CN211470452U - Steel construction elevator is with integrated vestibule of fast-assembling - Google Patents

Steel construction elevator is with integrated vestibule of fast-assembling Download PDF

Info

Publication number
CN211470452U
CN211470452U CN201921518107.XU CN201921518107U CN211470452U CN 211470452 U CN211470452 U CN 211470452U CN 201921518107 U CN201921518107 U CN 201921518107U CN 211470452 U CN211470452 U CN 211470452U
Authority
CN
China
Prior art keywords
beams
frame
corridor
cross beams
longitudinal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921518107.XU
Other languages
Chinese (zh)
Inventor
吴维云
吕保亮
贾兴振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Huada Windows And Doors Curtain Wall Co ltd
Shandong Quanshunda Assembly Building Co ltd
Weifang Dafujia Construction Supporting Engineering Co ltd
Shandong Huajian Aluminium Group Co Ltd
Original Assignee
Shandong Huada Windows And Doors Curtain Wall Co ltd
Shandong Quanshunda Assembly Building Co ltd
Weifang Dafujia Construction Supporting Engineering Co ltd
Shandong Huajian Aluminium Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Huada Windows And Doors Curtain Wall Co ltd, Shandong Quanshunda Assembly Building Co ltd, Weifang Dafujia Construction Supporting Engineering Co ltd, Shandong Huajian Aluminium Group Co Ltd filed Critical Shandong Huada Windows And Doors Curtain Wall Co ltd
Priority to CN201921518107.XU priority Critical patent/CN211470452U/en
Application granted granted Critical
Publication of CN211470452U publication Critical patent/CN211470452U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model relates to a fast-assembling integrated corridor for steel structure elevator, including corridor frame and decoration subassembly, corridor frame includes upper ledge, underframe and four at least middle vertical beams, and the upper ledge includes two entablature and two upper longitudinal beams, and two entablature are parallel to each other, and two upper longitudinal beams are located the both ends of entablature respectively and the both ends of entablature are respectively with two entablature fixed connection; the lower frame comprises two lower cross beams and two lower longitudinal beams, the two lower cross beams are parallel to each other, the two lower longitudinal beams are respectively positioned at two ends of the lower cross beams, and two ends of each lower longitudinal beam are respectively fixedly connected with the two lower cross beams; two ends of the middle vertical beam are respectively fixedly connected with the upper frame and the lower frame; the reinforcing longitudinal beam is positioned between the two lower longitudinal beams, and two ends of the reinforcing longitudinal beam are respectively fixedly connected with the two lower cross beams; and a bottom plate is fixed on the reinforcing longitudinal beam. The integral quick hoisting is convenient to carry out on site, and the project construction period is greatly shortened.

