all made of with the junction of first pre-embedded steel slab and the second pre-embedded steel slab respectively melts groove welding
It connects or fillet weld seam.
Compared with prior art, there are following technical effects for the utility model:
(1) prefabricated concrete structure column is connect by the utility model by pre-embedded steel slab with column, enormously simplifies assembly
The complexity that formula concrete frame structure column is connect with column.
(2) the utility model simplifies working procedure, improves speed of application, and the positioning of column and column is more accurate, is
Subsequent structural construction is brought convenience.
(3) pre-embedded steel slab makes any position of column that can pass through pre-buried steel in column used in the utility model
Plate is to connect, therefore the vertical link position of lower prop can according to need setting on the utility model.
(4) in column used in the utility model pre-embedded steel slab make any position of column can by steel plate come
Connection, therefore the utility model is applicable not only to the node of center pillar and center pillar in prefabricated concrete structure and connects, and is applicable in
The node of side column and side column connects in prefabricated concrete structure.
Certainly, any product for implementing the utility model does not necessarily require achieving all the advantages described above at the same time.
Detailed description of the invention
It, below will be to required in embodiment description in order to illustrate more clearly of the technical solution of the utility model embodiment
The attached drawing used is briefly described, it is therefore apparent that and the drawings in the following description are merely some embodiments of the present invention,
For those skilled in the art, without creative efforts, other be can also be obtained according to these attached drawings
Attached drawing.In attached drawing:
Fig. 1 is the utility model prefabricated concrete structure column and column rigid connection node outside drawing;
Fig. 2 is the utility model prefabricated concrete structure column and column rigid connection node schematic three dimensional views;
Fig. 3 is the utility model prefabricated concrete structure column and column rigid connection node schematic diagram;
Fig. 4 is the A-A sectional view of the utility model prefabricated concrete structure column and column rigid connection node;
Fig. 5 is the B-B sectional view of the utility model prefabricated concrete structure column and column rigid connection node.
Specific embodiment
Prefabricated concrete structure column provided by the utility model and column rigid connection are saved below with reference to Fig. 1 to Fig. 5
Point is described in detail, and the present embodiment is implemented under premised on technical solutions of the utility model, gives detailed
Embodiment and specific operating process, but the protection scope of the utility model is not limited to the following embodiments, art technology
Personnel can modify and polish to it in the range of not changing the spirit of the present invention and content.
Please refer to Fig. 1 to Fig. 5, a kind of prefabricated concrete structure column and column rigid connection node, including upper section concrete
Column 10 and lower section concrete column 20, the first pre-embedded steel slab 104 of lower end fixed setting of the upper section concrete column 10, described first
The fixed upper cross end plate of section in the lower end of pre-embedded steel slab 104;The upper end fixed setting second of the lower section concrete column 20 is pre-buried
Steel plate 204, the fixed lower cross end plate of section in the upper end of second pre-embedded steel slab 204, the upper cross end plate of section and lower section
Cross end plate is fixedly connected.
In the present embodiment, the area equation of the cross section of upper section concrete column 10 and lower section concrete column 20, therefore, the
The size of one pre-embedded steel slab 104 and the second pre-embedded steel slab 204 is identical and with upper section concrete column 10 and lower section concrete column 20
The area equation of cross section.
It in the present embodiment, include the first vertical muscle 101, the first stirrup 103 and the first built-in fitting in upper section concrete column 10
Dowel 102, the first stirrup 103 are connected to the outside of the first vertical muscle 101, the first built-in fitting dowel in the upper section concrete column
102 and first vertical muscle 101 be fixedly connected with first pre-embedded steel slab 104;
It include the second vertical muscle 201, the second stirrup 203 and the second built-in fitting dowel 202, the second hoop in lower section concrete column 20
Muscle 203 is connected to the outside of the second vertical muscle 201, the second built-in fitting dowel 202 and the second vertical muscle in the lower section concrete column
201 are fixedly connected with second pre-embedded steel slab 204.
Preferably, several first plug welding holes are set on first pre-embedded steel slab 104, the first built-in fitting dowel 102
It respectively corresponds and is welded in several first plug welding holes with the end of the first vertical muscle 101;
Several second plug welding holes are set on second pre-embedded steel slab 204, and the second built-in fitting dowel 202 and second is vertical
The end of muscle 201, which respectively corresponds, to be welded in several second plug welding holes.
In the present embodiment, the first built-in fitting dowel 102 and the first vertical muscle 101 respectively with first pre-embedded steel slab
104 planes are vertical;
The second built-in fitting dowel 202 and the second vertical muscle 201 are vertical with 204 plane of the second pre-embedded steel slab respectively.
Preferably, the first built-in fitting dowel 102 and the first vertical muscle 101 respectively with first pre-embedded steel slab 104
Junction, which uses, melts groove welding or fillet weld seam;
It adopts the junction of the second built-in fitting dowel 202 and the second vertical muscle 201 respectively with second pre-embedded steel slab 204
With melt groove welding or fillet weld seam.
In the present embodiment, the cross end plate of upper section include with it is vertical simultaneously with first pre-embedded steel slab 104 respectively
The first steel plate 106, the second steel plate 105 and the third steel plate 107 being fixedly connected, second steel plate 105 and third steel plate 107 divide
It is not installed in the two sides of first steel plate 106, second steel plate 105, third steel plate 107 hang down with the first steel plate 106 respectively
Straight is at cross;
The cross end plate of lower section includes the 4th steel that is vertical with second pre-embedded steel slab 204 respectively and being fixedly connected
Plate 206, the 5th steel plate 205 and the 6th steel plate 207, the 5th steel plate 205 and the 6th steel plate 207 are installed in the described 4th respectively
The two sides of steel plate 206, the 5th steel plate 205, the 6th steel plate 207 vertically form with the 4th steel plate 206 cross respectively.
In the present embodiment, the cross end plate of the upper section and the lower cross end plate of section are completely overlapped.That is the first steel plate 106
Identical with the structure size of the second steel plate 105, the second steel plate 105 is identical with the structure size of the 5th steel plate 205, third steel plate
107 is identical with the structure size of the 6th steel plate 207.
In the present embodiment, first steel plate 106, the second steel plate 105 and third steel plate 107 are pre-buried with described first
The junction of steel plate 104, which uses, melts groove welding or fillet weld seam;
First steel plate 106, the second steel plate 105 are used with the junction of the third steel plate 107 respectively melts groove
Welding or fillet weld seam;
4th steel plate 206, the connection of the 5th steel plate 205 and the 6th steel plate 207 with second pre-embedded steel slab 204
Place, which uses, melts groove welding or fillet weld seam;
5th steel plate 205 and the 6th steel plate 207 are used with the junction of the 4th steel plate 206 respectively melts groove
Welding or fillet weld seam.
In the present embodiment, if the outside of the cross end plate of the upper section and the lower cross end plate of section also passes through connection dry side
Plate 30 between the first pre-embedded steel slab 104, the second pre-embedded steel slab 204, the cross end plate of upper section and the lower cross end plate of section to form
Inside is with cross closed box structure.Specific structure is as follows:
It include four side plate groups in this closed body structure, each side plate group includes both side plate 30, both side plate 30
Side is vertically fixedly connected, the upper and lower ends of each side plate group respectively with first pre-embedded steel slab 104 and the second pre-embedded steel slab
204 are fixedly connected, and the left and right ends of each side plate group are fixed with the upper cross end plate of section and the lower cross end plate of section respectively
Connection.
Further, the both side plate in each side plate group, which uses, melts groove welding or fillet weld seam;
Each side plate is all made of with the connection of the cross end plate of upper section and the lower cross end plate of section respectively melts groove welding
Or fillet weld seam;
Each side plate 30 is all made of with the junction of first pre-embedded steel slab 104 and the second pre-embedded steel slab 204 respectively to be melted
Saturating groove welding or fillet weld seam.
In the present embodiment, the outer end face of the cross end plate of upper section is flushed with the outer end face of the first pre-embedded steel slab 104, lower section
The outer end face of cross end plate is flushed with the outer end face of the second pre-embedded steel slab 204;
The lateral surface of side plate 30 is flushed with the outer end face of the first pre-embedded steel slab 104 and the second pre-embedded steel slab 204 respectively, and
It is flushed respectively with the outer end face of the cross end plate of upper section and the lower cross end plate of section.
The utility model also provides the construction method of a kind of prefabricated concrete structure column and column rigid connection node, including
Following steps:
Firstly, the first pre-embedded steel slab is shelved in the template of upper section concrete column by the position according to design code, then arrange
Put the first vertical muscle, the first stirrup in component, after whole reinforcing bars bindings by the first pre-embedded steel slab respectively with the first vertical muscle, first
Together, casting concrete is simultaneously welded in the first pre-embedded steel slab by designated position and saves cross end plate the plug welding of built-in fitting dowel;
Secondly, the second pre-embedded steel slab is shelved in the template of lower section concrete column by the position according to design code, then arrange
Put the second vertical muscle, the second stirrup in component, after whole reinforcing bars bindings by the second pre-embedded steel slab respectively with the second vertical muscle, second
Together, casting concrete simultaneously saves cross end plate in the case where the second pre-embedded steel slab is welded by designated position to the plug welding of built-in fitting dowel;
Finally, upper section concrete column and lower section concrete column are transported to position as defined in Site Design, and by upper section cross
Type end plate and the lower cross end plate of section weld together, then with eight side plates respectively with the first built-in fitting steel plate, upper section cross
Type end plate, the cross end plate of lower section and the welding of the second built-in fitting steel plate are internal with closed box structure cruciferous to be formed,
With closed box structure cruciferous without casting concrete inside this;
The first two steps in no particular order sequence.
The utility model proposes a kind of prefabricated concrete structure column column rigid connection node form, basis in the design
Structural bearing capacity and deformation requirements determine section and the arrangement of reinforcement of assembly concrete component column.Pre-embedded steel slab plate thickness, dowel number
Amount, dowel diameter are designed according to the ultimate bearing capacity of column.
Illustrate use process by taking prefabricated concrete structure column rigid connection as an example, the prefabricated concrete structure center pillar
Section is 400 × 400, and Vertical Reinforcement is the reinforcing bar of 4 Ф 25 in column, and stirrup is 8@100 of Ф, double limb hoops.Styletable built-in fitting
Steel plate is 400mm × 400mm, with a thickness of 20mm.The dowel of styletable built-in fitting totally 8, diameter 22mm, along column section direction each 2
Root.Cross steel plate includes that 2 length are 400mm, a height of 200mm, thickness 30mm;4 length are 185mm, a height of 200mm,
Thickness is 30mm;Peripheral containment box-shaped steel plate includes that 4 length are 185mm, a height of 200mm, thickness 30mm, and 4 length are
155mm, a height of 200mm, thickness 30mm are detailed in attached drawing.
Disclosed above is only the specific embodiment of the application, and however, this application is not limited to this, any this field
Technical staff can think variation, should all fall in the protection domain of the application.
Claims (11)
1. a kind of prefabricated concrete structure column and column rigid connection node, which is characterized in that including upper section concrete column under
Save concrete column, the lower end of the upper section concrete column is fixedly installed one first pre-embedded steel slab, under first pre-embedded steel slab
It holds and saves cross end plate on fixed one;One second pre-embedded steel slab of upper end fixed setting of the lower section concrete column, described second
The upper end of pre-embedded steel slab is fixed once to save cross end plate, the upper cross end plate of section and the fixed company of the cross end plate of lower section
It connects.
2. prefabricated concrete structure column as described in claim 1 and column rigid connection node, which is characterized in that the upper section
The first built-in fitting dowel and the first vertical muscle in concrete column are fixedly connected with first pre-embedded steel slab;
The second built-in fitting dowel and the second vertical muscle in the lower section concrete column are fixedly connected with second pre-embedded steel slab.
