CN211473454U - Shear wall template positioning device based on BIM - Google Patents

Shear wall template positioning device based on BIM Download PDF

Info

Publication number
CN211473454U
CN211473454U CN201922023209.0U CN201922023209U CN211473454U CN 211473454 U CN211473454 U CN 211473454U CN 201922023209 U CN201922023209 U CN 201922023209U CN 211473454 U CN211473454 U CN 211473454U
Authority
CN
China
Prior art keywords
positioning
bim
riser
shear wall
wall template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922023209.0U
Other languages
Chinese (zh)
Inventor
路平
余兴涛
闵立勇
陈永飞
樊帅博
王思贵
何洋洋
陈海桥
沈谋公
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Yijian Group Co Ltd
Original Assignee
Zhengzhou Yijian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Yijian Group Co Ltd filed Critical Zhengzhou Yijian Group Co Ltd
Priority to CN201922023209.0U priority Critical patent/CN211473454U/en
Application granted granted Critical
Publication of CN211473454U publication Critical patent/CN211473454U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a shear force wall template positioner based on BIM, including reinforcing bar bed frame and the shell slab that is located reinforcing bar bed frame both sides, reinforcing bar bed frame is built by mutually perpendicular vertical muscle and horizontal muscle, still includes the positioner that is located reinforcing bar bed frame bottom, positioner includes the locating piece, is equipped with the locating lever respectively in the middle part position of the left and right sides of locating piece, one end of locating lever is located the locating piece, the other end is located the outside of locating piece and contacts with the shell slab; two positioning grooves are formed in the front side of the positioning block, and the longitudinal ribs are clamped in the positioning grooves. Both can play fine fixed action to the structure of whole shear wall template, need not weld the reinforcing bar head again and prop with the location, save material and manpower, apart from adjustment convenient and fast, can effectively improve site operation efficiency.