Description

Steel construction elevator is with integrated vestibule of fast-assembling
Technical Field
The utility model relates to a steel construction elevator technical field especially relates to a steel construction elevator is with integrated vestibule of fast-assembling.
Background
The corridor is used as an overhead connector, and the existing corridor installation welds and installs steel frames and glass step by step. The old building is additionally provided with a corridor between the elevator and the stairs, generally, the corridor is welded on site by using steel beams, and then interior decoration and exterior decoration are carried out; because the corridor position is too high, the corridor belongs to high-altitude operation, the installation is complex, great danger exists, the hoisting period is about 5-7 days, the construction period of the whole hoistway project is prolonged, and the use experience of residents is influenced. The defects of low construction precision and large site environmental pollution exist in temporary cutting, welding and the like of a construction site.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that a steel construction is integrated vestibule of fast-assembling for elevator of convenient construction is provided.
In order to solve the technical problem, the technical scheme of the utility model is that: a fast-assembly integrated corridor for a steel structure elevator, which comprises a corridor framework and a decoration component,
the corridor frame comprises
The upper frame comprises two upper cross beams and two upper longitudinal beams, the two upper cross beams are parallel to each other, the two upper longitudinal beams are respectively positioned at two ends of the upper cross beams, and two ends of the upper longitudinal beams are respectively fixedly connected with the two upper cross beams;
the lower frame comprises two lower cross beams and two lower longitudinal beams, the two lower cross beams are parallel to each other, the two lower longitudinal beams are respectively positioned at two ends of the lower cross beams, and two ends of each lower longitudinal beam are respectively fixedly connected with the two lower cross beams;
the two ends of the middle vertical beams are respectively fixedly connected with the upper frame and the lower frame;
the upper frame, the lower frame and the middle vertical beam are connected to form a corridor channel;
the reinforcing longitudinal beams are positioned between the two lower longitudinal beams, and two ends of each reinforcing longitudinal beam are respectively and fixedly connected with the two lower cross beams; and a bottom plate is fixed on the reinforcing longitudinal beam.
Preferably, the decoration components comprise decoration plates and window frames fixed on the left side and the right side of the corridor frame.
As a preferred technical scheme, a plurality of fixed connecting holes are formed in the lower cross beam.
As a preferred technical scheme, a plurality of hoisting rings are arranged on the upper cross beam.
As an optimized technical scheme, the upper cross beam is provided with two hoisting rings, and the two hoisting rings are respectively positioned at two ends of the upper cross beam.
Due to the adoption of the technical scheme, the steel structure elevator is assembled and integrated in a factory by the fast-assembly integrated corridor, the integral fast hoisting is convenient for the site, the interior decoration time of the corridor in a construction site is reduced, and the project construction period is greatly shortened.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without inventive exercise.
Fig. 1 is a schematic view of a usage state of an embodiment of the present invention;
fig. 2 is a schematic structural diagram of an embodiment of the present invention;
FIG. 3 is a left side view of FIG. 2;
FIG. 4 is a bottom view of FIG. 2;
fig. 5 is a schematic structural diagram of the corridor frame in the embodiment of the present invention.
Detailed Description
As shown in fig. 2, 3, 4 and 5, the quick-assembly integrated corridor for the steel structure elevator comprises a corridor frame and a decoration assembly, wherein the corridor frame comprises an upper frame 2, a lower frame 3 and at least four middle vertical beams 7, as shown in fig. 4 and 5, the upper frame 2 comprises two upper cross beams 21 and two upper longitudinal beams 22, the two upper cross beams 21 are parallel to each other, the two upper longitudinal beams 22 are respectively positioned at two ends of the upper cross beams 21, and two ends of the upper longitudinal beams 22 are respectively fixedly connected with the two upper cross beams 21; the upper cross member 21 and the upper side member 22 are integrally connected by welding or by a connecting member such as a bolt or a nut. The lower frame 3 comprises two lower cross beams 31 and two lower longitudinal beams 32, the two lower cross beams 31 are parallel to each other, the two lower longitudinal beams 32 are respectively positioned at two ends of the lower cross beams 31, and two ends of the lower longitudinal beams 32 are respectively fixedly connected with the two lower cross beams 31; the lower cross member 31 and the lower side member 32 are welded or connected by a connecting member such as a bolt or a nut. Two ends of the middle vertical beam 7 are respectively fixedly connected with the upper frame 2 and the lower frame 3; specifically, two ends of the middle vertical beam 7 are welded with the upper frame 2 and the lower frame 3 or connected into a whole through connecting pieces such as bolts, nuts and the like, and the upper frame 2, the lower frame 3 and the middle vertical beam 7 are connected to form a corridor channel; the corridor passage communicates the elevator 1 with the opening of the wall 6. A connecting beam 4 is arranged between the wall body 6 and the elevator 1, and a plurality of fixing connecting holes 9 are formed in the lower cross beam 31. The lower cross beam 31 and the connecting beam 4 are fixedly connected by a corridor through bolts.
The reinforcing longitudinal beams 33 are positioned between the two lower longitudinal beams 32, and two ends of each reinforcing longitudinal beam 33 are respectively fixedly connected with the two lower cross beams 31; the bottom plate 10 is fixed to the reinforcing longitudinal beam 33. As shown in fig. 1 and 2, the decoration device includes a decoration plate 12 and a window frame 11 fixed to both left and right sides of the corridor frame. In order to match the installation and fixation of the window frame 11, a middle cross beam can be arranged to match the middle vertical beam 7 so as to adapt to the installation size of the window frame 11. The upper cross beam 21 is provided with a plurality of hoisting rings 8 for hoisting the corridor during installation. Preferably, the upper beam 21 is provided with two hoisting rings 8, and the two hoisting rings 8 are respectively located at two ends of the upper beam. The hoisting rings 8 on the two upper cross beams 21 are oppositely arranged and are all positioned at the four corners of the upper frame 2, so that the hoisting stability is good and the hoisting is balanced.
As shown in fig. 1, the vestibule frame is welded in the workshop, window frame 11, decorative board 12 on the vestibule frame are all accomplished in the workshop, there is certain distance to the well of steel construction elevator 1 and the wall body 6 of building in the middle of, tie-beam 4 is located between the two and connects elevator 1 and wall body 6, on-the-spot only need with the integration vestibule through hoist and mount ring 8 hoist to the tie-beam 4 in the middle of well and the building on, be connected integration vestibule and tie-beam 4 through fixed orifices 9 with the bolt, form the pedestrian passageway between steel construction well and the building.
The basic principles, main features and advantages of the present invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (5)

1. The utility model provides a steel construction elevator is with integrated vestibule of fast-assembling which characterized in that: comprises a vestibule frame and a decoration component,
the corridor frame comprises
The upper frame comprises two upper cross beams and two upper longitudinal beams, the two upper cross beams are parallel to each other, the two upper longitudinal beams are respectively positioned at two ends of the upper cross beams, and two ends of the upper longitudinal beams are respectively fixedly connected with the two upper cross beams;
the lower frame comprises two lower cross beams and two lower longitudinal beams, the two lower cross beams are parallel to each other, the two lower longitudinal beams are respectively positioned at two ends of the lower cross beams, and two ends of each lower longitudinal beam are respectively fixedly connected with the two lower cross beams;
the two ends of the middle vertical beams are respectively fixedly connected with the upper frame and the lower frame;
the upper frame, the lower frame and the middle vertical beam are connected to form a corridor channel;
the reinforcing longitudinal beams are positioned between the two lower longitudinal beams, and two ends of each reinforcing longitudinal beam are respectively and fixedly connected with the two lower cross beams; and a bottom plate is fixed on the reinforcing longitudinal beam.
2. The fast-assembling integrated corridor for steel structure elevators as claimed in claim 1, characterized in that: the decoration assembly comprises a decoration plate and a window frame which are fixed on the left side and the right side of the corridor frame.
3. The fast-assembling integrated corridor for steel structure elevators as claimed in claim 1, characterized in that: and a plurality of fixed connecting holes are formed in the lower cross beam.
4. The fast-assembling integrated corridor for steel structure elevators as claimed in claim 1, characterized in that: and the upper cross beam is provided with a plurality of hoisting rings.
5. The fast-assembling integrated corridor for steel structure elevators as recited in claim 4, characterized in that: the upper cross beam is provided with two hoisting rings, and the two hoisting rings are respectively positioned at two ends of the upper cross beam.
CN201921518107.XU 2019-09-12 2019-09-12 Steel construction elevator is with integrated vestibule of fast-assembling Active CN211470452U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921518107.XU CN211470452U (en) 2019-09-12 2019-09-12 Steel construction elevator is with integrated vestibule of fast-assembling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921518107.XU CN211470452U (en) 2019-09-12 2019-09-12 Steel construction elevator is with integrated vestibule of fast-assembling

Publications (1)

Publication Number Publication Date
CN211470452U true CN211470452U (en) 2020-09-11

Family

ID=72358574

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921518107.XU Active CN211470452U (en) 2019-09-12 2019-09-12 Steel construction elevator is with integrated vestibule of fast-assembling

Country Status (1)

Country Link
CN (1) CN211470452U (en)

Similar Documents

Publication Publication Date Title
CN102180395B (en) Integrated sightseeing lift with steel-structured hoistway
CN108532769B (en) Jacking construction method of assembled additional elevator shaft structure
CN207211634U (en) A kind of segmented hoistway structure and integrated form hoistway elevator
CN106836475A (en) Modular many high level assembling type steel structure systems
CN211470452U (en) Steel construction elevator is with integrated vestibule of fast-assembling
CN201695668U (en) Assembly type walkdown platform
CN103821375A (en) Hanging boat auxiliary hung ceiling curtain wall installing method
CN107268971B (en) Dual self-lifting type external climbing frame for super high-rise building and application method
CN209384578U (en) A kind of hoistway with steel structure
CN208531964U (en) Install the guide-localization and attachment device of elevator hoistway with steel structure module additional
CN210827818U (en) Steel construction is rapid Assembly formula vestibule for elevator
CN214652865U (en) Concatenation formula installs old building elevator steel construction derrick additional
CN213233810U (en) Light steel structure assembled low-rise building structure
CN211597547U (en) Assembled home decoration elevator derrick
CN210084690U (en) Hoistway with elevator
CN112267563A (en) Steel beam column connection node for fine construction
CN109052109B (en) Steel construction elevator well subassembly
CN214220564U (en) Rail-walking single-double-layer hanging basket cantilever steel beam for shear wall or parapet wall
CN210263768U (en) High-strength, positioning and quick-mounting type elevator shaft steel structure
CN219771544U (en) Hoisting construction equipment
CN216305332U (en) Guide rail upright post for building construction
CN214614569U (en) Steel beam column connection node for fine construction
CN213898059U (en) Novel steel structure installation safety device
CN215160470U (en) Vertical transportation cantilever crane for curtain wall plate
CN219469394U (en) Assembled cage frame of construction elevator cage

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant