CN211498946U - Utility tunnel hoist and mount hole block structure - Google Patents

Utility tunnel hoist and mount hole block structure Download PDF

Info

Publication number
CN211498946U
CN211498946U CN201921877027.3U CN201921877027U CN211498946U CN 211498946 U CN211498946 U CN 211498946U CN 201921877027 U CN201921877027 U CN 201921877027U CN 211498946 U CN211498946 U CN 211498946U
Authority
CN
China
Prior art keywords
steel
pipe
layer
steel pipe
bidirectional
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921877027.3U
Other languages
Chinese (zh)
Inventor
朱明雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921877027.3U priority Critical patent/CN211498946U/en
Application granted granted Critical
Publication of CN211498946U publication Critical patent/CN211498946U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model provides a comprehensive pipe gallery lifting hole plugging structure, which comprises pipe joints, a bidirectional reinforcing mesh, a lifting assembly, a reinforcing ring, a polymer cement mortar layer, a sealing adhesive layer, a waterproof structure layer and an additional waterproof layer; the pipe joints are of a prefabricated waterproof concrete structure, and bidirectional reinforcing steel bar meshes are arranged in the pipe joints; the hoisting assembly comprises a steel pipe, a steel bottom plate, a steel hoisting ring and a steel bar hook; the steel pipe is embedded in the pipe joint, the steel bar hooks are welded on two sides of the bidirectional steel bar mesh on the outer wall of the steel pipe, and the steel bar hooks on the two sides of the bidirectional steel bar mesh are staggered with each other; a reinforcing bar ring is welded between the reinforcing bar hook and the bidirectional reinforcing bar net; the bottom of the steel pipe is welded with a steel bottom plate, and the middle part of the steel bottom plate is also welded with a steel hanging ring; after the pipe joints are hoisted, a polymer cement mortar layer is filled in the steel pipe, and a sealing adhesive layer is sprayed at the outer end of the steel pipe; the utility model discloses utility tunnel hole for hoist block structure increases substantially the water-proof effects of hole for hoist department, has reduced the not hard up possibility of hole for hoist department.

Description

Utility tunnel hoist and mount hole block structure
Technical Field
The utility model relates to a utility tunnel engineering field especially relates to a utility tunnel hole for hoist block structure.
Background
Utility tunnel refers to builds a tunnel space that collects electric power, communication, gas, heat supply, engineering such as plumbing as an organic whole in city underground, important infrastructure and lifeline that ensure city operation, current utility tunnel is mostly formed by the concatenation of prefabricated tube coupling, however because the weight of prefabricated tube coupling is great, it is not hard up easily to appear in its hole for hoist department, and constructor only often packs cement mortar in hole for hoist department when carrying out prefabricated tube coupling outer wall waterproof construction, in case the waterproof system of this department is invalid, the percolating water is very easily inside getting into the tube coupling from this department.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to prior art's defect and not enough, provide a utility tunnel hole for hoist block structure, this utility tunnel hole for hoist block structure increases substantially the water-proof effects of hole for hoist department, has reduced the not hard up possibility of hole for hoist department.
In order to achieve the above object, the utility model adopts the following technical scheme: a comprehensive pipe gallery hoisting hole plugging structure comprises pipe joints, a bidirectional reinforcing mesh, a hoisting assembly, reinforcing rings, a polymer cement mortar layer, a sealing adhesive layer, a waterproof structure layer and an additional waterproof layer; the pipe joints are of a prefabricated waterproof concrete structure, and bidirectional reinforcing steel bar meshes are arranged in the pipe joints; the hoisting assembly comprises a steel pipe, a steel bottom plate, a steel hoisting ring and a steel bar hook; the steel pipe is embedded in the pipe joint, the steel bar hooks are welded on two sides of the bidirectional steel bar mesh on the outer wall of the steel pipe, and the steel bar hooks on the two sides of the bidirectional steel bar mesh are staggered with each other; a reinforcing bar ring is welded between the reinforcing bar hook and the bidirectional reinforcing bar net; the bottom of the steel pipe is welded with a steel bottom plate, and the middle part of the steel bottom plate is also welded with a steel hanging ring; after the pipe joints are hoisted, a polymer cement mortar layer is filled in the steel pipe, and a sealing adhesive layer is sprayed at the outer end of the steel pipe; the outer wall of the pipe joint is also laid with a waterproof structure layer which sequentially comprises a high-molecular self-adhesive waterproof coil material layer, a petroleum asphalt felt isolating layer and a fine aggregate concrete protective layer from inside to outside; an additional waterproof layer is further laid between the outer wall of the pipe joint and the high-molecular self-adhesive waterproof coil material layer at the position of the steel pipe, and the distance between the outer end of the additional waterproof layer and the outer wall of the steel pipe is 100-200 mm.
Preferably, the outer end of the polymer cement mortar layer is provided with an angle joint on the inner wall of the steel pipe.
Preferably, the outer end of the steel bottom plate extends 50-100mm beyond the outer wall of the steel pipe.
The utility model has the advantages that: the comprehensive pipe gallery lifting hole plugging structure is characterized in that a sealing adhesive layer and an additional waterproof layer are arranged at the outer end of a steel pipe, and the sealing performance of the sealing adhesive layer is improved by reserving an angle seam at the outer end of a polymer cement mortar layer, so that the waterproof effect at the lifting hole is greatly improved; the steel bar hooks are welded on two sides of the two-way steel bar mesh on the outer wall of the steel pipe, and the steel bar rings are welded between the steel bar hooks and the two-way steel bar mesh, so that the connection performance of the steel pipe and the pipe joints is enhanced, the bearing capacity of the steel hanging ring is improved, and the possibility of looseness of the hoisting hole is reduced.
Drawings
Fig. 1 is utility tunnel hole of hoist block structure schematic diagram.
Wherein: the concrete waterproof structure comprises a pipe joint 1, a bidirectional reinforcing mesh 2, a hoisting component 3, a steel pipe 31, a steel bottom plate 32, a steel hoisting ring 33, a reinforcing hook 34, a reinforcing ring 4, a polymer cement mortar layer 5, a sealing adhesive layer 6, a waterproof structure layer 7, a high-molecular self-adhesion waterproof roll layer 71, a petroleum asphalt felt isolation layer 72, a fine aggregate concrete protection layer 73 and an additional waterproof layer 8.
Detailed Description
The present invention will be described in further detail with reference to fig. 1.
As shown in fig. 1, a comprehensive pipe gallery lifting hole plugging structure comprises pipe joints 1, a bidirectional reinforcing mesh 2, a lifting component 3, a reinforcing ring 4, a polymer cement mortar layer 5, a sealing adhesive layer 6, a waterproof structure layer 7 and an additional waterproof layer 8; the pipe joint 1 is of a prefabricated waterproof concrete structure, and a bidirectional reinforcing mesh 2 is arranged in the pipe joint 1; the hoisting assembly 3 comprises a steel pipe 31, a steel bottom plate 32, a steel hoisting ring 33 and a steel bar hook 34; the steel pipe 31 is pre-buried in the pipe joint 1, the steel bar hooks 34 are welded on two sides of the bidirectional steel bar mesh 2 on the outer wall of the steel pipe 31, and the steel bar hooks 34 on two sides of the bidirectional steel bar mesh 2 are staggered with each other; a reinforcing bar ring 4 is welded between the reinforcing bar hook 34 and the bidirectional reinforcing bar net 2; a steel bottom plate 32 is welded at the bottom of the steel pipe 31, and a steel hanging ring 33 is welded in the middle of the steel bottom plate 32; after the pipe joint 1 is hoisted, a polymer cement mortar layer 5 is filled in the steel pipe 31, and a sealing glue layer 6 is sprayed at the outer end of the steel pipe 31; the outer wall of the pipe joint 1 is further paved with a waterproof structure layer 7, and the waterproof structure layer 7 sequentially comprises a high-molecular self-adhesive waterproof roll material layer 71, a petroleum asphalt felt isolation layer 72 and a fine aggregate concrete protective layer 73 from inside to outside; an additional waterproof layer 8 is further paved at the position of the steel pipe 31 between the outer wall of the pipe joint 1 and the macromolecule self-adhesive waterproof roll material layer 71, and the distance between the outer end of the additional waterproof layer 8 and the outer wall of the steel pipe 31 is 150 mm.
In specific implementation, the outer end of the polymer cement mortar layer 5 is provided with an angle seam on the inner wall of the steel pipe 31.
In specific implementation, the outer end of the steel bottom plate 32 extends out of the outer wall of the steel pipe 31 by 90 mm.

Claims (3)

1. The utility model provides a utility tunnel hoist and mount hole block structure which characterized in that: comprises pipe joints, a bidirectional reinforcing mesh, a hoisting assembly, reinforcing rings, a polymer cement mortar layer, a sealing adhesive layer, a waterproof structure layer and an additional waterproof layer; the pipe joints are of a prefabricated waterproof concrete structure, and bidirectional reinforcing steel bar meshes are arranged in the pipe joints; the hoisting assembly comprises a steel pipe, a steel bottom plate, a steel hoisting ring and a steel bar hook; the steel pipe is embedded in the pipe joint, the steel bar hooks are welded on two sides of the bidirectional steel bar mesh on the outer wall of the steel pipe, and the steel bar hooks on the two sides of the bidirectional steel bar mesh are staggered with each other; a reinforcing bar ring is welded between the reinforcing bar hook and the bidirectional reinforcing bar net; the bottom of the steel pipe is welded with a steel bottom plate, and the middle part of the steel bottom plate is also welded with a steel hanging ring; after the pipe joints are hoisted, a polymer cement mortar layer is filled in the steel pipe, and a sealing adhesive layer is sprayed at the outer end of the steel pipe; the outer wall of the pipe joint is also laid with a waterproof structure layer which sequentially comprises a high-molecular self-adhesive waterproof coil material layer, a petroleum asphalt felt isolating layer and a fine aggregate concrete protective layer from inside to outside; an additional waterproof layer is further laid between the outer wall of the pipe joint and the high-molecular self-adhesive waterproof coil material layer at the position of the steel pipe, and the distance between the outer end of the additional waterproof layer and the outer wall of the steel pipe is 100-200 mm.
2. The utility model provides a utility tunnel hole for hoist block structure of claim 1, its characterized in that: and an angle joint is reserved at the outer end of the polymer cement mortar layer on the inner wall of the steel pipe.
3. The utility model provides a utility tunnel hole for hoist block structure of claim 1, its characterized in that: the outer end of the steel bottom plate extends 50-100mm out of the outer wall of the steel pipe.
CN201921877027.3U 2019-11-01 2019-11-01 Utility tunnel hoist and mount hole block structure Expired - Fee Related CN211498946U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921877027.3U CN211498946U (en) 2019-11-01 2019-11-01 Utility tunnel hoist and mount hole block structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921877027.3U CN211498946U (en) 2019-11-01 2019-11-01 Utility tunnel hoist and mount hole block structure

Publications (1)

Publication Number Publication Date
CN211498946U true CN211498946U (en) 2020-09-15

Family

ID=72408393

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921877027.3U Expired - Fee Related CN211498946U (en) 2019-11-01 2019-11-01 Utility tunnel hoist and mount hole block structure

Country Status (1)

Country Link
CN (1) CN211498946U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113152532A (en) * 2021-04-15 2021-07-23 中国能源建设集团广东省电力设计研究院有限公司 Detachable device and method for plugging hoisting hole of underground substation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113152532A (en) * 2021-04-15 2021-07-23 中国能源建设集团广东省电力设计研究院有限公司 Detachable device and method for plugging hoisting hole of underground substation

Similar Documents

Publication Publication Date Title
CN101985882B (en) Construction method of rigid primary support of mould-building concrete of plateau permafrost tunnel
CN205276316U (en) Modular prefabricated piping lane
CN104805866A (en) Prefabricated comprehensive pipe gallery and construction method
CN106869548B (en) A kind of newel frame assembled underground parking structural system and construction method
CN102966114A (en) Tower crane foundation structure and construction method thereof
CN105862990B (en) A kind of prefabrication and assembly construction shaft wall structure and its construction method
CN204753627U (en) Prefabricated comprehensive piping lane
CN202787334U (en) Sealing structure of deep well casing used during tunnel construction
CN110485430A (en) A kind of interlocking pile combines foundation pit supporting method with ground-connecting-wall
CN202660067U (en) Waterproof sleeve preventing wall body leakage
CN108590681A (en) Shield well reserving hole quick blocking system and its construction method
CN109914474A (en) A kind of pipe gallery U-type groove, which is excavated, presses push construction method
CN112832279A (en) Waterproof structure and method for dewatering well of underground foundation pit
CN211498946U (en) Utility tunnel hoist and mount hole block structure
CN106869174A (en) A kind of U-shaped Combined type concrete prefabricated box culvert
CN210163948U (en) Construction system for pouring post-cast strip of basement roof
CN104652495B (en) Internal support of foundation pit column and base plate node waterproof construction technology
CN203546759U (en) Plugging structure for post-cast strip of underground building
CN203007974U (en) Tower crane foundation structure
CN107152034B (en) Comprehensive pipe rack and construction method thereof
CN211498947U (en) Utility tunnel hole of hoist waterproof construction that uses repeatedly
CN203412598U (en) Cable-tunnel composite lining waterproof structure
CN204645093U (en) Poured band of outer wall of basement advanced processing constructs
CN203834477U (en) Waterproof structure of anti-floating anchor bars of basement
CN202989919U (en) Pressure-bearing water-sand-layer anchor rod mounting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200915

CF01 Termination of patent right due to non-payment of annual fee