Description

Shear wall template positioning device based on BIM
Technical Field
The utility model belongs to the technical field of the wall post construction, concretely relates to shear force wall template positioner based on BIM.
Background
Need set up the template earlier before building construction pours shear wall post, and fix a position at the root of template, however the fixed comparison difficulty of shear wall post template, in the construction stage, present wall post location mainly relies on pre-buried reinforcing bar head, the mode that welding position propped is fixed a position the shear wall again, however this kind of construction mode need use a large amount of reinforcing bars, and still need cut the reinforcing bar, weld the tie point again, not only extravagant reinforcing bar, still need professional welder to weld, the complicated extravagant manpower of operation, bring very big inconvenience for the site operation. And along with the development of society, the trade is to the improvement that construction cost saving required, and present construction methods hardly satisfies the building demand, consequently urgently needs a more simple and convenient, and this problem is solved to the positioner that the cost is practiced thrift more.
Disclosure of Invention
To complicated, extravagant manpower of present wall post location operation and reinforcing bar resource, the defect and the problem of the site operation of not being convenient for, the utility model discloses acquire the relevant data of building shear wall according to the BIM technique, provide a shear wall template positioner convenient to construction, saving manpower and cost.
The utility model provides a scheme that its technical problem adopted is: a shear wall template positioning device based on BIM comprises a steel bar base frame and shell plates positioned on two sides of the steel bar base frame, wherein the steel bar base frame is built by vertical bars and transverse bars which are perpendicular to each other; two positioning grooves are formed in the front side of the positioning block, and the longitudinal ribs are clamped in the positioning grooves.
According to the BIM-based shear wall template positioning device, the positioning grooves are symmetrically arranged on the front side of the positioning block along the central axis.
In the BIM-based shear wall template positioning device, the depth of the positioning groove is not more than one half of the width of the positioning block.
The shear wall template positioning device based on the BIM is characterized in that the positioning rod is a positioning screw rod, and a positioning screw tube is sleeved at one end of the positioning rod, which is positioned on the outer side of the positioning block, in a matching manner so as to adjust the distance between the positioning rod and the shell plate.
Foretell shear wall template positioner based on BIM, the reinforcing bar bed frame still includes the strengthening rib of perpendicular to vertical muscle and horizontal muscle, the cross point department of vertical muscle, horizontal muscle and strengthening rib adopts the bundle silk to bind.
The shear wall template positioning device based on the BIM is characterized in that the positioning block is a precast concrete block, the precast concrete block is manufactured by pouring concrete into the positioning block template, the positioning block template comprises a bottom plate, a front vertical plate and a rear vertical plate which are arranged at the front end and the rear end of the bottom plate, and a left vertical plate and a right vertical plate which are arranged at the left end and the right end of the bottom plate, two longitudinal partition plates are arranged on the inner side of the front vertical plate, positioning rods are respectively arranged at the middle parts of the left vertical plate and the right vertical plate, one end of each positioning rod is located on the inner side of the left vertical plate or the right vertical plate, and the other end of.
The utility model has the advantages that:
1. the utility model discloses a shear force wall template positioner based on BIM through positioner with the bottom mounting of reinforcing bar bed frame, through indulging fixed connection messenger reinforcing bar bed frame firm between muscle and horizontal muscle and the strengthening rib, in addition the constant head tank to indulge the injecing of muscle front and back position, can prevent effectively that reinforcing bar bed frame from producing the displacement on horizontal direction and direction of height, playing fine fixed action.
2. The utility model discloses the setting of positioner left and right sides locating lever can convenient and fast's control and the distance of coverboard, and is accurate convenient, no longer need additionally measure.
3. The positioning device of the utility model is formed by concrete pouring, and the site operation is convenient; the reinforcing steel bar head and the positioning support do not need to be welded, so that the reinforcing steel bar material and the labor of a welder are saved, the time for manufacturing the positioning support is reduced, and the on-site construction efficiency can be effectively improved.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a side view of the structure of the present invention.
Fig. 3 is a schematic structural diagram of the positioning device of the present invention.
Fig. 4 is a schematic diagram of a positioning block template structure for manufacturing a positioning device of the present invention.
Reference numbers in the figures: the device comprises a positioning device 1, a positioning block 11, a positioning groove 12, a positioning rod 13, a positioning solenoid 14, a shell plate 2, longitudinal ribs 31, transverse ribs 32, reinforcing ribs 33, a front vertical plate 4, a rear vertical plate 5, a bottom plate 6, a left vertical plate 7, a right vertical plate 8, a longitudinal partition plate 9 and a nut 10.
Detailed Description
The present invention will be further explained with reference to the drawings and examples.
Example 1: the shear wall template positioning device based on the BIM of the embodiment is shown in fig. 1 and fig. 2, and comprises a steel bar base frame, shell plates 2 located at two sides of the steel bar base frame, and a positioning device 1 located at the bottom of the steel bar base frame, wherein the steel bar base frame is constructed by vertical longitudinal bars 31, horizontal bars 32 and reinforcing bars 33 which are perpendicular to each other, and the crossing points of the longitudinal bars, the horizontal bars and the reinforcing bars are wound, bound and fixed for multiple times by binding wires; the positioning device comprises a positioning block 11 which is a precast concrete block, positioning rods 13 are embedded in the middle positions of the left side and the right side of the positioning block, one end of each positioning rod is embedded in the positioning block, and the other end of each positioning rod is exposed out of the outer side of the positioning block and is in contact with the shell plates 2 on the two sides of the steel bar base frame; two positioning grooves 12 are symmetrically formed in the front side of the positioning block along the central axis, and longitudinal ribs 31 of the steel bar base frame are correspondingly clamped in the positioning grooves 12. The locating lever is the reinforcing bar in this embodiment, and when practical application, the locating lever can be whole muscle, also can be two sections components of a whole that can function independently reinforcing bars, if the locating lever is whole muscle, then the degree of depth of constant head tank should not be greater than the half of locating piece width.
During field construction, two parallel longitudinal bars of the reinforcing steel bar base frame are respectively clamped in the positioning grooves of the positioning device, the distance between the two positioning grooves is the same as that between the two parallel longitudinal bars, so that the displacement of the longitudinal bars in the front and rear directions can be effectively controlled, and the firmness of the whole reinforcing steel bar base frame can be effectively ensured by combining the binding at the intersection points among the longitudinal bars, the transverse bars and the reinforcing bars; the locating levers that are located both ends about the locating piece contact with both sides shell plate respectively, just can control the distance of reinforcing bar bed frame and shell plate, do not need the manual work to measure, and site operation convenient and fast builds the completion back, and the inside concrete thick liquid that pours can be directly together locating piece and concrete placement, forms whole face shear force wall after condensing.
The locating piece is the precast concrete piece, it forms through pouring the concrete preparation in to the locating piece template in advance, as shown in fig. 4, the locating piece template includes bottom plate 6, install preceding riser 4 and the back riser 5 at both ends around the bottom plate, and install left riser 7 and the right riser 8 at both ends about the bottom plate, the inboard of riser is equipped with two longitudinal baffles 9 in the front, middle part at left riser and right riser is equipped with locating lever 13 respectively (also finally bury the locating lever in the precast concrete piece promptly), wherein the one end of locating lever is located the inboard of left riser or right riser, the other end is located the outside of left riser or right riser. After the template is manufactured, concrete slurry can be poured inwards, and after the concrete slurry is solidified, the template is detached to obtain the positioning device for positioning the reinforcing steel bar base frame.
Example 2: this embodiment provides a shear wall template positioner based on BIM, and the same parts of this shear wall template positioner and embodiment 1 are no longer repeated, and the difference lies in: the locating rod of this embodiment is positioning screw, and the one end that exposes in the locating piece outside at positioning screw matches the cover and is equipped with location solenoid 14, and this location solenoid can stretch out and draw back through the rotation to the distance of adjustment reinforcing bar bed frame apart from the shell plate.
The above description is only for the preferred embodiment of the present invention, and the present invention is not limited thereto, and any modification, equivalent replacement and improvement made within the spirit and principle scope of the present invention should be included within the protection scope of the present invention.

