CN211498946U - Utility tunnel hoist and mount hole block structure - Google Patents
Utility tunnel hoist and mount hole block structure Download PDFInfo
- Publication number
- CN211498946U CN211498946U CN201921877027.3U CN201921877027U CN211498946U CN 211498946 U CN211498946 U CN 211498946U CN 201921877027 U CN201921877027 U CN 201921877027U CN 211498946 U CN211498946 U CN 211498946U
- Authority
- CN
- China
- Prior art keywords
- steel
- pipe
- layer
- steel pipe
- bidirectional
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The utility model provides a comprehensive pipe gallery lifting hole plugging structure, which comprises pipe joints, a bidirectional reinforcing mesh, a lifting assembly, a reinforcing ring, a polymer cement mortar layer, a sealing adhesive layer, a waterproof structure layer and an additional waterproof layer; the pipe joints are of a prefabricated waterproof concrete structure, and bidirectional reinforcing steel bar meshes are arranged in the pipe joints; the hoisting assembly comprises a steel pipe, a steel bottom plate, a steel hoisting ring and a steel bar hook; the steel pipe is embedded in the pipe joint, the steel bar hooks are welded on two sides of the bidirectional steel bar mesh on the outer wall of the steel pipe, and the steel bar hooks on the two sides of the bidirectional steel bar mesh are staggered with each other; a reinforcing bar ring is welded between the reinforcing bar hook and the bidirectional reinforcing bar net; the bottom of the steel pipe is welded with a steel bottom plate, and the middle part of the steel bottom plate is also welded with a steel hanging ring; after the pipe joints are hoisted, a polymer cement mortar layer is filled in the steel pipe, and a sealing adhesive layer is sprayed at the outer end of the steel pipe; the utility model discloses utility tunnel hole for hoist block structure increases substantially the water-proof effects of hole for hoist department, has reduced the not hard up possibility of hole for hoist department.
Description
Technical Field
The utility model relates to a utility tunnel engineering field especially relates to a utility tunnel hole for hoist block structure.
Background
Utility tunnel refers to builds a tunnel space that collects electric power, communication, gas, heat supply, engineering such as plumbing as an organic whole in city underground, important infrastructure and lifeline that ensure city operation, current utility tunnel is mostly formed by the concatenation of prefabricated tube coupling, however because the weight of prefabricated tube coupling is great, it is not hard up easily to appear in its hole for hoist department, and constructor only often packs cement mortar in hole for hoist department when carrying out prefabricated tube coupling outer wall waterproof construction, in case the waterproof system of this department is invalid, the percolating water is very easily inside getting into the tube coupling from this department.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to prior art's defect and not enough, provide a utility tunnel hole for hoist block structure, this utility tunnel hole for hoist block structure increases substantially the water-proof effects of hole for hoist department, has reduced the not hard up possibility of hole for hoist department.
In order to achieve the above object, the utility model adopts the following technical scheme: a comprehensive pipe gallery hoisting hole plugging structure comprises pipe joints, a bidirectional reinforcing mesh, a hoisting assembly, reinforcing rings, a polymer cement mortar layer, a sealing adhesive layer, a waterproof structure layer and an additional waterproof layer; the pipe joints are of a prefabricated waterproof concrete structure, and bidirectional reinforcing steel bar meshes are arranged in the pipe joints; the hoisting assembly comprises a steel pipe, a steel bottom plate, a steel hoisting ring and a steel bar hook; the steel pipe is embedded in the pipe joint, the steel bar hooks are welded on two sides of the bidirectional steel bar mesh on the outer wall of the steel pipe, and the steel bar hooks on the two sides of the bidirectional steel bar mesh are staggered with each other; a reinforcing bar ring is welded between the reinforcing bar hook and the bidirectional reinforcing bar net; the bottom of the steel pipe is welded with a steel bottom plate, and the middle part of the steel bottom plate is also welded with a steel hanging ring; after the pipe joints are hoisted, a polymer cement mortar layer is filled in the steel pipe, and a sealing adhesive layer is sprayed at the outer end of the steel pipe; the outer wall of the pipe joint is also laid with a waterproof structure layer which sequentially comprises a high-molecular self-adhesive waterproof coil material layer, a petroleum asphalt felt isolating layer and a fine aggregate concrete protective layer from inside to outside; an additional waterproof layer is further laid between the outer wall of the pipe joint and the high-molecular self-adhesive waterproof coil material layer at the position of the steel pipe, and the distance between the outer end of the additional waterproof layer and the outer wall of the steel pipe is 100-200 mm.
Preferably, the outer end of the polymer cement mortar layer is provided with an angle joint on the inner wall of the steel pipe.
Preferably, the outer end of the steel bottom plate extends 50-100mm beyond the outer wall of the steel pipe.
The utility model has the advantages that: the comprehensive pipe gallery lifting hole plugging structure is characterized in that a sealing adhesive layer and an additional waterproof layer are arranged at the outer end of a steel pipe, and the sealing performance of the sealing adhesive layer is improved by reserving an angle seam at the outer end of a polymer cement mortar layer, so that the waterproof effect at the lifting hole is greatly improved; the steel bar hooks are welded on two sides of the two-way steel bar mesh on the outer wall of the steel pipe, and the steel bar rings are welded between the steel bar hooks and the two-way steel bar mesh, so that the connection performance of the steel pipe and the pipe joints is enhanced, the bearing capacity of the steel hanging ring is improved, and the possibility of looseness of the hoisting hole is reduced.
Drawings
Fig. 1 is utility tunnel hole of hoist block structure schematic diagram.
Wherein: the concrete waterproof structure comprises a pipe joint 1, a bidirectional reinforcing mesh 2, a hoisting component 3, a steel pipe 31, a steel bottom plate 32, a steel hoisting ring 33, a reinforcing hook 34, a reinforcing ring 4, a polymer cement mortar layer 5, a sealing adhesive layer 6, a waterproof structure layer 7, a high-molecular self-adhesion waterproof roll layer 71, a petroleum asphalt felt isolation layer 72, a fine aggregate concrete protection layer 73 and an additional waterproof layer 8.
Detailed Description
The present invention will be described in further detail with reference to fig. 1.
As shown in fig. 1, a comprehensive pipe gallery lifting hole plugging structure comprises pipe joints 1, a bidirectional reinforcing mesh 2, a lifting component 3, a reinforcing ring 4, a polymer cement mortar layer 5, a sealing adhesive layer 6, a waterproof structure layer 7 and an additional waterproof layer 8; the pipe joint 1 is of a prefabricated waterproof concrete structure, and a bidirectional reinforcing mesh 2 is arranged in the pipe joint 1; the hoisting assembly 3 comprises a steel pipe 31, a steel bottom plate 32, a steel hoisting ring 33 and a steel bar hook 34; the steel pipe 31 is pre-buried in the pipe joint 1, the steel bar hooks 34 are welded on two sides of the bidirectional steel bar mesh 2 on the outer wall of the steel pipe 31, and the steel bar hooks 34 on two sides of the bidirectional steel bar mesh 2 are staggered with each other; a reinforcing bar ring 4 is welded between the reinforcing bar hook 34 and the bidirectional reinforcing bar net 2; a steel bottom plate 32 is welded at the bottom of the steel pipe 31, and a steel hanging ring 33 is welded in the middle of the steel bottom plate 32; after the pipe joint 1 is hoisted, a polymer cement mortar layer 5 is filled in the steel pipe 31, and a sealing glue layer 6 is sprayed at the outer end of the steel pipe 31; the outer wall of the pipe joint 1 is further paved with a waterproof structure layer 7, and the waterproof structure layer 7 sequentially comprises a high-molecular self-adhesive waterproof roll material layer 71, a petroleum asphalt felt isolation layer 72 and a fine aggregate concrete protective layer 73 from inside to outside; an additional waterproof layer 8 is further paved at the position of the steel pipe 31 between the outer wall of the pipe joint 1 and the macromolecule self-adhesive waterproof roll material layer 71, and the distance between the outer end of the additional waterproof layer 8 and the outer wall of the steel pipe 31 is 150 mm.
In specific implementation, the outer end of the polymer cement mortar layer 5 is provided with an angle seam on the inner wall of the steel pipe 31.
In specific implementation, the outer end of the steel bottom plate 32 extends out of the outer wall of the steel pipe 31 by 90 mm.
Claims (3)
1. The utility model provides a utility tunnel hoist and mount hole block structure which characterized in that: comprises pipe joints, a bidirectional reinforcing mesh, a hoisting assembly, reinforcing rings, a polymer cement mortar layer, a sealing adhesive layer, a waterproof structure layer and an additional waterproof layer; the pipe joints are of a prefabricated waterproof concrete structure, and bidirectional reinforcing steel bar meshes are arranged in the pipe joints; the hoisting assembly comprises a steel pipe, a steel bottom plate, a steel hoisting ring and a steel bar hook; the steel pipe is embedded in the pipe joint, the steel bar hooks are welded on two sides of the bidirectional steel bar mesh on the outer wall of the steel pipe, and the steel bar hooks on the two sides of the bidirectional steel bar mesh are staggered with each other; a reinforcing bar ring is welded between the reinforcing bar hook and the bidirectional reinforcing bar net; the bottom of the steel pipe is welded with a steel bottom plate, and the middle part of the steel bottom plate is also welded with a steel hanging ring; after the pipe joints are hoisted, a polymer cement mortar layer is filled in the steel pipe, and a sealing adhesive layer is sprayed at the outer end of the steel pipe; the outer wall of the pipe joint is also laid with a waterproof structure layer which sequentially comprises a high-molecular self-adhesive waterproof coil material layer, a petroleum asphalt felt isolating layer and a fine aggregate concrete protective layer from inside to outside; an additional waterproof layer is further laid between the outer wall of the pipe joint and the high-molecular self-adhesive waterproof coil material layer at the position of the steel pipe, and the distance between the outer end of the additional waterproof layer and the outer wall of the steel pipe is 100-200 mm.
2. The utility model provides a utility tunnel hole for hoist block structure of claim 1, its characterized in that: and an angle joint is reserved at the outer end of the polymer cement mortar layer on the inner wall of the steel pipe.
3. The utility model provides a utility tunnel hole for hoist block structure of claim 1, its characterized in that: the outer end of the steel bottom plate extends 50-100mm out of the outer wall of the steel pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921877027.3U CN211498946U (en) | 2019-11-01 | 2019-11-01 | Utility tunnel hoist and mount hole block structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921877027.3U CN211498946U (en) | 2019-11-01 | 2019-11-01 | Utility tunnel hoist and mount hole block structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211498946U true CN211498946U (en) | 2020-09-15 |
Family
ID=72408393
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921877027.3U Expired - Fee Related CN211498946U (en) | 2019-11-01 | 2019-11-01 | Utility tunnel hoist and mount hole block structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211498946U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113152532A (en) * | 2021-04-15 | 2021-07-23 | 中国能源建设集团广东省电力设计研究院有限公司 | Detachable device and method for plugging hoisting hole of underground substation |
-
2019
- 2019-11-01 CN CN201921877027.3U patent/CN211498946U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113152532A (en) * | 2021-04-15 | 2021-07-23 | 中国能源建设集团广东省电力设计研究院有限公司 | Detachable device and method for plugging hoisting hole of underground substation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101985882B (en) | Construction method of rigid primary support of mould-building concrete of plateau permafrost tunnel | |
CN205276316U (en) | Modular prefabricated piping lane | |
CN104805866A (en) | Prefabricated comprehensive pipe gallery and construction method | |
CN106869548B (en) | A kind of newel frame assembled underground parking structural system and construction method | |
CN102966114A (en) | Tower crane foundation structure and construction method thereof | |
CN105862990B (en) | A kind of prefabrication and assembly construction shaft wall structure and its construction method | |
CN204753627U (en) | Prefabricated comprehensive piping lane | |
CN202787334U (en) | Sealing structure of deep well casing used during tunnel construction | |
CN110485430A (en) | A kind of interlocking pile combines foundation pit supporting method with ground-connecting-wall | |
CN202660067U (en) | Waterproof sleeve preventing wall body leakage | |
CN108590681A (en) | Shield well reserving hole quick blocking system and its construction method | |
CN109914474A (en) | A kind of pipe gallery U-type groove, which is excavated, presses push construction method | |
CN112832279A (en) | Waterproof structure and method for dewatering well of underground foundation pit | |
CN211498946U (en) | Utility tunnel hoist and mount hole block structure | |
CN106869174A (en) | A kind of U-shaped Combined type concrete prefabricated box culvert | |
CN210163948U (en) | Construction system for pouring post-cast strip of basement roof | |
CN104652495B (en) | Internal support of foundation pit column and base plate node waterproof construction technology | |
CN203546759U (en) | Plugging structure for post-cast strip of underground building | |
CN203007974U (en) | Tower crane foundation structure | |
CN107152034B (en) | Comprehensive pipe rack and construction method thereof | |
CN211498947U (en) | Utility tunnel hole of hoist waterproof construction that uses repeatedly | |
CN203412598U (en) | Cable-tunnel composite lining waterproof structure | |
CN204645093U (en) | Poured band of outer wall of basement advanced processing constructs | |
CN203834477U (en) | Waterproof structure of anti-floating anchor bars of basement | |
CN202989919U (en) | Pressure-bearing water-sand-layer anchor rod mounting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200915 |
|
CF01 | Termination of patent right due to non-payment of annual fee |