3. prefabricated concrete structure column as claimed in claim 2 and column rigid connection node, which is characterized in that described first
Several first plug welding holes are set on pre-embedded steel slab, and the end of the first built-in fitting dowel and the first vertical muscle, which respectively corresponds, to be welded on
In several first plug welding holes;
Several second plug welding holes, the end part of the second built-in fitting dowel and the second vertical muscle are set on second pre-embedded steel slab
It Dui Ying not be welded in several second plug welding holes.
4. prefabricated concrete structure column as claimed in claim 2 and column rigid connection node, which is characterized in that described first
Built-in fitting dowel and the first vertical muscle are vertical with the first pre-embedded steel slab plane respectively;
The second built-in fitting dowel and the second vertical muscle are vertical with the second pre-embedded steel slab plane respectively.
5. prefabricated concrete structure column as claimed in claim 2 and column rigid connection node, which is characterized in that described first
Built-in fitting dowel and the first vertical muscle are used with the junction of first pre-embedded steel slab respectively melts groove welding or fillet welding seam weld
It connects;
The second built-in fitting dowel and the second vertical muscle are used with the junction of second pre-embedded steel slab respectively melts groove welding
It connects or fillet weld seam.
6. prefabricated concrete structure column as described in claim 1 and column rigid connection node, which is characterized in that the upper section
Cross end plate includes and the first steel plate, the second steel plate and third vertical with first pre-embedded steel slab respectively and be fixedly connected
Steel plate, second steel plate and third steel plate are installed in the two sides of first steel plate, second steel plate, third steel plate respectively
It is vertically formed respectively with the first steel plate cross;
The cross end plate of lower section includes the 4th steel plate that is vertical with second pre-embedded steel slab respectively and being fixedly connected, the 5th
Steel plate and the 6th steel plate, the 5th steel plate and the 6th steel plate are installed in the two sides of the 4th steel plate, the 5th steel respectively
Plate, the 6th steel plate vertically form with the 4th steel plate cross respectively.
7. prefabricated concrete structure column as claimed in claim 6 and column rigid connection node, which is characterized in that the upper section
Cross end plate and the lower cross end plate of section are completely overlapped.
8. prefabricated concrete structure column as claimed in claim 6 and column rigid connection node, which is characterized in that described first
Steel plate, the second steel plate and third steel plate, which are used with the junction of first pre-embedded steel slab, melts groove welding or fillet welding seam weld
It connects;
First steel plate, the second steel plate are used with the junction of the third steel plate respectively melts groove welding or fillet welding seam weld
It connects;
4th steel plate, the 5th steel plate and the 6th steel plate, which are used with the junction of second pre-embedded steel slab, melts groove welding
It connects or fillet weld seam;
5th steel plate and the 6th steel plate are used with the junction of the 4th steel plate respectively melts groove welding or fillet weld
Welding.
9. prefabricated concrete structure column as claimed in claim 6 and column rigid connection node, which is characterized in that the upper section
The outside of cross end plate and the lower cross end plate of section also pass through several side plates of connection with the first pre-embedded steel slab, the second pre-buried steel
Closed body structure is formed between plate, the cross end plate of upper section and the lower cross end plate of section.
10. prefabricated concrete structure column as claimed in claim 9 and column rigid connection node, which is characterized in that including four
A side plate group, each side plate group include both side plate, and the side of both side plate is vertically fixedly connected, the upper and lower ends point of each side plate group
Be not fixedly connected with first pre-embedded steel slab and the second pre-embedded steel slab, the left and right ends of each side plate group respectively with the upper section
Cross end plate is fixedly connected with the lower cross end plate of section.
11. prefabricated concrete structure column as claimed in claim 10 and column rigid connection node, which is characterized in that each side
Both side plate in board group, which uses, melts groove welding or fillet weld seam;
Each side plate is all made of with the connection of the cross end plate of upper section and the lower cross end plate of section respectively melts groove welding or angle
Weld seam welding;
Each side plate be all made of respectively with the junction of first pre-embedded steel slab and the second pre-embedded steel slab melt groove welding or
Fillet weld seam.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821100231.XU CN208501880U (en) | 2018-07-11 | 2018-07-11 | Prefabricated concrete structure column and column rigid connection node |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821100231.XU CN208501880U (en) | 2018-07-11 | 2018-07-11 | Prefabricated concrete structure column and column rigid connection node |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208501880U true CN208501880U (en) | 2019-02-15 |
Family
ID=65284620
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821100231.XU Expired - Fee Related CN208501880U (en) | 2018-07-11 | 2018-07-11 | Prefabricated concrete structure column and column rigid connection node |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208501880U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108755950A (en) * | 2018-07-11 | 2018-11-06 | 上海应用技术大学 | Prefabricated concrete structure column and column rigid connection node and construction method |
CN111877831A (en) * | 2020-07-27 | 2020-11-03 | 上海应用技术大学 | Assembled prefabricated column splicing type rigid connecting node and construction method |
CN112709329A (en) * | 2020-12-28 | 2021-04-27 | 浙江精工钢结构集团有限公司 | Steel column butt joint installation three-axis adjusting device and construction method thereof |
-
2018
- 2018-07-11 CN CN201821100231.XU patent/CN208501880U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108755950A (en) * | 2018-07-11 | 2018-11-06 | 上海应用技术大学 | Prefabricated concrete structure column and column rigid connection node and construction method |
CN111877831A (en) * | 2020-07-27 | 2020-11-03 | 上海应用技术大学 | Assembled prefabricated column splicing type rigid connecting node and construction method |
CN112709329A (en) * | 2020-12-28 | 2021-04-27 | 浙江精工钢结构集团有限公司 | Steel column butt joint installation three-axis adjusting device and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107143034A (en) | A kind of assembly concrete frame structure beam column rigid connection node | |
CN108755950A (en) | Prefabricated concrete structure column and column rigid connection node and construction method | |
CN204876059U (en) | Prefabricated assembled shaped steel concrete frame structure system | |
CN108571071A (en) | Prefabricated PC beams of concrete column connected node and construction method | |
CN111997193A (en) | Assembly type prefabricated beam column connecting joint and construction method | |
CN208501880U (en) | Prefabricated concrete structure column and column rigid connection node | |
CN104790522A (en) | Prefabricated assembling type steel-reinforced concrete column-steel beam frame structure system and construction method | |
CN109083308B (en) | Anti-seismic prefabricated assembly type wall and construction method thereof | |
CN207553289U (en) | A kind of assembled steel and concrete frame space modular structure and system | |
CN108532796A (en) | Assembly concrete shear wall and face inner beam rigid connection node and construction method | |
CN107060104B (en) | Assembled steel frame concrete box type unit structure system and construction method thereof | |
CN108756038A (en) | Assembly concrete shear wall and floor support plate rigid connection node and construction method | |
CN107165274B (en) | A kind of more high-rise assembled modularization Self-resetting steel construction H profile steel column frame systems | |
CN205954965U (en) | Novel node of light -duty floor of steel skeleton | |
CN208586747U (en) | Prefabricated PC beams of concrete column connected node | |
CN208899692U (en) | Beam rigid connection node outside assembly concrete shear wall and face | |
CN212427508U (en) | Dry-type connected node of assembled concrete beam column | |
CN113482152A (en) | Assembled steel node | |
CN208899691U (en) | Assembly concrete shear wall and face inner beam rigid connection node | |
CN206428805U (en) | A kind of concrete prefabricated balcony of assembled steel | |
CN209011400U (en) | Assembly concrete shear wall and floor support plate rigid connection node | |
CN111809729A (en) | Dry-type connected node of assembled concrete beam column | |
CN107119800A (en) | A kind of many high-rise assembled modularization Self-resetting steel construction square tube post frame systems | |
CN108755949A (en) | Assembly concrete girder and time beam connecting node and construction method | |
CN203846660U (en) | Prefabricated assembled type open-web net rack for reinforced concrete |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190215 Termination date: 20200711 |