Claims (6)

1. The utility model provides a shear wall template positioner based on BIM, includes the steel bar bed frame and is located the shell plate of steel bar bed frame both sides, the steel bar bed frame is built by mutually perpendicular's vertical muscle and horizontal muscle and is formed its characterized in that: the positioning device comprises a positioning block, positioning rods are respectively arranged at the middle positions of the left side and the right side of the positioning block, one end of each positioning rod is positioned in the positioning block, and the other end of each positioning rod is positioned at the outer side of the positioning block and is in contact with the shell plate; two positioning grooves are formed in the front side of the positioning block, and the longitudinal ribs are clamped in the positioning grooves.
2. The BIM-based shear wall template positioning device according to claim 1, wherein: the positioning grooves are symmetrically arranged on the front side of the positioning block along the central axis.
3. The BIM-based shear wall template positioning device according to claim 1, wherein: the depth of the positioning groove is not more than one half of the width of the positioning block.
4. The BIM-based shear wall template positioning device according to claim 1, wherein: the positioning rod is a positioning screw rod, and a positioning screw tube is sleeved at one end of the positioning rod, which is positioned outside the positioning block, in a matching manner so as to adjust the distance between the positioning rod and the shell plate.
5. The BIM-based shear wall template positioning device according to claim 1, wherein: the reinforced bar base frame further comprises reinforcing bars perpendicular to the longitudinal bars and the transverse bars, and the crossing points of the longitudinal bars, the transverse bars and the reinforcing bars are bound by binding wires.
6. The BIM-based shear wall template positioning device according to claim 1, wherein: the locating piece is the precast concrete piece, and the precast concrete piece is formed through pouring concrete preparation in to the locating piece template, the locating piece template includes the bottom plate, installs preceding riser and the back riser at both ends around the bottom plate and installs left riser and the right riser at both ends about the bottom plate, and the inboard of riser is equipped with two vertical separators in the front, is equipped with the locating lever respectively at the middle part of left riser and right riser, the one end of locating lever is located the inboard of left riser or right riser, and the other end is located the outside of left riser or right riser.
CN201922023209.0U 2019-11-21 2019-11-21 Shear wall template positioning device based on BIM Active CN211473454U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922023209.0U CN211473454U (en) 2019-11-21 2019-11-21 Shear wall template positioning device based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922023209.0U CN211473454U (en) 2019-11-21 2019-11-21 Shear wall template positioning device based on BIM

Publications (1)

Publication Number Publication Date
CN211473454U true CN211473454U (en) 2020-09-11

Family

ID=72371368

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922023209.0U Active CN211473454U (en) 2019-11-21 2019-11-21 Shear wall template positioning device based on BIM

Country Status (1)

Country Link
CN (1) CN211473454U (en)

Similar Documents

Publication Publication Date Title
CN109736449A (en) Stiffness structure bean column node and construction method
CN104806011B (en) Raft board post poured band formwork for placing
CN201679231U (en) Template clamp for construction
CN206458083U (en) A kind of adjustable building template
CN207260599U (en) A kind of adjustable frame column bar spacer
CN211473454U (en) Shear wall template positioning device based on BIM
CN208441304U (en) A kind of LH assembled cast-in-place concrete shear wall is with exempting from demoulding shell
CN207327246U (en) A kind of precast beam molding die
CN208363609U (en) A kind of constructional column assembly type can have enough to meet the need aluminum alloy pattern plate
CN206859076U (en) For supporting the device of one-time-concreting Inner Moulding Board in Building
CN209538529U (en) A kind of lateral steel bar support
CN208702145U (en) One kind, which being hung mould and installed, uses support device
CN216516485U (en) Assembled constructional column for building reinforcement
CN202164555U (en) Bottom support of concrete box culvert template bracket post
CN205928989U (en) A non - design, can all rotary die plate bodys system for bench is prefabricated
CN205531381U (en) City rail U type girder iron muscle mould device
CN216475909U (en) Frame post reinforcing bar positioner
CN216766759U (en) Superimposed sheet piece match mould device
CN216157159U (en) Large-diameter reinforced concrete cylinder and multi-angle oblique beam joint forming die
CN215714992U (en) Forming device for river dyke wall body
CN216372683U (en) Prefabricated box girder template
CN204875498U (en) Device of steel sheet installation under supplementary bridge beam supports
CN218970253U (en) Fixing device of pre-buried line box
CN219992887U (en) Multi-row reinforcement erecting device
CN108979142A (en) One kind hanging mould pouring construction structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant